1 5 0 m m T H K 2 5 MP a R C S L A B RE I N F O RCE D IJ 100mm THK APRON SLAB 100mm THK APRON SLAB IJ 100mm THK APRON SLAB IJ NOTE: APRON SLABS TO BE CAST IN ALTERNATE PANELS NOT EXCEEDING 2 METRES IN LENGTH. ALL JOINTS BETWEEN APRON SLAB PANELS AND BETWEEN APRON SLABS AND THE RAFT SLAB ARE TO BE 10MM JONTS WITH 10MM THICK BITUMEN IMPREGNATED SOFTBOARD SEALED WITH POLYURETHANE JOINT SEALANT. 2400MM PANELS WITH 10MM SOFTBOARD JOINTS WITH POLYURETHANE JOINT SEALANT. IJ IJ IJ IJ IJ IJ IJ 100mm THK APRON SLAB 100mm THK APRON SLAB 100mm THK APRON SLAB 100mm THK APRON SLAB 100mm THK APRON SLAB RAMP 1:12 SLOPE (BROOM FINISH) 85mm STEP 85mm STEP 85mm STEP 85mm STEP 85mm STEP 85mm STEP 85mm STEP 150mm T HK 25M P a R C S LA B R E INF O R CE D 1 5 0mm TH K 25 MP a R C S L A B R E I N F OR C ED 15 0mm T HK 25MP a RC SLA B R EI N FORCED IJ IJ IJ IJ IJ IJ IJ IJ IJ IJ IJ IJ IJ IJ IJ 5 % MIN 5 % MIN 5 % MIN 5 % MIN 5 % MIN 5 % MIN 5 % MIN 5 % MIN IJ IJ 1220 11320 4220 10430 1220 4350 1420 1220 9900 7140 8930 1220 1773 1420 1773 2577 28410 3660 2110 2110 3660 RAMP 1:12 SLOPE (BROOM FINISH) FFL 0 250 MICRON USB GREEN DPM RIP & RECOMPACT 200mm IN - SITU LAYER TO 93% MOD AASHTO ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT 250 MICRON USB GREEN DPM RIP & RECOMPACT 200mm IN - SITU LAYER TO 93% MOD AASHTO 1000 300 920 300 3100 300 3550 300 3470 300 4220 300 3580 300 3660 300 1990 300 920 300 1000 1000 1220 25970 1220 1000 500 150 350 FFL 0 7770 250 MICRON USB GREEN DPM RIP & RECOMPACT 200mm IN - SITU LAYER TO 93% MOD AASHTO ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT A AB - WTH01 A AB - WTH01 B AB - WTH01 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam 300 2593 300 2277 300 5770 300 1120 300 3750 300 300 3750 300 1120 300 300 1120 300 1640 300 1810 300 300 1120 300 1640 300 1810 300 300 1120 300 3750 300 300 3750 300 1120 300 300 2593 300 2277 300 300 920 300 3100 300 3550 300 3470 300 4220 300 3580 300 3660 300 1990 300 920 300 28410 300 x 500 Deep Concrete Beam 300 x 500 Deep Concrete Beam 1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS. 2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS. 4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL). 5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED. 6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC. 7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS. 8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6. 9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200. 10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING. 11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE. 12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED. GENERAL NOTES: NZ 06/11/19 NZ KW Revision Rev Date Auth by Chkd by Rev by by App Rev Drawing No. Project Director Designed by Checked by Drawn by Scale : As Noted ABLUTION BLOCK Title Approved Date KASERNE TAXI HOLDING FACILITY FOR ERF 1230 DOORNFONTEIN No.:92-IR CITY AND SUBURBAN x10 1st Floor, Block C, Unit 7 Willow Wood Office Park 220 Third Street, Chartwell, FOURWAYS, 2191 Tel: +27 11 568 1318 Fax: +27 86 633 4995 Cell: +27 82 577 1299 eMail: [email protected] Client 04 STR PROJECT PHASE REVISION DISCIPLINE BLOCK / SERIES / SUFFIX A DA06 AB - WTH01 REV DATE DESCRIPTION A 06-11-2019 KW TENDER DRAWING 1. All reinforcement to be checked and approved by the engineer before any concrete is cast. 2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted. 3. Reinforcing yield strength: High tensile 'y' .................................................. 450 MPa Mild steel 'r' ...................................................... 250 MPa Welded steel wire mesh .................................... 485 MPa FOUNDATIONS 1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE. 2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL). 3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER. CONCRETE 4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH: BLINDING ....................................................................... 15 MPa FOUNDATIONS ................................................................. 30 MPa COLUMNS ...................................................................... 30 MPa SUSPENDED SLABS & BEAMS ....................................... 30 MPa GROUND SLABS .............................................................. 25 MPa 5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm 6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING. 7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001- CC1. 8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL. 9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER. 10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER. 11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED. 12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF. 13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER. 14. MINIMUM COVER TO REINFORCING: FOUNDATIONS .................................................................... 50mm COLUMNS .......................................................................... 30mm SUSPENDED SLABS & BEAMS .......................................... 20mm WALLS, RETAINING WALLS ................................................. 40mm 15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE. CONCRETE NOTES: REINFORCEMENT ISSUED FOR TENDER PURPOSES ONLY NZ GROUND PLAN SCALE 1 : 50 ELEVATION A - A SCALE 1 : 50 ELEVATION B - B SCALE 1 : 50 SECTIONAL VIEW RAFT SLAB BEAM LAYOUT SCALE 1 : 50

ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

150mm THK 25MPa RC SLAB REINFORCED

IJ

10

0m

m T

HK

A

PR

ON

SLA

B

100mm THK APRON SLAB

IJ

100mm THK APRON SLAB

IJ

NOTE:

APRON SLABS TO BE CAST IN ALTERNATE PANELS NOT EXCEEDING 2 METRES IN LENGTH. ALL JOINTS BETWEEN APRON SLAB PANELS AND BETWEEN APRON SLABS AND THE RAFT SLAB ARE TO BE 10MM JONTS WITH 10MM THICK BITUMEN IMPREGNATED SOFTBOARD SEALED WITH POLYURETHANE JOINT SEALANT. 2400MM PANELS WITH 10MM SOFTBOARD JOINTS WITH POLYURETHANE JOINT SEALANT.

IJ

IJ

IJ

IJ

IJ

IJ

IJ

100mm THK APRON SLAB

10

0m

m T

HK

A

PR

ON

SLA

B

10

0m

m T

HK

A

PR

ON

SLA

B

100mm THK APRON SLAB

10

0m

m T

HK

A

PR

ON

SLA

B

RAMP 1:12 SLOPE

(BROOM FINISH)

85m

m S

TE

P

85m

m S

TE

P

85mm STEP

85mm STEP85mm STEP

85m

m S

TE

P

85m

m S

TE

P

150mm THK 25MPa RC SLAB REINFORCED

150mm THK 25MPa RC SLAB REINFORCED

150mm THK 25MPa RC SLAB REINFORCED

IJ

IJ IJ

IJ

IJ

IJ

IJ

IJ

IJ

IJ IJ IJ IJ

IJIJ 5 %

MIN

5 % MIN

5 % MIN

5 %

MIN

5 %

MIN

5 %

MIN

5 % MIN

5 % MIN

IJ IJ

1220 11320 4220 10430 1220

4350

1420

1220 9900 7140 8930 1220

1773

1420

1773

2577

28410

3660

2110

2110

3660

RAMP 1:12 SLOPE

(BROOM FINISH)

FFL

0

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER

WITH POLYURETHANE JOINT SEALANT ISOLATION JOINT 10mm

SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

250 MICRON USB GREEN DPM RIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD

AASHTO

1000 300 920 300 3100 300 3550 300 3470 300 4220 300 3580 300 3660 300 1990 300 920 300 1000

1000 1220 25970 1220 1000

500

150

350

FFL

0

7770

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

A

AB - WTH01

A

AB - WTH01

B

AB - WTH01

300 x 500 Deep Concrete Beam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x 500 Deep Concrete Beam

300 x 500 Deep Concrete Beam

300 x 500 Deep Concrete Beam

300 x 500 Deep Concrete Beam

300 x 500 Deep Concrete Beam300 x 415 Deep Concrete Beam 300 x 415 Deep Concrete Beam

300 x

415 D

eep C

oncre

te B

eam

300 x

415 D

eep C

oncre

te B

eam

300 x 415 Deep Concrete Beam

300 x 415 Deep Concrete Beam300 x 415 Deep Concrete Beam

300

2593

300

2277

300

5770

300

1120

300

3750

300

300

3750

300

1120

300

300

1120

300

1640

300

1810

300

300

1120

300

1640

300

1810

300

300

1120

300

3750

300

300

3750

300

1120

300

300

2593

300

2277

300

300 920 300 3100 300 3550 300 3470 300 4220 300 3580 300 3660 300 1990 300 920 300

