7
DPA Project: Sheet Number: COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C. Sheet Title: 2301 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 0225 Main Street, Unit C101 Edwards, CO 81632 970.926.8960 Denver Vail Consultant Issue/Revisions Date No. Sheet Information Project Information 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 Shiloh House 9700 E. Easter Lane Centennial, CO 80112 13104.00.000 100% CONSTRUCTION DOCUMENTS 07/25/2014 PERMIT SET 06/24/2014 ADDENDUM #1 07/25/2014 1 100% CD'S 07/25/2014 42406 MECHANICAL LEGEND NOTES AND M-000 ABBREVIATIONS COMPILED SET - ADDENDUM #1 THRU #6 03/10/2015

Issue/Revisions Date No. CURRENT/Shiloh House Project/08 MECH DWGS.pdf · diffusers type neck face max max symbol service model size size spd nc notes inches inches in wg s1 supply

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

MECHANICAL LEGEND

NOTES AND

M-000

ABBREVIATIONS

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015

DIFFUSERS

TYPE

NECK FACE MAX MAX

SYMBOL SERVICE MODEL SIZE SIZE SPD NC NOTES

INCHES INCHES IN WG

S1 SUPPLY DIFFUSER LAY IN GRID PRICE SEE DRAWINGS 24" X 24" SQUARE LOUVERED BLADES

S2 SUPPLY DIFFUSER HARD LID PRICE SEE DRAWINGS 24" X 24" SQUARE LOUVERED BLADES

S3 SLOT DIFFUSER HARD LID PRICE SEE DRAWINGS 3.75" X 96" 2 SLOT. 3/4" WIDE SLOTS

R1 RETURN GRILLE LAY IN GRID PRICE 22" X 10" 24" X 12" PERFORATED FACE

R2 RETURN GRILLE LAY IN GRID PRICE 22" X 22" 24" X 24" PERFORATED FACE

E1 EXHAUST REGISTER HARD LID PRICE SEE DRAWINGS NECK + 2" LOUVERED IN HORIZONTAL DIRECTION

T1 TRANSFER AIR GRILLE HARD LID PRICE SEE DRAWINGS NECK + 2" LOUVERED IN HORIZONTAL DIRECTION

T2 TRANSFER AIR GRILLE LAY IN GRID PRICE 22" 22" 24" X 24" PERFORATED FACE

NOTES:

7/22/2014

FANSMIN MOTOR OPER.

SYMBOL SYSTEM TYPE MODEL CFM ESP FAN SONES VOLTAGE DRIVE WEIGHT SIZE HEIGHT NOTES

SERVED INCHES RPM BHP HP RPM LBS WITH CURB

AT SL(IN) (IN)

