15
/ MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Govt of Maharashtra Undertaking) Udyog Sarathi, Mahakali Caves Road, Andheri (East) Mumbai-93. CIRCULAR No .CE (HQ)! it. lof 2015 Dated: 1 0 MAR 2015 Sub: Simplification of procedure for Building plan approval, water supply connection, approval to internal drainage plan, approval to drainage connection plan, provision of fire NOC, CETP membership, power supply NOC etc. Ref: 1) This office circular No. CE (HQ)/03 of 2015 dated 12-01-2015. 2) Letter No. lF3~/~/Cf)lq\{1+~/iT ~OC,~~ ~ ~~/~~/~o~~ issued by GM (Land), addressed to all ROs. The guidelines on the subject are issued vide circular referred at Sr. No.1 above. However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines are already issued to all ROs vide letter referred at Sr. No.2 under reference. Hence the provision of issuance of power NOC at the time of issue of building plan approval by SPA is now deleted from the circular referred at Sr.No.1 above. Further, a revised citizen charter is enclosed. Other contents of the circular under reference at Sr. No.1 shall remain unchanged. This circular is issued with the approval of CEO. ~o~(." .M Chief Engineer (HQ) . r 112> I~ 1 s: MIDC Mumbai - 93. DA: Revised Citizen Charter. No.CE (HQ)I A 7 L(LY-1/of 2015 Date: 1 0 MA R 2015 Copy submitted to Chief Executive Officer, MIDC Mumbai-93. Copy fwcs to 1) All HODs in HQ 2) Chief Engineer (PZ) 3) Chief Engineer Nanded 4) Addl Chief Engineer, Nagpur D:IRajurkarlMRTP AcllSimplificalion of ProcedurelCirular_Simplificalion of procedure for Bldg Plan approval January 2-03-2015.doc

it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

/MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION

(A Govt of Maharashtra Undertaking)Udyog Sarathi, Mahakali Caves Road, Andheri (East) Mumbai-93.

CIRCULAR No .CE (HQ)! it. lof 2015

Dated: 1 0 MAR 2015Sub: Simplification of procedure for Building plan approval, water supply

connection, approval to internal drainage plan, approval to drainageconnection plan, provision of fire NOC, CETP membership, power supplyNOC etc.

Ref: 1) This office circular No. CE (HQ)/03 of 2015 dated 12-01-2015.

2) Letter No. lF3~/~/Cf)lq\{1+~/iT ~OC,~~ ~ ~~/~~/~o~~ issued by GM(Land), addressed to all ROs.

The guidelines on the subject are issued vide circular referred at Sr. No.1 above.

However, it is decided that the RO'shall issue power NOC in the plot allotment letter

itself. These guidelines are already issued to all ROs vide letter referred at Sr. No.2 under

reference. Hence the provision of issuance of power NOC at the time of issue of building plan

approval by SPA is now deleted from the circular referred at Sr.No.1 above. Further, a revised

citizen charter is enclosed.

Other contents of the circular under reference at Sr. No.1 shall remainunchanged.

This circular is issued with the approval of CEO.

~o~(." .M

Chief Engineer (HQ) .r112> I~ 1s:MIDC Mumbai - 93.

DA: Revised Citizen Charter.

No.CE (HQ)I A 7 L(LY-1/of 2015

Date: 1 0 MA R 2015• Copy submitted to Chief Executive Officer, MIDC Mumbai-93.

Copy fwcs to1) All HODs in HQ2) Chief Engineer (PZ)3) Chief Engineer Nanded4) Addl Chief Engineer, Nagpur

D:IRajurkarlMRTP AcllSimplificalion of ProcedurelCirular_Simplificalion of procedure for Bldg Plan approval January 2-03-2015.doc

Page 2: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

Copyto-1) All Superintending Engineers2) All Executive Engineers3) All Regional Officers, MIDC4) All Deputy Engineers/5) All SPAs6) Circular file7) Guard file.

