Reference Projects  

Page 2: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 2/34  

 

Reference Projects 

2004   BOTAS Natural Gas Distribution Stations ................................................................................................................................. 3 

2004    Panaran MRS Analyzer and Station Control System ................................................................................................................ 4 

2005    EGO MRS Revamp & SCADA systems ...................................................................................................................................... 5 

2006    Petkim Aliaga MRS .................................................................................................................................................................. 6 

2007    Türkgözü Border Metering Station .......................................................................................................................................... 7 

2007    Qarn Alam & Mukhaizna Metering Stations ............................................................................................................................ 8 

2007    Sohar Aluminium Smelter & Sohar GSS Expansion .................................................................................................................. 9 

2007    Barka Metering Station ......................................................................................................................................................... 10 

2008    Buraimi Metering Station ...................................................................................................................................................... 11 

2008   Al Ghubrah Metering Station ................................................................................................................................................. 12 

2008    OCTAL Metering and Pressure Reducing Station................................................................................................................... 13 

2009    Wadi Jizzi Metering Station ................................................................................................................................................... 14 

2009    SAS Downstream Metering & Pressure Reducing Station ..................................................................................................... 15 

2009    Oman Cement Co. Metering Station ..................................................................................................................................... 16 

2009    Zwitina Power Plant Metering and Pressure Reducing Station ............................................................................................. 17 

2010    VALE Metering Station .......................................................................................................................................................... 18 

2010    PDO‐BP Gas and Condensate Interface Metering Stations ................................................................................................... 19 

2010    DCDP Sales Gas Metering Station .......................................................................................................................................... 20 

2011    LDO Unloading Metering System .......................................................................................................................................... 21 

2011    OCTAL Pressure Reducing Station ......................................................................................................................................... 22 

2011    Daura Refinery gas metering stations ................................................................................................................................... 23 

2012    Woodside DOMGAS Metering Project .................................................................................................................................. 24 

2012    AUAB IPP Gas Transport Facility ............................................................................................................................................ 25 

2013    OOCEP Gas and Condensate Metering Stations .................................................................................................................... 26 

2014    BOTAŞ EMT Metering Station ................................................................................................................................................ 27 

2015    Bandirma‐II Power Plant ....................................................................................................................................................... 28 

2015    ZAULIYAH Gas and Condensate Export Metering Stations .................................................................................................... 29 

2015    OXY Block‐62 Development ‐ HIPPS Skids ............................................................................................................................. 30 

2015    Rabab Harweel Power Plant & HRSG Project ........................................................................................................................ 31 

2016    Crude Oil Export Metering / LACT skid .................................................................................................................................. 32 

2016‐2017    TANAP Pipeline Metering Stations ............................................................................................................................... 33 

2016‐2017    TRC GSS Metering Skid ................................................................................................................................................. 34 

   

Page 3: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 3/34  

2004 BOTAS Natural Gas Distribution Stations

  

  

Scope of Work  22 high‐pressure pressure reducing & metering stations were supplied, each one consisting of:  

Station inlet‐ and outlet ESD ball valves, equipped with gas‐over‐oil actuators; 

Filtering section with 2x 100% dry gas filters, designed in‐house, with quick‐opening closures; 

Pressure  reducing  section with  2x  100% pressure  letdown  streams,  each with  Shell &  Tube heat  exchangers  for  gas preheating. The pressure regulators are pilot‐operated monitor/active devices, complemented by slam‐shut valves; 

Flow metering section with 2x 100% turbine metering streams and “Z”‐connection for meter verification; 

Process Gas Chromatograph with sample takeoff and sample conditioning; 

Station Control Panel with flow computers, station control PLC system, PC‐based Supervisory / HMI / Invoicing system   

Additional Contract Details  

Contract type      : subcontract to main Project EPC (Pasiner A.S.) 

Contract no. & award date    : 1202‐TR  ‐  awarded 07/2004 

Contract price      : not disclosed 

Planned & actual completion  : planned 24 months  /  actual 24 months 

Owner details      : BOTAS ‐ Department of Natural Gas Operation Management           Ankara, Turkey  ‐  Tel.  +90 312 2998282  ‐  website: www.botas.gov.tr 

               

 

Quick Facts   Year built  2004 through 2006 

Customer  Pasiner A.S. 

End‐user  BOTAS Pipeline Co. 

Location  Various locations in Turkey 

Sizing  2” through 12” 

Capacity  2,000 to 150,000 Sm3/h 

Measurement  Turbine meters 

Pressure  40 to 75 barg 

Material class  Carbon steel, ANSI specifications 

Project DescriptionBetween 2004  and 2006,  the BOTAS  gas distribution pipeline network in the south of Turkey was expanded considerably  with  the  240  km  Malatya‐Gaziantep pipeline and  the 284 km Gaziantep‐Osmaniye‐Adana‐Mersin pipeline. Together with Turkish manufacturing company  Kalekalip  A.S.,  iSystems  designed  and supplied  22  high‐pressure  takeoff  stations  supplying gas to major cities and industries.  

 

Page 4: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 4/34  

2004 Panaran MRS Analyzer and Station Control System

 

Quick Facts   Year built  2004 

Customer  RMG Gaselan 

End‐user  PT Perusahaan Gas Negara 

Location  Batam Island, Indonesia 

  

Scope of Work  iSystems supplied the gas analyzer system and station control system to RMG Gaselan. 

 

Prefabricated analyzer shelter with process gas chromatograph, H2S/total sulphur analyzer and moisture analyzer. The analyzer shelter is equipped with explosion proof air conditioning, and fire & gas detection systems. 

Station Control Panel with flow computers, station control PLC system, PC‐based Supervisory / HMI / Invoicing System.   

Additional Contract Details  

Contract type      : subcontract to main Project EPC (RMG Gaselan) 

Contract no. & award date    : 1103‐DE  ‐  awarded 12/2003 

Contract price      : original EURO 301.000  /  with variations EURO 339.000 

Planned & actual completion  : planned 18 weeks  /  actual 20 weeks 

Owner details      : PGN Perusahaan Gas Negara           Jakarta, Indonesia  ‐  Tel. +6221 633 3080  ‐  website: www.pgn.co.id 

    

                

Project DescriptionIn  2004,  the  new  Panaran  gas‐fired  power  plant  was commissioned on Batam  Island,  just off the coast of Singapore. For  this  power  plant,  the  German  company  RMG  Gaselan supplied the natural gas pressure reducing and metering station. 

 

Page 5: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 5/34  

         

2005 EGO MRS Revamp & SCADA systems

 

Quick Facts   Year built  2005 

Customer  Kalekalip A.S. and EGO 

End‐user  EGO 

Location  Ankara, Turkey 

Sizing  3” through 20” 

Capacity  up to 125,000 Sm3/h 

Measurement  Turbine meters 

Pressure  25 to 50 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work  

iSystems performed a site survey of the 18 City Gate stations as well as the low‐pressure stations, made an uncertainty assessment and a full report, with recommendations for the revamp operation, to EGO; 

Basic and detailed engineering for the revamp of the 18 City Gate Stations, site supervision and project management during the actual revamp works; 

Design and supply of Metering Panels with flow computers and PC‐based Supervisory / HMI / Invoicing System for each of the 18 City Gate Stations; 

Basic design of a simple, standardized SCADA system for the remote monitoring of some 400 low‐pressure M&R stations.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC (Kalekalip A.S.) 