28410

300 x 500 Deep Concrete Beam

300 x 500 Deep Concrete Beam

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/19

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

ABLUTION BLOCK

Title

Approved

Date

KASERNE TAXI HOLDING FACILITY

FOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 AB - WTH01

REV DATE DESCRIPTION

A 06-11-2019 KWTENDER DRAWING

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

ISSUED FOR TENDER

PURPOSES ONLY

NZ

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION B-BSCALE 1 : 50

SECTIONAL VIEW

RAFT SLAB BEAM LAYOUTSCALE 1 : 50

Page 2: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

150mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 245 TOP & BOTTOM

RAMP 1:12 SLOPE

RAMP 1:12 SLOPE

150mm THK 25MPa CONCRETE RC SLAB

WITH MESH REF. 245 TOP & BOTTOM

150mm THK 25MPa CONCRETE RC SLAB

WITH MESH REF. 245 TOP & BOTTOM

150mm THK 25MPa

CONCRETE RC SLAB WITH

MESH REF. 245 TOP &

BOTTOM

100mm THK 25MPa CONCRETE

RC SLAB WITH MESH REF. 100

150mm THK 25MPa CONCRETE RC SLAB

WITH MESH REF. 245 TOP & BOTTOM

100m

m T

HK

25M

Pa C

ON

CR

ET

E

RC

SLA

B W

ITH

ME

SH

RE

F. 1

00

100m

m T

HK

25M

Pa C

ON

CR

ET

E

RC

SLA

B W

ITH

ME

SH

RE

F. 1

00

100m

m T

HK

25M

Pa C

ON

CR

ET

E

RC

SLA

B W

ITH

ME

SH

RE

F. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E

RC

SLA

B W

ITH

ME

SH

RE

F. 100

46 -R10 @250 mm -04 43 -R10 @250 mm -24

12 -R10 @250 mm -34

6 -R10 @250 mm -40

6 -R10 @250 mm -406 -R10 @250 mm -40

6 -R10 @250 mm -45 6 -R10 @250 mm -45

6 -R10 @250 mm -40 6 -R10 @250 mm -40 6 -R10 @250 mm -40

12 -R10 @250 mm -34

3 x Y12 -36

2 x Y12 -35 2 x Y12 -35 2 x Y12 -41 2 x Y12 -41 2 x Y12 -41 2 x Y12 -46 2 x Y12 -46 2 x Y12 -41 2 x Y12 -41 2 x Y12 -412 -Y12 -38 2 -Y12 -38 2 -Y12 -38

3 x Y12 -36 3 x Y12 -42 3 x Y12 -42 3 x Y12 -42 3 x Y12 -47 3 x Y12 -47 3 x Y12 -42 3 x Y12 -42 3 x Y12 -42

2 -Y12 -38 2 -Y12 -38 2 -Y12 -38

3 -Y12 -393 -Y12 -393 -Y12 -393 -Y12 -393 -Y12 -39

2 -Y12 -25

2 -Y12 -27

2 -Y12 -26

2 -Y12 -28

2 -Y12 -07

2 -Y12 -09

2 -Y12 -05

2 -Y12 -08

40

30

40

30

40

40

B

AB - WTH02

B

AB - WTH02

F

AB - WTH03

BE

AM

10

BEAM 02

BEAM 02

BEAM 05

BEAM 06

BEAM 07

BEAM 07

BE

AM

10

BE

AM

10

BE

AM

10

BE

AM

10

BE

AM

10

BE

AM

12

BE

AM

12

BE

AM

12

BE

AM

12

BE

AM

12

BE

AM

12

BE

AM

11

BE

AM

11

BE

AM

11

BE

AM

11

BE

AM

11

BE

AM

11

BE

AM

09

BE

AM

09

BEAM 03 BEAM 08

BEAM 01BEAM 01

C

AB - WTH02

C

AB - WTH02

A

AB - WTH02

A

AB - WTH02

E

AB - WTH03

BEAM 04

G

AB - WTH03

6 -R10 @250 mm -01

46 -R10 @250 mm -04

46 -R10 @250 mm -04

45 -R10 @250 mm -10

18 -R10 @250 mm -15

20 -R10 @250 mm -18

30 -R10 @250 mm -21

43 -R10 @250 mm -24

43 -R10 @250 mm -24

42 -R10 @250 mm -29

6 -R10 @250 mm -01

12 -

R10 @

250 m

m -

34

16 -

R10 @

250 m

m -

37

16 -

R10 @

250 m

m -

37

16 -

R10 @

250 m

m -

37

16 -

R10 @

250 m

m -

37

16 -

R10 @

250 m

m -

37

16 -

R10 @

250 m

m -

37

6 -

R10 @

250 m

m -

40

6 -

R10 @

250 m

m -

40

6 -

R10 @

250 m

m -

40

6 -

R10 @

250 m

m -

40

6 -

R10 @

250 m

m -

40

6 -

R10 @

250 m

m -

40

6 -

R10 @

250 m

m -

45

9 -

R10 @

250 m

m -

43

8 -

R10 @

250 m

m -

44

9 -

R10 @

250 m

m -

43

8 -

R10 @

250 m

m -

44

6 -

R10 @

250 m

m -

45

12 -

R10 @

250 m

m -

34

2 -Y12 -38T3 -Y12 -39B 2 -Y12 -38T

3 -Y12 -39B

2 -Y12 -38T3 -Y12 -39B

2 -Y12 -46T

3 -Y12 -47B

2 -Y12 -46T

3 -Y12 -47B

2 -Y12 -38T

3 -Y12 -39B

2 -Y12 -38T

3 -Y12 -39B

2 -Y12 -38T3 -Y12 -39B

2 -Y12 -41T

3 -Y12 -42B

2 -Y12 -41T

3 -Y12 -42B

2 -Y12 -46T

3 -Y12 -47B

2 -Y12 -46T

3 -Y12 -47B

2 -Y12 -19T 2 -Y12 -20B

2 -Y12 -41T

3 -Y12 -42B

2 -Y12 -41T

3 -Y12 -42B

2 -Y12 -41T

3 -Y12 -42B

2 -Y12 -41T

3 -Y12 -42B

2 -Y12 -35T3 -Y12 -36B

3 -Y12 -36B

2 -Y12 -35T

2 -Y12 -05T 2 -Y12 -08B2 -Y12 -07T 2 -Y12 -09B

2 -Y12 -05T 2 -Y12 -08B 2 -Y12 -07T 2 -Y12 -09B

2 -Y12 -11T 2 -Y12 -13B 2 -Y12 -12T 2 -Y12 -14B

2 -Y12 -02T2 -Y12 -03B

2 -Y12 -16T 2 -Y12 -17B

2 -Y12 -22T 2 -Y12 -23B

2 -Y12 -25T 2 -Y12 -27B 2 -Y12 -26T 2 -Y12 -28B

2 -Y12 -25T 2 -Y12 -27B 2 -Y12 -26T

2 -Y12 -28B

2 -Y12 -30T 2 -Y12 -32B

2 -Y12 -31T 2 -Y12 -33B

2 -Y12 -02T2 -Y12 -03B

D

AB - WTH03

BEAM 13 BEAM 14

H

AB - WTH03

H

AB - WTH0314 -R10 @250 mm -48

2 -Y12 -49T2 -Y12 -50B

9 -R10 @250 mm -51

2 -Y12 -52T2 -Y12 -53B

45 -R10 @250 mm -10 30 -R10 @250 mm -21 42 -R10 @250 mm -29

12 -R10 @250 mm -34

6 -R10 @250 mm -40 6 -R10 @250 mm -40 6 -R10 @250 mm -40 6 -R10 @250 mm -45 6 -R10 @250 mm -45 6 -R10 @250 mm -40

6 -R10 @250 mm -40 6 -R10 @250 mm -40

12 -R10 @250 mm -34

2 x Y12 -35

3 x Y12 -36

2 x Y12 -41

3 x Y12 -42

2 x Y12 -41

3 x Y12 -42

2 x Y12 -41

3 x Y12 -42

2 x Y12 -46

3 x Y12 -47

2 x Y12 -46

3 x Y12 -47

2 x Y12 -41

3 x Y12 -42

2 x Y12 -41

3 x Y12 -42 3 x Y12 -42

2 x Y12 -41 2 x Y12 -35

3 x Y12 -36

2 -Y12 -11

2 -Y12 -13

2 -Y12 -12

2 -Y12 -14

2 -Y12 -22

2 -Y12 -23

2 -Y12 -30

2 -Y12 -32

2 -Y12 -31

2 -Y12 -33

40

40

30

30

40

40

16 -R10 @250 mm -37 16 -R10 @250 mm -37 16 -R10 @250 mm -37 9 -R10 @250 mm -43 9 -R10 @250 mm -43 16 -R10 @250 mm -37 16 -R10 @250 mm -37

16 -R10 @250 mm -37 2 x Y12 -38 2 x Y12 -38 2 x Y12 -38 2 x Y12 -38 2 x Y12 -38 2 x Y12 -38 2 x Y12 -38 2 x Y12 -46 2 x Y12 -46 2 x Y12 -38 2 x Y12 -38 2 x Y12 -38

3 x Y12 -39 3 x Y12 -39 3 x Y12 -39 3 x Y12 -47 3 x Y12 -47 3 x Y12 -39 3 x Y12 -39 3 x Y12 -39