D:IRajurkanMRTP ActlSimplification of ProcedurelCirular_Simplification of procedure for Bldg Plan approvat January 2-03-201S.doc

Page 3: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

®ÖÖÝÖ׸üÛúÖÓ“Öê †×¬ÖÛúÖ¸ü (ÃÖ®Ö¤ü)

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

(1) (2) (3) (4) (5) (6) (7) 1. †) ²ÖÖÓ¬ÖÛúÖ´Ö

¯Ö¸ü¾ÖÖ®ÖÖ 1) ³ÖæÜÖÓ›ü ¾ÖÖ™ü¯Ö ¯Ö¡Ö. 2) ³ÖæÜÖÓ›üÖ“ÖÖ ´ÖÖê•ÖÞÖß ®ÖÛúÖ¿ÖÖü. 3) ¯ÖÏÖ£Ö×´ÖÛú Ûú¸üÖ¸ü®ÖÖ´ÖÖ / ´ÖÖ»ÖÛúß ÆüŒÛúÖ“Öê ÛúÖÝÖ¤ü¯Ö¡Ö (ÛÓú¯Ö®Öß“Öê/ ±ú´ÖÔ“Öê ®ÖÖë¤üÞÖß ¯Ö¡Ö ¾Ö MoA.) 4) ´ÖÆüÖ¸üÖ™Òü ¯ÖϤæüÂÖÞÖ ´ÖÓ›üôûÖÛú›æü®Ö ÃÖÓ´ÖŸÖ߯֡Ö. (ÝÖÏß®Ö ¾Ö †Öò¸ëü•Ö ¯ÖϾÖÝÖÖÔŸÖᯙ ÛúÖ¸üÜÖÖ®µÖÖ®Öß ´Ö.¯ÖÏ.×®Ö. ´ÖÓ›üôûÖÛú›êü ÃÖÖ¤ü¸ü Ûêú»Ö껵ÖÖ †•ÖÖÔ“Öß ¯ÖÖêÆüÖê“Ö ¯ÖÖ¾ÖŸÖß“Öß ¯ÖÏŸÖ ÝÖÏÖÊ ÃÖ´Ö•ÖÞµÖÖŸÖ µÖÖ¾Öß. ‡ŸÖ¸ü ¯ÖϾÖÝÖÖÔÃÖÖšüß Æüß ÃÖ¾Ö»ÖŸÖ »ÖÖÝÖæ ®ÖÖÆüß) 5) ¾ÖÖßÖæ¿ÖÖá֖Ö, ÙÒüŒ“Ö¸ü»Ö ‡ÓוÖ×®Ö†¸ü ¾Ö ¯»ÖÓ²Ö¸ü µÖÖÓ“Öê ®Öê´ÖÞÖæÛú ¯Ö¡Ö.

D.C. Rule 3.3 (a) D.C. Rule 3.3 (c) D.C. Rule 3.3 (b) D.C. Rule 14 D.C. Rule 4.3 & 4.4

15 פü¾ÖÃÖ

ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ / ˆ¯Ö †×³ÖµÖÓŸÖÖ / ¯ÖÏÖ¤êü׿ÖÛú †×¬ÖÛúÖ¸üß ÃÖÓ²ÖÓ¬ÖßŸÖ (ÃÖÓ²ÖÓ¬ÖßŸÖ ×¾Ö¿ÖêÂÖ †ÖÙ£ÖÛú õÖê¡ÖÖÃÖÖšüß)

´ÖãÜµÖ ÛúÖµÖÔÛúÖ¸üß †×¬ÖÛúÖ¸üß, ´ÖãܵÖÖ»ÖµÖ : ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ), ´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú : 022-2687 0052/54/27/73. Ûú±ú ¯Ö¸êü›ü ÛúÖµÖÖÔ»ÖµÖ : 4, 4 (‹), 12 ¾ÖÖ ´Ö•Ö»ÖÖ, ¾Ö»›Ôü ™Òêü›ü ÃÖë™ü¸ü, ÛúÖò´»ÖêŒÃÖ-1, Ûú±ú ¯Ö¸êü›ü, ´ÖãÓ²Ö‡Ô-400 005. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú: 0022-22151451/52/53. ‡Ô-´Öê»Ö : [email protected]