Contract no. & award date    : 1204‐TR  ‐  awarded 07/2004 

Contract price      : not disclosed 

Planned & actual completion  : planned 14 weeks  /  actual 16 weeks 

Owner details      : EGO Genel Müdürlüğü           Ankara, Turkey  ‐  Tel.  +90 312 231 7180  ‐  website: www.ego.gov.tr 

         

 

Project DescriptionThe  18  high‐pressure  City Gate Metering &  Pressure reducing  stations  of  the  Ankara  gas  distribution network  were  in  need  of  a  revamp  to  meet  the requirements of Custody Transfer Metering under the natural  gas  supply  contract.  At  the  same  time,  EGO endeavored to automate these stations and hundreds of  other  small,  low‐pressure  stations  which  would allow  them  to  monitor  and  control  the  complete Ankara  gas  distribution  grid  from  a  central  SCADA system supplied by Valmet Automation.  

Page 6: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 6/34  

2006 Petkim Aliaga MRS

 

Quick Facts   Year built  2006 

Customer  Europower / Ansaldo  

End‐user  PETKIM 

Location  Aliaga Plant, Turkey 

Sizing  6” through 24” 

Capacity  210,000 Sm3/h 

Measurement  Turbine meters 

Pressure  35 to 65 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Metering and Pressure Reducing stations for HRSG and Turbine, consisting of; 

 

Station inlet ESD ball valve, equipped with gas‐over‐oil actuator; 

2 each Filtering sections, each with 2x 100% filters‐liquid separators with quick‐opening closures, and a Liquids Storage Tank for capturing the separated condensate; 

2 each Flow metering sections, each with turbine meter and bypass line; 

2  each  Pressure  reducing  sections,  each  with  2x  100%  pressure  letdown  streams,  each  with  Shell  &  Tube  heat exchangers  for  gas preheating. The pressure  regulators  are pilot‐operated monitor/active devices,  complemented by quick‐acting slam‐shut valves; 

Steam heating system to provide steam and hot water for the gas preheating heat exchangers;    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 1500‐TR  ‐  awarded 01/2006 

Contract price      : EURO 610.000 

Planned & actual completion  : planned 28 weeks  /  actual 26 weeks 

Owner details      : PETKIM Petrokimya A.S.           Izmir, Turkey  ‐  Tel.  +90 232 616 1240  ‐  website: www.petkim.com.tr 

               

Project DescriptionIn  2006,  the Aliaga  plant  of  Petkim  Petrokimya was modernized with a new steam generating plant with HRSG and 56 MWe Alstom gas turbine. Together with Turkish  manufacturing  company  Kalekalip  A.S., iSystems  designed  and  supplied  the  Metering  and pressure  reducing  stations  providing  fuel  gas  to  the boiler and turbine. 

 

Page 7: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 7/34  

2007 Türkgözü Border Metering Station

 

Quick Facts   Year built  2007 

Customer  METOT  Ankara 

End‐user  BOTAS Pipeline Co. 

Location  Türkgözü, Turkey 

Sizing  18” through 42” 

Capacity  900,000 Sm3/h 

Measurement  Orifice meters 

Pressure  50 to 60 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work iSystems were involved in the design and construction of the complete border metering station; 

 

Basic and detailed design of all piping systems within the metering station site boundaries, including a 42” slug catcher, inlet and outlet headers, filtering and flow metering modules including their interconnecting piping; 

Supply of 3 each 18” Cyclone Scrubbers with accessories and instruments; 

Supply of 3 each 20” dual‐chamber orifice metering lines, complete with calibrated meter tubes and accessories; 

Complete detailed design and turnkey supply of a 12‐meter long Analyzer and Transmitter Building, installed straddling the  flow metering  lines  and  holding  the  differential  pressure,  pressure  and  temperature  transmitters  for  the  orifice metering lines, as well as an extensive Gas Quality Analysis system consisting of: 2 each Process Gas Chromatographs, 2 each Sulphur Gas Chromatographs, 2 each Hydrocarbon Dewpoint meters, 2 each Moisture Analyzers and 2 each trace oxygen analyzers. The system was supplied complete with custom‐built, extensive sample conditioning.  The analyzer house was supplied complete with explosion‐proof HVAC and pressurization system, fire & gas detection system and automatic fire‐fighting system. 

Complete detailed design and turnkey supply of the Station Metering and Control Panel, holding 6 each flow computers, a DeltaV Control System, and a redundant PC‐based Supervisory / HMI / Invoicing system.  

  

Additional Contract Details  

Contract type      : subcontract to main Project EPC (METOT) 

Contract no. & award date    : 1261‐TR  ‐  awarded 10/2005 

Contract price      : EURO 1.648.880 

Planned & actual completion  : planned 12 months  /  actual 23 months           (project was temporarily halted by the owner & main contractor) 

Owner details      : BOTAS ‐ Department of Natural Gas Operation Management           Ankara, Turkey  ‐  Tel.  +90 312 2998282  ‐  website: www.botas.gov.tr  

           

Project DescriptionIn  parallel  with  the  BTC  (Baku‐Tbilisi‐Ceyhan)  oil pipeline,  the  BTC  consortium  headed  up  by  BP installed the SCP or Shah Deniz gas pipeline to connect Baku, Tbilisi and Erzurum to the world gas market. A  Border  Metering  Station  was  constructed  on  the Turkish‐Georgian  border  for  the  custody  transfer  of the gas to the BOTAS‐operated portion of the pipeline in Turkey. 

 

Page 8: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 8/34  

2007 Qarn Alam & Mukhaizna Metering Stations

 

Quick Facts   Year built  2007 

Customer  Bharat Heavy Electricals Ltd. (BHEL) 

End‐user  Petroleum Development Oman (PDO) 

Location  Qarn Alam & Mukhaizna, Sultanate of Oman 

Sizing  8” to 12" 

Capacity  66,000 to 147,000 Sm3/h 

Measurement  3x 4‐Path Ultrasonic meters 

Pressure  30 to 95 barg 

Material class  Carbon steel, ANSI specifications 

   

Scope of Work Design and supply of the GTP inlet Custody Transfer Metering stations, consisting of; 

 

Prefabricated metering  skids with  2x  100%  ultrasonic metering  lines,  complete with motor‐operated  stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with  instrumentation, online densitometers and skid cabling & wiring; 

Analyzer shelter with 2 each C9+ Process Gas Chromatographs with sample takeoff and conditioning system; 

Station Control Panel with flow computers and PC‐based Supervisory / HMI / Invoicing System.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC (BHEL) 

Contract no. & award date    : 2006/BMLC/65843  ‐  awarded 07/2006  (through OHI P&E Services LLC) 

Contract price      : EURO 540.691 

Planned & actual completion  : planned 24 weeks  /  actual 25 weeks       

Owner details      : Petroleum Development Oman  (PDO)           Muscat, Sultanate of Oman ‐ Tel. + (968) 24678111  ‐  website: www.pdo.co.om 

                   

 

Project Description In  2007,  Contractor  BHEL  constructed open‐cycle  power  plants  in Qarn  Alam (North  Oman)  and  Mukhaizna  (South Oman).  iSystems supplied  the GTP  inlet metering skids. 

