36
page 1 SNCF Réseau commissioned oekom research to compile a Verification Report for Post-Issuance Certification by the Climate Bond Initiative (CBI) of its Green Bond issued in October 2016. The Climate Bond Certification process includes verifying whether the provisions of the Climate Bond Standard issued by the CBI are met and obtaining evidence to support the verification. The Green Bond issued SNCF Réseau in October 2016 is part of SNCF’s Green Bond Programme. Relevant CBI Standards for this Climate Bond Certification: Climate Bond Standard (Climate Bond Standard Version 2.1; status 01/2017) Low Carbon Land Transport – Eligibility & Guidance Document (Version 1.0; status 02/2016) SNCF Réseau’s responsibility was to provide information and documentation on: Part A: General Requirements Part B: Eligible Projects & Assets Part C: Requirements for Specific Bond Types SNCF Réseau’s Responsibility Criteria Scope Verification Report for Post-Issuance Certification of the Green Bond issued by SNCF Réseau in Oct 2016

issued by SNCF Réseau in Oct 2016 Réseau_oekom_post... · Climate Bond Certification process includes verifying whether the provisions of the Climate Bond Standard issued by the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

page 1

SNCF Réseau commissioned oekom research to compile a Verification Report for Post-Issuance Certification by the Climate Bond Initiative (CBI) of its Green Bond issued in October 2016. The Climate Bond Certification process includes verifying whether the provisions of the Climate Bond Standard issued by the CBI are met and obtaining evidence to support the verification.

The Green Bond issued SNCF Réseau in October 2016 is part of SNCF’s Green Bond Programme.

Relevant CBI Standards for this Climate Bond Certification:

• Climate Bond Standard (Climate Bond Standard Version 2.1; status 01/2017)

• Low Carbon Land Transport – Eligibility & Guidance Document (Version 1.0; status 02/2016)

SNCF Réseau’s responsibility was to provide information and documentation on:

• Part A: General Requirements

• Part B: Eligible Projects & Assets

• Part C: Requirements for Specific Bond Types

SNCF Réseau’s Responsibility

Criteria

Scope

Verification Report for Post-Issuance Certification of the

Green Bond issued by SNCF Réseau in Oct 2016

page 2

oekom research is managerially and economically independent. Its independence is guaranteed through registered shares with restricted transferability, rigorous codes of conduct for every analyst and the fact that neither consulting services nor asset management services are offered. oekom research can thus guarantee a high degree of credibility and objectivity for its research findings. Regular audits by an independent institution against the European voluntary quality standard for responsible investment ARISTA® attest oekom’s extensive quality standards which are complemented by a comprehensive quality management system.

oekom research reviewed the information and documentation provided by SNCF Réseau to assess the Green Bond’s alignment with the CBI requirements:

• Conformance with Part A, B and C of the CBI Standard

oekom research’s approach to assess whether the issuer meets the criteria of the CBI standard was as follows. The issuer provided an overview over the projects included in the Green Bond asset pool and the relevant processes regarding the proceeds (e.g. use of proceeds, management of proceeds) to oekom research. Further, the issuer needed to fill in a questionnaire that covers all criteria of the Climate Bond Standard 2.1. Additionally, the issuer had to provide background documents that elaborate further on the information mentioned in the questionnaire. With the help of this questionnaire and the background documents, oekom research carried out a desk-based assessment of the CBI criteria. In case any answers were unclear, oekom research contacted the issuer for more details and clarification.

This Verification Report for Post-Issuance Climate Bond Certification including all documentation provided alongside is intended for the use of SNCF Réseau and the Climate Bond Standard Board. The present document may be published by SNCF Réseau, CBI and oekom research. CBI and oekom research agree to publish the report with the consent of SNCF Réseau.

oekom’s Responsibility as a Verifier

Restriction on Distribution and Use of Report

Independence and Quality Control

page 3

Based on the limited assurance procedures conducted on SNCF Réseau’s Green Bond issued in October 2016, oekom research found no evidence for non-conformance with the Climate Bond Standard’s post-issuance requirements.

Robert Haßler, CEO

oekom research AG

Munich, 28 November 2017

Opinion

page 4

Disclaimer

1. oekom research AG uses a scientifically based rating concept to analyse and evaluate the environmental and social performance of companies and countries. In doing so, we adhere to the highest quality standards which are customary in responsibility research worldwide. In addition we create a Second Party Opinion (SPO) on bonds based on data from the issuer.

2. We would, however, point out that we do not warrant that the information presented in this SPO is complete, accurate or up to date. Any liability on the part of oekom research AG in connection with the use of these SPO, the information provided in them and the use thereof shall be excluded. In particular, we point out that the verification of the compliance with the selection criteria is based solely on random samples and documents submitted by the issuer.

3. All statements of opinion and value judgements given by us do not in any way constitute purchase or investment recommendations. In particular, the SPO is no assessment of the economic profitability and credit worthiness of a bond, but refers exclusively to the social and environmental criteria mentioned above.

4. We would point out that this SPO, in particular the images, text and graphics contained therein, and the layout and company logo of oekom research AG are protected under copyright and trademark law. Any use thereof shall require the express prior written consent of oekom research AG. Use shall be deemed to refer in particular to the copying or duplication of the SPO wholly or in part, the distribution of the SPO, either free of charge or against payment, or the exploitation of this SPO in any other conceivable manner.

About oekom research

oekom research is one of the world’s leading rating agencies in the field of sustainable investment. The agency analyses companies and countries with regard to their environmental and social performance. oekom research has extensive experience as a partner to institutional investors and financial service providers, identifying issuers of securities and bonds which are distinguished by their responsible management of social and environmental issues. More than 100 asset managers and asset owners routinely draw on the rating agency’s research in their investment decisionmaking. oekom research’s analyses therefore currently influence the management of assets valued at over 600 billion euros.

As part of our Green Bond Services, we provide support for companies and institutions issuing sustainable bonds, advise them on the selection of categories of projects to be financed and help them to define ambitious criteria. We verify the compliance with the criteria in the selection of projects and draw up an independent second party opinion so that investors are as well informed as possible about the quality of the loan from a sustainability point of view.

Contact: oekom research AG, Goethestraße 28, 80336 Munich, Germany, tel: +49 / (0) 89 / 54 41 84-90, e-mail: [email protected]

page 5

Annex

• Annex 1: Detailed Findings

• Annex 2: SNCF Réseau’s Green Bond Reporting 2016

page 6

4. Nominated Projects and Assets

Requirement Factual Findings

Analysis against Requirements

4.1. Decision-making process to determine the continuing eligibility of nominated projects and assets

SNCF Réseau has defined a set of environmental objectives (i.e. to promote eco-friendly modes of transportation and contribute to the fight against greenhouse gas emissions) and has implemented processes to determine the eligibility of nominated projects.

4.2 Conformance with the Bond’s documented objectives and requirements of Part B of the CBI Standard

SNCF Réseau assesses all nominated projects against its self-defined eligibility criteria, which meet the bond’s objectives. All nominated projects are electrified rail infrastructure projects. Through the financing of these projects it will be possible to avoid emissions of approx. 2.9 million tCO2e over the next 40 years. The nominated projects are therefore compliant with the eligibility criteria under Part B of the Climate Bond Standard.

4.3 No double nomination of projects and assets

By earmarking projects SNCF Réseau has designed a process to ensure that projects are not nominated twice.

Annex 1: Detailed Findings

page 7

5. Use of Proceeds

Requirement Factual Findings Analysis against Requirements

5.1 Allocation of net proceeds to nominated projects and assets.

All proceeds had been allocated to nominated assets by 1st March 2017. ✓

5.2 Allocation of funds within 24 months of issuance of the bond

All proceeds had been allocated to nominated assets by 1st March 2017. ✓

5.3 Share of financing and refinancing.

The net proceeds of the Green Bond were exclusively used to finance newly originated projects of SNCF Réseau.

5.4 Tracking of proceeds SNCF Réseau tracks the proceeds using an internal IT system. Allocation is reviewed annually.

5.5 Net proceeds of the loan and investment to nominated projects and assets

SNCF Réseau has identified eligible projects significantly greater than the net proceeds of the bond. SNCF Réseau reviews allocation annually.

6. Non-contamination of Proceeds

Requirement Factual Findings Analysis against Requirements

6.1 Tracking of proceeds SNCF Réseau confirms that proceeds are tracked using an internal IT system. Allocation is reviewed annually.

page 8

Requirement Factual Findings Analysis against Requirements

6.2 Non-contamination of

proceeds

SNCF Réseau invests temporarily

unallocated proceeds in SRI mutual funds,

bank deposits, cash, and/or cash

equivalents.

SNCF Réseau also states that by 1st March

2017 100% of the proceeds had been

allocated to eligible assets which are

earmarked in the internal IT system.

6.3 Cases of force majeure n/a. All proceeds have been allocated. n/a

7. Confidentiality

Requirement Factual Findings Analysis against Requirements

7.1 Description of the projects All financed assets are electrified rail

infrastructure projects (maintenance,

upgrades and extensions of existing lines

as well as construction of new lines).

Through the financing of these projects it

will be possible to avoid emissions of

approx. 2.9 million tCO2e over the next 40

years.

7.2 Disclosure of information

to the market

Details on SNCF Réseau’s Green Bond are

available in SNCF Réseau’s Green Bond

Reporting 2016, available on a dedicated

section of SNCF Réseau corporate website:

https://www.sncf-reseau.fr/en/sri-green-

bonds.

page 9

8. Reporting

Requirement Factual Findings Analysis against Requirements

8.1 Description of reporting Details on SNCF Réseau’s Green Bond are available in SNCF Réseau’s Green Bond Reporting 2016. The 2016 project report can be found in Annex 2.

The quantitative performance indicators which include the following:

• Aggregated information on financed projects

• Greenhouse gases emitted and avoided

• Resources protected

9. Climate Bond Taxonomy

Requirement Factual Findings Analysis against Requirements

9.1 Matching of Climate Bond category

All assets of the Green Bond are electrified rail infrastructure projects (maintenance, upgrades and extensions of existing lines as well as construction of new lines). Through the financing of these projects it will be possible to avoid emissions of approx. 2.9 million tCO2e over the next 40 years.

page 10

10. Technical Criteria

Requirement Factual Findings Analysis against Requirements

10.1 Sector-specific eligibility criteria

All assets of the Green Bond are electrified rail infrastructure projects (maintenance, upgrades and extensions of existing lines as well as construction of new lines). Through the financing of these projects it will be possible to avoid emissions of approx. 2.9 million tCO2e over the next 40 years.

10.2 Bonds covering several sector-specific criteria

n/a (low carbon rail transportation only) n/a

11. Project Holding

Requirement Factual Findings Analysis against Requirements

11.1 Holding of assets with a fair market value at least of the original amount at time of issuance

SNCF Réseau is financing own projects, which will be on their books for the long-run. The pool of underlying projects will remain the same over the term of the loan.

12. Settlement Period

Requirement Factual Findings Analysis against Requirements

12.1 Description of the process and timeline of distribution of proceeds

cf. 5.1 ✓

page 11

Requirement Factual Findings Analysis against Requirements

12.2 Description of process regarding unallocated proceeds after 24 months

n/a (cf. 5.1) n/a

13. Earmarking

Requirement Factual Findings Analysis against Requirements

13.1 Description of internal earmarking process

Every project that is being financed through the Green Bond is earmarked in SNCF Réseau’s internal IT system. This system is managed by the Treasury and the Accounting Departments.

page 12

Annex 2: SNCF Réseau’s Green Bond Reporting 2016

RE

PO

RT

2016

GR

EE

N

BO

ND

S

SNCF-RESEAU.FR

ED

ITO

RIA

L

Dea

r inv

esto

rs a

nd p

artn

ers,

With

this

Gre

en B

onds

pro

gram

me,

SN

CF

Rése

au is

see

king

to d

emon

stra

te it

s co

mm

itmen

t

to e

colo

gica

l tra

nsiti

on o

n a

daily

bas

is.

The

inte

rest

of t

his

prog

ram

me,

for a

com

pany

suc

h as

our

s, w

hose

act

ivity

is n

atur

ally

at

the

hear

tof t

he fi

ght a

gain

st c

limat

e ch

ange

, can

be

conv

eyed

in a

few

ess

entia

l mes

sage

s:–

enco

urag

ing

mod

es o

f tra

nsp

ort

that

are

eco

-frie

ndly

, saf

e, fa

st, a

nd w

ith lo

w re

quire

men

ts

in te

rms

of s

pace

and

nat

ural

reso

urce

s;–

cont

ribut

ing

to th

e se

lect

ion

of p

roje

cts

that

hel

p in

the

fig

ht a

gai

nst

gre

enho

use

gas

em

issi

ons,

th

e pr

eser

vatio

n of

nat

ural

reso

urce

s an

d th

e pr

otec

tion

of b

iodi

vers

ity;

– p

artic

ipat

ing

in t

he d

evel

opm

ent

of s

ocia

lly r

esp

onsi

ble

fina

ncin

g a

nd s

uppo

rtin

g th

e ef

fort

in

itiat

ed b

y th

e Fr

ench

aut

horit

ies

as p

art o

f CO

P21

.

Our

com

mitm

ent a

t the

tim

e th

is pr

ogra

mm

e w

as la

unch

ed in

aut

umn

2016

was

to b

ecom

e a

lead

ing

pl

ayer

in th

e G

reen

Bon

d m

arke

t. In

less

than

12

mon

ths,

SN

CF

Rése

au h

as la

unch

ed th

ree

Gre

en B

onds

iss

ues

(mat

urity

per

iods

of 1

5, 1

7 an

d 30

year

s) fo

r a to

tal a

mou

nt o

f 2.6

5bi

llion

euro

s, th

us b

ecom

ing

on

e of

the

wor

ld’s

top

fifte

en p

laye

rs in

thi

s do

mai

n, a

nd h

as re

ceiv

ed a

Clim

ate

Bond

Aw

ard.

We

mad

e a

com

mitm

ent t

o se

t ne

w h

igh-

leve

l sta

ndar

ds

for t

rans

port

and

railw

ay in

dust

ry

infr

astr

uctu

res

in p

artic

ular

: with

the

help

of C

arbo

ne4,

SN

CF

Rése

au h

as e

stab

lishe

d a

new

met

hod

fo

r ass

essi

ng th

e en

viro

nmen

tal i

mpa

ct o

f its

reno

vatio

n an

d de

velo

pmen

t pro

ject

s w

hich

was

use

d

in th

e dr

aftin

g of

this

repo

rt. A

sum

mar

y of

this

met

hodo

logy

can

be

foun

d on

pag

e 33

of t

his

repo

rt.

We

wer

e co

mm

itted

to a

dopt

ing

the

bes

t ce

rtifi

catio

n st

and

ard

s: th

e SN

CF

Rése

au G

reen

Bon

ds

prog

ram

me

is o

ne o

f the

few

pro

gram

mes

wor

ldw

ide

to h

ave

rece

ived

dou

ble

cert

ifica

tion:

G

reen

Bon

d Pr

inci

ples

and

Clim

ate

Bon

ds In

itiat

ive,

aw

arde

d by

Oek

om R

esea

rch.