Page 4: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

6)¾ÖÖßÖã¿ÖÖÃ¡Ö–Ö ¾Ö ¸ü“Ö®ÖÖŸÖÓ¡Ö–Ö ¾Ö ¯»ÖÓ²Ö¸ü µÖÖÓ“Öß ´ÖÖ®µÖŸÖÖ ¯ÖÏÖ¯ŸÖ ÃÖÓãÖêÛú›üᯙ ®ÖÖë¤üÞÖ߯֡ÖÖ“Öß ¯ÖÏŸÖ. 7) ¾ÖÖßÖæ¿ÖÖá֖Ö, ÙÒüŒ“Ö¸ü»Ö ‡ÓוÖ×®Ö†¸ü ¾Ö ¯»ÖÓ²Ö¸ü µÖÖÓ“Öê ÃÖÓ´ÖŸÖß ¯Ö¡Ö (†òŒÃÖꯙü®ÃÖ). 8) ¾ÖÖßÖæ¿ÖÖá֖Ö, ÙÒüŒ“Ö¸ü»Ö ‡ÓוÖ×®Ö†¸ü ¾Ö ¯»ÖÓ²Ö¸ü µÖÖÓ“Öê ¤êüÜÖ¸êüÜÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö. 9) †×Ý®Ö¿Ö´Ö®Ö ×¾Ö³ÖÖÝÖÖ“Öê ®ÖÖ Æü¸üÛúŸÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö. 10) ´ÖãÓ²Ö‡Ô ¯ÖÏÖ׬ÖÛú¸üÞÖÖÓŸÖÝÖÔŸÖ †ÖîªÖê×ÝÖÛú õÖê¡ÖÖÛú¸üߟÖÖ ŸÖÖÓסÖÛú ÃÖ»»ÖÖÝÖÖ¸ü µÖÖÓ“Öê Location Policy †ÓŸÖÝÖÔŸÖ ®ÖÖÆü¸üÛúŸÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö . 11) ³ÖæÜÖÓ›ü¬ÖÖ¸üÛúÖÛú›æü®Ö 100 “µÖÖ Ã™Ñü´¯Ö ¯Öê¯Ö¸ü¾Ö¸ü ÜÖÖ»Öᯙ Æü´Öß ¯Ö¡Ö †) ‡´ÖÖ¸üŸÖ ²ÖÖÓ¬ÖÛúÖ´Ö ÃÖã¸üõÖÖ. ²Ö) ×¾Ö×ÆüŸÖ ®Ö´Ö㮵ÖÖŸÖᯙ •ÖÖ×Æü¸ü®ÖÖ´ÖÖ.

D.C. Rule 3.3 (d) D.C. Rule 4.3 & 4.4 D.C. Rule 3.3 (k) & 4.3 ´Ö†Öî×¾Ö´Ö“ÖÖ ÛúÖµÖÖÔ»ÖµÖß®Ö †Ö¤êü¿Ö ÛÎú. 1114,פü.17/08/2009

Page 5: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

Ûú) ‡´ÖÖ¸üŸÖß“Öê ÝÖ““Öß/ ×ÃÖ»™ü/ŸÖôû‘Ö¸ü µÖÖÓ“Öê ¾ÖÖ¯Ö¸üÖ²ÖÖ²ÖŸÖ. ›ü) ¾ÖÖÆü®ÖŸÖôûÖ“µÖÖ ŸÖ¸üŸÖã¤üß²ÖÖ²ÖŸÖ ¾Ö ¾ÖéõÖ”ûÖ™üÞÖß²ÖÖ²ÖŸÖ. 12)†Ö¾Ö¿µÖÛúŸÖÖ †ÃÖ»µÖÖÃÖ 1) ¯ÖÏÖ¤êü׿ÖÛú †×¬ÖÛúÖ¸üß,

´Ö†Öî×¾Ö´Ö µÖÖÓ“ÖêÛú›æü®Ö ‡´ÖÖ¸üŸÖ ²ÖÖÓ¬ÖÛúÖ´Ö ´Öã¤üŸÖ¾ÖÖœüß“Öê ¯Ö¡Ö.

2) ×¾Ö´ÖÖ®ÖŸÖôû ¯ÖÏÖ׬ÖÛú¸üÞÖ µÖÖÓ“Öê ®ÖÖÆü¸üÛúŸÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö.

3) ‡ŸÖ¸ü ×¾Ö³ÖÖÝÖ •ÖÃÖê ˆªÖêÝÖ ÃÖÓ“Ö®ÖÖ»ÖµÖ, Chief Controller of Explosives, Inspectorate of Boilers and Smoke Nuisance µÖÖÓ“ÖêÛú›üᯙ ¯Ö¸ü¾ÖÖ®ÖÝÖß.

D.C. Rule 14 D.C. Rule 14

1. ²Ö) ®Öôû •ÖÖê›üÞÖß 1) †•ÖÔ ÜÖÖ»Öᯙ ŸÖ¯Ö׿ֻÖÖÃÖÆü. †) ¯ÖÖÞµÖÖ“Öß ¤îü®ÖÓפü®Ö ÝÖ¸ü•Ö ‘Ö®Ö´Öß™ü¸ü / ¯ÖÏןÖפü®Ö ¾Ö ®Öôû

15 פü¾ÖÃÖ ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ/ ˆ¯Ö †×³ÖµÖÓŸÖÖ

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ (´ÖãܵÖÖ»ÖµÖ), ´Ö†Öî×¾Ö´Ö, ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ),