30

40

40

30

40

40

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/19

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

ABLUTION BLOCK

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06

REV DATE DESCRIPTION

A 06-11-2019 KWTENDER DRAWING

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

ISSUED FOR TENDER PURPOSES ONLY

NZ

AB - WTH02

GROUND PLANSCALE 1 : 50

RAFT SLAB BEAM LAYOUTSCALE 1 : 50

SECTION A-ASCALE 1 : 50

SECTION B-BSCALE 1 : 50

SECTION C-CSCALE 1 : 50

Page 3: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

16 -R10 @250 mm -37 6 -R10 @250 mm -40

2 x Y12 -05 2 x Y12 -02 2 x Y12 -05 2 x Y12 -11

2 x Y12 -08 2 x Y12 -03 2 x Y12 -08 2 x Y12 -13

2 -Y12 -38

3 -Y12 -39

2 -Y12 -41

3 -Y12 -42

46 -R10 @250 mm -04

6 -R10 @250 mm -01 46 -R10 @250 mm -04

45 -R10 @250 mm -10

30

40

40

30

40

40

16 -R10 @250 mm -37 6 -R10 @250 mm -40

2 x Y12 -07 2 x Y12 -07 2 x Y12 -12

2 x Y12 -09 2 x Y12 -09 2 x Y12 -14

2 -Y12 -38

3 -Y12 -39

2 -Y12 -41

3 -Y12 -42

46 -R10 @250 mm -04

46 -R10 @250 mm -0445 -R10 @250 mm -10

30

40

40

30

40

40

9 -R10 @250 mm -43 8 -R10 @250 mm -44 6 -R10 @250 mm -45

2 x Y12 -07 2 x Y12 -19 2 x Y12 -07 2 x Y12 -22

2 x Y12 -09 2 x Y12 -20 2 x Y12 -09 2 x Y12 -23

2 -Y12 -46

3 -Y12 -47

46 -R10 @250 mm -04

20 -R10 @250 mm -18

46 -R10 @250 mm -04

30 -R10 @250 mm -21

2 -Y12 -16

2 -Y12 -17

30

40

40

30

40

40

18 -R10 @250 mm -15

12 -R10 @250 mm -34

2 x Y12 -02 2 x Y12 -11

2 x Y12 -03 2 x Y12 -13

2 -Y12 -35

3 -Y12 -36

6 -R10 @250 mm -01 45 -R10 @250 mm -10

30

40

40

30

40

40

14 -R10 @250 mm -486 -R10 @250 mm -01

3 x Y12 -36

2 x Y12 -35

3 x Y12 -39

2 x Y12 -38

3 x Y12 -39

2 x Y12 -382 -Y12 -02

2 -Y12 -03

2 -Y12 -49

2 -Y12 -506 -R10 @250 mm -01

16 -R10 @250 mm -37 16 -R10 @250 mm -37

30

40

40

30

40

40

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/19

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

ABLUTION BLOCK

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06

REV DATE DESCRIPTION

A 06-11-2019 KWTENDER DRAWING

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

ISSUED FOR TENDER PURPOSES ONLY

NZ

AB - WTH03

Rebar Schedule

MemberNo.Of

BarsPer

Memb Dia LengthTotal

Number Mark S C A B C D

BEAM 01 2 6 R10 1230 mm 12 01 60 220 mm 370 mm 0 mm 0 mm

BEAM 01 2 2 Y12 3670 mm 4 02 37 100 mm 3600 mm 0 mm 0 mm

BEAM 01 2 2 Y12 3670 mm 4 03 37 100 mm 3600 mm 0 mm 0 mm

BEAM 02 2 46 R10 1360 mm 92 04 60 220 mm 430 mm 0 mm 0 mm

BEAM 02 2 2 Y12 6070 mm 4 05 37 100 mm 6000 mm 0 mm 0 mm

BEAM 02 2 2 Y12 5850 mm 4 07 37 100 mm 5780 mm 0 mm 0 mm

BEAM 02 2 2 Y12 6070 mm 4 08 37 100 mm 6000 mm 0 mm 0 mm

BEAM 02 2 2 Y12 5850 mm 4 09 37 100 mm 5780 mm 0 mm 0 mm

BEAM 03 1 45 R10 1230 mm 45 10 60 220 mm 370 mm 0 mm 0 mm

BEAM 03 1 2 Y12 6070 mm 2 11 37 100 mm 6000 mm 0 mm 0 mm

BEAM 03 1 2 Y12 6270 mm 2 12 37 100 mm 6200 mm 0 mm 0 mm

BEAM 03 1 2 Y12 6070 mm 2 13 37 100 mm 6000 mm 0 mm 0 mm

BEAM 03 1 2 Y12 6270 mm 2 14 37 100 mm 6200 mm 0 mm 0 mm

BEAM 04 1 18 R10 1230 mm 18 15 60 220 mm 370 mm 0 mm 0 mm

BEAM 04 1 2 Y12 5510 mm 2 16 38 100 mm 5380 mm 100 mm 0 mm

BEAM 04 1 2 Y12 5510 mm 2 17 38 100 mm 5380 mm 100 mm 0 mm

BEAM 05 1 20 R10 1360 mm 20 18 60 220 mm 430 mm 0 mm 0 mm

BEAM 05 1 2 Y12 4880 mm 2 19 38 100 mm 4740 mm 100 mm 0 mm

BEAM 05 1 2 Y12 4880 mm 2 20 38 100 mm 4740 mm 100 mm 0 mm

BEAM 06 1 30 R10 1360 mm 30 21 60 220 mm 430 mm 0 mm 0 mm

BEAM 06 1 2 Y12 7200 mm 2 22 38 100 mm 7060 mm 100 mm 0 mm

BEAM 06 1 2 Y12 7370 mm 2 23 38 100 mm 7230 mm 100 mm 0 mm

BEAM 07 2 43 R10 1360 mm 86 24 60 220 mm 430 mm 0 mm 0 mm

BEAM 07 2 2 Y12 6070 mm 4 25 37 6000 mm 100 mm 0 mm 0 mm

BEAM 07 2 2 Y12 4960 mm 4 26 37 4890 mm 100 mm 0 mm 0 mm

BEAM 07 2 2 Y12 6070 mm 4 27 37 6000 mm 100 mm 0 mm 0 mm

BEAM 07 2 2 Y12 5000 mm 4 28 37 4930 mm 100 mm 0 mm 0 mm

BEAM 08 1 42 R10 1230 mm 42 29 60 220 mm 370 mm 0 mm 0 mm

BEAM 08 1 2 Y12 6610 mm 2 30 37 6540 mm 100 mm 0 mm 0 mm

BEAM 08 1 2 Y12 4760 mm 2 31 37 4690 mm 100 mm 0 mm 0 mm

BEAM 08 1 2 Y12 6610 mm 2 32 37 6540 mm 100 mm 0 mm 0 mm

BEAM 08 1 2 Y12 4760 mm 2 33 37 4690 mm 100 mm 0 mm 0 mm

BEAM 09 2 12 R10 1230 mm 24 34 60 220 mm 370 mm 0 mm 0 mm

BEAM 09 2 2 Y12 3250 mm 4 35 38 100 mm 3110 mm 100 mm 0 mm

BEAM 09 2 3 Y12 3250 mm 6 36 38 100 mm 3110 mm 100 mm 0 mm

BEAM 10 6 16 R10 1360 mm 96 37 60 220 mm 430 mm 0 mm 0 mm

BEAM 10 6 2 Y12 4410 mm 12 38 38 100 mm 4270 mm 100 mm 0 mm

BEAM 10 6 3 Y12 4500 mm 18 39 38 100 mm 4360 mm 100 mm 0 mm

BEAM 11 6 6 R10 1230 mm 36 40 60 370 mm 220 mm 0 mm 0 mm

BEAM 11 6 2 Y12 1560 mm 12 41 38 100 mm 1420 mm 100 mm 0 mm

BEAM 11 6 3 Y12 1560 mm 18 42 38 100 mm 1420 mm 100 mm 0 mm

BEAM 12 2 9 R10 1360 mm 18 43 60 430 mm 220 mm 0 mm 0 mm

BEAM 12 2 8 R10 1360 mm 16 44 60 430 mm 220 mm 0 mm 0 mm

BEAM 12 2 6 R10 1360 mm 12 45 60 430 mm 220 mm 0 mm 0 mm

BEAM 12 2 2 Y12 5810 mm 4 46 38 100 mm 5670 mm 100 mm 0 mm

BEAM 12 2 3 Y12 5810 mm 6 47 38 100 mm 5670 mm 100 mm 0 mm

BEAM 13 1 14 R10 1360 mm 14 48 60 220 mm 430 mm 0 mm 0 mm

BEAM 13 1 2 Y12 3760 mm 2 49 38 100 mm 3620 mm 100 mm 0 mm

BEAM 13 1 2 Y12 3760 mm 2 50 38 100 mm 3620 mm 100 mm 0 mm

BEAM 14 1 9 R10 1360 mm 9 51 60 220 mm 430 mm 0 mm 0 mm

BEAM 14 1 2 Y12 2650 mm 2 52 38 100 mm 2510 mm 100 mm 0 mm

BEAM 14 1 2 Y12 2650 mm 2 53 38 100 mm 2510 mm 100 mm 0 mm

SECTION D-DSCALE 1 : 30

SECTION E-ESCALE 1 : 30

SECTION F-FSCALE 1 : 30

SECTION G-GSCALE 1 : 30

PERSPECTIVE

BEAM 09

BEAM 09

BEAM 02

BEAM 02

BEAM 01

BEAM 10

BEAM 10

BEAM 10

BEAM 10

BEAM 10

BEAM 10

BEAM 03

BEAM 04

BEAM 05

BEAM 06

BEAM 07

BEAM 07

BEAM 08

BEAM 01

BEAM 11

BEAM 11

BEAM 11

BEAM 11

BEAM 11

BEAM 11

BEAM 12

BEAM 12

SECTION H-HSCALE 1 : 30

BEAM 13

BEAM 14

Page 4: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

A

AO - WTH01

A

AO - WTH01

B

AO - WTH01

B

AO - WTH01

10

0m

m T

HK

A

PR

ON

SLA

B

10

0m

m T

HK

A

PR

ON

SLA

B

100mm THK APRON SLAB

100mm THK APRON SLAB

5 %

MIN

5 %

MIN

5 % MIN5 % MIN

IJ IJ

IJ

IJ

150mm

THK 25MPa R

C SLAB R

EINFORCED

NOTE:

APRON SLABS TO BE CAST IN ALTERNATE PANELS NOT EXCEEDING 2 METRES IN LENGTH. ALL JOINTS BETWEEN APRON SLAB PANELS AND BETWEEN APRON SLABS AND THE RAFT SLAB ARE TO BE 10MM JONTS WITH 10MM THICK BITUMEN IMPREGNATED SOFTBOARD SEALED WITH POLYURETHANE JOINT SEALANT. 2400MM PANELS WITH 10MM SOFTBOARD JOINTS WITH POLYURETHANE JOINT SEALANT.