Last

ly, w

e w

ante

d to

pro

duce

a re

port

bas

ed o

n th

e b

est

pra

ctic

es in

this

fiel

d:–

the

allo

catio

n of

fund

s ra

ised

as

part

of o

ur G

reen

Bon

ds is

sues

has

bee

n ve

rifie

d an

d in

clud

ed

in a

n as

sura

nce

repo

rt b

y th

e fir

m K

PMG

;–

the

asse

ssm

ent o

f the

env

ironm

enta

l im

pact

of e

ligib

le p

roje

cts,

as

defin

ed in

the

SNC

F Ré

seau

pr

ogra

mm

e, h

as b

een

valid

ated

by

a co

nsul

ting

firm

spe

cial

isin

g in

the

ener

gy tr

ansi

tion

and

clim

ate

chan

ge a

dapt

atio

n, C

arbo

ne4.

As

rega

rds

the

envi

ronm

enta

l im

pact

, one

sta

tistic

in p

artic

ular

sho

uld

be h

ighl

ight

ed: t

he fu

nds

ra

ised

than

ks to

the

SNC

F Ré

seau

Gre

en B

ond

2016

hav

e m

ade

it po

ssib

le to

avo

id e

mis

sion

of

2.9

mill

ion

tons

eq

uiva

lent

of C

O2

over

the

fort

y ne

xt y

ears

, i.e

. an

impa

ct c

ompa

rabl

e

to th

e ca

rbon

foot

prin

t of a

ppro

xim

atel

y 6,

000

Fren

ch re

side

nts

over

the

sam

e pe

riod.

We

hope

that

you

will

take

as

muc

h pl

easu

re in

read

ing

this

repo

rt a

s w

e di

d in

pre

parin

g

and

emba

rkin

g up

on th

is G

reen

Bon

d ad

vent

ure,

with

all

the

SNC

F Ré

seau

bus

ines

s lin

es,

over

the

past

two

year

s.

We

are

prou

d to

be

wor

king

alo

ngsi

de y

ou in

cre

atin

g th

e co

nditi

ons

for t

he r

esp

onsi

ble

m

oder

nisa

tion

of o

ur n

etw

ork.

PATR

ICK

JE

AN

TET,

DE

PU

TY C

HA

IRM

AN

OF

THE

SN

CF

EX

EC

UTI

VE

BO

AR

DA

ND

CE

O O

F SN

CF

SEA

U

02SN

CF

RÉS

EAU

G

REE

N B

ON

DS

REP

ORT

201

603

01

/ P

RE

SE

NTA

TIO

N

OF

SN

CF

SE

AU

P.0

6_S

NC

F RÉ

SEA

U

AN

D T

HE

FREN

CH

RA

ILW

AY

NET

WO

RK

P.0

7_A

CRE

DIT

RIS

K

EQU

IVA

LEN

T TO

TH

AT

O

F TH

E FR

ENC

H S

TATE

02

/ E

CO

LOG

ICA

L

TR

AN

SIT

ION

AN

D R

AIL

WA

Y

INF

RA

STR

UC

TU

RE

P.1

0_T

HE

OB

JEC

TIVE

S

OF

THE

ECO

LOG

ICA

L TR

AN

SITI

ON

P.1

2_T

HE

“CLI

MA

TE”

B

ENEF

ITS

OF

RAIL

IN T

HE

FIG

HT

AG

AIN

ST C

LIM

ATE

CH

AN

GE

P.1

4_T

HE

SNC

F RÉ

SEA

U

CA

RBO

N A

PPRO

AC

H

P.15

_SN

CF

RÉSE

AU

’S

CSR

PO

LIC

Y

P.16

_SN

CF

RÉSE

AU

EX

TRA

-FIN

AN

CIA

L RA

TIN

GS

03

/ SN

CF

SE

AU

’S

“GR

EE

N B

ON

DS F

UN

DIN

G”

P.21

_CH

ARA

CTE

RIST

ICS

O

F TH

E 20

16 O

PERA

TIO

N

_ TY

POLO

GY

A

ND

GEO

GRA

PHIC

AL

DIS

TRIB

UTI

ON

OF

INVE

STO

RS

04

/ A

LLO

CA

TIO

N

OF

BO

RR

OW

ED

FU

ND

S

P.24

_PRE

PARA

TIO

N

OF

THE

SNC

F RÉ

SEA

U

GRE

EN B

ON

DS

PRO

GRA

MM

E

_A “

CLI

MA

TE”

CER

TIFI

ED

PRO

GRA

MM

E

P.2

5_E

LIG

IBLE

PRO

JEC

T

CA

TEG

ORI

ES

P.2

6_T

AB

LE

OF

ALL

OC

ATI

ON

S

P.2

7__

DES

CRI

PTIO

N

OF

THE

FUN

D

MA

NA

GEM

ENT

POLI

CY

P.2

8_K

PMG

ASS

URA

NC

E RE

PORT

05

/ R

EP

OR

TIN

G

AN

D M

ETH

OD

OLO

GY

O

F T

HE

GR

EE

N B

ON

DS

PR

OG

RA

MM

E IN

DIC

ATO

RS

P.3

2_M

AP

OF

THE

GRE

EN B

ON

D

2016

SIT

ES

P.3

3_G

ENER

AL

IND

ICA

TORS

TA

BLE

P.3

4_D

ETA

ILED

REP

ORT

PE

R C

ATE

GO

RY

P.3

5_C

ateg

ory

1. In

vest

men

ts

in m

aint

enan

ce, m

oder

nisa

tion

an

d e

nerg

y ef

ficie

ncy

pro

ject

s

conc

erni

ng th

e ra

il sy

stem

P.3

9_C

ateg

ory

2. In

vest

men

ts

rela

ted

to n

ew ra

il lin

es

and

rail

line

exte

nsio

ns

06/

ON

E S

TE

P F

UR

TH

ER

TA

BLE

OF

CO

NTE

NTS

04

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

60

5

01

INTR

OD

UC

TIO

NT

O S

NC

F R

ÉS

EA

U

SNC

F R

ÉSE

AU

A

ND

TH

E F

RE

NC

H

RA

ILW

AY

NE

TWO

RK

Cre

ated

in J

anua

ry 2

015

thro

ugh

th

e m

erg

er o

f th

e R

ésau

fer

de

Fran

ce(R

FF),

SNC

F In

fra

an

d t

he D

irect

ion

de

la c

ircul

atio

n fe

rro

viai

re(D

CF)

, SN

CF

Rés

eau

ow

ns a

nd m

anag

es t

he F

renc

h

natio

nal r

ail n

etw

ork.

SN

CF R

ése

au’s

main

resp

onsi

bili

ties:

– en

surin

g fa

ir ac

cess

to

the

rail

ne

twor

k fo

r 26

rai

l tra

nsp

ort

com

pan

ies

an

d 1

2 re

gio

nal t

rans

por

t au

thor

ities

;

A C

RE

DIT

RIS

K

EQ

UIV

ALE

NT

TO T

HA

T

OF

THE

FR

EN

CH

STA

TE

As

a 10

0% S

tate

-ow

ned

pub

lic e

ntity

, SN

CF

Rés

eau

ben

efits

from

the

str

ong

su

pp

ort

of t

he F

renc

h St

ate

bas

edon

its

leg

al s

tatu

s (E

PIC

).

As

an E

PIC

, SN

CF R

ése

au:

– is

not

sub

ject

to

priv

ate-

sect

or

ban

krup

tcy

law

;–

may

onl

y b

e d

isso

lved

by

an

am

end

ing

law

tra

nsfe

rrin

g

its r

ight

s an

d o

blig

atio

ns

to a

noth

er p

ublic

ent

ity.

SN

CF R

ése

au:

– p

erfo

rms

a p

ublic

sec

tor

mis

sion

an

d e

njoy

s a

natu

ral m

onop

oly

p

ositi

on w

ith n

o ris

k of

der

egul

atio

n;–

was

incl

uded

in t

he “

Gov

ernm

ent

Rel

ated

Ent

ity”

list

by

the

Euro

pea

n co

mm

issi

on in

200

2 an

d is

elig

ible

to

the

EC

B P

ublic

Sec

tor

Purc

hasi

ng

Prog

ram

me.

SNC

F R

ésea

u d

ebt

is s

een

by

cred

it ra

ting

ag

enci

es a

s im

plic

itly

g

uara

nte

ed

by

the F

rench

Sta

te.

TUR

NO

VE

R P

ER

BU

SIN

ESS

LI

NE

IN 2

016

TRA

FFIC

IN 2

016

–or

gan

isin

g a

nd d

evel

opin

g r

ail t

raff

ic:

15,0

00tr

ains

circ

ulat

e d

aily

, tra

nsp

ortin

g

mor

e th

an 5

mill

ion

pas

seng

ers

per

day

;–

ensu

ring

the

mai

nten

ance

and

en

hanc

emen

t of

the

net

wor

k,

SNC

FR

ésea

u is

one

of t

he le

adin

g

inve

stor

s in

Fra

nce

with

3.4

bill

ion

euro

s in

vest

ed in

201

6;–

ensu

ring

the

dev

elop

men

t

of t

he n

etw

ork.

With

its

54,0

00em

plo

yees

, SN

CF

Rés

eau

has

gene

rate

d a

turn

over

of 6

.4bi

llion

euro

s w

ith a

n op

erat

ing

mar

gin

(EB

ITD

A-

earn

ing

s b

efo

re in

tere

st, t

ax,

dep

reci

atio

n an

d a

mo

rtis

atio

n)

of

1.9

bill

ion

euro

s an

d a

net

res

ult

o

f -

0.1

bill

ion

euro

s in

201

6.

TE

R

38%

Hig

h-s

peed

tra

ins

35%

Inte

rcit

y tr

ains

13%

6.4

4

BIL

LIO

N

EU

RO

S

Tran

silie

n

14%

Fre

ight

3%

Reg

ional

tr

ains

(TE

R a

nd

Tr

ansi

lien)

50%

Hig

h-s

peed

tr

ains

28%

Inte

rcit

y tr

ains

13%

Fre

ight

15%

471

MIL

LIO

N

OF

TR

AIN

S-

KIL

OM

ET

ER

RA

TIN

G

AG

EN

CIE

SLO

NG

TE

RM

SH

OR

T

TE

RM

Fitc

hA

A

F1+

Mo

od

y’s

Aa2

P-1

Stan

dar

d &

P

oo

r’s

AA

A

-1+

06

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

07

As

the

mo

st

eco

-fri

en

dly

mo

de

o

f tr

ansp

ort

, rai

lway

tr

ansp

ort

has

a

crit

ical

ro

le t

o p

lay

in

th

e t

ran

siti

on

to

a lo

w c

arb

on

e

con

om

y.

02 EC

OLO

GIC

AL

TR

AN

SIT

ION

AN

D R

AIL

IN

FRA

STR

UC

TU

RE

08

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

60

9

RED

UC

ING

G

HG

EM

ISSI

ON

S

FOU

RFO

LD

BY

2050

Vario

us s

cena

rios

of t

he p

rog

ress

ion

of

gre

enho

use

gas

em

issi

ons

(GH

G)

and

the

ir co

nseq

uenc

es o

n th

e av

erag

e g

lob

al t

emp

erat

ure

are

bei

ng s

tud

ied

b

y th

e IP

CC

1 . Th

ey h

ave

pre

dic

ted

a

rise

in t

he t

emp

erat

ure

on a

glo

bal

sc

ale

of

bet

wee

n 1.

8 an

d 4

°C

on

aver

age

by

2100

, co

mp

ared

to

the

end

of

the

19th c

entu

ry.

The o

bje

ctiv

e s

et

by

deci

sio

n-m

akers

at

glo

bal le

vel and

reaff

irm

ed

in

the P

ari

s A

gre

em

ent,

resu

ltin

g

fro

m t

he 2

1st C

onfe

rence

of

the

Part

ies

(CO

P2

1)

in D

ece

mb

er

20

15

,

TH

E O

BJE

CTIV

ES

OF

TH

E E

CO

LO

GIC

AL

TR

AN

SIT

ION

AT E

UR

OP

EA

N L

EV

EL

The E

uro

pean U

nio

n h

as m

ade

a

stro

ng c

om

mit

men

t to

the

fig

ht

agai

nst

clim

ate

chan

ge

by

anti

cip

atin

g

the

“po

st-K

yoto

” p

erio

d t

hro

ugh

th

e C

limate

and

Energ

y P

ack

ag

e,

adop

ted

in 2

008,

whi

ch s

ets

the

obje

ctiv

e of

“3

x20

” (2

0% G

HG

em

issi

ons

save

d,

20%

mor

e re

new

able

ene

rgy,

20%

mor

e en

erg

y ef

ficie

ncy)

.D

urin

g 2

014,

Eur

opea

n d

iscu

ssio

ns

focu

sed

on

the

def

initi

on o

f a n

ew

C

limate

and

Energ

y P

ack

ag

e

for

20

30

. Th

is c

onst

itute

d t

he

bas

is fo

r th

e Eu

rop

ean

com

mitm

ent

to

the

glo

bal

ag

reem

ent

reac

hed

in

Par

is d

urin

g C

OP

21.

AT N

ATIO

NA

L LE

VE

L

In o

rder

to

stre

ngth

en t

he C

limate

Pla

n

by

inco

rpor

atin

g lo

ng-t

erm

nat

iona

l m

easu

res,

Fra

nce

has

und

erta

ken

a

maj

or c

omm

itmen

t to

red

ucin

g

its G

HG

em

issi

ons

four

fold

by

2050

: th

e “F

acto

r4”

ob

ject

ive.

The

goa

l is

to

achi

eve

a le

vel o

f ap

pro

xim

atel

y 2

tCO

2eq

3 per

inha

bita

nt, w

hich

co

rres

pon

ds

to t

he r

ecom

men

ded

leve

l for

lim

iting

glo

bal

war

min

g t

o 2°

C.

Last

ly, t

he L

aw

on E

nerg

y Tr

ansi

tio

n

for

Gre

en G

row

th (

LTE

CV

),

pub

lishe

d in

the

Jo

urn

al O

ffic

iel

dat

ed 1

8A

ugus

t20

15, a

s w

ell a

s it

s ac

com

pan

ying

act

ion

pla

ns, a

re d

esig

ned

to

hel

p F

ranc

e co

ntrib

ute

mor

e ef

fect

ivel

y to

the

fig

ht a

gai

nst

clim

ate

chan

ge

an

d t

he p

rote

ctio

n of

the

env

ironm

ent,

an

d t

o im

pro

ve it

s en

erg

y in

dep

end

ence

w

hile

off

erin

g it

s co

mp

anie

s an

d c

itize

ns

acce

ss t

o en

erg

y at

com

pet

itive

cos

ts.