 

Page 9: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 9/34  

2007 Sohar Aluminium Smelter & Sohar GSS Expansion

 

Quick Facts   Year built  2007 

Customer  Arabian Industries LLC (Sohar Aluminium) GALFAR (Sohar GSS Expansion) 

End‐user  Oman Gas Company (OGC) 

Location  Sohar, Sultanate of Oman 

Sizing  2” through 10” 

Capacity  Up to 180,000 Sm3/h 

Measurement  Orifice meters and  4‐Path Ultrasonic meters 

Pressure  30 to 95 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the new Sohar GSS custody transfer metering stations, consisting of; 

 

For Aromatics Oman: prefabricated metering skid with 2 each 6” ultrasonic metering lines, complete with stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with  instrumentation, online densitometers and skid cabling & wiring; 

For SIS: prefabricated metering skid with 2 each 10” ultrasonic metering lines, complete with stream inlet & outlet valves and  “Z”‐configuration  piping  for meter  verification;  complete  with  instrumentation,  online  densitometers  and  skid cabling & wiring; 

For SSSRM: prefabricated metering skid with 2 each 4” ultrasonic metering  lines, complete with stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, online densitometers and skid cabling & wiring; 

For  SAPPF: prefabricated metering  skid with  2  each  1.5” orifice metering  lines,  complete with  stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, online densitometers and skid cabling & wiring. Due to special requirements with regard to size and flow range, the orifice meters were not industry‐standard items, but custom‐designed and specially machined by iSystems. 

For SAS: prefabricated metering skid with 2 each 3” single‐chamber orifice metering lines, complete with stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with  instrumentation, online densitometers and skid cabling & wiring; 

5 each (one for each metering station) Station Control Panels with flow computers and PC‐based Supervisory / HMI / Invoicing System.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : Q.ISYS/SK/GS/2369  ‐  awarded 01/2007  (through OHI P&E Services LLC) 

Contract price      : EURO 1.300.150 

Planned & actual completion  : planned 27 weeks  /  actual 27 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

       

Project Description In 2007,  the existing Sohar Gas Supply Station  (GSS) was extended  to provide natural  gas  to  Sohar  Aluminium Smelter  (SAS),  Aromatics  Oman  (AO), Sharq  Sohar  Steel  Rolling  Mills (SSSRM), SAPPF and SIS. 

 

Page 10: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 10/34  

2007 Barka Metering Station

 

Quick Facts   Year built  2007 

Customer  GPS / Punj Lloyd 

End‐user  Oman Gas Company (OGC) 

Location  Barka, Sultanate of Oman 

Sizing  16” 

Capacity  Up to 330,000 Sm3/h 

Measurement  2x   4‐Path Ultrasonic meters 

Pressure  30 to 95 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and supply of the new Barka GSS Train‐2 custody transfer metering stations, consisting of; 

 

Prefabricated metering skid with 2 each 16” ultrasonic metering  lines, complete with stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, online densitometers and skid cabling & wiring; 

2 each Process Gas Chromatographs with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.   

 

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : ISYSTEMS.SR.GS.2469  ‐  awarded 07/2007  (through OHI P&E Services LLC) 

Contract price      : EURO 579.495 

Planned & actual completion  : planned 28 weeks  /  actual 29 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                      

Project Description In  2007,  the  existing  Barka  Gas  Supply Station  (GSS)  was  extended  to  provide natural  gas  to  Barka  IWPP  Power  Plant, located 50 km to the west of Muscat. 

 

Page 11: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 11/34  

2008 Buraimi Metering Station

 

Quick Facts   Year built  2008 

Customer  GPS 

End‐user  Oman Gas Company (OGC) 

Location  Buraimi, Sultanate of Oman 

Sizing  24” 

Capacity  330,000 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  25 to 95 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the Buraimi CS gas import Custody Transfer Metering station; 

 

Prefabricated metering skid with 2 each 24” ultrasonic metering  lines, complete with stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, online densitometers and skid cabling & wiring; 

2 each Process Gas Chromatographs with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : ISYSTEMS.SR.GS.2389  ‐  awarded 08/2007  (through OHI P&E Services LLC) 

Contract price      : EURO 825.263 

Planned & actual completion  : planned 28 weeks  /  actual 27 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                    

Project Description Oman  is connected to the Dolphin Pipeline, supplying  gas  from  Qatar’s  North  Field  to Oman  and  the  UAE.  In  Buraimi,  a  border metering & compressor station was built to boost  the  pressure  of  the  natural  gas supplied through the Dolphin Pipeline at the UAE / Oman border. 

 

Page 12: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 12/34  

2008 Al Ghubrah Metering Station

 

Quick Facts   Year built  2008 

Customer  Arabian Industries LLC 

End‐user  Oman Gas Company (OGC) 

Location  Al Ghubrah, Sultanate of Oman 

Sizing  14” 

Capacity  250,000 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  35 to 66 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and supply of the Al Ghubrah PRT Custody Transfer Metering station; 

 

Prefabricated metering skid with 2 each 14” ultrasonic metering  lines, complete with stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

2 each Process Gas Chromatographs with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory/HMI.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 0672‐OM  ‐  awarded 08/2008  (through OHI P&E Services LLC) 

Contract price      : EURO 533.500 

Planned & actual completion  : planned 28 weeks  /  actual 32 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                   

Project Description In  2008  the  Al  Ghubrah  Pressure Reduction  Terminal  in  Muscat  was expanded  to  cater  for  the gas  supply  to the  Al  Ghubrah  power  plant  and desalination plant. 

 

Page 13: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 13/34  

2008 OCTAL Metering and Pressure Reducing Station

 

Quick Facts   Year built  2008 

Customer  OCTAL 

End‐user  Oman Gas Company (OGC) 

Location  Salalah, Sultanate of Oman 

Sizing  3” through 6” 

Capacity  13,000 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  30 to 35 barg 

Material class  Carbon steel, ANSI specifications 

   

Scope of Work Design and supply of the OCTAL custody transfer metering and pressure reducing station; 

 

Prefabricated metering skid with 2 each 3” ultrasonic metering lines, complete with stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

Prefabricated pressure  reduction skid with  inlet ESD valve, and 2 each 100% pressure  reducing  lines, each with pilot‐operated pressure regulator and full‐capacity safety relief valve. 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 0684‐OM  ‐  awarded 02/2008  (through OHI P&E Services LLC) 

Contract price      : EURO 207.000 

Planned & actual completion  : planned 22 weeks  /  actual 23 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                    

Project Description In  2008  the  largest  PET  plant  in  the Middle  East  was  commissioned  for OCTAL  Petrochemicals.  The  existing Sapphire GSS in Salalah was expanded to supply gas to the OCTAL plant. 