FFL

0

250 MICRON USB GREEN DPM

1000300506030051403001000

150

350

500

RIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

FFL

0

1000 300 3340 300 3360 300 1000

350

150

500

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

A

AO - WTH01

A

AO - WTH01

B

AO - WTH01

B

AO - WTH01

300 x 500 DEEP CONCRETE BEAM

300 x 500 DEEP CONCRETE BEAM

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x 500 DEEP CONCRETE BEAM300 x 500 DEEP CONCRETE BEAM

300

3360

300

3340

300

7600

300 5140 300 5060 300

11100

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

ADMINISTRATION OFFICE

Title

Approved

Date

KASERNE TAXI HOLDING FACILITY

FOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 AO - WTH01

REV DATE DESCRIPTION

A 06-11-2019 KWTENDER DRAWINGS

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

ISSUED FOR TENDER

PURPOSES ONLY

NZ

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

SECTIONAL VIEW

RAFT SLAB BEAM LAYOUTSCALE 1 : 50

Page 5: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

A

AO - WTH02

A

AO - WTH02

B

AO - WTH02

B

AO - WTH02

150mm

THK 25MPa C

ONCRETE RC S

LAB WIT

H MESH R

EF. 245 T

OP & B

OTTOM

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F.

100

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 1

00

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

1000 11100 1000

13100

1000

7600

1000

9600

4

AO - WTH02

4

AO - WTH02

15 -R10 @250 mm -01

2 x Y12 -08

3 x Y12 -06

30

40

40 4015 -R10 @250 mm -01

2 x Y12 -08

3 x Y12 -06

30

40

40 4015 -R10 @250 mm -01

2 x Y12 -08

3 x Y12 -06

30

40

40 40

46 -R10 @250 mm -01

40

40

2 x Y12 -03

2 x Y12 -02 46 -R10 @250 mm -01

2 x Y12 -03

2 x Y12 -02

46 -R10 @250 mm -01

30

2 x Y12 -03

2 x Y12 -02

40

30

15 -R10 @250 mm -0115 -R10 @250 mm -01

2 -Y12 -08

3 -Y12 -06

2 -Y12 -09

3 -Y12 -07

40

A

AO - WTH02

A

AO - WTH02

B

AO - WTH02

B

AO - WTH02

BE

AM

02

BE

AM

02

BE

AM

02

BEAM 01

BEAM 01

BEAM 01

BE

AM

02

BE

AM

02

BE

AM

02

46 -R10 @250 mm -01

46 -R10 @250 mm -01

46 -R10 @250 mm -01

15 -

R10 @

250 m

m -

01

15 -

R10 @

250 m

m -

01

15 -

R10 @

250 m

m -

01

15 -

R10 @

250 m

m -

01

15 -

R10 @

250 m

m -

01

15 -

R10 @

250 m

m -

01

4

AO - WTH02

4

AO - WTH02

2 -Y12 -08

3 -Y12 -06

2 -Y12 -08

3 -Y12 -06

2 -Y12 -08

3 -Y12 -06

2 -Y12 -03

2 -Y12 -02

2 -Y12 -05

2 -Y12 -04

2 -Y12 -09

3 -Y12 -07 2 -Y12 -09

3 -Y12 -072 -Y12 -09

3 -Y12 -07

2 -Y12 -03

2 -Y12 -02

2 -Y12 -03

2 -Y12 -02

2 -Y12 -05

2 -Y12 -04

2 -Y12 -05

2 -Y12 -04

46 -R10 @250 mm -01

2 -Y12 -032 -Y12 -05

2 -Y12 -042 -Y12 -02

46 -R10 @250 mm -01

2 -Y12 -032 -Y12 -05

2 -Y12 -042 -Y12 -02

46 -R10 @250 mm -01

2 -Y12 -032 -Y12 -05

2 -Y12 -042 -Y12 -02

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

ADMINISTRATION OFFICE

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 AO - WTH02

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWING

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

ISSUED FOR TENDER

PURPOSES ONLY

NZ

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

PERSPECTIVE

RAFT SLAB BEAM LAYOUTSCALE 1 : 50

Rebar Schedule

MemberNo.Of

BarsPer

Memb Dia LengthTotal

Number Mark S C A B C D

Beam 01 3 46 R10 1360 mm 138 01 60 220 mm 430 mm 0 mm 0 mm

Beam 01 3 2 Y12 3850 mm 6 02 37 100 mm 3780 mm 0 mm 0 mm

Beam 01 3 2 Y12 3850 mm 6 03 37 100 mm 3780 mm 0 mm 0 mm

Beam 01 3 2 Y12 7850 mm 6 04 37 100 mm 7780 mm 0 mm 0 mm

Beam 01 3 2 Y12 7850 mm 6 05 37 100 mm 7780 mm 0 mm 0 mm

Beam 02 6 15 R10 1360 mm 90 01 60 430 mm 220 mm 0 mm 0 mm

Beam 02 3 3 Y12 6070 mm 9 06 37 6000 mm 100 mm 0 mm 0 mm

Beam 02 3 3 Y12 2130 mm 9 07 37 100 mm 2060 mm 0 mm 0 mm

Beam 02 3 2 Y12 6080 mm 6 08 37 6000 mm 110 mm 0 mm 0 mm

Beam 02 3 2 Y12 2130 mm 6 09 37 100 mm 2060 mm 0 mm 0 mm

BEAM 01

BEAM 01

BEAM 01BEAM 02

BEAM 02

BEAM 02

ELEVATION B-BSCALE 1 : 50

Page 6: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 3

4350 4350

A

B

3365

A

EA - WTH01

A

EA - WTH01

C

EA - WTH01

C

EA - WTH01

B1 B1 B1

B1B1B1

8700

B

EA - WTH01

B

EA - WTH01

FFL

0

Lintol Level

2125

1 2 3

4350 4350

IPE 160 IPE 160IPE 160

8700

2125

Wall Plate

280050x50x3L Bracing 50x50x3L Bracing

FFL

0

A B

3365

450 616 616 616 616 616 450C1EA -

WTH01

C2EA -

WTH01

IPE 160IPE 160

IPE 160

3055

3350

5° Wall Plate

280050x50x3L Bracing

A

290

PLT

10 300

325

300 150

126

IPE160

IPE160

3055

50x50x3L

IPE160 190

300 10Wall Plate

2800

B150 300

290

317

PLT

10

82

IPE160

IPE160

3350

325

190 IPE160

PLT

10 300

82

290

50

80

90

70

10

260

20

40

Wall Plate

2800

40

82

290

50

80

90

70

10

260

20

30 60 30

120

100

100 2

00

200x120x10 THK PLT2 x D16 8.8 HD Bolts5mm Cont. Fillet WeldIPE160

120

10 P

LT

30

30 P

LT

10

200

1 2 3

A

B

4350 4350

8700

3365

L50X50X3

L50X50X3

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

IBR ROOF SHEETING

LC100X50X20X3.0

FFL

0

Lintol Level

2125

1 2 3

4350 4350

8700

2125

Wall Plate

280050x50x3L Bracing 50x50x3L Bracing

82

40

190

50

80

60

10

20

20

82

40

190

50

80

60

10

20

20

Wall Plate

2800

1. The copyright of this drawing is vested in CIVPRO and it may not be reproduced in whole or part or used for the manufacture of any article without the express permission of the copyright holders.

2. These notes are read in conjunction with the specifications. The notes take precedence should a discrepancy arise which is to be brought to the attention of the Engineer.

3. All dimensions and setting out information are checked prior to the commencement of the setting out of the works. Written dimensions take precedence over scaled dimensions. No scaling of dimensions is permitted.

4. All levels are Above Mean Sea Level (AMSL).

5. This drawing is to be read in conjunction with the architect's drawing and all dimensions verified.

6. All work to be carried out in accordance with the National Building Regulations and the regulations as set out by the NHBRC.

7. All work is to be carried out in accordance with the latest edition of the Occupational Health and Safety Act and the Construction Regulations.

8. Subcontracting of any portion of the works does not relieve the Contractor of his responsibilities and liabilities in terms of the contract and the regulations noted in 6.

9. All quantities are to be measured in accordance with SANS 1200.

1. All structural steelwork design, fabrication, surface preparation, painting etc. shall conform to the project specification, SANS 10162, SANS 2001- CS.

2. Structural steelwork to be Grade S355JR in accordance with SANS 10025.

3. All welds shall be 5mm continuous fillet welds unless otherwise noted.

4. All welds shall be shop welded.

5. All holes shall be 22 Dia. For 20 Dia. Black bolts unless otherwise noted . Holes for fasteners shall not be more than 2mm greater than the diameter of the fastener of diameter up to 24mm and not more than 3mm greater for fasteners of diameter over 24mm.

6. Holes for fasteners and distances between holes and edges shall comply with the relevant requirements of SANS 10162 or as detailed on the Drawings.

7. Holes for fasteners shall be drilled. Holes including backmarks and gauges for fasteners, pins and holding bolts shall not be formed by flame cutting.

8. All burrs shall be removed from holes before assembly.

9. All bolts and nuts (other than friction grip) shall be hexagonal headed and shall comply with SANS 1700 or SANS 1143 as applicable.

10. All beam and bracing connections shall have a minimum of 2 No. M12 Gr 4.8 bolts unless otherwise noted.

11. Beam end plates shall have a minimum thickness of 10mm.

12. All gusset plates shall be 8 mm thick unless otherwise noted.

13. All connections shall be full strength to SAISC and AWS D1.1. No eccentric connections are allowed.

14. Cold rolled sections shall have a minimum guaranteed yield stress of 250 MPa.

15. All packers used for adjustment shall be from laminated off-cuts and used only where required.

16. All shop detail drawings shall be submitted to the Engineer for review and approval at a minimum of two weeks prior to the commencement of any fabrication takes place.