The t

arg

ets

set

by

the law

To p

rovi

de

a fr

amew

ork

for

the

join

t ac

tion

of c

itize

ns, c

omp

anie

s,

terr

itorie

s an

d t

he S

tate

, the

law

has

se

t m

ediu

m-

and

long

-ter

m t

arg

ets:

red

ucin

g g

reen

hous

e g

as e

mis

sion

s

by

40%

bet

wee

n 19

90 a

nd 2

030,

an

d b

y 75

% b

etw

een

1990

and

205

0 (F

acto

r 4)

;–

red

ucin

g fi

nal e

nerg

y co

nsum

ptio

n

by

50%

in 2

050

com

par

ed t

o 20

12,

with

an

inte

rmed

iate

tar

get

of 2

0%

in 2

030;

– re

duc

ing

prim

ary

ener

gy

cons

ump

tion

of fo

ssil

fuel

s b

y 30

% in

203

0 co

mp

ared

to

201

2;–

brin

gin

g t

he s

hare

of r

enew

able

en

erg

ies

to 2

3% o

f gro

ss fi

nal e

nerg

y co

nsum

ptio

n in

202

0, a

nd t

o 32

%

in 2

030;

– b

ring

ing

the

sha

re o

f nuc

lear

ene

rgy

in

ele

ctric

ity g

ener

atio

n to

50%

by

2025

.

is t

o lim

it t

he t

em

pera

ture

incr

ease

to

2°C

betw

een n

ow

and

21

00

.

To d

o s

o, w

e m

ust

red

uce

glo

bal

G

HG

em

issi

ons

tw

ofo

ld b

y 20

50

com

par

ed t

o 1

990

leve

ls in

ord

er

to a

chie

ve t

he m

ost

op

timis

tic

scen

ario

s an

d li

mit

the

cons

eque

nces

of

clim

ate

chan

ge.

The S

NC

F R

ése

au e

nerg

y and

ca

rbo

n p

erf

orm

ance

ap

pro

ach

is

part

of

a g

lob

al fr

am

ew

ork

to

red

uce

GH

G e

mis

sio

ns

at

wo

rld

, E

uro

pean a

nd

nati

onal le

vels

, su

mm

ari

sed

in t

he t

ab

le b

elo

w.

1. T

he

Inte

rgo

vern

me

nta

l Pan

el o

n C

limat

e C

han

ge

(IP

CC

) is

an in

terg

ove

rnm

en

tal o

rgan

isat

ion

ass

ign

ed

“t

o a

sse

ss o

n a

co

mp

reh

en

sive

, ob

ject

ive

, op

en

an

d t

ran

spar

en

t b

asis

th

e s

cie

nti

fic, t

ech

nic

al a

nd

so

cio

-eco

no

mic

in

form

atio

n r

ele

van

t to

un

de

rsta

nd

ing

th

e s

cie

nti

fic b

asis

of r

isk

of h

um

an-i

nd

uce

d c

limat

e c

han

ge

, its

po

ten

tial

im

pac

ts a

nd

op

tio

ns

for

adap

tati

on

an

d m

itig

atio

n.”

2. P

OP

E la

w (E

ne

rgy

Po

licy

Ori

en

tati

on

Pro

gra

mm

e).

3. T

on

s e

qu

ival

en

t C

O2.

GLO

BA

LE

UR

OP

EFR

AN

CE

Kyo

to P

roto

col

20

20

Clim

ate

and

E

nerg

y P

ack

ag

e2

030

Clim

ate

and

E

nerg

y P

ack

ag

eFact

or

4(-

3%

per

year)

Red

uci

ng

GH

G b

y 5.2

% b

etw

een 2

008-

2012.

 

Red

uci

ng

GH

G

by

20%

by

20

20

.  T

hro

ug

h a

co

mb

inat

ion

of re

new

able

energ

y (2

0%

) an

d g

reat

er

energ

y effic

iency

(2

0%

).

Red

uci

ng

GH

G

by

40

% b

y 2

03

0.

Thro

ug

h a

co

mb

inat

ion

of re

new

able

energ

y (2

7%

) and

gre

ater

energ

y effic

iency

(2

7%

).

Red

uci

ng

G

HG

em

issi

ons

fo

urf

old

b

y 2050

(PO

PE

2 la

w2).

GH

G E

MIS

SIO

NS R

ED

UC

TIO

N T

AR

GE

TS (

VS 1

990)

10

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

11

TH

E “

CLIM

ATE

BE

NE

FIT

S O

F R

AIL

IN

TH

E F

IGH

T A

GA

INST

CLIM

ATE

CH

AN

GE

In F

rance

, ra

il tr

ansp

ort

,

whic

h a

cco

unts

fo

r 1

0%

of

traff

ic

GH

G E

MIS

SIO

NS P

ER

MO

DE

OF T

RA

NSP

OR

T

Gra

ms

equi

vale

nt C

O2

per

pas

seng

er-k

m

Pass

eng

ers

TG

V, L

YR

IA, I

DT

GV,

OU

IGO

TR

AN

SILI

EN

INT

ER

CIT

IES

EU

RO

STA

R, T

HA

LYS,

ALL

EO

, ELI

PSO

S, G

ALA

TE

RLO

NG

DIS

TAN

CE

BU

S (O

UIB

US)

CA

RP

OO

LIN

GC

AR

S, L

ON

G D

ISTA

NC

E T

RA

VE

LC

AR

S, L

ON

G D

ISTA

NC

E/S

UB

UR

BA

N T

RA

VE

LP

LAN

E (D

OM

EST

IC F

LIG

HT

S)R

EG

ION

AL

OR

DE

PAR

TM

EN

TAL

BU

SSI

NG

LE P

ASS

EN

GE

R V

EH

ICLE

020

3 611

8 to

27

30

90

44

148

74

168

171

207

4060

8010

012

014

016

018

020

022

0

Gra

ms

equi

vale

nt C

O2

per

to

nne-

km

Fre

ight

RA

ILM

AR

ITIM

EC

OM

BIN

ED

RIV

ER

TR

UC

KA

IR

020

4060

8010

012

014

016

018

020

022

0

7

21

77

17

34

552

BR

EA

KD

OW

N P

ER

SO

UR

CE

OF

GH

G E

MIS

SIO

NS

(EX

CLU

DIN

G L

ULU

CF

1)

IN F

RA

NC

E I

N 2

01

4

EN

ER

GY

IND

UST

RY:

8.6

%

TR

AN

SPO

RT:

28.

5%

MA

NU

FAC

TU

RIN

G A

ND

C

ON

STR

UC

TIO

N IN

DU

STR

Y: 1

3.1%

TE

RT

IAR

Y/R

ESI

DE

NT

IAL:

15.

8%

OT

HE

RS:

3.8

%

Ag

ricu

ltur

e:

17.2

5%

Ind

ustr

ial

pro

ced

ures

and

so

lven

ts: 8

.75%

Was

te m

ater

ial:

4.3%

Ene

rgy

co

nsum

pti

on:

69

.7%

So

urc

e: C

ite

pa,

Ju

ne

201

6

GH

G E

MIS

SIO

NS P

ER

MO

DE

S O

F T

RA

NSP

OR

T

IN F

RA

NC

E A

S A

% (

INC

LU

DIN

G F

OD

)

AIR

: 3.5

%

RIV

ER

AN

D M

AR

ITIM

E: 1

%

RA

IL: 0

.4%

OT

HE

RS:

0.4

%

Hea

vy

go

od

s ve

hicl

es:

21.3

%

Pri

vate

veh

icle

s:

53.2

%

Uti

lity

ve

hicl

es:

19.1

%

Two

whe

eler

s: 1

.2%

Off

-ro

ad

vehi

cles

: 5.

3%

So

urc

es:

-

Pas

sen

ge

rs: m

eth

od

olo

gy

no

te o

n C

O2

info

rmat

ion

fo

r tr

ansp

ort

se

rvic

es

(2

016,

sta

tist

ics

ob

tain

ed

fr

om

SN

CF,

ME

DD

E, A

DE

ME

).-

Fre

igh

t: S

NC

F C

arg

o (2

014)

, S

NC

F L

og

isti

cs (2

011)

, AD

EM

E.

Thus

, any

mod

al s

hift

from

air

an

d r

oad

to

rail

is g

reat

ly b

enef

icia

l to

the

GH

G e

mis

sion

s b

alan

ce

shee

t, g

iven

tha

t tr

ansp

ort

in

Fra

nce

acc

ounts

fo

r 3

0%

o

f to

tal G

HG

em

issi

ons

o

f Fra

nce

(i.e.

13

3M

tCO

2eq

).

Mor

eove

r, th

e ad

vant

ages

of r

ail

tran

spor

t ar

e no

t lim

ited

to

low

leve

ls

of C

O2 e

mis

sion

s. T

here

are

oth

er

ben

efits

suc

h as

low

er a

ir p

ollu

tion,

fe

wer

acc

iden

ts, o

ptim

ised

use

of

sp

ace,

less

noi

se a

nd a

low

er

neg

ativ

e b

iod

iver

sity

imp

act.

(fre

ight

and

pass

eng

ers

), e

mit

s

less

than 1

% o

f all

GH

G e

mis

sio

ns

fr

om

tra

nsp

ort

. Th

is c

an b

e ex

pla

ined

by:

– th

e lo

w a

mou

nt o

f ene

rgy

need

ed

for

rail

trac

tion

(whe

el-r

ail c

onta

ct

vs t

yre-

road

);–

mas

s-tr

ansp

ort;

– th

e hi

gh

use

of e

lect

ricity

(7

8% o

f tra

ins

use

elec

tric

tra

ctio

n),

only

4%

of w

hich

is g

ener

ated

b

y fo

ssil

fuel

s in

Fra

nce.

1. L

ULU

CF

: Lan

d u

se, L

and

Use

Ch

ang

e a

nd

Fo

rest

ry.

12

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

13

THE

SN

CF

SEA

U

CA

RB

ON

AP

PR

OA

CH

Alth

oug

h ra

il tr

ansp

ort

is a

key

co

ntrib

utor

to

Fran

ce’s

low

car

bon

tr

ansi

tion,

SN

CF

Rés

eau

none

thel

ess

strik

e fo

r g

reat

er e

nerg

y ef

ficie

ncy

an

d r

educ

ing

it’s

ow

n G

HG

em

issi

ons.

SN

CF R

ése

au h

as

thus

mad

e

a c

om

mit

ment

to r

ed

uce

its

energ

y co

nsu

mp

tio

n a

nd

its

GH

G e

mis

sio

ns

b

y 2

0%

betw

een 2

01

5 a

nd

20

25

.

To a

chie

ve t

his,

act

ions

hav

e b

een

iden

tifie

d a

nd in

itiat

ed.

– Fo

r al

l our

act

iviti

es:

tert

iary

, op

erat

iona

l act

iviti

es, p

roje

cts

(rel

ated

to

the

Gre

en B

ond

s p

rog

ram

me)

;–

For

the

prim

ary

sour

ces

of

GH

G e

mis

sion

s: e

nerg

y re

qui

red

fo

r co

nstr

uctio

n, s

ervi

ce v

ehic

les,

tr

ain

eng

ines

, mat

eria

ls u

sed

, etc

.

Kno

win

g t

he c

arb

on w

eig

ht

of S

NC

FR

ésea

u ac

tiviti

es is

the

sta

rtin

g

poi

nt fo

r ac

tions

for

imp

rove

men

t

and

com

mitm

ent

as p

art

of a

sus

tain

able

d

evel

opm

ent

app

roac

h. It

hel

ps

iden

tify

prio

ritie

s fo

r op

timis

atio

n an

d im

pro

ves

ou

r op

erat

iona

l met

hod

s.In

ord

er t

o in

dus

tria

lise

the

app

roac

h,

SNC

F R

ésea

u is

cur

rent

ly p

rep

arin

g

an o

per

atio

nal t

ool t

o ca

lcul

ate

an

d r

epor

t th

e G

HG

em

issi

ons

of t

he c

omp

any’

s m

ain

activ

ity,

i.e. m

aint

enan

ce a

nd m

oder

nisa

tion

of

the

nat

iona

l rai

l net

wor

k.

Sinc

e 20

15, S

NC

F R

ésea

u ha

s p

rod

uced

a

first

Bilan C

arb

one

® (C

arb

on B

alan

ce

shee

t) fo

r tr

ack

rene

wal

pro

ject

s us

ing

a

mob

ile w

orks

hop

kno

wn

as a

“Su

ite

Rap

ide”

(90

km b

etw

een

Nar

bon

ne a

nd

Mon

tpel

lier)

, id

entif

ied

act

ions

to

red

uce

GH

G e

mis

sion

s an

d c

reat

ed a

too

l to

ass

ess

the

emis

sion

s of

sim

ilar

pro

ject

s.

Oth

er B

ilans C

arb

one

® (C

arb

on B

alan

ce

shee

ts) w

ill b

e p

rod

uced

for

othe

r ty

pes

of

pro

ject

s to

con

solid

ate

our

know

led

ge

as p

art

of a

con

tinuo

us im

pro

vem

ent

app

roac

h.

SNC

F R

ÉSE

AU

’S

CSR

PO

LIC

Y

This

car

bon

ap

pro

ach

is p

art

of

a g

lob

al C

SR p

olic

y fo

r th

e su

stai

nab

le

mod

erni

satio

n of

the

net

wor

k, d

efin

ed

and

imp

lem

ente

d b

y SN

CF

Rés

eau

ov

er t

he p

ast

few

yea

rs.

The

Fren

ch r

ailw

ay n

etw

ork

mus

t tr

ansf

orm

itse

lf to

kee

p pa

ce w

ith

a co

nsta

ntly

cha

ngin

g w

orld

. SN

CF

Rése

au

has

thus

ado

pted

a c

orpo

rate

str

ateg

y w

ith t

hree

maj

or c

omm

itmen

ts1 :

– ac

cele

ratin

g th

e re

new

al o

f the

net

wor

k;

Leve

l of

safe

ty

Terr

ito

rial

invo

lvem

ent

Soci

al p

erfo

rman

ce

Eco

log

ical

fo

otp

rint

FOU

R M

AIN

PR

IOR

ITIE

S1 FO

RM

TH

E B

ASI

S

OF

THE

CO

MPA

NY

’S C

SR P

OLI

CY

1. D

eta

ils c

an b

e f

ou

nd

in t

he

“20

16 r

esp

on

sib

le a

ctiv

ity

rep

ort

”. 2

.On

line

su

rve

y ca

rrie

d o

ut

b

y S

NC

F R

ése

au b

etw

ee

n J

un

e a

nd

No

vem

be

r 20

16 w

ith

a r

ep

rese

nta

tive

sam

ple

of

all o

f it

s st

ake

ho

lde

rs.

– sh

iftin

g fr

om a

19th

cen

tury

ind

ustr

y m

odel

to

a 21

stce

ntur

y in

dus

try

mod

el;

– su

cces

sful

ly o

pen

ing

up

inte

rnal

p

asse

nger

tra

nsp

ort

to c

omp

etiti

on

and

ens

urin

g t

hat

the

cust

omer

is

at

the

core

of o

ur s

ervi

ce o

ffer

.