 

Page 14: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 14/34  

2009 Wadi Jizzi Metering Station

 

Quick Facts   Year built  2009 

Customer  Arabian Industries LLC 

End‐user  Oman Gas Company (OGC) 

Location  Wadi Jizzi, Sultanate of Oman 

Sizing  12” 

Capacity  125,000 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  18 to 23 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and supply of the Wadi Jizzi PRT Custody Transfer Metering station;   

Prefabricated metering skid with 2 each 12” ultrasonic metering  lines, complete with stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

2 each Process Gas Chromatographs with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 0672B‐OM  ‐  awarded 08/2008  (through OHI P&E Services LLC) 

Contract price      : EURO 443.500 

Planned & actual completion  : planned 32 weeks  /  actual 32 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                       

Project Description In  2009  the  Wadi  Jizzi  Pressure  Reduction Terminal  in Muscat was expanded  to cater  for the gas supply to the Wadi Jizzi power plant. 

 

Page 15: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 15/34  

2009 SAS Downstream Metering & Pressure Reducing Station

 

Quick Facts   Year built  2009 

Customer  Oman Gas Company (OGC) 

End‐user  Oman Gas Company (OGC) 

Location  Sohar, Sultanate of Oman 

Sizing  3” through 12” 

Capacity  12,500 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  38 to 89 barg 

Material class  Carbon steel, ANSI specifications 

    

Scope of Work Design and supply of the SAS Downstream custody transfer metering and pressure reducing station; 

 

Prefabricated metering skid with 2 each 3” ultrasonic metering lines, complete with stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

Prefabricated pressure  reduction skid with 2 each 100% pressure  reducing  lines, each with  two ESD/slam‐shut valves, two pilot‐operated pressure regulators in monitor + active configuration, and a creep/relief valve. 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.    

Additional Contract Details  

Contract type      : Direct contract with gas company 

Contract no. & award date    : OGC/54/2007  ‐  awarded 07/2008  (through OHI P&E Services LLC) 

Contract price      : EURO 506.670   

Planned & actual completion  : planned 26 weeks  /  actual 26 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                   

Project Description In 2009 the Sohar Pressure Reduction Terminal in Muscat was  expanded  to  cater  for  the  gas supply  to  Sohar  Aluminium  Smelter downstream industries. 

 

Page 16: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 16/34  

2009 Oman Cement Co. Metering Station

 

Quick Facts   Year built  2009 

Customer  GPS 

End‐user  Oman Gas Company (OGC) 

Location  Rusayl, Sultanate of Oman 

Sizing  6” 

Capacity  50,000 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  54 to 63 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and supply of the Oman Cement Custody Transfer Metering station; 

 

Prefabricated metering skid with 2 each 6” ultrasonic metering lines, complete with stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

2 each Process Gas Chromatographs with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.  

  

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 0711‐OM  ‐  awarded 06/2009  (through OHI P&E Services LLC) 

Contract price      : EURO 355.580 

Planned & actual completion  : planned 26 weeks  /  actual 27 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                       

Project DescriptionA new custody transfer metering station was added in Rusayl  to  cater  for  the  increased gas demand of  the Oman Cement factory. 

 

Page 17: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 17/34  

2009 Zwitina Power Plant Metering and Pressure Reducing Station

 

Quick Facts   Year built  2009 

Customer  ENKA Teknik A.S. 

End‐user  General Electric Co. of Libya (GECOL) 

Location  Zwitina, Libya 

Sizing  8” through 16” 

Capacity  180,000 Sm3/h 

Measurement  3x  4‐path Ultrasonic meters 

Pressure  30 to 50 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and project services and supply of equipment for the turbine fuelgas metering and pressure reducing station; 

 

Complete basic and detailed engineering of the complete fuelgas station, consisting of inlet‐ and outlet headers with ESD valves,  inlet slug catcher, and 3  identical metering & pressure reducing system each containing a dry gas filter, shell & tube heat exchanger for gas preheating, ultrasonic flowmeter, slam‐shut valve and pilot‐operated pressure regulator. 

Supply of critical equipment and instruments, such as the ultrasonic flowmeters, slam‐shut valves and pressure regulators, process gas chromatograph and other items. 

Design and turnkey supply of the main Station Control Panel with flow computers, redundant PLC‐based station control system and redundant PC‐based Supervisory / HMI / Invoicing System. 

Miscellaneous project services such as procurement support, assistance for HAZOP and interface meetings, assistance during pre‐commissioning and commissioning etc. 

   

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 0679‐TR  ‐  awarded 02/2009  

Contract price      : EURO 415.690 

Planned & actual completion  : planned 20 weeks  /  actual 18 weeks       

Owner details      : General Electric Co. of Libya  (GECOL)           Tarabulus, Libya ‐ Tel. +218 21 480 8424  ‐  website: www.gecol.ly 

                

 

Project Description A new 2x 250 MW power plant was constructed in Zwitina, Libya. 

 

Page 18: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 18/34  

2010 VALE Metering Station

Quick Facts   Year built  2010 

Customer  Larsen & Toubro Electromech LLC 

End‐user  Oman Gas Company (OGC) 

Location  Sultanate of Oman 

Sizing  12” 

Capacity  41,670 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters 

Pressure  8 to 12 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and supply of the VALE Custody Transfer Metering station;   

Prefabricated metering skid with 2 each 12” ultrasonic metering  lines, complete with stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

2 each Process Gas Chromatographs with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing System.     

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 0704‐OM  ‐  awarded 08/2009  (through OHI P&E Services LLC) 

Contract price      : EURO 461.553 

Planned & actual completion  : planned 28 weeks  /  actual 30 weeks       

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om 

                   

Project Description A new iron ore pellet plant is constructed 230  km  southwest  of  Muscat  for Brazilian mining company VALE. 

 

Page 19: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 19/34  

2010 PDO-BP Gas and Condensate Interface Metering Stations

 

Quick Facts   Year built  2010 

Customer  Petroleum Development Oman (PDO) 

End‐user  Petroleum Development Oman (PDO) 

Location  Saih Rawl, Sultanate of Oman 

Sizing  2” through 8” 

Capacity  75 MMSCFD (natural gas, wet, sour) 150 m3/day (condensate) 150 m3/day (produced water) 

Measurement  2x  4‐path Ultrasonic meters (gas) 3x Coriolis meters (condensate & water) 

Pressure  Up to 106 barg 

Material class  Duplex stainless steel, ANSI specifications 

  Scope of Work Design and supply of the Custody Transfer Metering stations for natural gas and condensate, consisting of; 

 

Prefabricated gas metering skid with 2 each 8” ultrasonic metering lines, complete with stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

1 each Process Gas Chromatographs with sample takeoff and conditioning; 

Prefabricated  condensate metering  skid with  2  each  2”  coriolis metering  lines,  complete with  stream  inlet &  outlet valves and “Z”‐configuration piping for meter verification, complete with  instrumentation, skid cabling and wiring. The condensate metering skid is further complete with a BS&W metering section at the outlet. 