10. Surface preparation shall be to ISO 8501-1 Sa 2½. Weld seams, burned and rusty areas blast-cleaned to ISO 8501-1 Sa 2½.

11. All steelwork shall be coated with red oxide paint prior to delivery to Site. Subsequent paint coating to Architect's specfications.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL SEATING AREA

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 EA - WTH01

REV DATE DESCRIPTION

A 06-11-2019 KWTENDER DRAWING

STRUCTURAL STEEL NOTES:

NZ

ISSUED FOR TENDER PURPOSES ONLY

ROOF PLANSCALE 1 : 50

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

B1 BASE PLT DETAILSCALE 1 : 10

C1 RAFTER DETAILSCALE 1 : 10

PERSPECTIVE

C2 RAFTER DETAILSCALE 1 : 10

ELEVATION B-BSCALE 1 : 50

Page 7: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 4

90 4350 4350 90

A

B

130

3365

130

A

EA - WTH02

A

EA - WTH02

B

EA - WTH02

B

EA - WTH02

1000 8880 1000

1000

3625

1000

150mm THK 25MPa RC SLAB REINFORCED

5 %

MIN100mm THK

APRON SLAB

IJ

100mm THK APRON SLAB

IJ

10

0m

m T

HK

A

PR

ON

SLA

B

IJ

10

0m

m T

HK

A

PR

ON

SLA

B

IJ

5 %

MIN

5 % MIN 5 % MIN

NOTE:

APRON SLABS TO BE CAST IN ALTERNATE PANELS NOT EXCEEDING 2 METRES IN LENGTH. ALL JOINTS BETWEEN APRON SLAB PANELS AND BETWEEN APRON SLABS AND THE RAFT SLAB ARE TO BE 10MM JONTS WITH 10MM THICK BITUMEN IMPREGNATED SOFTBOARD SEALED WITH POLYURETHANE JOINT SEALANT. 2400MM PANELS WITH 10MM SOFTBOARD JOINTS WITH POLYURETHANE JOINT SEALANT.

FFL

0

1 2 4

90 4350 4350 90

1000 8880 1000

30039903003990300

150

350

500

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH

POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

FFL

0

A B

1000 3625 1000

130 3365 130

300 3025 300

350

150

500

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER

WITH POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

1 2 4

A

B

A

EA - WTH02

A

EA - WTH02

B

EA - WTH02

B

EA - WTH02

300 3990 300 3990 300

8880

300

3025

300

3625

90 4350 4350 90

8880

130

3365

130

3625

300 x 500 DEEP CONCRETE BEAM

300 x 500 DEEP CONCRETE BEAM300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL SEATING AREA

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 EA - WTH02

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWING

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

NZ

ISSUED FOR TENDER PURPOSES ONLY

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

SECTIONAL VIEW

RAFT SLAB BEAM LAYOUTSCALE 1 : 50

Page 8: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2

90 4350 4350 150

A

B

3

3365

150mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 245 TOP & BOTTOM

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 100

1000

3625

1000

5625

1000 8940 1000

10940

1 2 3

D

EA - WTH03

D

EA - WTH03

14 -R10 @250 mm -01 14 -R10 @250 mm -01

3 x Y12 -06

2 x Y12 -07

3 x Y12 -06

2 x Y12 -07

3 x Y12 -06

2 x Y12 -07

14 -R10 @250 mm -01

30

4040

30

40

40

40

30

40

40 40

A B

37 -R10 @250 mm -0137 -R10 @250 mm -01

2 x Y12 -02

30

40

40

30

40

40

14 -R10 @250 mm -01

2 x Y12 -04 2 x Y12 -04

2 x Y12 -02

2 -Y12 -07

3 -Y12 -06

1 2

A

B

A

EA - WTH03

A

EA - WTH03

C

EA - WTH03

C

EA - WTH03

4350 4350

3365

3

37 -R10 @250 mm -01

37 -R10 @250 mm -01

D

EA - WTH03

D

EA - WTH03

B

EA - WTH03

B

EA - WTH03

Beam 01

Beam 01

Be

am

02

Be

am

02

Be

am

02

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

2 -Y12 -07T

3 -Y12 -06B

2 -Y12 -07T

3 -Y12 -06B

2 -Y12 -07T

3 -Y12 -06B

2 -Y12 -04T

2 -Y12 -02B

2 -Y12 -05T

2 -Y12 -03B

2 -Y12 -04T

2 -Y12 -02B

2 -Y12 -05T

2 -Y12 -03B

A B

37 -R10 @250 mm -0137 -R10 @250 mm -01

30

40

4040

30

40

4040

2 x Y12 -05

2 x Y12 -03

2 x Y12 -05

2 x Y12 -03

1 2C

EA - WTH03

C

EA - WTH03

3D

EA - WTH03

D

EA - WTH03

37 -R10 @250 mm -01

30

40

40

30

40

40

2 x Y12 -07 2 x Y12 -07 2 x Y12 -07

3 x Y12 -06 3 x Y12 -06 3 x Y12 -06

2 -Y12 -04

2 -Y12 -02

2 -Y12 -05

2 -Y12 -0314 -R10 @250 mm -01 14 -R10 @250 mm -01 14 -R10 @250 mm -01

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL SEATING AREA

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 EA - WTH03

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

NZ

ISSUED FOR TENDER PURPOSES ONLY

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

PERSPECTIVE

RAFT SLAB BEAM LAYOUT SCALE 1 : 50

ELEVATION D-DSCALE 1 : 50ELEVATION B-B

SCALE 1 : 50

Rebar Schedule

MemberNo.Of

BarsPer

Memb Dia LengthTotal

Number Mark S C A B C D

Beam 01 2 37 R10 1580 mm 74 01 60 220 mm 430 mm 0 mm 0 mm

Beam 01 2 2 Y12 3460 mm 4 02 37 100 mm 3390 mm 0 mm 0 mm

Beam 01 2 2 Y12 6070 mm 4 03 37 100 mm 6000 mm 0 mm 0 mm

Beam 01 2 2 Y12 3460 mm 4 04 37 100 mm 3390 mm 0 mm 0 mm

Beam 01 2 2 Y12 6070 mm 4 05 37 100 mm 6000 mm 0 mm 0 mm

Beam 02 3 14 R10 1580 mm 42 01 60 220 mm 430 mm 0 mm 0 mm

Beam 02 3 3 Y12 3660 mm 9 06 38 100 mm 3530 mm 100 mm 0 mm

Beam 02 3 2 Y12 3660 mm 6 07 38 100 mm 3530 mm 100 mm 0 mm

BEAM 01

BEAM 01

BEAM 02

BEAM 02

BEAM 02

Page 9: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 3 4

2900 2900 2900

A

B

3365

A

VS - WTH01

A

VS - WTH01

C

VS - WTH01

C

VS - WTH01

B1 B1 B1 B1

B1B1B1B1

8700

B

VS - WTH01

B

VS - WTH01

FFL

0

Lintol Level

2125

1 2 3 4

2900 2900 2900

IPE 160 IPE 160 IPE 160 IPE 160

8700

636

636

2125

L50X50X3 L50X50X3 L50X50X3

L50X50X3 L50X50X3 L50X50X3

IPE 160IPE 160IPE 160

FFL

0

A B

450 616 616 616 616 616 450C1VS -

WTH01

C2VS -

WTH01

IPE 160IPE 160

IPE 160

3055

3350

A

290

PLT

10 300

325

300 150

126

IPE160

IPE160

3055

50x50x3L

IPE160 190

300 10

B150 300

290

317

PLT

10

82

IPE160

IPE160

3350

325

190 IPE160

PLT

10 300

82

290

50

80

90

70

10

260

20

40

40

82

290

50

80

90

70

10

260

20

30 60 30

120

100

100 2

00

200x120x10 THK PLT2 x D16 8.8 HD Bolts5mm Cont. Fillet WeldIPE160

120

10 P

LT

30

30 P

LT

10

200

1 2 3 4

A

B

2900 2900 2900

8700

3365

L50X

50X3

L50X50X3

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

IBR ROOF SHEETING

LC100X50X20X3.0

FFL

0

Lintol Level

2125

1 2 3 4

L50X50X3

L50X50X3 L50X50X3

L50X50X3 L50X50X3L50X50X3

2900 2900 2900

8700

2125

950

L50X50X3 L50X50X3

82

40

190

50

80

60

10

20

20

82

40

190

50

80

60

10

20

20

1. The copyright of this drawing is vested in CIVPRO and it may not be reproduced in whole or part or used for the manufacture of any article without the express permission of the copyright holders.

2. These notes are read in conjunction with the specifications. The notes take precedence should a discrepancy arise which is to be brought to the attention of the Engineer.

3. All dimensions and setting out information are checked prior to the commencement of the setting out of the works. Written dimensions take precedence over scaled dimensions. No scaling of dimensions is permitted.

4. All levels are Above Mean Sea Level (AMSL).

5. This drawing is to be read in conjunction with the architect's drawing and all dimensions verified.

6. All work to be carried out in accordance with the National Building Regulations and the regulations as set out by the NHBRC.

7. All work is to be carried out in accordance with the latest edition of the Occupational Health and Safety Act and the Construction Regulations.

8. Subcontracting of any portion of the works does not relieve the Contractor of his responsibilities and liabilities in terms of the contract and the regulations noted in 6.

9. All quantities are to be measured in accordance with SANS 1200.

1. All structural steelwork design, fabrication, surface preparation, painting etc. shall conform to the project specification, SANS 10162, SANS 2001- CS.

2. Structural steelwork to be Grade S355JR in accordance with SANS 10025.

3. All welds shall be 5mm continuous fillet welds unless otherwise noted.

4. All welds shall be shop welded.

5. All holes shall be 22 Dia. For 20 Dia. Black bolts unless otherwise noted . Holes for fasteners shall not be more than 2mm greater than the diameter of the fastener of diameter up to 24mm and not more than 3mm greater for fasteners of diameter over 24mm.