This

CSR

pol

icy

was

cre

ated

in

col

labo

ratio

n w

ith a

ll of

the

com

pany

’s

inte

rnal

sta

keho

lder

s, in

acc

orda

nce

w

ith t

he s

usta

inab

le d

evel

opm

ent

polic

y of

the

SN

CF

Gro

up, s

o as

to

sup

por

t th

e b

usin

ess

pro

ject

and

pro

vid

e be

tter

tr

ansp

aren

cy o

f our

act

iviti

es fo

r al

l ou

r st

akeh

olde

rs. S

NC

F Ré

seau

is t

hus

crea

ting

the

cond

ition

s fo

r th

e re

spon

sibl

e m

oder

nisa

tion

of t

he F

renc

h ra

il ne

twor

k.

Thes

e m

ain

prio

ritie

s ar

e b

roke

n d

own,

th

roug

hout

the

com

pan

y, in

to s

ixte

en

com

mitm

ents

1 , th

e im

por

tanc

e of

whi

ch

was

con

firm

ed b

y a

surv

ey c

arrie

d o

ut

amon

g o

ver

1,50

0p

eop

le2 (

emp

loye

es,

cust

omer

s, s

upp

liers

, reg

iona

l and

d

epar

tmen

tal b

oard

off

icia

ls, a

ssoc

iatio

ns,

com

mun

ities

aff

ecte

d b

y th

e ra

il ne

twor

k,

etc.

). W

ithin

prio

rity

no. 2

“red

ucin

g o

ur e

colo

gic

al fo

otp

rint

and

con

solid

atin

g o

ur e

nviro

nmen

tal

asse

ts”

–, c

om

mit

ment

no

. 7

is

d

irect

ly c

onnect

ed

to

the G

reen

Bo

nd

s p

rog

ram

me s

ince

it

consi

sts

of

“red

uci

ng

our

gre

enho

use

gas

em

issi

ons

and

im

pro

ving

energ

y eff

icie

ncy

”.

14

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

15

RA

TIN

G A

GE

NC

IES

RA

TIN

GP

OSIT

ION

OF S

NC

F R

ÉSE

AU

Vig

eo64

/100

2nd

fro

m a

pan

el o

f 38

Eur

op

ean

com

pan

ies

in

the

log

isti

cs/t

rans

po

rt s

ecto

r.

Oek

om

R

esea

rch

C+

5th f

rom

a p

anel

of

45 G

lob

al c

om

pan

ies

in

the

tra

nsp

ort

infr

astr

uctu

re m

anag

emen

t se

cto

r.

SNC

F R

ÉSE

AU

E

XTR

A-F

INA

NC

IAL

R

ATI

NG

S

Ref

lect

ing

thi

s p

olic

y an

d C

SR s

trat

egy,

SN

CF

Rés

eau

is m

onito

red

by

two

The

ratin

g o

bta

ined

from

Vig

eo

for

the

envi

ronm

enta

l asp

ect

(77/

100)

is a

ccom

pan

ied

by

the

follo

win

g c

omm

ent:

”SN

CF R

ése

au a

bso

lute

perf

orm

ance

in

the

Envi

ronm

ent

do

mai

n

is a

dva

nce

d, w

hic

h is

an in

creas

e

com

par

ed

to

the p

revi

ous

revi

ew

.-

Th

is im

pro

vem

en

t is

mai

nly

du

e

to t

he

Co

mp

any’

s h

igh

ly r

ele

van

t co

mm

itm

en

t to

en

viro

nm

en

tal

issu

es,

sup

po

rted

by

com

pre

hensi

ve

reso

urc

es

to e

nvi

ronm

enta

l

man

agem

ent

that

co

vers

al

l of

SN

CF R

ése

au’s

pro

duct

ion s

ites.

C

once

rnin

g it

s energ

y use

th

e c

om

pan

y has

set

quan

tifie

d t

arg

et

an

d c

om

pre

hensi

ve m

eas

ure

s,

such

as

fleet

and

build

ing

op

tim

isat

ion.

In a

dd

itio

n, th

e C

om

pan

y ap

pear

s

to h

ave d

eve

lop

ed

meas

ure

s

to p

reve

nti

ng

loca

l po

lluti

on.”

The

late

st r

atin

gs

rep

orts

fr

om t

hese

tw

o ag

enci

es a

re a

vaila

ble

on

the

SN

CF

Rés

eau

web

site

.

extr

a-fin

anci

al r

atin

g a

gen

cies

, V

igeo

and

Oek

om R

esea

rch,

w

hich

hav

e aw

ard

ed it

the

rat

ing

s

giv

en in

the

tab

le b

elow

.

16

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

17

In O

cto

be

r 20

16,

SN

CF

seau

b

eca

me

th

e f

irst

ra

ilway

infr

astr

uct

ure

m

anag

em

en

t o

pe

rato

r in

th

e w

orl

d

and

th

e f

irst

tra

nsp

ort

co

mp

any

in E

uro

pe

to

issu

e a

Gre

en

Bo

nd

.

03 SN

CF R

ÉSE

AU

’S

“GR

EE

N

BO

ND

S

FU

ND

ING

18

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

61

9

A “

CLI

MA

TE

BO

ND

S

INIT

IATI

VE”

C

ERTI

FIED

ISSU

E

On

27 O

ctob

er 2

016,

SN

CF

Rés

eau,

th

e ow

ner

and

op

erat

or o

f the

Fre

nch

railw

ay n

etw

ork,

rat

ed A

a2 (M

ood

y’s)

, A

A (S

&P)

, AA

 (Fitc

h), l

aunc

hed

an

inau

gur

al is

suan

ce o

f Gre

en B

ond

s am

ount

ing

to

900 

mill

ion

euro

s

with

a m

atur

ity p

erio

d o

f 15 

year

s.

SN

CF R

ése

au w

as

the f

irst

railw

ay

infr

ast

ruct

ure

manag

em

ent

op

era

tor

in t

he w

orl

d a

nd

the f

irst

tra

nsp

ort

co

mp

any

in E

uro

pe t

o iss

ue

a G

reen B

ond

.

In o

rder

to

def

ine

the

mos

t st

ring

ent

stan

dar

ds

in t

erm

s of

gre

en fi

nanc

ing

an

d t

o th

us b

ecom

e a

glo

bal

poi

nt

of r

efer

ence

in t

he t

rans

por

t se

ctor

, th

e b

ond

issu

e la

unch

ed b

y SN

CF 

Rés

eau

is in

line

with

the

Gre

en B

ond

P

rinci

ple

s 201

6 (

GB

P)

and

has

als

o b

een a

ward

ed

Clim

ate

Bo

nd

s In

itia

tive

 (C

BI) c

ert

ific

ati

on,

b

y O

eko

m R

ese

arc

h.

Last

ly, S

NC

F R

ésea

u, a

s a

mem

ber

of

the

GB

P an

d t

he F

inan

ce fo

r To

mor

row

1

1. F

inan

ce

fo

r To

mo

rro

w is

an

init

iati

ve le

d b

y th

e p

laye

rs o

f th

e P

aris

Fin

anci

al C

en

tre

to

pro

mo

te s

ust

ain

able

fi

nan

ce in

Fra

nce

an

d in

tern

atio

nal

ly.

It c

on

trib

ute

s to

re

ori

en

tin

g f

inan

cial

flo

ws

tow

ard

s a

low

car

bo

n

and

incl

usi

ve e

con

om

y, in

lin

e w

ith

th

e P

aris

Ag

ree

me

nt

and

th

e S

ust

ain

able

De

velo

pm

en

t G

oal

s (S

DG

).

initi

ativ

e, fu

lly p

artic

ipat

es in

the

d

iscu

ssio

ns a

nd m

arke

t d

evel

opm

ents

of

Gre

en B

ond

s.

The

pro

ceed

s fr

om t

his

gre

en b

ond

hav

e b

een

used

to

finan

ce t

he r

eno

vati

on

of

the s

truct

ura

l netw

ork

and

deve

lop

new

pro

ject

s.

No

elig

ible

pro

ject

s in

cat

egor

y 3

(“

Oth

er in

vest

men

ts li

nked

to

the

glo

bal

cl

imat

e ch

ang

e ch

alle

nges

, the

pro

tect

ion

of b

iod

iver

sity

and

nat

ural

res

ourc

es”)

w

ere

iden

tifie

d in

201

6. H

owev

er,

the

elig

ible

pro

ject

s fr

om t

he fi

rst

tw

o ca

teg

orie

s g

ener

ally

incl

ude

pro

visi

ons

for

pro

tect

ion

of b

iod

iver

sity

an

d n

atur

al r

esou

rces

. The

imp

act

ind

icat

ors

refle

ctin

g th

e po

licy

of

pres

ervi

ng re

sour

ces

are

give

n in

par

t 5

of

thi

s re

port

.

In 2

016,

ap

pro

xim

atel

y 20

% o

f the

ann

ual

issu

ance

s of

the

SN

CF

Rés

eau

in

the

fina

ncia

l mar

kets

wer

e in

the

form

of

Gre

en B

ond

s.

MA

IN C

HA

RA

CTE

RIS

TIC

S

OF

TH

E G

RE

EN

BO

ND

S 2

01

6 O

PE

RA

TIO

N

ISSU

ER

SN

CF R

ése

au

RA

TIN

GA

a2 (M

oo

dy’

s) /

AA

(S&

P) /

AA

(Fit

ch)

OR

DE

R B

OO

KS

1.4

bill

ion e

uro

s

FIN

AL S

IZE

900 m

illio

n e

uro

s

ISSU

E D

ATE

27 O

cto

ber

2016

SE

TTLE

ME

NT D

ATE

9 N

ove

mb

er

2016

MA

TU

RIT

Y D

ATE

9 N

ove

mb

er

2031

PR

ICE

/ R

EO

FF

ER

YIE

LD

98.5

70%

/ 1

.104%

CO

UP

ON

1%

annual

SP

RE

AD

OA

Ts +

 31 b

p

Th

e S

NC

F R

ése

au 1

% N

ove

mb

er 

2031

is

incl

ud

ed

in

th

e B

arcl

ays

MS

CI

Gre

en

Bo

nd

s In

de

x.

So

urc

e: S

NC

F R

ése

au.

So

urc

e: S

NC

F R

ése

au.

TY

PO

LO

GY

AN

D G

EO

GR

AP

HIC

AL

DIS

TR

IBU

TIO

N O

F I

NV

ESTO

RS

Fra

nce

44%

Oth

ers

5%

Sca

nd

inav

ia 5

%

Asi

a 11%

Sw

itze

rlan

d 4

%

Neth

erl

and

s 7%

Unit

ed

Kin

gd

om

6%

Germ

any

17%

Oth

ers

38%

SR

I inve

sto

rs

62%

20

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

21

04 ALLO

CA

TIO

N

OF

NE

T

PR

OC

EE

DS

Th

e r

eso

urc

es

fro

m

the

issu

ance

of

Gre

en

Bo

nd

s ar

e a

lloca

ted

to

pro

ject

s fo

rth

e r

en

ova

tio

n

and

mo

de

rnis

atio

n

on

th

e c

ore

n

etw

ork

as

we

ll

as t

he

co

mp

leti

on

o

f n

ew

lin

es.

22

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

62

3

STR

UC

TUR

E

OF

THE

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S PR

OG

RA

MM

E

The

gre

en b

ond

s is

sued

by

SNC

F R

ésea

u ha

ve t

he s

ame

char

acte

rist

ics

as c

onv

enti

ona

l b

ond

s in

ter

ms

of

cred

it r

isk.

Nev

erth

eles

s, t

hey

have

som

e

add

ition

al c

hara

cter

istic

s

in t

erm

s of

rep

ortin

g o

blig

atio

ns,

mon

itorin

g t

he c

orre

ct a

lloca

tion

of

fund

s to

elig

ible

pro

ject

s an

d

asse

ssm

ent

of t

he e

nviro

nmen

tal

imp

act

of e

ligib

le p

roje

cts.

PR

EPA

RA

TIO

N

OF

THE

SN

CF

SEA

U

GR

EE

N B

ON

DS

P

RO

GR

AM

ME

CLI

MA

TE

BO

ND

S

CE

RTIF

IED

BO

ND

“IS

SU

E”

SNC

F R

ésea

u ha

s co

mp

lied

w

ith t

he p

rinci

ple

s la

id o

ut

by

the

Clim

ate

Bon

ds

Initi

ativ

e (C

BI),

an

d p

artic

ular

ly w

ith L

ow C

arb

on

Tran

spor

t El

igib

ility

Crit

eria

(V1.

0)1 .

D

raw

ing

on

bes

t m

arke

t p

ract

ices

,

the

fram

ewor

k d

evel

oped

by

SN

CF

Rés

eau

is a

lso

bas

ed o

n

the

4 p

illar

s st

ruct

ure

dev

elop

ed

in 2

016

by

the

ICM

A2 G

reen

Bon

d

Prin

cip

les.

The

201

6 ve

rsio

n

of t

he G

reen

Bon

ds

pro

gra

mm

e

(Gre

en B

ond

Fra

mew

ork)

is availa

ble

on

the

SN

CF

Rés

eau

web

site

3 .

The

Seco

nd O

pin

ion,

issu

ed

by

Oek

om R

esea

rch,

con

firm

s

the

com

plia

nce

of t

he S

NC

F R

ésea

u

Gre

en B

ond

s fr

amew

ork

with

the

IC

MA

Gre

en B

ond

Prin

cip

les 

(201

6).

The

2016

ver

sio

n o

f th

is S

eco

nd

Part

y O

pin

ion 

(SPO

) is

avai

lab

le

on

the

SNC

F R

ésea

u w

ebsi

te4 .

Last

ly, t

he S

NC

F R

ésea

u G

reen

Bon

ds

pro

gra

mm

e co

mp

lies

with

with

Low

C

arb

on T

rans

por

t El

igib

ility

Crit

eria

(V

1.0)

. est

ablis

hed

by

the

CB

I.

Oek

om R

esea

rch

is a

lso

resp

onsi

ble

fo

r ve

rifyi

ng t

he c

omp

lianc

e of

thi

s al

ignm

ent

on b

ehal

f of t

he C

BI.

The

2016

ver

sion

 of t

his

cert

ifica

tion

awar

ded

by

Oek

om R

esea

rch

is

ava

ilab

le o

n th

e SN

CF

Rés

eau

web

site

5 .

1. T

he

an

ne

xe L

ow

Car

bo

n T

ran

spo

rtat

ion

is a

vaila

ble

at

ww

w.c

limat

eb

on

ds.

ne

t2.

ICM

A: I

nte

rnat

ion

al C

apit

al M

arke

t A

sso

ciat

ion

.3.

bit

.ly/G

Bo

nd

2016

4. b

it.ly

/GB

on

dS

PO

5. b

it.ly

/GB

on

dO

eko

m

6. T

he

Inte

rnat

ion

al U

nio

n o

f R

ailw

ays

(UIC

) has

est

ablis

he

d a

me

tho

d t

o c

lass

ify

line

s d

ep

en

din

g o

n

the

tra

ffic

load

s su

pp

ort

ed

by

the

infr

astr

uct

ure

as

we

ll as

th

e t

ype

of

traf

fic. G

rou

p U

IC 1

co

rre

spo

nd

s

to li

ne

s w

ith

ve

ry h

eav

y lo

ads,

an

d a

t th

e o

pp

osi

te e

nd

of

the

sca

le, g

rou

p U

IC 9

co

rre

spo

nd

s to

lin

es

w

ith

ve

ry li

gh

t lo

ads.