Page 6: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

•ÖÖê›üÞÖß“ÖÖ †ÖÛúÖ¸ü. 2) ¯ÖÖÞÖß ¯Öã¸ü¾ÖšüÖ Ûú¸üÖ¸ü¯Ö¡Ö ³Ö¹ý®Ö ÃÖÖ¤ü¸ü Ûú¸üÞÖê. 3) ¯ÖÖÞÖß ¯Öã¸ü¾Öšü¶Ö“µÖÖ ¯ÖÏ“Ö×»ÖŸÖ ×®ÖµÖ´ÖÖ®ÖãÃÖÖ¸ü 90 פü¾ÖÃÖÖ‹¾Öœüß ÃÖã¸üõÖÖ ¸üŒÛú´Ö (Deposit) ¾Ö ®Öôû•ÖÖê›üÞÖß †ÖÛúÖ¸ü, †Ö¾Ö¿µÖÛúŸÖê®ÖãÃÖÖ¸ü ¸üßÖÖ ÜÖÖê¤üÖ‡Ô †ÖÛúÖ¸ü ‡ŸµÖÖ¤üß. 4) ¯ÖÖÞµÖÖ“µÖÖ ´ÖÖÝÖÞÖß®ÖãÃÖÖ¸ü ³ÖÖÓ›ü¾Ö»Öß ÜÖ“ÖÔ

´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú : 022-2687 0052/54/27/73. ‡Ô-´Öê»Ö : [email protected] ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ¯ÖãÞÖê, •ÖÖêÝÖ ÃÖë™ü¸ü, ´Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ¯ÖãÞÖê-´ÖãÓ²Ö‡Ô ´ÖÆüÖ´ÖÖÝÖÔ, ¾ÖÖÛú›êü¾ÖÖ›üß, ¯ÖãÞÖê - 441003. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 020-25819753/25813985 ‡Ô-´Öê»Ö : [email protected] ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÓ¤êü›ü, ¯Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ˆ•¾Ö»ÖÖ ‹®™ü¸ü¯ÖÏÖµÖ—ÖêÃÖ, •ÖÖ®ÖÛúß ®ÖÝÖ¸ü, ×¾Ö´ÖÖ®ÖŸÖôû ´ÖÖÝÖÔ, ®ÖÖÓ¤êü›ü- 431603. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú

Page 7: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

0240-2334235 ‡Ô-´Öê»Ö : [email protected] †×ŸÖ׸üŒŸÖ ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÝÖ¯Öæ¸ü, ˆªÖêÝÖ ³Ö¾Ö®Ö, ×ÃÖ¾Æüᯙ »ÖÖ‡Ô®Ö, ÃÖê»Ö™òüŒÃÖ ‡´ÖÖ¸üŸÖß •Ö¾Öôû, ®ÖÖÝÖ¯Öæ¸ü- 440001 ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0712-2526361 ‡Ô-´Öê»Ö : [email protected]

1. ›ü) ÃÖÖÓ›ü¯ÖÖÞÖß •ÖÖê›üÞÖßÃÖÖšüß ®ÖÛúÖ¿Öê ´ÖÓ•Öã¸üß (External)

1) ×¾ÖÆüßŸÖ ®Ö´Ö㮵ÖÖŸÖᯙ †•ÖÔ. 2) ÃÖÖÓ›ü¯ÖÖÞÖß •ÖÖê›üÞÖß“Öê ®ÖÛúÖ¿Öê 3) •ÖÖê›üÞÖß ¿Öã»Ûú,

†Ö¾Ö¿ÖŒŸÖ®ÖãÃÖÖ¸ü ¸üßÖÖ ÜÖÖê¤üÖ‡Ô †ÖÛúÖ¸ü.

4) ÃÖÖÓ›ü¯ÖÖÞÖß •ÖÖê›üÞÖß Ûú¸üÖ¸ü¯Ö¡Ö ³Ö¹ý®Ö ÃÖÖ¤ü¸ü Ûú¸üÞÖê.