6. Holes for fasteners and distances between holes and edges shall comply with the relevant requirements of SANS 10162 or as detailed on the Drawings.

7. Holes for fasteners shall be drilled. Holes including backmarks and gauges for fasteners, pins and holding bolts shall not be formed by flame cutting.

8. All burrs shall be removed from holes before assembly.

9. All bolts and nuts (other than friction grip) shall be hexagonal headed and shall comply with SANS 1700 or SANS 1143 as applicable.

10. All beam and bracing connections shall have a minimum of 2 No. M12 Gr 4.8 bolts unless otherwise noted.

11. Beam end plates shall have a minimum thickness of 10mm.

12. All gusset plates shall be 8 mm thick unless otherwise noted.

13. All connections shall be full strength to SAISC and AWS D1.1. No eccentric connections are allowed.

14. Cold rolled sections shall have a minimum guaranteed yield stress of 250 MPa.

15. All packers used for adjustment shall be from laminated off-cuts and used only where required.

16. All shop detail drawings shall be submitted to the Engineer for review and approval at a minimum of two weeks prior to the commencement of any fabrication takes place.

10. Surface preparation shall be to ISO 8501-1 Sa 2½. Weld seams, burned and rusty areas blast-cleaned to ISO 8501-1 Sa 2½.

11. All steelwork shall be coated with red oxide paint prior to delivery to Site. Subsequent paint coating to Architect's specfications.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL TYPE A

Title

Approved

Date

KASERNE TAXI HOLDING FACILITY

FOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 VS - WTH01

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

STRUCTURAL STEEL NOTES:

NZ

ISSUED FOR TENDER PURPOSES ONLY

ROOF PLANSCALE 1 : 50

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

B1 BASE PLT DETAILSCALE 1 : 10

C1 RAFTER DETAILSCALE 1 : 10

PERSPECTIVE

C2 RAFTER DETAILSCALE 1 : 10

ELEVATION B-BSCALE 1 : 50

Page 10: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

2 4

2900 2900 2900 90

B

130

3495

A

VS - WTH02

A

VS - WTH02

B

VS - WTH02

B

VS - WTH02

1000 8880 1000

1000

3625

1000

150mm THK 25MPa RC SLAB REINFORCED

3

10

0m

m T

HK

A

PR

ON

SLA

B

IJ

10

0m

m T

HK

A

PR

ON

SLA

B

IJ

100mm THK APRON SLAB

IJ

100mm THK APRON SLAB

IJ

5 %

MIN

5 %

MIN

5 % MIN5 % MIN

NOTE:

APRON SLABS TO BE CAST IN ALTERNATE PANELS NOT EXCEEDING 2 METRES IN LENGTH. ALL JOINTS BETWEEN APRON SLAB PANELS AND BETWEEN APRON SLABS AND THE RAFT SLAB ARE TO BE 10MM JONTS WITH 10MM THICK BITUMEN IMPREGNATED SOFTBOARD SEALED WITH POLYURETHANE JOINT SEALANT. 2400MM PANELS WITH 10MM SOFTBOARD JOINTS WITH POLYURETHANE JOINT SEALANT.

1

FFL

0

2 4

2990 2900 2900 90

1000 8880 1000

300254030026003002540300

150

350

500

3

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER

WITH POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

1

FFL

0

B

1000 3625 1000

3495 130

300 3025 300

350

150

500

250 MICRON USB GREEN DPMRIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER

WITH POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

2 4

B

A

VS - WTH02

A

VS - WTH02

B

VS - WTH02

B

VS - WTH02

300 2540 300 2600 300 2540 300

8880

300

3025

300

3625

2990 2900 2900 90

8880130

3495

3625

3

300 x 500 Deep Concrete Beam

300 x 500 Deep Concrete Beam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

300 x

500 D

eep C

oncre

te B

eam

1

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL TYPE A

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 VS - WTH02

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

NZ

ISSUED FOR TENDER PURPOSES ONLY

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

SECTIONAL VIEW

RAFT SLAB BEAM LAYOUTSCALE 1 : 50

Page 11: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 4

2900 2900 2900

A

B

3

3365

150mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 245 TOP & BOTTOM

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 100

1000 8880 1000

10880

1000

3625

1000

5625

1 2 4

2900 2900 2900

3

D

VS - WTH03

D

VS - WTH03

14 -R10 @250 mm -01S 14 -R10 @250 mm -01S 14 -R10 @250 mm -01S

3 x Y12 -06

2 x Y12 -07

3 x Y12 -06

2 x Y12 -07

3 x Y12 -06 3 x Y12 -06

2 x Y12 -07 2 x Y12 -07

14 -R10 @250 mm -01S

30

4040

40

30

4040

40

30

4040

40

30

4040

40

A B

37 -R10 @250 mm -01S37 -R10 @250 mm -01S

30

40

40 40

2 x Y12 -03

2 x Y12 -02 2 x Y12 -02

2 x Y12 -03

14 -R10 @250 mm -01S

2 -Y12 -07

3 -Y12 -06

1 2 4

A

B

A

VS - WTH03

A

VS - WTH03

C

VS - WTH03

C

VS - WTH03

90 2900 2900 2900 90

3365

3

37 -R10 @250 mm -01S

37 -R10 @250 mm -01S

D

VS - WTH03

D

VS - WTH03

B

VS - WTH03

B

VS - WTH03

Beam 01

Beam 01

Be

am

02

Be

am

02

Be

am

02

Be

am

02

14 -

R10 @

250 m

m -

01S

14 -

R10 @

250 m

m -

01S

14 -

R10 @

250 m

m -

01S

14 -

R10 @

250 m

m -

01S

2 -Y12 -07T 2 -Y12 -07T 2 -Y12 -07T 2 -Y12 -07T

3 -Y12 -06B 3 -Y12 -06B 3 -Y12 -06B 3 -Y12 -06B

2 -Y12 -03T

2 -Y12 -02B

2 -Y12 -03T

2 -Y12 -02B

2 -Y12 -05T

2 -Y12 -04B

2 -Y12 -05T

2 -Y12 -04B

A B

37 -R10 @250 mm -01S37 -R10 @250 mm -01S

2 x Y12 -05 2 x Y12 -05

2 x Y12 -04 2 x Y12 -04

1 2 4C

VS - WTH03

C

VS - WTH03

3 D

VS - WTH03

D

VS - WTH03

37 -R10 @250 mm -01S

30

40

30

40

4030

14 -R10 @250 mm -01S

2 x Y12 -07

3 x Y12 -06

2 x Y12 -07 2 x Y12 -07

3 x Y12 -06

2 x Y12 -07

3 x Y12 -06

2 x Y12 -07

3 x Y12 -06

14 -R10 @250 mm -01S 14 -R10 @250 mm -01S 14 -R10 @250 mm -01S

2 -Y12 -03

2 -Y12 -02

2 -Y12 -05

2 -Y12 -04

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL TYPE A

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 VS - WTH03

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

NZ

ISSUED FOR TENDER PURPOSES ONLY

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

PERSPECTIVE

RAFT SLAB BEAM LAYOUT SCALE 1 : 50

ELEVATION D-DSCALE 1 : 50

ELEVATION B-BSCALE 1 : 50

Rebar Schedule

MemberNo.Of

BarsPer

Memb Dia LengthTotal

Number Mark S C A B C D

Beam 01 2 37 R10 1580 mm 74 01S 60 220 mm 430 mm 0 mm 0 mm

Beam 01 2 2 Y12 4770 mm 4 02 37 100 mm 4700 mm 0 mm 0 mm

Beam 01 2 2 Y12 4770 mm 4 03 37 100 mm 4700 mm 0 mm 0 mm

Beam 01 2 2 Y12 4710 mm 4 04 37 4640 mm 100 mm 0 mm 0 mm

Beam 01 2 2 Y12 4710 mm 4 05 37 4640 mm 100 mm 0 mm 0 mm

Beam 02 4 14 R10 1580 mm 56 01S 60 220 mm 430 mm 0 mm 0 mm

Beam 02 4 3 Y12 3680 mm 12 06 38 100 mm 3550 mm 100 mm 0 mm

Beam 02 4 2 Y12 3680 mm 8 07 38 100 mm 3550 mm 100 mm 0 mm

BEAM 02

BEAM 01

BEAM 01

BEAM 02

BEAM 02

BEAM 02

Page 12: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 3 4

2900 2900 2900 2900 2900 2900

A

B

3365

A

VS - WTH04

A

VS - WTH04

C

VS - WTH04

C

VS - WTH04

B1 B1 B1 B1

B1B1B1B1

17400

B

VS - WTH04

B

VS - WTH04

230 2645 230 2670 230 2670 230 2670 230 2670 230 2645 230

5 6 7

B1

B1 B1 B1

B1B1

FFL

0

Lintol Level

2125

1 2 34

2900 2900 2900 2900 2900 2900

IPE 160 IPE 160 IPE 160 IPE 160

17400

636

636

2125

L50X50X3 L50X50X3 L50X50X3

L50X50X3 L50X50X3 L50X50X3

IPE 160IPE 160IPE 160

5 6 7

IPE 160 IPE 160 IPE 160

IPE 160 IPE 160 IPE 160

L50X50X3L50X50X3L50X50X3

L50X50X3 L50X50X3 L50X50X3

FFL

0

A B

3365

450 616 616 616 616 616 450C1VS -

WTH04

C2VS -

WTH04

IPE 160IPE 160

IPE 160

3055

3350

A

290

PLT

10 300

325

300 150

126

IPE160

IPE160

3055

50x50x3L

IPE160 190

300 10

B150 300

290

317

PLT

10

82

IPE160

IPE160

3350

325

190 IPE160

PLT

10 300

82

290

50

80

90

70

10

260

20

40

40

82

290

50

80

90

70

10

260

20

30 60 30

120

100

100 2

00

200x120x10 THK PLT2 x D16 8.8 HD Bolts5mm Cont. Fillet WeldIPE160

120

10 P

LT

30

30 P

LT

10

200

1 2 3 4

A

B

2900 2900 2900 2900 2900 2900

8700

3365

L50X

50X3

L50X50X3

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

LC100X50X20X3.0

IBR ROOF SHEETING

LC100X50X20X3.0

5 6 7

L50X50X3

L50X

50X3

LC100X50X20X3.0

FFL

0

Lintol Level

2125

1 2 34

L50X50X3

L50X50X3 L50X50X3

L50X50X3 L50X50X3L50X50X3

2900 2900 2900 2900 2900 2900

17400

2125

950

L50X50X3 L50X50X3

5 6 7

L50X50X3L50X50X3L50X50X3 L50X50X3

L50X50X3

L50X50X3L50X50X3L50X50X3

82

40

190

50

80

60

10

20

20

82

40

190

50

80

60

10

20

20

1. The copyright of this drawing is vested in CIVPRO and it may not be reproduced in whole or part or used for the manufacture of any article without the express permission of the copyright holders.