EF-1 NORTH MAIN RESTROOMS ROOF TOP DOME GREENHECK CUBE-141-71,900

1.0 1560 12.0 208-3 BELT 0.64 3/4 1725 105 29" DIA 44

EF-2CAFÉ & CLASSROOM RESTROOMS

ROOF TOP DOME GREENHECK CUBE-141HP-51,000

1.0 1714 14.8 115-1 BELT 0.38 1/2 1725 105 29" DIA 44

EF-3 BOYS BATH ROOM IN LINE GREENHECK SQ-98-VG 300 0.5 1394 9.8 115-1 DIRECT 0.09 1/4 1725 62 21L x 15W 15 1

EF-4 GIRLS BATH ROOM IN LINE GREENHECK SQ-98-VG 300 0.5 1394 9.8 115-1 DIRECT 0.09 1/4 1725 62 21L x 15W 15 1

TF-1 MAIN ELECTRICAL ROOM IN LINE GREENHECK SQ-100-VG1,100

0.3 1524 9.2 115-1 DIRECT 0.14 1/4 1725 68 21L x 17W 17 1

TF-2 ELEVATOR SHAFT IN LINE GREENHECK SQ-130-VG1,200

0.3 1107 6.5 208-3 DIRECT 0.14 3/4 1725 84 21L x 21W 21 1

TF-3 2ND FLOOR DATA ROOM IN LINE GREENHECK SQ-100-VG1,100

0.3 1524 9.2 115-1 DIRECT 0.14 1/4 1725 68 21L x 17W 17 1

KEF-1 KITCHEN GREASE HOOD ROOF TOP UP BLAST ACCUREX XRUB-220HP-304,200

1.5 1107 208-3 1.88 3.0 1725 247 43" DIA. 662,3

NOTES: 1. PROVIDE DIRCT DRIVE MOTORS WITH VARIABLE SPEED BALANCING SWITCH

2. FAN SHOWN FOR REFERENCE ONLY. TO BE PROVIDED AND DELIVERED TO SITE BY GC.

3. WITH HINGED BASE, HEAT BAFFLES, GREASE TRAP, VENTILATED FACTORY CURB.7/22/2014

CABINET HEATERS - ELECTRICAIRSIDE

SYMBOL SERVICE MODEL CAPACITY CAPACITY VOLTAGE AMPS CFM EAT LAT WIDTH DEPTH HEIGHT WEIGHT NOTES

KW MBH F DEG. F DEG. (IN) (IN) (IN) (LBS)

ECUH-1 MAIN ENTRY VESTIBULE MARKEL 18 61.4 208-3 52.6 750 60 150 66 9 252,4

ECUH-2 EAST ENTRY MARKEL 12 40.9 208-3 35.1 500 60 150 46 9 25 1702,4

ECUH-3 SOUTH STAIR WELL MARKEL 12 40.9 208-3 35.1 500 60 150 46 9 25 1701,3

NOTES: 1. PROVIDE INTEGRAL THERMOSTAT. 3. PROVIDE TRIM AND HOUSING FOR SURFACE MOUTING.

2. PROVIDE TRIM FOR FULL CEILING RECESS MOUNTING. 4. PROVIDE REMOTE WALL MOUNTED THERMOSTAT.

7/22/2014

SERIES FAN POWERED BOX (FPB) & VAV BOX SCHEDULEBOX AIR SIDE ELECTRIC REHEAT COIL FAN POWERED BOX MOTOR

SYMBOL RTU SIZE INLET DISCHARGE DISCHARGE MODEL LOCATION MINIMUM CAPACITY EAT LAT MAX MIN FAN KW VOLTAGE STAGES WATTS HP CURRENT VOLTAGE MOP MCA ESP RPM WEIGHT NOTES