15 פü¾ÖÃÖ ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ / ˆ¯Ö †×³ÖµÖÓŸÖÖ

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ (´ÖãܵÖÖ»ÖµÖ), ´Ö†Öî×¾Ö´Ö, ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ), ´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú : 022-2687 0052/54/27/73. ‡Ô-´Öê»Ö : [email protected]

Page 8: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ¯ÖãÞÖê, •ÖÖêÝÖ ÃÖë™ü¸ü, ´Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ¯ÖãÞÖê-´ÖãÓ²Ö‡Ô ´ÖÆüÖ´ÖÖÝÖÔ, ¾ÖÖÛú›êü¾ÖÖ›üß, ¯ÖãÞÖê - 441003. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 020-25819753/25813985 ‡Ô-´Öê»Ö : [email protected] ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÓ¤êü›ü, ¯Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ˆ•¾Ö»ÖÖ ‹®™ü¸ü¯ÖÏÖµÖ—ÖêÃÖ, •ÖÖ®ÖÛúß ®ÖÝÖ¸ü, ×¾Ö´ÖÖ®ÖŸÖôû ´ÖÖÝÖÔ, ®ÖÖÓ¤êü›ü- 431603. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0240-2334235 ‡Ô-´Öê»Ö : [email protected] †×ŸÖ׸üŒŸÖ ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÝÖ¯Öæ¸ü,

Page 9: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

ˆªÖêÝÖ ³Ö¾Ö®Ö, ×ÃÖ¾Æüᯙ »ÖÖ‡Ô®Ö, ÃÖê»Ö™òüŒÃÖ ‡´ÖÖ¸üŸÖß •Ö¾Öôû, ®ÖÖÝÖ¯Öæ¸ü- 440001 ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0712-2526361 ‡Ô-´Öê»Ö : [email protected]

1. ‡) ÃÖÖ´ÖÖ‡ÔÛú ÃÖÖÓ›ü¯ÖÖÞÖß ¯ÖÏÛÎúßµÖÖ Ûëú¦üÖ“Öê ÃÖ¤üõ֟¾Ö (»ÖÖÝÖæ †ÃÖ»µÖÖÃÖ)

1) ×¾ÖÆüßŸÖ ®Ö´Ö㮵ÖÖŸÖᯙ †•ÖÔ. 2) ÃÖ¤üõ֟¾Ö ¿Öã»Ûú. 3) ׫ü¯ÖõÖßµÖ /ס֯ÖõÖßµÖ Ûú¸üÖ¸ü®ÖÖ´ÖÖ.

15 פü¾ÖÃÖ ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ / ˆ¯Ö †×³ÖµÖÓŸÖÖ

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ (´ÖãܵÖÖ»ÖµÖ), ´Ö†Öî×¾Ö´Ö, ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ), ´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú : 022-2687 0052/54/27/73. ‡Ô-´Öê»Ö : [email protected] ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ¯ÖãÞÖê, •ÖÖêÝÖ ÃÖë™ü¸ü, ´Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ¯ÖãÞÖê-´ÖãÓ²Ö‡Ô ´ÖÆüÖ´ÖÖÝÖÔ, ¾ÖÖÛú›êü¾ÖÖ›üß, ¯ÖãÞÖê - 441003. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 020-25819753/25813985

Page 10: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

‡Ô-´Öê»Ö : [email protected] ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÓ¤êü›ü, ¯Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ˆ•¾Ö»ÖÖ ‹®™ü¸ü¯ÖÏÖµÖ—ÖêÃÖ, •ÖÖ®ÖÛúß ®ÖÝÖ¸ü, ×¾Ö´ÖÖ®ÖŸÖôû ´ÖÖÝÖÔ, ®ÖÖÓ¤êü›ü- 431603. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0240-2334235 ‡Ô-´Öê»Ö : [email protected]

†×ŸÖ׸üŒŸÖ ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÝÖ¯Öæ¸ü, ˆªÖêÝÖ ³Ö¾Ö®Ö, ×ÃÖ¾Æüᯙ »ÖÖ‡Ô®Ö, ÃÖê»Ö™òüŒÃÖ ‡´ÖÖ¸üŸÖß •Ö¾Öôû, ®ÖÖÝÖ¯Öæ¸ü- 440001 ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0712-2526361 ‡Ô-´Öê»Ö : [email protected]

Page 11: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

2. ÃÖã¬ÖÖ¸üßŸÖ ²ÖÖÓ¬ÖÛúÖ´Ö ¯Ö¸ü¾ÖÖ®ÖÖ ¤êüÞÖê

1) ³ÖæÜÖÓ›ü¬ÖÖ¸üÛú/ ¾ÖÖßÖã¿ÖÖÃ¡Ö–Ö µÖÖÓ“ÖÖ †•ÖÔ. 2) ÃÖã¬ÖÖ¸üßŸÖ ²ÖÖÓ¬ÖÛúÖ´Ö ®ÖÛúÖ¿Öê. (†Ö¾Ö¿µÖÛúŸÖÖ †ÃÖ»µÖÖÃÖ.) 3) ¾ÖÖßÖã¿ÖÖá֖Ö/ ¸ü“Ö®ÖÖ ŸÖÓ¡Ö–Ö/ ¯»ÖÓ²Ö¸ü ²Ö¤ü»Ö»µÖÖÃÖ ¾Ö¸ü ˆ»»ÖêÜÖ Ûêú»Öê»Öß ÃÖ¾ÖÔ ÛúÖÝÖ¤ü¯Ö¡Öê.