2. These notes are read in conjunction with the specifications. The notes take precedence should a discrepancy arise which is to be brought to the attention of the Engineer.

3. All dimensions and setting out information are checked prior to the commencement of the setting out of the works. Written dimensions take precedence over scaled dimensions. No scaling of dimensions is permitted.

4. All levels are Above Mean Sea Level (AMSL).

5. This drawing is to be read in conjunction with the architect's drawing and all dimensions verified.

6. All work to be carried out in accordance with the National Building Regulations and the regulations as set out by the NHBRC.

7. All work is to be carried out in accordance with the latest edition of the Occupational Health and Safety Act and the Construction Regulations.

8. Subcontracting of any portion of the works does not relieve the Contractor of his responsibilities and liabilities in terms of the contract and the regulations noted in 6.

9. All quantities are to be measured in accordance with SANS 1200.

1. All structural steelwork design, fabrication, surface preparation, painting etc. shall conform to the project specification, SANS 10162, SANS 2001- CS.

2. Structural steelwork to be Grade S355JR in accordance with SANS 10025.

3. All welds shall be 5mm continuous fillet welds unless otherwise noted.

4. All welds shall be shop welded.

5. All holes shall be 22 Dia. For 20 Dia. Black bolts unless otherwise noted . Holes for fasteners shall not be more than 2mm greater than the diameter of the fastener of diameter up to 24mm and not more than 3mm greater for fasteners of diameter over 24mm.

6. Holes for fasteners and distances between holes and edges shall comply with the relevant requirements of SANS 10162 or as detailed on the Drawings.

7. Holes for fasteners shall be drilled. Holes including backmarks and gauges for fasteners, pins and holding bolts shall not be formed by flame cutting.

8. All burrs shall be removed from holes before assembly.

9. All bolts and nuts (other than friction grip) shall be hexagonal headed and shall comply with SANS 1700 or SANS 1143 as applicable.

10. All beam and bracing connections shall have a minimum of 2 No. M12 Gr 4.8 bolts unless otherwise noted.

11. Beam end plates shall have a minimum thickness of 10mm.

12. All gusset plates shall be 8 mm thick unless otherwise noted.

13. All connections shall be full strength to SAISC and AWS D1.1. No eccentric connections are allowed.

14. Cold rolled sections shall have a minimum guaranteed yield stress of 250 MPa.

15. All packers used for adjustment shall be from laminated off-cuts and used only where required.

16. All shop detail drawings shall be submitted to the Engineer for review and approval at a minimum of two weeks prior to the commencement of any fabrication takes place.

10. Surface preparation shall be to ISO 8501-1 Sa 2½. Weld seams, burned and rusty areas blast-cleaned to ISO 8501-1 Sa 2½.

11. All steelwork shall be coated with red oxide paint prior to delivery to Site. Subsequent paint coating to Architect's specfications.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL TYPE B

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 VS - WTH04

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

STRUCTURAL STEEL NOTES:

NZ

ISSUED FOR TENDER PURPOSES ONLY

ROOF PLANSCALE 1 : 50

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

B1 BASE PLT DETAILSCALE 1 : 10

C1 RAFTER DETAILSCALE 1 : 10

PERSPECTIVE

C2 RAFTER DETAILSCALE 1 : 10

ELEVATION B-BSCALE 1 : 50

Page 13: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 4

90 2900 2900 2900 2900 2900 2900 90

A

B

130

3365

130

A

VS - WTH05

A

VS - WTH05

B

VS - WTH05

B

VS - WTH05

1000 17580 1000

1000

3625

1000

150mm THK 25MPa RC SLAB REINFORCED

3 5 6 7

10

0m

m T

HK

A

PR

ON

SLA

B

IJ

10

0m

m T

HK

A

PR

ON

SLA

B

IJ

100mm THK APRON SLAB

IJ

100mm THK APRON SLAB

IJ

5 % MIN

5 %

MIN

5 %

MIN

5 % MIN

NOTE:

APRON SLABS TO BE CAST IN ALTERNATE PANELS NOT EXCEEDING 2 METRES IN LENGTH. ALL JOINTS BETWEEN APRON SLAB PANELS AND BETWEEN APRON SLABS AND THE RAFT SLAB ARE TO BE 10MM JONTS WITH 10MM THICK BITUMEN IMPREGNATED SOFTBOARD SEALED WITH POLYURETHANE JOINT SEALANT. 2400MM PANELS WITH 10MM SOFTBOARD JOINTS WITH POLYURETHANE JOINT SEALANT.

FFL

0

1 2 4

90 2900 2900 2900 2900 2900 2900 90

1000 17580 1000

300254030026003002600300260030026003002540300

150

350

500

3 5 6 7

250 MICRON USB GREEN DPM

RIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH

POLYURETHANE JOINT SEALANT

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

FFL

0

A B

1000 3625 1000

130 3365 130

300 3025 300

350

150

500

250 MICRON USB GREEN DPM

RIP & RECOMPACT 200mm IN-SITU LAYER TO 93% MOD AASHTO

ISOLATION JOINT 10mm SOFTBOARD JOINT FILLER WITH POLYURETHANE JOINT SEALANT

1 2 4

A

B

A

VS - WTH05

A

VS - WTH05

B

VS - WTH05

B

VS - WTH05

300 2540 300 2600 300 2600 300 2600 300 2600 300 2540 300

17580

300

3025

300

3625

90 2900 2900 2900 2900 2900 2900 90

17580

130

3365

130

3625

3 5 6 7

300 x 500 DEEP CONCRETE BEAM

300 x 500 DEEP CONCRETE BEAM

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

300 x

500 D

EE

P C

ON

CR

ET

E B

EA

M

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL TYPE B

Title

Approved

Date

KASERNE TAXI HOLDING FACILITY

FOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 VS - WTH05

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

NZ

ISSUED FOR TENDER PURPOSES ONLY

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

SECTIONAL VIEW

RAFT SLAB BEAM LAYOUT SCALE 1 : 50

Page 14: ISSUED FOR TENDER PURPOSES ONLY€¦ · softboard joint filler with polyurethane joint sealant isolation joint 10mm softboard joint filler with polyurethane joint sealant 250 micron

1 2 4

2900 2900 2900 2900 2900 2900

A

B

3 5 6 7

3365

150mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 245 TOP & BOTTOM

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100mm THK 25MPa CONCRETE RC SLAB WITH MESH REF. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 100

100m

m T

HK

25M

Pa C

ON

CR

ET

E R

C S

LA

B W

ITH

ME

SH

RE

F. 100

1000 17580 1000

19580

1000

3625

1000

5625

1 2 4

2900 2900 2900 2900 2900 2900

3 5 6 7

D

VS - WTH06

D

VS - WTH06

E

VS - WTH06

E

VS - WTH06

14 -R10 @250 mm -01 14 -R10 @250 mm -01 14 -R10 @250 mm -01 14 -R10 @250 mm -01 14 -R10 @250 mm -01 14 -R10 @250 mm -01