Th

e m

ain

lin

es

of

the

Fre

nch

rai

lway

ne

two

rk a

re in

UIC

 gro

up

s 1

to 4

. Th

e m

ajo

r lin

es

w

ith

lig

hte

r lo

ads

fall

un

de

r U

IC g

rou

ps

5 an

d 6

. Th

e li

ne

s w

ith

low

load

s in

th

e U

IC g

rou

ps

7 to

9 c

orr

esp

on

d

to t

he

re

gio

nal

ne

two

rk in

ge

ne

ral.

7. M

ore

de

tails

pag

e 4

0/41

.

Cat

ego

ry 1

INV

EST

ME

NTS

RE

LATE

D T

O

MA

INTE

NA

NC

E,

UP

GR

AD

E A

ND

EN

ER

GY

E

FFIC

IEN

CY

OF

THE

R

AIL

SY

STE

M

Pro

ject

s to

ren

ova

te t

rack

s

and

tra

ctio

n p

ow

er s

upp

ly

infr

astr

uctu

re, a

nd s

igna

lling

sy

stem

up

gra

des

. The

pro

ject

s el

igib

le f

or

this

cat

ego

ry

nece

ssar

ily c

onc

ern

inve

stm

ents

fo

r th

e re

nova

tio

n o

f th

e co

re n

etw

ork

, co

nsi

stin

g o

f th

e m

ost

use

d a

nd

100

% e

lect

rifi

ed

p

art

of

the n

etw

ork

(lin

es

in U

IC g

roup

s 1 t

o 4

6).

Cat

ego

ry 2

INV

EST

ME

NTS

RE

LATE

D

TO N

EW

LIN

ES

A

ND

LIN

ES

EX

TEN

SIO

NS

Pro

ject

s re

late

d t

o n

ew

lines

and

line

ext

ensi

ons

, im

pro

ving

acc

ess

to

the

netw

ork

fo

r p

asse

nger

s

and

fre

ight

mo

bili

ty.

For

exam

ple

LG

V E

st,

LGV

 SE

A,

LGV

 BP

L,

LGV

 CN

M h

igh-

spee

d li

nes 

etc7 .

Cat

ego

ry 3

OTH

ER

INV

EST

ME

NTS

LIN

KE

D

TO G

LOB

AL

CLI

MA

TE C

HA

NG

E

CH

ALL

EN

GE

S, P

RO

TEC

TIO

N

OF

BIO

DIV

ER

SITY

AN

D N

ATU

RA

L R

ESO

UR

CE

S

Pro

ject

s re

late

d t

o t

he

pro

tect

ion

of

bio

div

ersi

ty

and

nat

ural

res

our

ces

surr

oun

din

g S

NC

F’s

exis

ting

ne

two

rk.

CA

TE

GO

RIE

S

OF E

LIG

IBLE

PR

OJE

CTS

The

pro

ceed

s of

the

201

6 G

reen

 Bon

d

wer

e al

loca

ted

to

inve

stm

ents

co

rres

pon

din

g t

o on

e of

the

follo

win

g

thre

e ca

teg

orie

s.

24

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

25

INV

ESTM

EN

TS IN

M

ILLIO

N E

UR

OS

THEO

RET

ICA

L A

LLO

CA

TIO

NG

REE

N B

ON

DS

SC

OPE

GR

EEN

BO

ND

S

2016

ALL

OC

ATI

ON

TO B

E

ALL

OC

ATE

D

IN 2

017

2016

pr

ojec

tion

Brea

k-do

wn

On

31

Dec

20

16

Bre

ak-

dow

nA

lloca

tion

Bre

ak-

dow

n

MA

INTE

NA

NC

E

AN

D U

PG

RA

DE

1,3

06

76

%1,3

03

88%

710

80%

59

3

Trac

ks, b

alla

st

and

sle

eper

s, e

tc.

855

889

68%

484

Switc

hes

195

15%

106

Sig

nalli

ng

357

183

14%

100

Trac

tion

pow

er

sup

ply

infr

astr

uctu

re94

363%

20

NE

W L

INE

S

AN

D L

INE

S

EX

TE

NSIO

NS

414

24

%17

51

2%

175

20%

0

EST 

214

8%14

SEA

7342

%73

BPL

5330

%53

CN

M

3620

%36

OTH

ER

S P

RO

JE

CTS

00%

00%

00

TO

TA

L

1,7

20

1

,479

885

59

3

So

urc

e: S

NC

F R

ése

au

.S

ou

rce

: S

NC

F R

ése

au

.

DE

SC

RIP

TIO

N

OF

TH

E F

UN

D

MA

NA

GE

ME

NT P

OLIC

Y

For

pro

ceed

s ye

t to

be

allo

cate

d

thes

e am

oun

ts c

oul

d b

e p

lace

d

on

SRI m

utua

l fun

ds,

ban

k d

epo

sit

or

cash

in b

ank

in o

rder

to

ens

ure

TH

E A

LLO

CA

TIO

N I

N D

ETA

IL

The

follo

win

g t

able

sho

ws

the

allo

catio

n of

the

issu

ance

of

Gre

en B

ond

s fo

r 20

16

acco

rdin

g t

o th

e th

ree

elig

ible

in

vest

men

t ca

teg

orie

s.

Defi

nit

ions

– “T

heo

reti

cal allo

cati

on”:

am

ount

of t

he p

roje

cted

inve

stm

ents

fo

r 20

16 fo

r ea

ch o

f the

cat

egor

ies

as

giv

en in

the

SN

CF

Rés

eau

2016

bud

get

and

pre

sent

ed t

o in

vest

ors

d

urin

g t

he in

aug

ural

Gre

en R

oad

show

in

Oct

ober

201

6.–

“Gre

en B

ond

s sc

op

e”:

am

ount

s of

inve

stm

ents

act

ually

mad

e b

y SN

CF

Rés

eau

in e

ach

of t

he c

ateg

orie

s

as o

n 31

/12/

2016

.–

“Gre

en B

ond

s allo

cati

on

”:

allo

catio

n p

er c

ateg

orie

s of

the

net

re

sour

ces

obta

ined

from

the

issu

ance

of

Gre

en B

ond

s fr

om N

ovem

ber

201

6

to 3

1/12

/201

6.–

“Yet

to b

e a

lloca

ted

”: a

mou

nts

of

elig

ible

inve

stm

ents

in 2

016

not

allo

cate

d

to a

Gre

en B

ond

s is

suan

ce a

nd w

hich

m

ay c

onse

que

ntly

be

reus

ed in

201

7.

GR

EE

N B

ON

D 2

016

ALLO

CA

TIO

N - M

ON

ITO

RIN

G O

F F

UN

DS (

IN €

M)

Sett

lem

ent

dat

e9

Nov

20

169

Nov

20

1601

Dec

20

1630

Dec

20

1601

Mar

ch

2017

Net

Pro

ceed

s 88

5.33

SIC

AV

ISR

385.

330

0-

384.

99

Uns

ecur

ed

dep

osit

300

0-

300

0

Ban

k ac

coun

ts20

0-

200

00

Sub

-tot

al

885.

33-

200

- 30

0-

384.

99

TO

TA

L

88

5.3

38

85

.33

685

.33

385

.33

0.3

4

Full

allo

catio

n

trac

eab

ility

of

the

fund

m

anag

emen

t p

olic

y.

The

full

allo

catio

n fo

r th

e

2016

op

erat

ion

was

car

ried

out

on

1st

Mar

ch 2

017.

26

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

27

KP

MG

A

SSU

RA

NC

E

RE

PO

RT

SNC

F R

ésea

u ap

poi

nted

KPM

G

to g

ive

a in

dép

end

ent

assu

ranc

e

on t

he g

reen

bon

d r

epor

t.

Extr

act

fro

m t

he c

oncl

usi

on

of

the K

PM

G a

ssura

nce

rep

ort

“We c

onsi

de

r th

at t

he e

vid

ence

g

athe

red

is s

uff

icie

nt

and

ap

pro

pri

ate

to b

ase

ou

r co

ncl

usi

on o

n.

On

the

bas

is o

f th

is w

ork

s, w

e h

ave

no

t fo

und

an

y si

gnific

ant

ano

mal

y

wh

ich

may

cas

t d

oub

t up

on

the V

eri

fied

Info

rmat

ion

, nam

ely

: –

the

co

mp

liance

of

the

pro

ject

s ap

pe

arin

g in

the p

arag

rap

h

“Tab

le o

f al

loca

tio

ns”

on p

age 2

6

wit

h t

he

elig

ibili

ty c

rite

ria

defined

b

y SN

CF R

ése

au in

the “

Gre

en B

ond

Fra

mew

ork

”;

– th

e a

lloca

tio

n o

f th

e f

un

ds

rais

ed

d

uri

ng

the G

reen B

on

d is

suan

ce

for

elig

ible

pro

ject

s g

ive

n in

th

e p

arag

rap

h “

Tab

le o

f al

loca

tio

ns”

o

n p

age 2

6;

– th

e d

esc

rip

tio

n o

f th

e f

und

m

anag

em

ent

po

licy

giv

en in

th

e p

arag

rap

h “

Desc

rip

tio

n

of

the f

un

d m

anag

em

ent

po

licy”

o

n p

age 2

7;

– th

e “

tota

l car

bo

n im

pac

t o

f th

e

exp

ense

s finan

ced

by

Gre

en B

ond

s”

ind

icat

or

giv

en in

the t

able

of

th

e p

arag

rap

h “

Glo

bal

ove

rvie

w”

o

n p

age 4

4;

are p

rese

nte

d in

the a

nnual

Rep

ort

,

in a

ll th

eir

sig

nific

ant

asp

ect

s,

in c

om

plia

nce

wit

h t

he

Refe

rence

d

ocu

me

nt.

The

KPM

G a

ssur

ance

rep

ort

mus

t

be

read

in it

s en

tiret

y. It

is a

vaila

ble

on

the

SN

CF

Rés

eau

web

site

.

28

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

29

SN

CF

seau

h

as d

eve

lop

ed

a

spe

cifi

c m

eth

od

fo

r m

eas

uri

ng

th

e im

pac

t o

f it

s

rail

ne

two

rk r

en

ew

al

and

lin

e c

reat

ion

p

olic

y, in

te

rms

o

f g

ree

nh

ou

se

gas

em

issi

on

s

and

pro

tect

ion

o

f re

sou

rce

s.

05

RE

PO

RTIN

G A

ND

M

ETH

OD

OLO

GY

O

F T

HE

G

RE

EN

BO

ND

S

PR

OG

RA

MM

E

IND

ICA

TO

RS

30

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

63

1

I

I

Ram

boui

llet

Bloi

sTo

urs

St-P

ierr

e-de

s-C

orps

Savo

nniè

res

Port

-Bo

ulet

Vier

zon

Ché

ry-L

ury

Châ

teau

roux

Forg

evie

ille

Pier

re-B

uffiè

reTu

nnel

des

Bén

édic

tins

Tunn

el L

es P

lans

Ruffe

c

Vivo

nne

Biar

ritz

Bayo

nneRi

vièr

eDax

Cas

teln

auda

ry Car

cass

onneVi

llene

uve-

les-

Mag

uelo

ne

Nar

bonn

e

Bézi

ers

Mat

abia

uSt

-Jor

y

Villo

gnon

Mon

tmor

eau

Gaz

inet

Lagr

ave

d’A

mba

rès

Cou

tras

St-J

ean

Pess

ac

Fact

ure-

Biga

nos

Solfé

rino

Lang

on

Mor

cenx

St-J

ean-

de-L

uz

Pont

rout

e La

benn

e

Tonn

eins

Pont

anev

aux

Mâc

on

Sens La

roch

e-M

igen

nes

Gev

rey-

Cha

mbe

rtin Cha

gny

Am

bérie

u-en

-Bug

ey

Tunn

el d

esM

erci

ères

St-C

lair

Sala

ise

Sibe

lin

Perr

ache

Véni

ssie

ux

Tunn

eldu

Crie

lG

ière

s

Cag

nes

Gol

f-Jua

n-Va

llaur

is

Ant

héor

-Cap

-Rou

x

Les

Arc

s-D

ragu

igna

nSa

int-

Cha

mas

Arle

sTa

rasc

on

Gra

veso

n-M

ailla

ne

Épie

rre

St-P

ierr

e-d’

Alb

igny

Mon

tmél

ian

Peyr

aud

Giv

ors

Cah

ors

Mon

taub

an

Tunn

els

de V

igeo

iset

de

Sain

t Ant

oine

Save

nay

Mon

trel

ais

Le M

ans

Con

lie

Sillé

-le-

Gui

llaum

e

Mer

La C

hape

lleSt

Mes

min

St-P

ierr

e-la

-Cou

r

Ang

ers

Jouy

Eper

no

nVern

on

Mot

tevi

lle

Fouc

art-

Alv

imar

e

Le H

avreBr

éaut

é

Har

fleur

Gai

llon-

Aub

evoy

e

Vove

s

Man

duel

Avi

gnon

Bollè

ne

Belfo

rt

Mul

hous

e

Koen

igsc

hoffe

n

Rém

illy

Bene

stro

ff

Uck

ange

Thio

nvill

eVi

aduc

de

Knut

ange

Tunn

el d

e M

ercy

Reim

s

Revi

gny

Erne

cour

tLo

xevi

lle

Onv

ille

Bar-

le-D

uc

Liar

t

Hau

mon

t

Rais

mes

Ost

ricou

rt

Ronc

hin

Ach

iet

TGV

Hte

-Pic

ardi

e

Ach

icou

rt

Haz

ebro

uck

Mai

ng-F

amar

s

Woi

ppy

Erst

ein

Tunn

els

de V

aché

mon

tet

de

la P

latin

erie

OR

AN

S

BO

RD

EA

UX

NA

NTE

S

MET

Z

STR

ASB

OU

RG

DIJ

ON

MO

NTP

ELLI

ER

MA

RSE

ILLE

RE

NN

ES

LIM

OG

ES

LIL

LE

RO

UE

N

LYO

N

TO

ULO

USE

LO

ND

ON

BR

USSE

LS

LU

XE

MB

OU

RG

PA

RIS

Zo

om

Île-d

e-F

rance

Ber

laim

ont

St-Q

uent

in

Noy

on

Cre

ilLe

Pet

it-Th

érai

nO

rry-

la-V

ille

Aub

agne

Toul

on

Blan

card

e

éch

elle

au

1/1

400

000

èm

e e

nvi

ron

1 cm

re

pré

sen

te 1

4 km

en

viro

n

N

50

km

201

6 A

LLO

CA

TIO

N I

ND

ICA

TO

R T

AB

LE

CA

TE

GO

RIE

SIN

DIC

ATO

RS

RE

SU

LTS

INV

EST

ME

NT

S IN

MA

INT

EN

AN

CE

, M

OD

ER

NIS

AT

ION

A

ND

EN

ER

GY

E

FFIC

IEN

CY

P

RO

JEC

TS

CO

NC

ER

NIN

G

TH

E R

AIL

SY

STE

M

GR

EE

NH

OU

SE

GA

SE

S (

GH

G)