DIAMETER HEIGHT WIDTH (CFM) MBH F DEG F DEG CFM CFM FLOW AMPS INCHES LBS

FPB 1-1 RTU-1

7016 16 18.00 48.00 FDC8

2ND FLR 900

70.00 85.00 3600 900 3600 14.00 208-3 3 39.42

208-1 ECM

60.00 60.00

0.5

203

1,2

FPB 1-2 RTU-1

7016 16 18.00 48.00 FDC8

2ND FLR 900

70.00 85.00 3600 900 3600 14.00 208-3 3 39.42

208-1 ECM

60.00 60.00

0.5

203

1,2

FPB 1-3 RTU-1

7016 16 18.00 48.00 FDC8

2ND FLR 900

70.00 84.00 3750 900 3750 13.80 208-3 3 38.30

208-1 ECM

60.00 59.00

0.5

203

1,2

FPB 2-1 RTU-2

1005 5 10.00 12.00 FDC8

1ST FLR 300

55.00 103.00 300 300 350 4.50 208-3 3 12.49

208-1 ECM

20.00 17.00

0.5

86

1,2

FPB 2-2 RTU-2

2008 8 12.50 14.00 FPC6

1ST FLR 225

67.50 96.00 600 225 600 4.50 208-3 3 12.49

208-1 ECM

20.00 18.00

0.5

86

1,2

FPB 2-3 RTU-2

2008 8 12.50 14.00 FDC8

1ST FLR 150

69.00 104.00 500 150 500 4.60 208-3 3 12.77

208-1 ECM

20.00 18.00

0.5

86

1,2

VAV 2-4 RTU-2

8 8 10.00 12.00 SDV8

1ST FLR 180

600 180

N/A N/A

0

N/A N/A N/A

15

VAV 2-5 RTU-2

8 8 10.00 12.00 SDV8

1ST FLR 270

300 270

N/A N/A

0

N/A N/A N/A

15

VAV 2-13 RTU-2

8 8 10.00 12.00 SDV8

1ST FLR 250

600 250

N/A N/A

0

N/A N/A N/A

15

FPB 2-6 RTU-2

3008 8 10.00 12.00 FDCLP8

1ST FLR 195

69.00 96.00 650 195 650 4.60 208-3 3 12.77

208-1 ECM

20.00 19.00

0.5

88

1,2

FPB 2-7 RTU-2

1005 5 10.00 12.00 FDC8

2ND FLR 300

55.00 103.00 300 300 350 4.50 208-3 3 12.49

208-1 ECM

20.00 17.00

0.5

86

1,2

FPB 2-8 RTU-2

4010 10 15.00 16.00 FDC8

2ND FLR 360

69.00 90.00 1200 360 1200 6.60 208-3 3 18.32

208-1 ECM

35.00 31.00

0.5

132

1,2

FPB 2-9 RTU-2

2008 8 12.50 14.00 FDC8

2ND FLR 180

69.00 98.00 600 180 600 4.60 208-3 3 12.77

208-1 ECM

20.00 18.00

0.5

86

1,2

VAV 2-10 RTU-2

8 8 10.00 12.00 SDV8

2ND FLR 180

650 180

N/A N/A

0

N/A N/A N/A

15

VAV 2-11 RTU-2

8 8 10.00 12.00 SDV8

2ND FLR 240

800 240

N/A N/A

0

N/A N/A N/A

15

FPB 2-12 RTU-2

2008 8 12.50 14.00 FDC8

2ND FLR 135

69.00 95.00 450 135 450 3.10 208-3 2 8.60

208-1 ECM

15.00 13.00

0.5

86

1,2

FPB 3-1 RTU-3

4012 12 15.00 16.00 FDC8

1ST FLR 585

69.00 90.00 1950 585 1950 10.80 208-3 3 29.98

208-1 ECM

50.00 45.00

0.5

132

1,2

FPB 3-2 RTU-3

4012 12 15.00 16.00 FDC8

1ST FLR 540

69.00 90.00 1800 540 1800 10.00 208-3 3 27.76

208-1 ECM