3 x Y12 -07

2 x Y12 -08

14 -R10 @250 mm -01

30

40 40

40

30

40

40

40

30

4040

40

30

4040

40

30

4040

40

30

40

40

40

30

4040

40

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

A B

71 -R10 @250 mm -0171 -R10 @250 mm -01

30

40

30

40

40 4040

40

14 -R10 @250 mm -01

2 x Y12 -05

2 x Y12 -02

2 x Y12 -05

2 x Y12 -02

2 -Y12 -08

3 -Y12 -07

1 2 4

A

B

A

VS - WTH06

A

VS - WTH06

C

VS - WTH06

C

VS - WTH06

2900 2900 2900 2900 2900 2900

3365

3 5 6 7

71 -R10 @250 mm -01

71 -R10 @250 mm -01

D

VS - WTH06

D

VS - WTH06

E

VS - WTH06

E

VS - WTH06

B

VS - WTH06

B

VS - WTH06

Beam 01

Beam 01

Be

am

02

Be

am

02

Be

am

02

Be

am

02

Be

am

02

Be

am

02

Be

am

02

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

14 -

R10 @

250 m

m -

01

3 -Y12 -07B

2 -Y12 -08T

3 -Y12 -07B

2 -Y12 -08T

3 -Y12 -07B

2 -Y12 -08T

3 -Y12 -07B

2 -Y12 -08T

3 -Y12 -07B

2 -Y12 -08T

3 -Y12 -07B

2 -Y12 -08T

3 -Y12 -07B

2 -Y12 -08T

2 -Y12 -05T

2 -Y12 -02B

2 -Y12 -04T

2 -Y12 -04B

2 -Y12 -06T

2 -Y12 -03B

2 -Y12 -05T

2 -Y12 -02B

2 -Y12 -04T

2 -Y12 -04B

2 -Y12 -06T

2 -Y12 -03B

A B

71 -R10 @250 mm -0171 -R10 @250 mm -01

30

40

40 40

30

40

4040

14 -R10 @250 mm -01

2 x Y12 -04 2 x Y12 -04

2 x Y12 -04 2 x Y12 -04

2 -Y12 -08

3 -Y12 -07

A B

71 -R10 @250 mm -0171 -R10 @250 mm -01

30

40

40 40

30

40

4040

14 -R10 @250 mm -01

2 x Y12 -06

2 x Y12 -03

2 x Y12 -06

2 x Y12 -03

2 -Y12 -08

3 -Y12 -07

1 2 4C

VS - WTH06

C

VS - WTH06

3 5 6 7D

VS - WTH06

D

VS - WTH06

E

VS - WTH06

E

VS - WTH06

71 -R10 @250 mm -01

30

40

40

30

40

40

2 -Y12 -06

2 -Y12 -03

2 -Y12 -04

2 -Y12 -04

2 -Y12 -05

2 -Y12 -0214 -R10 @250 mm -01 14 -R10 @250 mm -01 14 -R10 @250 mm -01

14 -R10 @250 mm -0114 -R10 @250 mm -01

14 -R10 @250 mm -01 14 -R10 @250 mm -01

71 -R10 @250 mm -01

2 x Y12 -08

3 x Y12 -07 3 x Y12 -07 3 x Y12 -07 3 x Y12 -07 3 x Y12 -07 3 x Y12 -07 3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

2 x Y12 -08

3 x Y12 -07

1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN CIVPRO AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.

2. THESE NOTES ARE READ IN CONJUNCTION WITH THE SPECIFICATIONS. THE NOTES TAKE PRECEDENCE SHOULD A DISCREPANCY ARISE WHICH IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

3. ALL DIMENSIONS AND SETTING OUT INFORMATION ARE CHECKED PRIOR TO THE COMMENCEMENT OF THE SETTING OUT OF THE WORKS.

4. ALL LEVELS ARE ABOVE MEAN SEA LEVEL (AMSL).

5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ARCHITECT'S DRAWING AND ALL DIMENSIONS VERIFIED.

6. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING REGULATIONS AND THE REGULATIONS AS SET OUT BY THE NHBRC.

7. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE LATEST EDITION OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND THE CONSTRUCTION REGULATIONS.

8. SUBCONTRACTING OF ANY PORTION OF THE WORKS DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES AND LIABILITIES IN TERMS OF THE CONTRACT AND THE REGULATIONS NOTED IN 6.

9. ALL QUANTITIES ARE TO BE MEASURED IN ACCORDANCE WITH SANS 1200.

10. ALL WET SERVICES ARE TO HAVE FLEXIBLE JOINTS AGAINST THE BUILDING.

11. STORMWATER IS TO BE ADEQUATELY ROUTED AWAY FROM THE STRUCTURE.

12. PONDING OF WATER DURING AND AFTER CONSTRUCTION IS NOT BE PERMITTED.

GENERAL NOTES:

NZ

06/11/2019

NZ

KW

RevisionRev DateAuthby

Chkdby

Revby by

App

RevDrawing No.

Project

Director

Designed by

Checked by

Drawn by

Scale : As Noted

FOOD STALL TYPE B

Title

Approved

Date

KASERNE TAXI HOLDING FACILITYFOR

ERF 1230

DOORNFONTEIN No.:92-IR

CITY AND SUBURBAN x10

1st Floor, Block C, Unit 7Willow Wood Office Park220 Third Street,Chartwell,FOURWAYS, 2191

Tel: +27 11 568 1318

Fax: +27 86 633 4995

Cell: +27 82 577 1299

eMail: [email protected]

Client

04 STR

PROJECT PHASE REVISIONDISCIPLINE BLOCK / SERIES / SUFFIX

ADA06 VS - WTH06

REV DATE DESCRIPTION

A 06/11/2019 KWTENDER DRAWINGS

1. All reinforcement to be checked and approved by the engineer before any concrete is cast.

2. Lap lengths to reinforcing to be min. 45 x smaller diameter, unless otherwise noted.

3. Reinforcing yield strength:High tensile 'y' .................................................. 450 MPaMild steel 'r' ...................................................... 250 MPaWelded steel wire mesh .................................... 485 MPa

FOUNDATIONS1. EXCAVATIONS FOR FOUNDATIONS TO BE APPROVED BY THE ENGINEER AND GEOTECHNICAL ENGINEER PRIOR TO THE CONCRETE BEING CAST THEREFORE FOUNDING LEVELS ARE SUBJECT TO CHANGE.

2. ALL FOUNDATIONS TO BE BUILT ON FIRM IN-SITU SOIL (NOT ON FILL).

3. FOUNDING CONDITIONS AS RECOMMENDED IN THE GEOTECHNICAL REPORT BY THE GEOTECHNICAL ENGINEER.

CONCRETE4. CONCRETE CHARACTERISTIC 28-DAY STRENGTH:

BLINDING ....................................................................... 15 MPaFOUNDATIONS ................................................................. 30 MPaCOLUMNS ......................................................................30 MPaSUSPENDED SLABS & BEAMS ....................................... 30 MPaGROUND SLABS .............................................................. 25 MPa

5. MINIMUM CONCRETE AGGREGATE SIZE ............................ 19mm

6. ALL CONCRETE TO BE PROPERLY CURED BY KEEPING SURFACES CONTINUOUSLY DAMP FOR AT LEAST 5 DAYS AFTER CASTING.

7. ALL CONCRETE WORK MUST CONFORM WITH THE SPECIFICATIONS OF SANS 10100-2 AND SANS 2001-CC1.

8. A SET OF THREE (3) TEST CUBES SHALL BE MADE FOR EVERY 50M³ OR PORTION THEREOF FOR EVERY GRADE OF CONCRETE CAST ON A PARTICULAR DAY. CUBES SHALL BE CURED IN ACCORDANCE WITH THE SANS SPECIFICATIONS AND TESTED ON THE REQUISITE DAYS BY AN APPROVED TESTING LABORATORY AS APPROVED BY THE ENGINEER. TEST RESULTS TO BE TIMEOUSLY SUBMITTED TO ENGINEER FOR APPROVAL.

9. NO CONCRETE SHALL BE CAST WITHOUT THE ENGINEER HAVING INSPECTED THE REINFORCING. CONCRETE SHALL BE CAST ON WRITTEN APPROVAL OF THE ENGINEER.

10. BREAKS IN CONCRETE AND CONSTRUCTION JOINTS ARE ONLY TO BE MADE WITH THE APPROVAL OF THE ENGINEER.

11. THE USE OF KICKERS FOR WALL AND COLUMN CONSTRUCTION IS NOT PERMITTED.

12. SHOULD THERE BE A BREAK IN EXCESS OF 45MINS. AT ANY STAGE DURING A CONCRETE POUR, THE ENGINEER IS IMMEDIATELY NOTIFIED THEREOF.

13. CONCRETE SLABS ARE NOT TO BE USED FOR THE STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE ENGINEER.

14. MINIMUM COVER TO REINFORCING:FOUNDATIONS .................................................................... 50mmCOLUMNS .......................................................................... 30mmSUSPENDED SLABS & BEAMS .......................................... 20mmWALLS, RETAINING WALLS ................................................. 40mm

15. ONLY CONCRETE COVER BLOCKS APPROVED BY THE ENGINEER ARE TO BE USED TO MAINTAIN THE REQUIRED COVER TO REINFORCEMENT. THE CONTRACTOR TAKES PARTICULAR CARE TO ENSURE THAT THE SPECIFIED COVER TO ALL REINFORCEMENT IS IATTAINED THROUGHOUT BEFORE THE ENGINEER IS CALLED TO SITE.

CONCRETE NOTES:

REINFORCEMENT

NZ

ISSUED FOR TENDER PURPOSES ONLY

GROUND PLANSCALE 1 : 50

ELEVATION A-ASCALE 1 : 50

ELEVATION C-CSCALE 1 : 50

SECTIONAL VIEW

RAFT SLAB BEAM LAYOUT SCALE 1 : 50

ELEVATION D-DSCALE 1 : 50

ELEVATION E-ESCALE 1 : 50ELEVATION B-B

SCALE 1 : 50

Rebar Schedule

MemberNo.Of

BarsPer

Memb Dia LengthTotal

Number Mark S C A B C D

Beam 01 2 71 R10 1580 mm 142 01 60 220 mm 430 mm 0 mm 0 mm

Beam 01 2 2 Y12 4570 mm 4 02 37 100 mm 4500 mm 0 mm 0 mm

Beam 01 2 2 Y12 7710 mm 4 03 37 100 mm 7640 mm 0 mm 0 mm

Beam 01 4 2 Y12 6420 mm 8 04 20 6420 mm 0 mm 0 mm 0 mm

Beam 01 2 2 Y12 4570 mm 4 05 37 100 mm 4500 mm 0 mm 0 mm

Beam 01 2 2 Y12 7710 mm 4 06 37 100 mm 7640 mm 0 mm 0 mm

Beam 02 7 14 R10 1580 mm 98 01 60 220 mm 430 mm 0 mm 0 mm

Beam 02 7 3 Y12 3660 mm 21 07 38 100 mm 3530 mm 100 mm 0 mm

Beam 02 7 2 Y12 3660 mm 14 08 38 100 mm 3530 mm 100 mm 0 mm

Beam 01

Beam 01

BEAM 01

BEAM 01

BEAM 02

BEAM 02

BEAM 02

BEAM 02