EM

ITTE

D

AN

D A

VO

IDE

D E

MIS

SIO

NS

– G

reen

hous

e G

as e

mis

sio

ns

due

to

the

ren

ewal

pro

ject

– G

reen

hous

e G

as e

mis

sio

ns a

void

ed

than

ks t

o t

he r

enew

al p

roje

ct

253 

ktC

O2e

q

2,98

0 kt

CO

2eq

PR

OTE

CTIO

N O

F R

ESO

UR

CE

S

– Sh

are

of

re-u

sed

rai

ls (t

ons

)–

Shar

e o

f re

cycl

ed r

ails

(to

ns)

– Sh

are

of

bal

last

re-

used

(to

ns)

– Vo

lum

e o

f w

oo

den

sle

eper

s re

cycl

ed f

or

ener

gy

pur

po

ses

– N

umb

er o

f ki

lom

etre

s

of

cate

nary

rep

lace

d

3.5%

96.5

%30

to

50%

78,3

00 t

ons

400 

km

INV

EST

ME

NT

S R

ELA

TE

D

TO

NE

W L

INE

S A

ND

LIN

E

EX

TE

NSI

ON

S

GR

EE

NH

OU

SE

GA

S (

GH

G)

EM

ISSIO

NS

– G

reen

hous

e G

as e

mis

sio

ns

due

to

the

pro

ject

– E

mis

sio

ns a

void

ed

54 k

tCO

2eq

244

ktC

O2e

q

PR

OTE

CTIO

N O

F R

ESO

UR

CE

S

– N

umb

er o

f he

ctar

es c

om

pen

sate

d–

Num

ber

of

wild

life

cro

ssin

gs

crea

ted

6,43

01,

253

OT

HE

R

INV

EST

ME

NT

S LI

NK

ED

TO

T

HE

GLO

BA

L C

LIM

AT

E C

HA

NG

E

CH

ALL

EN

GE

S,

TH

E P

RO

TE

CT

ION

O

F B

IOD

IVE

RSI

TY

A

ND

NA

TU

RA

L R

ESO

UR

CE

S

The

cat

ego

ry is

to

be

exp

and

ed a

s it

gro

ups

seve

ral

pro

ject

s th

at a

re le

ss s

igni

fican

t in

ter

ms

of

amo

unts

, b

ut im

po

rtan

t fo

r th

e o

vera

ll co

rpo

rate

str

ateg

y.

MA

P

OF

PR

OJE

CTS

FIN

AN

CE

D

BY

TH

E

GR

EE

N B

ON

D

2016 ISSU

E

IIIIIII

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

II

IIIIIIIIIIIIIIIIIIIII IIII

IIII

IIIIIIIIIIIIIIIIIIIIIIIIII

IIIIII

IIIIIIIIIIIIIIIIIIIIIIIIII

IIIIIIIIIIII

II

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

II

IIII

I I

IIIIIIIIIIIIIII

III I I

IIIIIIIIII

I

IIII

IIII

II

IIIII

IIIIIIII

IIIIIIIIIII

IIIIII

I

IIIIIIIIIIIIIIIIIIIIIIIIIII

IIIIIIIII

IIIIIIIII

IIIIIIIIIIIIII

IIIIIII

I II IIIII

IIIIIIIII

IIII I I

I I I

IIII

IIIIIII

I II

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

IIIIIIIIIIII

I I I I I I I

IIIIII

IIIIIIIIIIIIIIIIIIIII

IIII

IIIIIIIIIIIIIIIIIIII

IIIIIIII

II

III

IIIIIIIIIIIIII

IIIIIII

IIII

I I

III

III

éch

elle

au

1/2

00 0

00è

me

en

viro

n1

cm r

ep

rése

nte

2km

en

viro

n

N

5 k

m

Bobi

gny

Noi

sy-

le-S

ec

Évry

Brét

igny

Juvi

sy

Vers

aille

sC

hant

iers

Sain

t-C

yr

Nan

terr

e

2 B

écon

-les-

Bruy

ères

St-G

erm

ain-

Gde

-Cei

ntur

e

Surv

illie

rs-

Foss

es

76

St-D

enis

Mon

tsou

lt-M

affli

ers

Le B

ourg

et

6 G

enne

villi

ers

7 A

uber

villi

ers

8 Pa

ris-A

uste

rlitz

10 S

aint

-Mic

hel-N

.-D.

11 H

auss

man

n-St

-Laz

are

Aul

nay

sous

-Boi

s

Mitr

y-C

laye

Pont

-de-

Rung

is-

Aér

opor

t d’O

rly

Cho

isy-

le-R

oi

Noi

sy-

le-R

oi

Plai

sir-

Grig

non

Man

tes-

la-J

olie

Cer

gy-

St-C

hris

toph

e

St-R

émy-

lès-

Che

vreu

se

Bois

sy-

St-L

éger

Long

jum

eau

Grig

ny

Vale

nton

Sucy

Émer

ainv

ille-

Pont

ault-

Com

baul

t

Épin

ay-

sur-O

rge

Robi

nson

Cla

mar

t

St-G

erm

ain-

en-L

ayeM

aiso

n-La

ffitt

eH

ouill

es-

Car

rière

s-su

r-S.

Paris

-Be

rcy

Paris

-St-

Laza

re

52

8

1011

5 P

aris

-Bat

igno

lles

Paris

-Est

Mar

ne-la

-Val

lée-

Che

ssy-

TGV

Aér

opor

t-C

h. D

e G

aulle

2TG

VG

ones

se

Mas

sy-T

GV

Mas

sy-P

alai

seau

St-M

iche

l-sur

-Org

e

Paris

-Nor

dPant

in

Paris

-Gar

ede

Lyo

nVa

l-de-

Font

enay

Vaire

s

Nog

ent-

le-P

erre

ux

Gre

tz-

Arm

ainv

illie

rs

Les

Ard

oine

s

77

91

7895

PARIS

Samois

BourayVaires

Ang

erville

Moret-

Vene

ux-

les-Sa

blons

20

km

Gone

sse

Île-d

e-Fr

ance

LEGEND

LGV

(HIG

H-S

PE

ED

LIN

ES)

UN

DE

R C

ON

STR

UC

TIO

N

WIT

H C

ON

NE

CT

ION

S T

O T

HE

CO

NV

EN

TIO

NA

L N

ET

WO

RK

.TR

AC

K W

ORK

, IN

CLU

DIN

G “

SUIT

E RA

PID

E” O

PERA

TIO

NS.

SIG

NA

LLIN

G IN

STA

LLA

TIO

NS/

CC

R.

SWIT

CH

ES.

CA

TE

NA

RY

WIR

ES.

32

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

633

DET

AIL

ED R

EPO

RT

PER

CA

TEG

ORY

1. C

arb

on

e 4

is a

n in

de

pe

nd

en

t co

nsu

ltin

g f

irm

sp

eci

alis

ed

in lo

w c

arb

on

str

ate

gy

and

ad

apta

tio

n

to c

limat

e c

han

ge

.2.

Th

is m

eth

od

olo

gy

is a

vaila

ble

at

sncf

-re

seau

.fr/

fr/f

inan

ce-d

ura

ble

3. T

he

sco

pe

of

this

su

mm

ary

cove

rs a

ll d

ire

ct a

nd

ind

ire

ct e

mis

sio

ns

up

stre

am a

nd

do

wn

stre

am o

f th

e

wo

rks

carr

ied

ou

t, b

ut

do

es

no

t co

ver

the

op

era

tio

n a

nd

mai

nte

nan

ce o

f th

e in

fras

tru

ctu

re in

qu

est

ion

.

In o

rder

to

hig

hlig

ht t

he p

ositi

ve

cons

eque

nces

of t

he p

roje

cts

finan

ced

b

y its

issu

ance

of G

reen

Bon

ds,

SN

CF 

Rés

eau

wis

hed

to

qua

ntify

th

e im

pac

t of

the

se p

roje

cts

in t

he fi

ght

ag

ains

t g

reen

hous

e g

as e

mis

sio

ns.

To a

chie

ve t

his,

SN

CF

Rés

eau,

in

co

llab

ora

tio

n w

ith

Car

bo

ne 4

1 ,

has

dra

fted

a s

peci

fic

meth

od

olo

gy2

that

est

ablis

hes

the

prin

cip

les

an

d m

etho

d u

sed

to

calc

ulat

e

the c

arb

on im

pact

of t

hese

pro

ject

s.

The

carb

on im

pac

t is

ob

tain

ed b

y

com

par

ing

the c

arb

on f

oo

tpri

nt

(e

mis

sion

s re

sulti

ng fr

om t

he

pro

ject

) with

the

em

issi

ons

avo

ided

(d

urin

g t

he p

roje

ct o

per

atio

n p

hase

):– 

the

calc

ulat

ion

of t

he c

arb

on fo

otp

rint

cons

ists

of e

stab

lishi

ng a

sum

mar

y

of G

reen

hous

e G

as e

mis

sion

s re

sulti

ng

from

a li

ne r

enew

al o

r cr

eatio

n p

roje

ct3 ,

acco

rdin

g t

o ex

istin

g c

arb

on a

naly

sis

met

hod

s.

– th

e ca

lcul

atio

n of

the

em

issi

ons

avoi

ded

b

y a

line

rene

wal

or

crea

tion

pro

ject

co

nsis

ts o

f com

par

ing

the

em

issi

ons

from

th

e tr

ansp

ort

syst

em in

bot

h sc

enar

ios,

on

e w

ithou

t th

e ex

ecut

ion

of t

he p

roje

ct,

and

the

oth

er w

ith it

.

CA

RB

ON

IM

PA

CT

OF

TH

E P

RO

JEC

TS

FIN

AN

CE

D B

Y T

HE

G

RE

EN

BO

ND

IMPA

CT

OF

RE

NE

WA

L

PR

OJE

CTS

CA

RB

ON

F

OO

TP

RIN

T

CA

RB

ON

F

OO

TP

RIN

T

EM

ISSIO

NS

AV

OID

ED

EM

ISSIO

NS

AV

OID

ED

IMPA

CT O

F T

HE

D

EV

ELO

PM

EN

T O

FN

EW

RA

IL L

INE

P

RO

JEC

TS

CA

TE

GO

RY

1

Inve

stm

ents

in m

ainte

nan

ce,

mo

de

rnis

ati

on

an

d

en

erg

y e

ffic

ien

cy p

roje

cts

o

f th

e r

ail s

yst

em

CA

RB

ON

IM

PA

CT O

F T

HE

RE

NE

WA

L E

XP

EN

SE

S F

INA

NC

ED

B

Y G

RE

EN

BO

ND

S TR

AC

KS

SW

ITC

HE

S

TRA

CTI

ON

PO

WER

SU

PPLY

IN

FRA

-ST

RUCTU

RE

SIG

NA

LLIN

GTO

TAL

EX

PE

NSE

S F

INA

NC

ED

B

Y G

RE

EN

BO

ND

S 2

016

(€M

)484

106

20

100

710

CA

RB

ON

FO

OT

PR

INT

(IN

TH

OU

SA

ND

TO

NS O

F C

O2E

Q)...

... A

LLO

CA

TE

D T

O

EX

PE

NSE

S F

INA

NC

ED

B

Y T

HE

GR

EE

N B

ON

DS

175

38

238

253

AV

OID

ED

EM

ISSIO

NS (IN

TH

OU

SA

ND

TO

NS O

F C

O2E

Q)...

... A

LLO

CA

TE

D T

O

EX

PE

NSE

S F

INA

NC

ED

B

Y T

HE

GR

EE

N B

ON

DS

2,0

83

456

92

350

2,9

80

CA

RB

ON

IM

PA

CT

(FO

OT

PR

INT

- A

VO

IDE

D E

MIS

SIO

NS) (IN

TH

OU

SA

ND

TO

NS O

F C

O2E

Q)...

... A

LLO

CA

TE

D T

O

EX

PE

NSE

S F

INA

NC

ED

B

Y T

HE

GR

EE

N B

ON

DS

- 1,9

08

- 41

8-

90

- 31

2-

2,7

28

AV

ER

AG

E C

AR

BO

N

NE

UT

RA

LIT

Y T

IME

O

F R

EPA

IR P

RO

JE

CT

S

3.3

YE

AR

S

ME

TH

OD

USE

D T

O C

ALC

ULA

TE

TH

E C

AR

BO

N IM

PA

CT

OF R

EN

EW

AL

PR

OJE

CTS

Carb

on f

oo

tpri

nt

The

Gre

en B

ond

s he

lps

finan

ce h

und

red

s of

ren

ewal

p

roje

cts

per

yea

r, of

var

ying

sca

le. A

sses

sing

th

e ca

rbon

foot

prin

t of

eac

h p

roje

ct in

div

idua

lly w

ould

re

qui

re a

n ex

trem

ely

cum

ber

som

e re

por

ting

pro

cess

an

d a

cos

tly m

obili

satio

n of

res

ourc

es.

34

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

35

INV

ESTM

EN

TS R

ELA

TE

D T

O M

AIN

TE

NA

NC

E,

U

PG

RA

DE

AN

D E

NE

RG

Y E

FF

ICIE

NC

Y

OF

TH

E R

AIL

SY

STE

M

GR

EE

N B

ON

DS

SC

OP

EG

RE

EN

BO

ND

S

ALLO

CA

TIO

N

€M

NO

1€

MN

O

TO

TA

L1

,30

31

,06

77

10

36

TR

AC

KS

1,0

83

61

95

90

27

OF W

HIC

H H

SL

113

33

62

3

OF W

HIC

H U

IC 1

TO

4776

360

423

8

OF W

HIC

H S

WIT

CH

ES

195

226

106

16

SIG

NA

LLIN

G A

ND

OP

ER

ATIO

N1

83

18

71

00

5

ELE

CTR

IC T

RA

CTIO

N3

62

61

20

4

A d

ecis

ion

was

mad

e to

det

erm

ine

th

e ca

rbon

foot

prin

t of

the

rep

rese

ntat

ive

rene

wal

pro

ject

s an

d t

o ex

trap

olat

e th

e re

sults

of s

imila

r p

roje

cts

with

th

e sa

me

carb

on p

rofil

e.

The

proj

ects

cov

ered

by

SNC

F Ré

seau

’s

Gre

en B

onds

hav

e ve

ry d

iffer

ent

char

acte

ristic

s (m

ater

ials

, ser

vice

life

, etc

.),

and

wer

e th

eref

ore

grou

ped

into

var

ious

ca

tego

ries

rega

rdin

g th

ese

char

acte

ristic

s.

A c

arb

on fo

otp

rint

was

det

erm

ined

fo

r re

new

al o

f the

follo

win

g

equi

pm

ent

cate

gor

ies,

acc

ord

ing

to

diff

eren

t ca

lcul

atio

n m

etho

ds.