Loose supplied coriolis flowmeter for produced water. 

Station Control Panel with flow computers and redundant PC‐based Supervisory/HMI.    

Additional Contract Details  

Contract type      : Direct contract with Owner 

Contract no. & award date    : Project PAIE00303  ‐  awarded 04/2010  (through OHI P&E Services LLC) 

Contract price      : EURO 771.831 

Planned & actual completion  : planned 28 weeks  /  actual 30 weeks       

Owner details      : Petroleum Development Oman  (PDO)           Muscat, Sultanate of Oman ‐ Tel. + (968) 24678111  ‐ website: www.pdo.com.om                

Project Description PDO  have  awarded  BP  Exploration  Ltd. (Epsilon)  the  exploration  and  production sharing agreement for Block 61 (onshore) in the Sultanate of Oman with a commitment to  appraise  the  gas  reservoirs  in  the Khazzan  and  Makarem  fields.  In  order  to evacuate the produced gas, condensate and water from the Extended Well Test Facility, they  will  be  exported  to  the  Saih  Rawl Central Processing Plant. 

 

Page 20: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 20/34  

2010 DCDP Sales Gas Metering Station

 

Quick Facts   Year built  2010 

Customer  Clough 

End‐user  Apache Energy Ltd. 

Location  Devil Creek, West Australia 

Sizing  10” through 20” 

Capacity  260,000 Sm3/h 

Measurement  2x  4‐path Ultrasonic meters (gas) 

Pressure  Up to 114 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work iSystems is awarded, by Clough Projects Australia, the contract to supply the Sales Gas Metering station that will measure the gas supplied from the treatment plant to DBNGP. The system consists of; 

 

Prefabricated gas metering  skid with 2 each 10”‐900# ultrasonic metering  lines,  complete with  stream  inlet & outlet valves and “Z”‐configuration piping  for meter verification; complete with  instrumentation, skid cabling & wiring. Each metering stream is equipped with a 2‐stage filter/separator, flow control valve and check valve. 

2 each Process Gas Chromatographs and 2 each moisture analyzers with sample takeoff and conditioning; 

Station Control Panel with flow computers, redundant DeltaV station control system and redundant PC‐based Supervisory/HMI; 

The analyzers and station control panel are supplied installed inside a prefabricated Equipment Building, complete with air conditioning, fire detection system and other accessories. 

   

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : A8220‐J‐5042 

Contract price      : EURO 1.755.931 original  /  EURO 1.841.686 with variations 

Planned & actual completion  : planned 36 weeks  /  actual 39 weeks       

Owner details      : Apache Energy Ltd.           Perth, Australia ‐ Tel. 08 62187159 ‐ website: www.apachecorp.com 

             

Project Description The  Devil  Creek  Development  Project (DCDP)  comprises  a  new  gas  treatment plant,  receiving  gas  from  the  offshore Reindeer  Field  and  supplying  it  into  the Dampier‐Bunbury Natural Gas Pipeline. 

 

Page 21: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 21/34  

2011 LDO Unloading Metering System

 

Quick Facts   Year built  2011 

Customer  SEPCO‐III 

End‐user  Sembcorp Salalah 

Location  Salalah IWPP, Sultanate of Oman 

Sizing  6” 

Capacity  60,000 kg/h (Light Diesel Oil) 

Measurement  2x Coriolis Meter 

Pressure  Up to 6 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the flow metering system for the backup fuel oil circuit, consisting of; 

 

Prefabricated oil metering skid  for LDO unloading  (batch metering application) with 2 each 6” coriolis metering  lines, complete with stream inlet, outlet and bypass valve; complete with instrumentation, skid cabling & wiring; 

Loose supplied coriolis flow meter for measuring the LDO flow to the turbines of the power plant; 

Station Control Panel with flow computers and PC‐based Supervisory/HMI.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : ISYSTEMS.SR.GS.4991  ‐  awarded 11/2010  (through OHI P&E Services LLC) 

Contract price      : EURO 278.210 

Planned & actual completion  : planned 24 weeks  /  actual 24 weeks       

Owner details      : Sembcorp Salalah Power & Water Co.           Salalah, Oman ‐ Tel. + (968) 23238510 ‐ website: www.sembcorpsalalah.com.om 

                       

Project Description To meet  increased  power  demands  in  the Dhofar  region,  the  Salalah  independent water  and  power  project  was  developed, covering  a  400 MW power plant  and  a  15 MIGD water generation capacity.  

 

Page 22: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 22/34  

2011 OCTAL Pressure Reducing Station

 

Quick Facts   Year built  2011 

Customer  Uhde Inventa‐Fischer 

End‐user  OCTAL 

Location  Salalah, Sultanate of Oman 

Sizing  3” through 6” 

Capacity  13,000 Sm3/h 

Measurement  N/A 

Pressure  30 to 35 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Design and supply of the OCTAL pressure reducing station; 

 

Prefabricated pressure  reduction skid with  inlet ESD valve, and 2 each 100% pressure  reducing  lines, each with pilot‐operated pressure regulator and full‐capacity safety relief valve. 

Changes to the existing Station Control Panel.    

Additional Contract Details  

Contract type      : subcontract to main Project EPC 

Contract no. & award date    : 45110309  ‐  awarded 02/2011 

Contract price      : EURO 198.880 

Planned & actual completion  : planned 24 weeks  /  actual 24 weeks       

Owner details      : OCTAL Oman           Muscat, Oman ‐ Tel. + (968) 22030700 ‐ website: www.octal.com 

                       

Project Description The  existing  OCTAL  PET  plant  is  being extended by the installation of a second, identical  plant  (PEARL  Project)  by  the Swiss company Uhde Inventa‐Fischer. 

 

Page 23: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 23/34  

2011 Daura Refinery gas metering stations

 

Quick Facts   Year built  2011 

Customer  Midland Refineries Co. 

End‐user  Midland Refineries Co. 

Location  Daura refinery, Iraq 

Sizing  4” 

Capacity  1,200 Sm3/h 

Measurement  4x  4‐path Ultrasonic meters (gas) 

Pressure  Up to 10 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work iSystems supplies two (2) identical metering skids for natural gas, consisting of; 

 

2 ea. prefabricated gas metering skids with 2 each 4”‐150# ultrasonic metering lines, complete with stream inlet & outlet valves and  “Z”‐configuration piping  for meter  verification;  complete with  instrumentation,  skid  cabling & wiring. The complete metering  stations are built  inside protective  cabinets, and are  complete with  steam  jacketing,  lighting, gas detection etc.; 

Station Control Panel with flow computers and PC‐based Supervisory/HMI;    

Additional Contract Details  

Contract type      : direct contract with Owner 

Contract no. & award date    : CR/121/2011  ‐  awarded 08/2011 

Contract price      : EURO 517.140 original  /  EURO 529.350 with variations 

Planned & actual completion  : planned 24 weeks  /  actual 32 weeks       

Owner details      : Midland Refineries Co. / Daura Refinery           Daura, Iraq ‐ Tel. +964 17750300 ‐ website: www.mrc.oil.gov.iq                       

Project Description Operated  by  the  Midland  Refineries  Co., the  Daura  Refinery  is  located  just  outside Baghdad. It has a refining capacity of up to 130,000 bpd.  