15 פü¾ÖÃÖ ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ/ ˆ¯Ö †×³ÖµÖÓŸÖÖ

´ÖãÜµÖ ÛúÖµÖÔÛúÖ¸üß †×¬ÖÛúÖ¸üß, ´ÖãܵÖÖ»ÖµÖ : ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ), ´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú : 022-2687 0052/54/27/73. Ûú±ú ¯Ö¸êü›ü ÛúÖµÖÖÔ»ÖµÖ : 4, 4 (‹), 12 ¾ÖÖ ´Ö•Ö»ÖÖ, ¾Ö»›Ôü ™Òêü›ü ÃÖë™ü¸ü, ÛúÖò´»ÖêŒÃÖ-1, Ûú±ú ¯Ö¸êü›ü, ´ÖãÓ²Ö‡Ô-400 005. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú: 0022-22151451/52/53. ‡Ô-´Öê»Ö : [email protected]

3. ‡´ÖÖ¸üŸÖ ¯ÖæÞÖÔŸ¾ÖÖ“ÖÖ ¤üÖÜÖ»ÖÖ/ ³ÖÖêÝÖ¾Ö™üÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö (Occupancy Certificate)/ ³ÖÖÝÖ ³ÖÖêÝÖ¾Ö™üÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö (Part

1) ³ÖæÜÖÓ›ü¬ÖÖ¸üÛú/ ¾ÖÖßÖã¿ÖÖÃ¡Ö–Ö µÖÖÓ“ÖÖ ‡´ÖÖ¸üŸÖ ¯ÖãÞÖÔŸ¾Ö ¯ÖÏ´ÖÖÞÖ¯Ö¡ÖÖÃÖÖšüß †•ÖÔ. 2) ²ÖÖÓ¬ÖÛúÖ´Ö ¯ÖæÞÖÔ —ÖÖ»µÖÖ“Öê ¾ÖÖßÖæ-¿ÖÖá֖ÖÖ“Öê ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö "±úÖò´ÖÔ ®ÖÓ. 8" ´Ö¬µÖê (¾Öî¬Ö ¯Ö¸ü¾ÖÖ®µÖÖ“µÖÖ ¯ÖÏŸÖß ÃÖÆü)

21 פü¾ÖÃÖ ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ ´ÖãÜµÖ ÛúÖµÖÔÛúÖ¸üß †×¬ÖÛúÖ¸üß, ´ÖãܵÖÖ»ÖµÖ : ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ), ´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú : 022-2687 0052/54/27/73.

Page 12: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

O.C.) 3) ¸ü“Ö®ÖÖ †×³ÖµÖÓŸµÖÖÛú›æü®Ö ²ÖÖÓ¬ÖÛúÖ´Ö ×ãָüŸÖê“Öê ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö "±úÖò´ÖÔ ®ÖÓ. 14" (¾Öî¬Ö ¯Ö¸ü¾ÖÖ®µÖÖ“µÖÖ ¯ÖÏŸÖß ÃÖÆü) 4) †×Ý®Ö¿Ö´Ö®Ö ×¾Ö³ÖÖÝÖ, ´Ö†Öî×¾Ö´Ö µÖÖÓ“ÖêÛú›æü®Ö †Ó×ŸÖ´Ö ®ÖÖ Æü¸üÛúŸÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö. 5) ÃÖÖÓ›ü¯ÖÖÞÖß ¾µÖ¾ÖãÖê²ÖÖ²ÖŸÖ ¯Ö¸ü¾ÖÖ®ÖÖ ¬ÖÖ¸üÛú ¯»ÖÓ²Ö¸ü Ûú›æü®Ö ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö. (¾Æòü×»Ö›ü ¯Ö¸ü¾ÖÖ®µÖÖ“µÖÖ ¯ÖÏŸÖß ÃÖÆü) 6) 24 ŸÖÖÃÖÖ“Öê ¯ÖÖÞÖß ÃÖÖšü¾ÖÞÖß²ÖÖ²ÖŸÖ ÛÓú¯Ö®Öß“µÖÖ »Öê™ü¸üÆêü›ü¾Ö¸ü Æü´Ö߯֡Ö. 7) ³ÖæÜÖÓ›ü¬ÖÖ¸üÛúÖÛú›æü®Ö 100 “µÖÖ Ã™Ñü´¯Ö ¯Öê¯Ö¸ü¾Ö¸ü ÜÖÖ»Öᯙ ²ÖÖ²ÖŸÖ Æü´Öß ¯Ö¡Ö †) ´ÖÆüÖ¸üÖ™Òü ¯ÖϤãüÂÖÞÖ ´ÖÆüÖ´ÖÓ›üôûÖÛú›æü®Ö Æü¾ÖÖ ¾Ö ¯ÖÖÞµÖÖ²ÖÖ²ÖŸÖ ÃÖÓ´ÖŸÖß¯Ö¡Ö ¯ÖÏÖ¯ŸÖ Ûú¸üÞÖê. ²Ö) ÛúÖ¸üÜÖÖ®ÖÖ / ˆªÖêÝÖ