45.00 43.00

0.5

132

1,2

FPB 3-3 RTU-3

3010 10 12.50 14.00 FDC8

1ST FLR 210

69.00 94.00 700 221 700 4.60 208-3 3 12.77

208-1 ECM

20.00 20.00

0.5

103

1,2

FPB 3-4 RTU-3

2008 8 12.50 14.00 FDC8

1ST FLR 150

69.00 104.00 500 150 500 4.60 208-3 3 12.77

208-1 ECM

20.00 18.00

0.5

86

1,2

FPB 3-5 RTU-3

2008 8 12.50 14.00 FDC8

1ST FLR 120

55.00 91.00 400 132 400 3.90 208-3 2 10.83

208-1 ECM

20.00 16.00

0.5

86

1,2

FPB 3-6 RTU-3

2008 8 12.50 14.00 FDC8

1ST FLR 120

55.00 91.00 400 132 400 3.90 208-3 2 10.83

208-1 ECM

20.00 16.00

0.5

86

1,2

VAV 3-7 RTU-3

8 8 10.00 12.00 SDV8

1ST FLR 225

750 225

N/A N/A

0

N/A N/A N/A

15

FPB 3-8 RTU-3

5012 12 17.50 20.00 FDC8

2ND FLR 600

69.00 90.00 2000 600 2000 11.10 208-3 3 30.81

208-1 ECM

50.00 46.00

0.5

147

1,2

FPB 3-9 RTU-3

4012 12 15.00 16.00 FDC8

2ND FLR 540

69.00 90.00 1800 540 1800 10.00 208-3 3 27.76

208-1 ECM

45.00 43.00

0.5

132

1,2

VAV 3-10 RTU-3

8 8 10.00 12.00 SDV8

2ND FLR 180

600 180

N/A N/A

0

N/A N/A N/A

15

VAV 4-1 with Elec Reheat RTU-4

8 8 10.00 12.00 SDV8

2ND FLR 240

55.00 104.00 800 240 4.60 208-3 3 12.77

N/A

20.00 17.00

0.5

43

1

FPB 4-2 RTU-4

2008 8 12.50 14.00 FDC8

2ND FLR 120

55.00 91.00 400 132 400 3.90 208-3 2 10.83

208-1 ECM

20.00 16.00

0.5

86

1,2

FPB 4-3 RTU-4

2008 8 12.50 14.00 FDC8

2ND FLR 150

69.00 104.00 500 150 500 4.60 208-3 3 12.77

208-1 ECM

20.00 18.00

0.5

86

1,2

FPB 4-4 RTU-4

3010 10 12.50 14.00 FDC8

2ND FLR 240

69.00 91.00 800 240 800 4.60 208-3 3 12.77

208-1 ECM

20.00 20.00

0.5

103

1,2

FPB 4-5 RTU-4

2008 8 12.50 14.00 FDC8

2ND FLR 135

69.00 95.00 450 135 450 3.10 208-3 2 8.60

208-1 ECM

15.00 13.00

0.5

86

1,2

NOTES: 1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.

2. PROVIDE INTEGRAL TRANSFORM FOR MOTOR VOLTAGE STEP DOWN WHEN NECESSARY.

7/23/2014

LOUVERS

SERVICE

DIMENSIONS

SYMBOL LENGTH HEIGHT DEPTH CFM VELOCITY PRESS DROP MATERIAL FREE AREA MODEL NOTES

INCHES INCHES INCHES FPM IN. WG SQFT

L-1 ELEVATOR SHAFT SMOKE RELIEF 40 24 6 ALUM 3.43 RUSKIN ELF6375DXH1,2,3,4,6

L-2 ELEVATOR SHAFT COOLING FAN OUTLET 36 24 61,200

415 0.05 ALUM 2.92 RUSKIN ELF6375DXH1,2,3,5

NOTES: 1. 37.5 DEG DRAINABLE BLADES. 4. PROVIDE SHEET METAL PLENUM AND MOTORIZED DAMPER.