 

Page 24: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 24/34  

2012 Woodside DOMGAS Metering Project

 

Quick Facts   Year built  2012 

Customer  Wester Process Equipment Ltd. 

End‐user  Woodside Energy Ltd. 

Location  Karratha Gas Plant, West Australia 

Sizing  16”‐600# and 16”‐900# 

Capacity  4x 15,000 m3/h (uncorrected) 

Measurement  4x  4+1‐path Ultrasonic meters (gas) 

Pressure  Up to 125 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work iSystems is awarded, by Western Process Equipment in Perth, the contract to supply the Sales Gas Metering stations that will measure the gas supplied from the treatment plant to DBNGP. The system consists of; 

 

4 each 16”‐900# and 16”‐600# ultrasonic metering lines, complete with instrumentation; 

4 each Process Gas Chromatographs, 2 each moisture analyzers and H2S analyzers with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / invoicing system.    

Additional Contract Details  

Contract type      : subcontractor to main Project EPC 

Contract no. & award date    : 43852_DOMGAS  ‐  awarded 01 / 2012 

Contract price      : EURO 1.018.495  + variations EURO 4.510 

Planned & actual completion  : planned 28 weeks  /  actual 32 weeks             Note: metering requirements are being re‐assessed, goods are delivered but           not installed & commissioning pending facilities redesign.  

Owner details      : Woodside Energy Ltd.           Perth, Australia ‐ Tel. +618 93484000 ‐ website: www.woodside.com.au                 

Project Description The  DOMGAS  Project  at  Woodside’s Karratha  Gas  Plant  comprises  new  fiscal metering systems  for supplying natural gas into  the  Dampier‐Bunbury  Natural  Gas Pipeline. 

 

Page 25: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 25/34  

2012 AUAB IPP Gas Transport Facility

 

Quick Facts   Year built  2012 ‐ 2013 

Customer  AYTB Ltd. 

End‐user  QIT‐PowerTech 

Location  Al‐Udeid Air Base IPP, State of Qatar 

Sizing  4” through 8” 

Capacity  1,000 m3/h (uncorrected) 

Measurement  2x  4”‐600# 4‐path Ultrasonic meters 

Pressure  Up to 79 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the GTF for natural gas, consisting of; 

 

Dual‐stage gas filtering skid (liquids & particles); 

Flow metering skid with ultrasonic flow meters and Process Gas Chromatograph; 

Heating Skid with electrical explosion‐proof gas heater; 

HIPPS skid with 2 each HIPPS valves and accessories; 

Pressure Reducing Skid with pilot‐operated pressure regulators; 

Station Control Panel with flow computers and accessories. 

Engineering and design of further parts of the GTF, such as the GTF’s inlet and outlet sections, cold vent stack, pig receiver are etc. 

   

Additional Contract Details  

Contract type      : subcontractor to main Project EPC 

Contract no. & award date    : PO No. 21007123  ‐  awarded 08 / 2012 

Contract price      : EURO 656.000 

Planned & actual completion  : planned 26 weeks  /  actual 32 weeks         

Owner details      : QIT ‐ PowerTech           Doha, Qatar ‐ Tel. +974 4667782              

Project Description The  Independent  Power  Plant  at  the  Al‐Udeid Air Force Base  in Qatar, operated by QIT‐PowerTech, is upgraded to operated on gaseous  fuel  rather  than  liquid  fuel. A new pipeline  from  the  Qatar  Petroleum  main grid  to  the  IPP  is  installed,  together with a GTF (Gas Transport Facility) to condition the gas for use by the IPP. 

 

Page 26: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 26/34  

2013 OOCEP Gas and Condensate Metering Stations

 

Quick Facts   Year built  2013 

Customer  OOCEP 

End‐user  OOCEP 

Location  Abu Tubul Block‐60, Sultanate of Oman 

Sizing  2” through 8” 

Capacity  140 MMSCFD (natural gas, wet, sour) 12,600 BPD (condensate) 

Measurement  2x  10”‐900# 4‐path Ultrasonic meters (gas) 3x 4”‐600# Coriolis meters (condensate) 

Pressure  Up to 129 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the Custody Transfer Metering stations for natural gas and condensate, consisting of; 

 

Prefabricated gas metering skid with 2 each 10”‐900# ultrasonic metering lines, complete with motorized stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

2  each  Process  Gas  Chromatographs,  water  dew  point  analyzer,  hydrocarbon  dew  point  analyzer  and  2  each  H2S analyzers, all complete with sample takeoff and conditioning; 

Prefabricated condensate metering skid with 3 each 4”‐600# coriolis metering lines, complete with stream inlet & outlet valves and Master meter verification, complete with instrumentation, skid cabling and wiring. 

Automatic condensate sampling system, BS&W analyzer and Vapor Pressure analyzer, all complete with sample takeoff and conditioning; 

2 each Station Control Panels with flow computers and redundant PC‐based Supervisory / HMI / Invoicing system 

Additional Contract Details  

Contract type      : direct contract with Owner 

Contract no. & award date    : 4600000366  ‐  awarded 01/2013  (through OHI P&E Services LLC) 

Contract price      : EURO 1.326.520 

Planned & actual completion  : planned 36 weeks  /  actual 44 weeks       

Owner details      : OOCEP  (Omain Oil Company Exploration & Production)           Muscat, Oman ‐ Tel. +968 2464 0900 ‐ website: www.oocep.com 

Project Description OOCEP have been awarded the exploration rights  for  Block  60  (onshore).  In  order  to evacuate the produced gas and condensate and  water  from  the  Extended  Well  Test Facility,  they will  be  exported  to  the  PDO (condensate)  and  OGC  (gas)  pipelines respectively. 

 

Page 27: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 27/34  

2014 BOTAŞ EMT Metering Station

 

Quick Facts   Year built  2014 

Customer  BOTAŞ  

End‐user  BOTAŞ 

Location  Ceyhan Oil Terminal, Turkey 

Sizing  16" ‐ 12" 

Capacity  2,750 m3/h 

Measurement  Ultrasonic + Turbine meters 

Pressure  5 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Metering and Proving station for crude oil, consisting of; 

 

2 each metering streams with filters/basket strainers, ultrasonic flow meters, double‐expanding plug valves with electrical actuators, secondary instrumentation for measurement of pressure/temperature/density; 

Master metering stream with turbine meter, valves and instrumentation; 

Volume prover with valves and instrumentation; 

Revamp of the existing control building; 

Station control system with flow computers, redundant PLC, redundant Supervisory/HMI system.    