Ûú±ú ¯Ö¸êü›ü ÛúÖµÖÖÔ»ÖµÖ : 4, 4 (‹), 12 ¾ÖÖ ´Ö•Ö»ÖÖ, ¾Ö»›Ôü ™Òêü›ü ÃÖë™ü¸ü, ÛúÖò´»ÖêŒÃÖ-1, Ûú±ú ¯Ö¸êü›ü, ´ÖãÓ²Ö‡Ô-400 005. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú: 0022-22151451/52/53. ‡Ô-´Öê»Ö : [email protected]

Page 13: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

×®Ö¸üßõÖÛúÖ“Öß ´ÖÖ®µÖŸÖÖ. (†Ö¾Ö¿µÖÛú †ÃÖ»µÖÖÃÖ) 8) £ÖÛú²ÖÖÛúß ®ÖÃÖ»µÖÖ²ÖÖ²ÖŸÖ ´Ö.†Öî.×¾Ö.´Ö.“µÖÖ ¯ÖÖÞÖß ¤êüµÖÛú ×¾Ö³ÖÖÝÖÖÛú›æü®Ö ¯ÖÏ´ÖÖÞÖ¯Ö¡Ö. 9) ³ÖÖÝÖ ³ÖÖêÝÖ¾Ö™üÖ ¯ÖÏ´ÖÖÞÖ¯Ö¡ÖÖÃÖÖšüß ¹ý.100/- ÙÑü´¯Ö ¯Öê¯Ö¸ü¾Ö¸ü õÖן֯ÖæŸÖá ²ÖÓ¬Ö¯Ö¡Ö (Indemnity Bond). †Ö¾Ö¿µÖÛú †ÃÖ»µÖÖÃÖ 1) ´Ö.†Öî.×¾Ö.´ÖÆüÖ´ÖÓ›üôûÖ“µÖÖ ¯ÖÏÖ¤êü׿ÖÛú †×¬ÖÛúÖ¸üß µÖÖÓ“ÖêÛú›æü®Ö ´Öã¤üŸÖ ¾ÖÖœüß“Öê ¯Ö¡Ö. 2) †®®Ö ¾Ö †ÖîÂÖ¬Öß ¦ü¾µÖ ×¾Ö³ÖÖÝÖÖ“Öß ´ÖÖ®µÖŸÖÖ. 3) ²ÖÖÓ¬ÖÛúÖ´ÖÖ“Öê ÃÖã¬ÖÖ¸üßŸÖ ®ÖÛúÖ¿ÖÖ“Öê ÃÖÓ“Ö

4. ®ÖÖ £ÖÛú²ÖÖÛúß ¤üÖÜÖ»ÖÖ 1) †•ÖÔ. 2) ¯ÖÖÞÖß ¤êüµÖÛúÖ“Öß ¯ÖÏŸÖ.

7 פü¾ÖÃÖ ÛúÖµÖÔÛúÖ¸üß †×³ÖµÖÓŸÖÖ / ˆ¯Ö †×³ÖµÖÓŸÖÖ

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ (´ÖãܵÖÖ»ÖµÖ), ´Ö†Öî×¾Ö´Ö, ˆªÖêÝÖ ÃÖÖ¸ü£Öß, ´ÖÆüÖÛúÖ»Öß ÝÖãÓ±úÖ ¸üÖê›üü, †Ó¬Öê¸üß (¯Öæ¾ÖÔ), ´ÖãÓ²Ö‡Ô-400 093. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú :

Page 14: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

022-2687 0052/54/27/73. ‡Ô-´Öê»Ö : [email protected] ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ¯ÖãÞÖê, •ÖÖêÝÖ ÃÖë™ü¸ü, ´Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ¯ÖãÞÖê-´ÖãÓ²Ö‡Ô ´ÖÆüÖ´ÖÖÝÖÔ, ¾ÖÖÛú›êü¾ÖÖ›üß, ¯ÖãÞÖê - 441003. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 020-25819753/25813985 ‡Ô-´Öê»Ö : [email protected]

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÓ¤êü›ü, ¯Ö×Æü»ÖÖ ´Ö•Ö»ÖÖ, ˆ•¾Ö»ÖÖ ‹®™ü¸ü¯ÖÏÖµÖ—ÖêÃÖ, •ÖÖ®ÖÛúß ®ÖÝÖ¸ü, ×¾Ö´ÖÖ®ÖŸÖôû ´ÖÖÝÖÔ, ®ÖÖÓ¤êü›ü- 431603. ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0240-2334235 ‡Ô-´Öê»Ö :

Page 15: it. 1 0 MAR 2015di.maharashtra.gov.in/_layouts/15/doistaticsite/... · However, it is decided that the RO'shall issue power NOC in the plot allotment letter itself. These guidelines

F:\old data\Suhas\Nagrikachi  sanad December 2014_Revised.docx 

†. ÛÎú.

ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã¸ü×¾Ö»Öß •ÖÖÞÖÖ¸üß

ÃÖê¾ÖÖ

†Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê/ ÛúÖµÖÔ¾ÖÖÆüß

×¾ÖÛúÖÃÖ ×®ÖµÖÓ¡ÖÞÖ ×®ÖµÖ´ÖÖ¾ÖŸÖß ´Ö¬Öᯙ ÃÖÓ²ÖÓ¬ÖßŸÖ ×®ÖµÖ´Ö

¯Ö׸ü¯ÖæÞÖÔ †•ÖÔ Ûêú»µÖÖ®ÖÓŸÖ¸ü

ÃÖê¾ÖÖ ¤êüÞµÖÖ“ÖÖ ÛúÖ»ÖÖ¾Ö¬Öß

ÃÖê¾ÖÖ ¯Öã¸ü×¾ÖÞÖÖ¸üÖ †×¬ÖÛúÖ¸üß

ÃÖê¾ÖÖ ×¾Ö×ÆüŸÖ ÛúÖ»ÖÖ¾Ö¬ÖßŸÖ ®Ö פü»µÖÖÃÖ ŸÖÛÎúÖ¸ü Ûú¸üŸÖÖ µÖê‡Ô»Ö †ÃÖÖ †×¬ÖÛúÖ¸üß

¾Ö ŸµÖÖÓ“ÖÖ ¤æü¸ü¬¾Ö®Öß ÛÎú. ¾Ö ‡-´Öê»Ö

[email protected] †×ŸÖ׸üŒŸÖ ´ÖãÜµÖ †×³ÖµÖÓŸÖÖ, ´Ö†Öî×¾Ö´Ö, ®ÖÖÝÖ¯Öæ¸ü, ˆªÖêÝÖ ³Ö¾Ö®Ö, ×ÃÖ¾Æüᯙ »ÖÖ‡Ô®Ö, ÃÖê»Ö™òüŒÃÖ ‡´ÖÖ¸üŸÖß •Ö¾Öôû, ®ÖÖÝÖ¯Öæ¸ü- 440001 ¤æü¸ü¬¾Ö®Öß ÛÎú´ÖÖÓÛú 0712-2526361 ‡Ô-´Öê»Ö : [email protected]

×™ü¯Ö: ¾Ö¸üᯙ ÃÖê¾ÖÖ ±úŒŸÖ ´ÖÆüÖ´ÖÓ›üôûÖ“µÖÖ ³ÖæÜÖÓ›ü¬ÖÖ¸üÛúÃÖÖšüß ¾Ö ´ÖÆüÖ´ÖÓ›üôû •Öê£Öê ×¾Ö¿ÖêÂÖ ×®ÖµÖÖê•Ö®Ö ¯ÖÏÖ׬ÖÛú¸üÞÖ ´ÆüÞÖæ®Ö ÛúÖµÖÔ¸üŸÖ †ÖÆêü †¿ÖÖÓÃÖÖšüß“Ö »ÖÖÝÖæ †ÖÆêü.

´ÖãÜµÖ †×³ÖµÖÓŸÖÖ(´ÖãܵÖÖ»ÖµÖ.)

´Ö†Öî×¾Ö´Ö, ´ÖãÓ²Ö‡Ô 400 093.