2. PROVIDE BIRD SCREEN. 5. PROVIDE SHEET METAL TRANSITION TO FAN AND BACKDRAFT DAMPER.

3. COLOR PER ARCHITECT. 6. LOUVER TO HAVE MINIMUM 3 SQUARE FEET FREE AREA.

4. COORINDATE LOCATION WITH ARCHITECTURAL WALL DESIGN AND ELEVATIONS.

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

MECHANICAL

SCHEDULES

M-010

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

MECHANICAL

SCHEDULES

M-011

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

MECHANICAL

DETAILS

M-020

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015

UP

UP

169 SF

CONFERENCE1403

93 SF

OFFICE1402

92 SF

OFFICE1401

110 SF

OFFICE1304

165 SF

CONFERENCE1302

103 SF

OFFICE1301

78 SF

ELECT.1101

117 SF

PUMP ROOM1100

88 SF

PANTRY1001

182 SF

STAIR AA

208 SF

MEN'SRESTROOM

1201

208 SF

WOMEN'SRESTROOM

1202

440 SF

CONFERENCE1451

44 SF

JANITOR1111

60 SF

DATA1112

23 SF

ELECT.1701

115 SF

OFFICE1407

156 SF

OFFICE1405

157 SF

OFFICE1404

83 SF

ELEVATOR1120

64 SF

STORAGE1121

152 SF

OFFICE1461

117 SF

WOMEN'SRESTROOM

1130 119 SF

MEN'SRESTROOM

1131

188 SF

CONFERENCE1462

124 SF

OFFICE1463

116 SF

OFFICE1464

574 SF

CAFETERIA1720

142 SF

COFFEE PREP.1730

864 SF

KITCHEN1700

226 SF

STAIR BB

1032 SF

LOBBY1501

209 SF

HALLWAY1400

222 SF

HALLWAY1300

1200 SF

PRE-FUNCTION1502

234 SF

HALLWAY1520

114 SF

HALLWAY1521

185 SF

HALLWAY1450

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

2

2

3 3

4 4

5

5

6 6

7 7

8 8

9

9

10 10

11 11

12 12

13 13

14 14

101 SF

OFFICE1409

K

K

2700 SF

CONFERENCEHALL1000

340 SF

CAFE1731

95 SF

OFFICE1602

121 SF

OFFICE1601

94 SF

OFFICE1603

139 SF

OFFICE1604

121 SF

OFFICE1605 215 SF

CONFERENCEROOM1606

1 1

68 SF

DRY STORAGE1465

33 SF

TRASH ROOM1702

137 SF

OFFICE1408

71 SF

STORAGE1002

99 SF

HALLWAY1003

26 SF

WATER HEATER1466

105 SF

VESTIBULE1004

C.6

C.6

M-101

FIRST FLOOR

MECHANICAL PLAN

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015

DN

DN

UP

402 SF

CONFERENCE2150

184 SF

WOMEN'SRESTROOM

2202

183 SF

MEN'SRESTROOM

2201

410 SF

CORRIDOR2000

188 SF

CONFERENCE2001

48 SF

STAIR A1

122 SF

OFFICE2002

122 SF

OFFICE2003

118 SF

OFFICE2004

115 SF

OFFICE2005

118 SF

OFFICE2006

118 SF

OFFICE2101

131 SF

OFFICE2102

262 SF

CONFERENCE2103

120 SF

OFFICE2107

44 SF

JANITOR2110

60 SF

DATA2111

20 SF

ELECTRICAL2132

114 SF

OFFICE2106

153 SF

OFFICE2105

206 SF

OFFICE2104

203 SF

CORRIDOR2100

444 SF

TRAINING ROOM2311

352 SF

TRAINING ROOM2300

157 SF

COMPUTER LAB2301

362 SF

TRAINING ROOM2302

78 SF

TIME-OUT ROOM2320

65 SF

BOYSBATHROOM

2410

262 SF

QUAD ROOM2420

124 SF

SINGLE ROOM2430

127 SF

SINGLE ROOM2440 127 SF

SINGLE ROOM2450

121 SF

SINGLE ROOM2460

265 SF

QUAD ROOM2470

228 SF

STAIR B2

1036 SF

LIVING AREA2400

452 SF

TRAINING ROOM2312

385 SF

HALLWAY2200

114 SF

MEN'SRESTROOM

2131115 SF

WOMEN'SRESTOOM

2130

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

2 2

3 3

4

4

5

5

6 6

7 7

8 8

9

9

10 10

11 11

12 12

13 13

14 14

26 SF

LAUNDRY2401

82 SF

STORAGE2112

K

K

1 1

C.6

C.6

110 SF

GIRLSBATHROOM

2480

26 SF

JANITOR2321

M-102

SECOND FLOOR

MECHANICAL PLAN

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

1 1

2 2

3 3

4 4

5

5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

K

K

5

6

7

8

9

10

11

12

13

14

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

1 1

2 2

3 3

4 4

5

5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

K

K

5

6

7

8

9

10

11

12

13

14

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

1 1

2 2

3 3

4 4

5

5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

K

K

5

6

7

8

9

10

11

12

13

14

DPA Project:

Sheet Number:

COPYRIGHT 2013 - DAVIS PARTNERSHIP, P.C.

Sheet Title:

2301 Blake Street, Suite 100

Denver, CO 80205 303.861.8555

0225 Main Street, Unit C101

Edwards, CO 81632 970.926.8960

Denver

Vail

Consultant

Issue/Revisions Date No.

Sheet Information

Project Information

1

A

B

C

D

E

2 3 4 5 6

A

B

C

D

E

1 2 3 4 5 6

Shilo

h H

ouse

97

00

E

. E

aste

r L

an

e

Ce

nte

nn

ia

l, C

O 8

01

12

13104.00.000

100%

CONSTRUCTION

DOCUMENTS07/25/2014

PERMIT SET 06/24/2014ADDENDUM #1 07/25/2014 1100% CD'S 07/25/2014

42406

M-103

ROOF MECHANICAL

PLAN

COMPILED SET -ADDENDUM #1 THRU #6

03/10/2015