Additional Contract Details  

Contract type      : direct contract between Akfel Holding and Owner 

Contract no. & award date    : 1317‐TR  ‐  awarded 2014 

Contract price      : EURO 1,400,000 

Planned & actual completion  : planned 44 weeks  /  actual 48 weeks 

Owner details      : BOTAS ‐ Turkey  ‐  Tel.  +90 312 2998282  ‐  website: www.botas.gov.tr 

Project DescriptionCeyhan's marine transport terminal is the terminus of the  Baku‐Tbilisi‐Ceyhan  (BTC)  pipeline  which  brings crude oil from the Caspian Sea. The terminal contains seven  storage  tanks,  a  jetty  capable  of  loading  two tankers simultaneously, and metering facilities. Under the scope of  this project,  iSystems/Akfel replaced an existing crude oil metering & prover station. 

Page 28: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 28/34  

2015 Bandirma-II Power Plant

 

Quick Facts   Year built  2015 

Customer  SIEMENS AG 

End‐user  EnerjiSA 

Location  Bandirma‐II Power Plant, Turkey 

Sizing  12" ‐ 16" 

Capacity  21  kg/s 

Measurement  Ultrasonic + Turbine meters 

Pressure  75 ‐ 35 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work Filtering, preheating, pressure reducing and metering systems, pipelines consisting of; 

 

Hot‐tap / Tie‐in of the 16" takeoff line with the main 36" gas transport line, and 16" pipeline to the main RMS (Reducing & Metering Station) 

Off‐site Natural Gas RMS with 2x 100% filter/separators, heat exchangers and hot water system, turbine (fiscal) and ultrasonic (check) flow metering, pressure reducing trains with Active & Monitor pressure regulators; control building with Station Control System including flow computers and Supervisory/HMI system; 

16" and 4" pipelines from the main RMS to the Bandirma‐II power plant site; 

On‐site flow metering system (turbine meter), gas preheating system with 2x high‐pressure heat exchangers, hot water recirculation system, steam/water preheating system; final filter and outlet ESD valve. 

   

Additional Contract Details  

Contract type      : subcontractor to main Project EPC 

Contract no. & award date    : 140607‐TR  ‐  awarded 2014 

Contract price      : (not disclosed at Owner's request) 

Planned & actual completion  : planned 50 weeks  /  actual 50 weeks 

Owner details      : EnerjiSA ‐ Bandirma‐II Power Plant, Bandirma ‐ Turkey 

Project DescriptionEnerjisa Power Generation, a joint venture of Sabanci Holding  and  E.ON,  is  developing  the  Bandirma  II natural  gas‐fired  combined  cycle power plant  in  the Balikesir province of Turkey. The  600MW  power  plant  is  being  erected  by SIEMENS,  alongside  the  existing  930MW  Bandirma power plant.  iSystems/Akfel provided the natural gas delivery/conditioning system from the tie‐in with the gas suppliers' main pipeline up to the turbine inlet.

Page 29: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 29/34  

2015 ZAULIYAH Gas and Condensate Export Metering Stations

 

Quick Facts   Year built  2015 

Customer  Al Hassan ‐ TR Project JV 

End‐user  Petroleum Development Oman (PDO) 

Location  Zauliyah Gas Plant Project, Sultanate of Oman 

Sizing  3” through 6” 

Capacity  1.2 MMSCMD (natural gas, wet, sour) 12 m3/h (condensate) 

Measurement  2x  6”‐600# 4‐path Ultrasonic meters (gas) 2x 1”‐600# Coriolis meters (condensate) 

Pressure  Up to 95 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the Custody Transfer Metering stations for natural gas and condensate, consisting of; 

 

Prefabricated gas metering skid with 2 each 6”‐600# ultrasonic metering lines, complete with motorized stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

Process Gas  Chromatograph, water  dew  point  analyzer,  hydrocarbon  dew  point  analyzer,  all  complete with  sample takeoff and conditioning; 

Prefabricated condensate metering skid with 2 each 3”‐600# coriolis metering  lines, complete with motorized stream inlet & outlet valves and "Z"‐configuration piping for meter verification, complete with instrumentation, skid cabling and wiring. 

Automatic condensate sampling system, BS&W analyzer and redundant density meters, all complete with sample takeoff and conditioning; 

2 each Station Control Panels with flow computers and redundant PC‐based Supervisory / HMI / Invoicing system. 

Additional Contract Details  

Contract type      : subcontractor to main Project EPC 

Contract no. & award date    : 1347‐OM  ‐  awarded 06/2013  (through OHI P&E Services LLC) 

Contract price      : EURO 600.000  + variations (to be defined) 

Planned & actual completion  : Delivered – Main project halted/delayed due to EPC insolvency     

Owner details      : Petroleum Development Oman  (PDO)           Muscat, Sultanate of Oman ‐ Tel. + (968) 24678111  ‐  website: www.pdo.co.om 

Project Description The  Zauliyah  Gas  Plant,  being  newly constructed next to the Zauliyah oil field,  is designed  to  handle  1.2  MMSCMD  of  raw gas as a base case. The  facility will process raw  gas  and  liquids  to  produce  Export Quality gas and stabilized condensate. 

 

Page 30: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 30/34  

2015 OXY Block-62 Development - HIPPS Skids

 

Quick Facts   Year built  2015 

Customer  Occidental of Oman 

End‐user  Occidental of Oman 

Location  "Habiba" Block 62, northern Oman 

Sizing  12" 

Capacity  Natural Gas 

Measurement  N/A 

Pressure  ANSI Class 900 and 1500 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of two (2) HIPPS skids, each consisting of; 

 

Two (2) full‐bore ball valves with fail‐close pneumatic actuators and redundant valve control systems with partial stroke testing facilities; 

Three (3) pressure transmitters with DBB isolation valves; 

Prefabrication and testing of the complete systems including piping, steelwork, electrical, instrument air/gas buffer tanks, secondary instrumentation & valves, etc; 

Integration and iFAT testing with the HIMA control systems 

Additional Contract Details  

Contract type      : direct contract with the Owner 

Contract no. & award date    : 141003‐OM  ‐  awarded 02/2015  (through OHI P&E Services LLC) 

Contract price      : EURO 500.000  

Planned & actual completion  : Delivered     

Owner details      : Occidental of Oman LLC           Muscat, Sultanate of Oman ‐  website: www.oxy.com                 

Project Description Occidental  was  awarded  Block  62  in November  2008  under  a  20‐year  contract. Block 62 is comprised of both development and exploration opportunities targeting gas and condensate resources. iSystems,  together  with  OPES  and  HIMA, provide two (2) HIPPS skids in the main gas process piping. 

Page 31: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 31/34  

2015 Rabab Harweel Power Plant & HRSG Project

 

Quick Facts   Year built  2015 

Customer  Al Hassan ‐ Arabian Industries JV 

End‐user  Petroleum Development Oman (PDO) 

Location  Rabab Harweel Power Station, Sultanate of Oman 

Sizing  6” 

Capacity  44,000  kg/h  natural gas 

Measurement  2x  6”‐600# 4‐path Ultrasonic meters 

Pressure  Up to 90 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the Custody Transfer Metering station for natural gas, consisting of; 

 

Prefabricated gas metering skid with 2 each 6”‐600# ultrasonic metering lines, complete with motorized stream inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

Redundant Process Gas Chromatograph system, complete with sample takeoff and conditioning; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing system. 