– 

Track

s and

sw

itch

es:

foot

prin

t

of 3

61 t

CO

2eq

per

mill

ion

euro

s in

vest

ed,

bas

ed o

n th

e ca

rbon

foot

prin

t re

por

ted

at

a 9

0-km

tra

ck r

enew

al o

per

atio

n re

aliz

ed b

y a

hig

h ou

tput

ren

ewal

tr

ain

on t

he li

ne fr

om N

arb

onne

to

Mon

tpel

lier

line

in 2

015.

– 

Tract

ion p

ow

er

sup

ply

infr

ast

ruct

ure

: fo

otpr

int

of 8

6 tC

O2e

q pe

r m

illio

n eu

ros

inve

sted

, bas

ed o

n lif

e cy

cle

anal

ysis

of

1.5

and

25

kV c

aten

arie

s.

– Sig

nalli

ng

: foo

tprin

t of

380

tC

O2e

q

per

mill

ion

euro

s in

vest

ed, b

ased

on

two

mon

etar

y em

issi

on fa

ctor

s es

tab

lishe

d b

y A

DEM

E2 [c

omp

uter

, el

ectr

onic

and

op

tic p

rod

ucts

(4

00 t

CO

2eq

/€M

) and

con

stru

ctio

n (3

60 t

CO

2eq

/€M

), co

ncer

ning

th

e b

uild

ing

s ho

stin

g t

he c

entr

aliz

ed

traf

fic c

ontr

ol r

oom

s].

1. N

um

be

r o

f p

roje

cts.

2. A

DE

ME

is t

he

Fre

nch

sta

te a

ge

ncy

fo

r e

ne

rgy

savi

ng

. Mo

ne

tary

em

issi

on

fac

tors

of

pro

du

cts

and

se

rvic

es

at b

ilan

s-g

es.

ade

me

.fr

(bit

.ly/b

ilan

sad

em

e).

PR

ESE

NTA

TIO

N

OF LI

NE

RE

NE

WA

L P

RO

JEC

TS

The

rene

wal

op

erat

ions

car

ried

out

on

the

rail

netw

ork

ensu

re t

he in

fras

truc

ture

is

mai

ntai

ned

in a

n op

erat

iona

l co

nditi

on a

t its

rat

ed le

vel,

thus

sec

urin

g

the

attr

activ

enes

s of

the

rai

l net

wor

k

for

user

s. A

ren

ewal

pro

ject

con

sist

s

of r

epla

cing

all

or p

art

of t

he

infr

astr

uctu

re c

omp

onen

ts, w

hich

m

ay b

e g

roup

ed in

to fo

ur s

ub-s

ets:

– Tr

ack

and

sw

itch

es,

prim

arily

com

pose

d

of

two

rai

ls, s

leep

ers,

bal

last

and

sw

itch

ing

sys

tem

s, a

llow

ing

tra

ins

to

run

;– 

Tract

ion p

ow

er

sup

ply

infr

ast

ruct

ure

, co

nsis

ting

of c

aten

ary

wire

s, s

upp

orts

, su

b-s

tatio

ns, p

rovi

din

g p

ower

to

elec

tric

tr

ains

; – 

Sig

nalli

ng

, con

sist

ing

of d

iffer

ent

typ

es

of s

igna

ls (l

ight

, mec

hani

cal,

man

ual,

aud

ible

) as

wel

l as

op

erat

ions

bui

ldin

gs

that

co

ntai

n th

e ce

ntra

lised

net

wo

rk

com

man

d c

entr

e. S

igna

lling

co

nvey

s o

rder

s to

the

tra

in d

rive

r an

d is

use

d

to r

egul

ate

circ

ulat

ion

in c

omp

lete

saf

ety;

– C

ivil

eng

ineeri

ng

str

uct

ure

s (b

rid

ges,

tu

nnels

) and

eart

hw

ork

s th

at a

llow

th

e tr

ack

to c

ross

nat

ural

or

artif

icia

l ob

stac

les.

Po

wer

cab

les

Cat

enar

y w

ires

Can

tile

ver

or

conso

le

Po

st

Bal

last

Rai

ls

Sle

ep

er

Trac

ks

Sub

-lay

er

36

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

37

CA

TE

GO

RY

2

Investm

ents

rela

ted

to

new

lin

es

and

lin

e e

xte

nsio

ns

Thes

e va

lues

are

ap

plie

d t

o th

e ex

pen

ditu

res

fund

ed b

y th

e G

reen

B

ond

s, w

hich

det

erm

inat

es t

he c

arb

on

foot

prin

t of

an

equi

pm

ent

cate

gor

y.

Car

bon

foot

prin

ts o

f the

thr

ee e

qui

pm

ent

cate

gor

ies

pro

vid

e th

e to

tal c

arb

on

foot

prin

t of

the

ren

ewal

pro

ject

s.

Em

issi

ons

avo

ided

b

y in

frast

ruct

ure

renew

al p

roje

cts

The

qua

lity

of r

ail i

nfra

stru

ctur

e w

ould

d

eclin

e if

no r

enew

al is

don

e, g

rad

ually

fo

llow

ed b

y sp

eed

res

tric

tions

for

trai

ns.

Pass

eng

ers

and

shi

pp

ers

wou

ld t

hen

pre

fer

othe

r m

odes

of t

rans

por

t

(roa

d, a

ir, w

ater

bor

ne),

whi

ch e

mit

m

ore

gre

enho

use

gas

es t

han

trai

ns.

In o

rder

to

estim

ate

the

neg

ativ

e co

nseq

uenc

es o

f mod

al s

hift

from

rai

l, th

e re

fere

nce

scen

ario

(no

rene

wal

) is

com

par

ed t

o th

e p

roje

ct s

cena

rio.

In s

imp

le t

erm

s, t

he m

etho

d t

o ca

lcul

ate

emis

sion

s av

oid

ed b

y ke

epin

g a

rai

lway

lin

e in

goo

d c

ond

ition

is a

s fo

llow

s:

• C

alc

ula

tio

n o

f em

issi

ons

in t

he r

enew

al p

roje

ct s

cenari

o1.

Est

imat

ion

of t

he t

raff

ic r

unni

ng

on t

he li

ne s

ectio

n d

urin

g t

he y

ear

prio

r to

the

ren

ewal

.2.

Tra

ffic

fore

cast

dur

ing

the

ser

vice

lif

e of

the

ren

ewed

eq

uip

men

t.3.

Ap

plic

atio

n of

rai

l tra

nsp

ort

emis

sion

fa

ctor

s an

d t

heir

evol

utio

n (o

rigin

of

ele

ctric

ity, e

tc.)

on t

he s

ervi

ce

life

of t

he r

enew

ed e

qui

pm

ent.

• C

alc

ula

tio

n o

f em

issi

ons

in

the r

efe

rence

sce

nari

o1.

Sam

e as

poi

nts

1 an

d 2

ab

ove.

2. A

pp

licat

ion

of h

ypot

hesi

s of

mod

al

shift

from

rai

l res

ultin

g o

f the

lack

of

ren

ewal

on

the

line

sect

ion.

3. A

pp

licat

ion

of t

rans

por

t m

ode

emis

sion

fa

ctor

s an

d t

heir

evol

utio

n (e

lect

ric c

ars,

or

igin

of e

lect

ricity

, etc

.) on

the

ser

vice

lif

e of

the

ren

ewed

eq

uip

men

t.

The

diff

eren

ce in

GH

G e

mis

sion

s ov

er

the

entir

e tr

ansp

ort

syst

em b

etw

een

th

e tw

o sc

enar

ios

corr

esp

ond

s to

th

e em

issi

ons

avoi

ded

by

oper

atin

g t

he

rene

wed

eq

uip

men

t ov

er it

s se

rvic

e lif

e.

The

shar

e of

the

se a

void

ed e

mis

sion

s al

loca

ted

to

Gre

en B

ond

s is

pro

por

tiona

l to

the

sco

pe

of o

per

atio

ns a

nd

thei

r p

art

fund

ed b

y G

reen

Bon

ds.

Avo

ided

em

issi

ons

are

calc

ulat

ed o

ver

th

e se

rvic

e lif

e of

the

rene

wed

equ

ipm

ent:

fo

rty

year

s fo

r tr

acks

, for

ty t

hree

yea

rs

for

trac

tion

pow

er s

uppl

y in

fras

truc

ture

, an

d th

irty

thre

e ye

ars

for

sign

allin

g

inst

alla

tions

.

CA

RB

ON

IM

PA

CT O

F R

EN

EW

AL E

XP

EN

SE

S F

INA

NC

ED

B

Y G

RE

EN

BO

ND

S F

OR

NE

W R

AIL

LIN

E P

RO

JE

CTS

EST 2

BP

LSE

AC

NM

TO

TA

L

EX

PE

NSE

S F

INA

NC

ED

B

Y G

RE

EN

BO

ND

S 2

016

(€M

)14

53

73

36

175

CA

RB

ON

FO

OT

PR

INT

(IN

TH

OU

SA

ND

TO

NS O

F C

O2E

Q)...

... A

LLO

CA

TE

D T

O

EX

PE

NSE

S F

INA

NC

ED

B

Y T

HE

GR

EE

N B

ON

DS

721

16

10

54

AV

OID

ED

EM

ISSIO

NS (IN

TH

OU

SA

ND

TO

NS O

F C

O2E

Q)...

... A

LLO

CA

TE

D T

O

EX

PE

NSE

S F

INA

NC

ED

B

Y T

HE

GR

EE

N B

ON

DS

536

98

105

244

CA

RB

ON

IM

PA

CT

(FO

OT

PR

INT

- A

VO

IDE

D E

MIS

SIO

NS) (IN

TH

OU

SA

ND

TO

NS O

F C

O2E

Q)...

... A

LLO

CA

TE

D T

O

EX

PE

NSE

S F

INA

NC

ED

B

Y T

HE

GR

EE

N B

ON

DS

2- 

15

- 82

- 95

- 19

0

AV

ER

AG

E C

AR

BO

N

NE

UT

RA

LIT

Y T

IME

O

F N

EW

LIN

E P

RO

JE

CT

S7

.4 Y

EA

RS

38

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

39

LGV

Sud

Euro

pe A

tlanti

que (

SE

A),

3

40

 km

of

line a

nd

co

nnect

ions

in

to s

erv

ice s

ince

on 2

 July

20

17

.

Pro

ject

. Th

e LG

V S

EA h

igh-

spee

d li

ne,

from

the

sou

th o

f Tou

rs t

o th

e no

rth

of

Bor

dea

ux, i

s p

art

of t

he e

xten

sion

of

the

sou

ther

n b

ranc

h of

th

e LG

V A

tlant

ique

com

mis

sion

ed

in 1

990,

from

Tou

rs t

o B

ord

eaux

. It

is a

larg

e-sc

ale

pro

ject

, ser

ving

m

ost

of S

outh

-Wes

tern

Fra

nce.

Ob

ject

ive.

Ensu

ring

tim

e sa

ving

s

of fi

fty

min

utes

bet

wee

n Pa

ris

and

the

Nor

th-E

ast,

and

bet

wee

n

Bor

dea

ux a

nd t

he S

outh

-Wes

t.

The

pro

ject

is s

ubje

ct t

o a

conc

essi

on

cont

ract

for

a te

rm o

f fift

y ye

ars

with

th

e co

mp

any

LISE

A, o

f whi

ch V

inci

C

once

ssio

ns a

nd V

inci

 SA

ow

n 33

.4%

of t

he s

hare

s, C

DC

 Infr

a 25

.4%

, M

erid

iam

22%

and

Ard

ian

19.2

%.

The

SEA

pro

ject

cro

sses

are

as

of h

igh

envi

ronm

enta

l val

ue (5

0%

of t

he p

rote

cted

sp

ecie

s lis

ted

in F

ranc

e an

d E

urop

e, 1

4 N

atur

a 20

00 s

ites,

etc

.).

Des

pite

an

itera

tive

stud

y to

def

ine

the

bes

t ro

ute,

the

hab

itat

of 2

23 p

rote

cted

sp

ecie

s w

as a

ffec

ted

by

the

LGV

 pro

ject

. Th

e co

nces

sion

ary

trie

d it

s ut

mos

t to

avo

id o

r re

duc

e th

e im

pac

ts

of t

he p

roje

ct (w

ide

cros

sing

str

uctu

res,

80

0 ec

olog

ical

tra

nsp

aren

cy w

orks

, p

rote

cted

are

as, e

tc.).

Nîm

es

– M

ontp

elli

er

Byp

ass

(C

NM

),

80

 km

of

line a

nd

co

nnect

ions

com

mis

sio

ned

on 1

0 D

ece

mb

er

20

17

.

Pro

ject

. Th

e N

îmes

– M

ontp

ellie

r B

ypas

s

is a

n es

sent

ial l

ink

in t

he E

urop

ean

hig

h-sp

eed

net

wor

k an

d t

he t

rans

-Eur

opea

n ra

il fr

eig

ht n

etw

ork.

Ob

ject

ives.

– B

oost

ing

the

dev

elop

men

t of

rai

l fr

eig

ht, o

f whi

ch t

he L

ang

ued

oc li

ne

is a

n im

por

tant

link

, mov

ing

hea

vy

goo

ds

traf

fic fr

om t

he p

aral

lel A

9.– 

Rel

ievi

ng t

he c

onve

ntio

nal l

ine

an

d e

nhan

cing

the

reg

iona

l ser

vice

.–

Ensu

ring

hig

h-sp

eed

pas

seng

er

tran

spor

t in

the

med

ium

and

long

te

rm, w

hen

the

CN

M w

ill b

e ex

tend

ed

tow

ard

s th

e So

uth.

In t

he im

med

iate

futu

re, t

he C

NM

en

sure

s tim

e sa

ving

s of

alm

ost

twen

ty

min

utes

bet

wee

n Pa

ris a

nd t

he S

outh

of

the

Lan

gue

doc

reg

ion

and

Bar

celo

na.

PR

ESE

NTA

TIO

N O

F

NE

W R

AIL

LIN

E P

RO

JEC

TS

Four

new

rai

l lin

e p

roje

cts

wer

e fin

ance

d

by

the

Gre

en B

ond

s

LGV

Est

euro

péenne h

igh-s

peed

lin

e p

hase

2 (E

st2

), 1

16 k

m o

f ra

il

line a

nd

co

nnect

ions

op

era

tio

nal

since

3 J

uly

 201

6.

Pro

ject

. Th

e se

cond

pha

se o

f the

Es

t eu

rop

éen

Hig

h-Sp

eed

Lin

e (L

GV

) co

nnec

ts B

aud

reco

urt

(Mos

elle

) to

Ven

den

heim

(to

the

Nor

th o

f St

rasb

ourg

), co

ntin

uous

ly fo

r th

e fir

st

300 

km, c

omm

issi

oned

in 2

007.

Ob

ject

ives.

Con

nect

ing

the

Eas

tern

G

reat

er P

aris

are

a an

d o

ther

Fre

nch

reg

ions

(Nor

th, W

est,

Sou

th-W

est)

w

ith a

tim

e g

ain

of t

hirt

y m

inut

es.