Additional Contract Details  

Contract type      : subcontractor to main Project EPC 

Contract no. & award date    : 1348‐OM  ‐  awarded 02/2015  (through OHI P&E Services LLC) 

Contract price      : EURO 440.000 

Planned & actual completion  : Delivered – Main project halted/delayed due to EPC insolvency     

Owner details      : Petroleum Development Oman  (PDO)           Muscat, Sultanate of Oman ‐ Tel. + (968) 24678111  ‐  website: www.pdo.co.om                     

Project Description The Rabab Harweel Power Station is located in  South Oman,  approximately  10km  from the Harweel AB existing Production Station.  iSystems  provide  the  Fiscal  Metering Station for Natural Gas of this power plant. 

Page 32: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 32/34  

2016 Crude Oil Export Metering / LACT skid

 

Quick Facts   Year built  2016 

Customer  Occidental of Oman (OXY) 

End‐user  Occidental of Oman (OXY) 

Location  Wadi Latham, Sultanate of Oman 

Sizing  12” headers / 3x 8” metering streams 

Capacity  100,000 USBPD (crude oil) 

Measurement  3x 50% Coriolis Flow and Density Meters 

Pressure  Up to 90 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of one (1) LACT metering skid, consisting of; 

 

Three  (3)  identical  Coriolis metering  streams  (each  sized  for  50%  of  the  total  station  capacity)  c/w  automatic  run switching and flow control valves;

One (1) bi‐directional loop prover system; One (1) pumped sample loop with Automatic Sampler, Density and Water Cut measurement systems; One (1) metering & control panel with (redundant) flow computer and Supervisory/HMI computers; Prefabrication and testing of the complete system  including piping, steelwork, electrical, secondary  instrumentation & 

valves, integration and FAT testing etc.

Additional Contract Details  

Contract type      : direct contract with Owner 

Contract no. & award date    : 1405‐OM  ‐  awarded 11/2015  (through OHI P&E Services LLC) 

Contract price      : EURO 1.300.000 

Planned & actual completion  : Finished and awaiting transport & installation   

Owner details      : Occidental of Oman LLC   Muscat, Sultanate of Oman  ‐  website: www.oxy.com 

            

Project Description OXY  are  installing  two  new  crude  transfer pumps  and  a  16”  pipeline  from  Wadi Latham  to  PDO MOL, with  a  LACT  unit  at Wadi  Latham  Station  to  cater  for  the current and peak oil production forecast. 

Page 33: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 33/34  

2016-2017 TANAP Pipeline Metering Stations

 

Quick Facts   Year built  2016 ‐ 2017 

Customer  TANAP 

End‐user  TANAP 

Location  4 different locations in Turkey 

Sizing  18” through 30” 

Capacity  Up to 4,000,000 Sm3/h 

Measurement  Orifice + Ultrasonic meters 

Pressure  50 ‐ 70 barg 

Material class  Carbon steel, ANSI specifications 

  

Scope of Work  

One (1) complete Custody Transfer / Border Metering Station at the Turkish‐Georgian border; 

One (1) complete Custody Transfer / Border Metering Station at the Greek‐Turkish border; 

Two (2) complete Custody Transfer / Takeoff Metering Stations connecting to the Turkish distribution grid; 

Four (4) Fuel Gas metering skids for gas compressors; 

Four (4) Analyzer and Metering Buildings (one for each Custody Transfer Station), each holding the differential pressure, pressure  and  temperature  transmitters  for  the  metering  lines,  as  well  as  extensive  Gas  Quality  Analysis  systems consisting  of  2  ea.  Process Gas  Chromatographs,  2  ea.  Sulphur Gas  Chromatographs,  2  ea. Hydrocarbon Dew  Point analyzers, 2 ea. Moisture Analyzers and 2 ea. trace oxygen analyzers. The systems are supplied complete with custom‐built,  extensive  sample  conditioning,  explosion  proof  HVAC  &  Pressurization  systems,  Fire  &  Gas  detection  and automatic fire fighting systems. 

Four (4) Station Metering and Control Panels (one for each Custody Transfer station) complete with flow computers and Supervisory/HMI Computers (redundant systems).  

   

Additional Contract Details  

Contract type      : subcontractor to main Project EPCM (Worley Parsons) 

Award date      : 2015 

Contract price      : USD 20,000,000 

Planned & actual completion  : Under construction 

Owner details      : TANAP Natural Gas Transmission Company   Ankara, Turkey  ‐  Tel. +90 312 9991111  ‐  website: www.tanap.com 

Project DescriptionThe aim of the TANAP pipeline project is to bring gas from Azerbaijan’s Shah Deniz‐2 field (and other areas of  the  Caspian  Sea)  to  Turkey  and  on  to  Europe through  a  new  pipeline  running  from  the  Turkish border with Georgia to the tie‐in point with the new TAP pipeline at the Turkish‐Greek border. The project includes  two  (2)  Border  metering  stations,  two  (2) major takeoff stations in Turkey, and several smaller‐size compressor fuel gas skids.

Page 34: iSystems reference list Rev Jun 17isystems.be/images/iSystems reference list.pdf · iSystems NV Project Reference List Revision date June 2017 Page 3/34 2004 BOTAS Natural Gas Distribution

iSystems NV Project Reference List Revision date June 2017  

Page 34/34  

2016-2017 TRC GSS Metering Skid

 

Quick Facts   Year built  2016 ‐ 2017 

Customer  Oman Gas Company 

End‐user  Oman Gas Company 

Location  Sultan Qaboos University, Sultanate of Oman 

Sizing  6” 

Capacity  2,000 Sm3/h  natural gas 

Measurement  2x  6”‐150# 4‐path Ultrasonic meters 

Pressure  Up to 19 barg 

Material class  Carbon steel, ANSI specifications 

  Scope of Work Design and supply of the Custody Transfer Metering station for natural gas, consisting of; 

 

Prefabricated gas metering  skid with 2 each 6”‐150# ultrasonic metering  lines,  complete with manual  stream  inlet & outlet valves and “Z”‐configuration piping for meter verification; complete with instrumentation, skid cabling & wiring; 

Station Control Panel with flow computers and redundant PC‐based Supervisory / HMI / Invoicing system. 

Additional Contract Details  

Contract type      : direct contract with Owner 

Contract no. & award date    : 151202‐OM  ‐  awarded 2016  (through OHI P&E Services LLC) 

Contract price      : EURO 240,000 

Planned & actual completion  : Ready – awaiting shipment 

Owner details      : Oman Gas Company  (OGC)           Muscat, Oman ‐ Tel. + (968) 24681600  ‐  website: www.oman‐gas.com.om   

 

Project Description The Technical and research centre (TRC) will utilize the gas from Sultan Qaboos University Gas  Supply  Station  (SQU  GSS)  which  is approximately  40km  from  the  coast  and 15km from the Muscat international Airport