The

pro

ject

als

o im

pro

ves

inte

rnat

iona

l co

nnec

tions

bet

wee

n th

e St

rasb

ourg

an

d L

uxem

bou

rg r

egio

ns, a

nd p

rovi

des

q

uick

er a

cces

s to

Sou

ther

n G

erm

any.

Th

e se

cond

pha

se o

f the

LG

V E

st

euro

pée

nne

com

ple

tes

Fran

ce’s

p

artic

ipat

ion

in t

he “

Mai

n Li

ne

for

Euro

pe”

, a t

rans

-Eur

opea

n ra

il ne

twor

k th

at s

pan

s 1

500 

km

from

Par

is t

o B

udap

est.

In 2

010,

for

its a

ctio

ns w

ithin

the

fr

amew

ork

of t

he L

GV

Est

eur

opée

nne,

SN

CF 

Rés

eau

obta

ined

the

Gre

nelle

de

l’env

ironn

emen

t la

bel

“B

iod

iver

sity

Yea

r”.

LGV

Bre

tag

ne -

Pays

de la L

oir

e (

BP

L),

21

3 k

m o

f lin

e a

nd

co

nnect

ions

co

mm

issi

oned

on 2

 July

20

17

.

Pro

ject

. Th

e LG

V B

reta

gne

 – P

ays

de

la

Loi

re, h

igh-

spee

d li

ne fr

om C

onne

rré

to t

he w

est

of R

enne

s, is

par

t of

the

ex

tens

ion

tow

ard

s R

enne

s an

d N

ante

s of

th

e w

este

rn b

ranc

h of

the

LG

V A

tlant

ique

hi

gh-

spee

d li

ne c

omm

issi

oned

in 1

989.

Ob

ject

ive.

Sig

nific

antly

dev

elop

ing

th

e se

rvic

e to

Brit

tany

and

the

Pay

s d

e la

Loi

re, b

y re

duc

ing

the

per

iphe

ral

pos

ition

of t

he W

est

and

by

imp

rovi

ng

acce

ssib

ility

to

othe

r Fr

ench

reg

ions

(P

aris

and

maj

or r

egio

nal c

ities

w

ith d

irect

“p

rovi

nce-

pro

vinc

e”

conn

ectio

ns) a

nd E

urop

ean

citie

s.A

thi

rty

seve

n-m

inut

e tim

e g

ain

bet

wee

n Pa

ris a

nd R

enne

s an

d fu

rthe

r in

to

Brit

tany

. Par

is is

22

min

utes

clo

ser

from

La

val a

nd 8

min

utes

clo

ser

from

Ang

ers,

N

ante

s an

d t

he t

errit

orie

s b

eyon

d.

For

the

exis

ting

TG

V A

tlant

ique

tra

ins

(com

mer

cial

sp

eed

of 3

00 k

m/h

),

the

bes

t jo

urne

y tim

e is

for

exam

ple

h 26

min

utes

for

Paris

 – R

enne

s,

1 h 

17 m

inut

es fo

r Pa

ris –

Ang

ers

(inst

ead

of 1

 h 2

5 m

inut

es) a

nd

1 h 

51 m

inut

es fo

r Pa

ris –

Nan

tes.

The

new

rai

l lin

e al

so h

as a

pos

itive

im

pac

t on

the

reg

iona

l and

inte

r-re

gio

nal

serv

ices

. Mor

e re

gio

nal a

nd fr

eig

ht t

rain

s ca

n ci

rcul

ate

on t

he c

onve

ntio

nal l

ine

bet

wee

n Le

Man

s an

d R

enne

s.

The

“Virg

ule

de S

ablé

-sur

-Sar

the”

junc

tion

also

sig

nific

antly

red

uces

the

reg

iona

l tr

avel

tim

e b

etw

een

Nan

tes

and

Lav

al,

and

betw

een

Ang

ers,

Lav

al a

nd R

enne

s.

40

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

41

ME

TH

OD

TO

CA

LCU

LATE

TH

E C

AR

BO

N IM

PA

CT

OF N

EW

LIN

E P

RO

JEC

TS

New

line

pro

ject

s ar

e lim

ited

in n

umb

er

(four

) and

rep

rese

nt a

maj

or in

vest

men

t (1

5 b

illio

n eu

ros

in t

otal

).

Thei

r ca

rbon

imp

act

can

be

det

erm

ined

in

div

idua

lly, w

ithou

t ex

trap

olat

ion

b

ased

on

a lim

ited

pan

el o

f op

erat

ions

as

ap

plie

d t

o re

new

al o

per

atio

ns.

Carb

on f

oo

tpri

nt

The

carb

on fo

otp

rints

of t

he fo

ur n

ew

line

pro

ject

s w

ere

calc

ulat

ed b

y th

eir

pro

ject

ow

ners

(SN

CF

Rés

eau

for

Est

2,

Eiff

age

Rai

l Exp

ress

for

BPL

, LIS

EA

for

SEA

, Oc’

Via

for

CN

M).

Em

issi

ons

avo

ided

b

y new

rail

line p

roje

cts

Sinc

e ra

il is

the

mod

e of

tra

nsp

ort

with

th

e lo

wes

t G

HG

em

issi

ons,

op

enin

g

a ne

w li

ne r

educ

es t

he o

vera

ll em

issi

on

leve

l of t

he t

rans

por

t sy

stem

.C

alcu

latin

g a

void

ed e

mis

sion

s co

nsis

ts

of c

omp

arin

g t

he c

arb

on fo

otp

rint

of

pas

seng

ers

and

frei

ght

tra

nsp

ort

in

tw

o sc

enar

ios:

– re

fere

nce

scen

ario

: the

stu

die

d p

roje

ct

is n

ot r

ealiz

ed a

nd t

he in

itial

situ

atio

n g

oes

on;

– p

roje

ct s

cena

rio: o

pen

ing

the

new

line

sh

ifts

traf

fic fr

om r

oad

or

air

to r

ail a

nd

gen

erat

es a

new

tra

nsp

ort

dem

and

cal

led

in

duc

tion.

The

met

hod

use

d t

o ca

lcul

ate

the

emis

sion

s av

oid

ed b

y op

enin

g

a ne

w li

ne is

form

ulat

ed a

s fo

llow

s.

• C

alc

ula

tio

n o

f em

issi

ons

in t

he

refe

rence

sce

nari

o (

wit

ho

ut

pro

ject

):– 

estim

atio

n of

the

tra

ffic

, for

eac

h m

ode

of t

rans

por

t, o

f pas

seng

ers

and

goo

ds

runn

ing

on

the

rout

e im

pac

ted

by

th

e ne

w li

ne p

roje

ct;

– tr

affic

fore

cast

on

the

long

ter

m;

– ap

plic

atio

n of

em

issi

on fa

ctor

s

for

diff

eren

t ty

pes

of t

raff

ic a

nd t

heir

evol

utio

n (fo

r ex

amp

le: g

CO

2/km

fo

r p

rivat

e ca

rs).

• C

alc

ula

tio

n o

f em

issi

ons

in

the p

roje

ct s

cenari

o:

– es

timat

ion

of t

he t

raff

ic r

unni

ng o

n

the

new

line

and

its

orig

in (o

ther

rai

l se

rvic

es, m

odal

shi

ft, t

raff

ic in

duc

tion)

;– 

traf

fic fo

reca

st o

n th

e lo

ng t

erm

;– 

app

licat

ion

of e

mis

sion

fact

ors

for

diff

eren

t ty

pes

of t

raff

ic a

nd t

heir

evol

utio

n (fo

r ex

amp

le: g

CO

2/kW

hof

the

Fre

nch

elec

tric

ity m

ix).

The

diff

eren

ce in

em

issi

ons

bet

wee

n

the

two

scen

ario

s is

the

vol

ume

of a

void

ed e

mis

sion

s d

ue t

o th

e ne

w

rail

line

over

the

ser

vice

life

of i

ts r

ail

equi

pm

ent

(fort

y ye

ars,

leve

l of

unc

erta

inty

is t

oo h

igh

bey

ond

).

PR

OJE

CT

LE

NG

TH

(LIN

ES,

C

ON

NE

CTI

ON

S)

CO

ST (

€M

)G

HG

EM

ISSIO

NS

(BIL

AN

CA

RB

ON

E®)

TO

TAL

OF

WH

ICH

F

INA

NC

ED

B

Y

SN

CF

R

ÉS

EA

U

OF

WH

ICH

F

INA

NC

ED

B

Y G

RE

EN

B

ON

DS

2

01

6

THO

USA

ND

T

CO

2EQ

THO

USA

ND

T

CO

2EQ

PER

KM

T C

O2E

QP

ER

€M

IN

VE

STE

D

THO

USA

ND

T

CO

2EQ

A

LLO

CA

TED

TO

TH

E

GR

EE

N

BO

ND

S

2016

AB

CD

EF

=E

/AG

=E

/BH

=D

*G

EST

2L:

10

7 k

mC

: 9 k

m2,1

91

580

14

1,0

49

9479

7

BP

LL:

18

2 k

mC

: 32 k

m3,3

80

1,4

35

53

1,3

50

6400

21

SE

AL:

30

2 k

mC

: 38 k

m 7

,54

62,0

98

73

1,6

71

5221

16

CN

ML:

60

km

C:

20 k

m2,2

91

465

36

621

8271

10

TO

TAL

L:

65

1km

C:

99

 km

15

,40

84

,57

81

76

4,6

91

63

04

54

CA

RB

ON

FO

OTP

RIN

T O

F N

EW

LIN

E P

RO

JE

CTS

42

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

43

GLO

BA

L O

VE

RV

IEW

The

tota

l car

bon

imp

act

allo

cate

d t

o ex

pen

ses

finan

ced

by

the

Gre

en B

ond

s 20

16 is

ob

tain

ed b

y ad

din

g:

- th

e ca

rbon

imp

act

allo

cate

d t

o

exp

ense

s fin

ance

d b

y G

reen

Bon

ds

fo

r th

e re

new

al p

roje

cts

(cat

egor

y 1)

;-

the

carb

on im

pac

t al

loca

ted

to

exp

ense

s fin

ance

d b

y G

reen

Bon

ds

for

new

rai

l lin

e p

roje

cts

(cat

egor

y 2)

;

Ther

efor

e, in

tot

al, t

he e

xpen

ses

fin

ance

d b

y th

e G

reen

Bon

ds 

2016

re

duc

e th

e G

HG

em

issi

ons

of t

he t

rans

por

t sy

stem

by

2.9 

mill

ion

tons

eq

uiva

lent

CO

2.

The

carb

on im

pac

t of

the

SN

CF

Rés

eau

Gre

en B

ond

s 20

16 is

eq

uiv

ale

nt

to

the c

arb

on f

oo

tpri

nt

of

ap

pro

xim

ate

ly

6,0

00

 Fre

nch

cit

izens

ove

r fo

rty

years

.

TO

TAL C

AR

BO

N I

MPA

CT O

F T

HE

EX

PE

NSE

S F

INA

NC

ED

B

Y G

RE

EN

BO

ND

S A

S O

N 3

1 D

EC

EM

BE

R 2

01

6

RE

NE

WA

L P

RO

JE

CT

S-

2,7

27,8

00 T

CO

2E

Q

NE

W R

AIL

LIN

E P

RO

JE

CT

S-

190,2

00 T

CO

2E

Q

TO

TAL

- 2,9

18,0

00 t

CO

2eq

ON

E S

TE

P F

UR

TH

ER

All

of t

he d

ocum

ents

rel

ated

to

this

G

reen

Bon

ds

pro

gra

mm

e (G

reen

Bon

ds

Fram

ewor

k, S

econ

d P

arty

Op

inio

n,

Clim

ate

Bon

ds

Initi

ativ

e ce

rtifi

catio

n,

pre

sent

atio

n of

Gre

en B

ond

inve

stor

s,

etc.

) are

ava

ilab

le o

n th

e SN

CF

Rés

eau

web

site

, in

the

sect

ion

“SR

I/G

reen

B

ond

s”:

sncf

-rese

au.f

r/fr

/fin

ance

-dura

ble

All

the

info

rmat

ion

conc

erni

ng

the

SNC

F R

ésea

u C

SR p

olic

y is

ava

ilab

le o

n th

e d

edic

ated

pag

es

of t

he S

NC

F R

ésea

u w

ebsi

te:

sncf

-rese

au.f

r/fr

/a-p

rop

os/

develo

pp

em

ent-

dura

ble

The

first

SN

CF

Rés

eau

resp

onsi

ble

ac

tivity

rep

ort 

(201

6) is

ava

ilab

le a

t

flip

bo

ok.s

ncf

-rese

au.f

r/rs

e-2

01

6

All

the

CSR

rep

orts

, ind

icat

ors,

an

d m

etho

dol

ogie

s ca

n b

e ac

cess

ed

on t

he d

edic

ated

pag

e “R

epor

ts

and

ind

icat

ors”

: sn

cf-r

ese

au.f

r/fr

/rap

po

rts-

et-

ind

icate

urs

Con

tact

:sn

cf.r

ese

au.invest

isse

urs

@ré

seau.s

ncf

.fr

44

SNC

F R

ÉSEA

U

GR

EEN

BO

ND

S R

EPO

RT 2

016

45

DIS

CLA

IME

R

This

do

cum

ent

is b

ein

g f

urn

ished

to

yo

u s

ole

ly f

or

your

info

rmat

ion o

n a

co

nfid

enti

al b

asis

and

m

ay n

ot

be r

ep

rod

uce

d, re

dis

trib

ute

d o

r p

asse

d o

n, in

who

le o

r in

par

t, t

o a

ny

oth

er

pers

on.

Th

is d

ocu

ment

do

es

no

t co

nst

itute

or

form

par

t o

f an

y so

licit

atio

n,

off

er

or

invi

tati

on t

o p

urc

has

e o

r su

bsc

rib

e

for

any

secu

riti

es

issu

ed

by

SN

CF R

ése

au a

nd

neit

her

it n

or

any

par

t o

f it

shal

l fo

rm t

he b

asis

of,

or

be r

elie

d

up

on in

co

nnect

ion w

ith, an

y co

ntr

act

or

com

mit

ment

what

soeve

r. A

cco

rdin

gly

, it

is n

ot

dir

ect

ed

to

the s

peci

fic

inve

stm

en

t o

bje

ctiv

es,

fin

anci

al s

itu

atio

n o

r p

arti

cula

r need

s o

f an

y re

cip

ient.

Yo

u s

ho

uld

co

nsu

lt w

ith y

our

ow

n le

gal

, re

gula

tory

, ta

x, b

usi

ness

, in

vest

ment,

fin

anci

al a

nd

acc

ounti

ng

ad

vise

rs t

o t

he e

xtent

that

yo

u d

eem

it

ne

cess

ary,

and

mak

e y

our

ow

n in

vest

ment,

hed

gin

g a

nd

tra

din

g d

eci

sio

ns

(incl

ud

ing

deci

sio

ns

reg

ard

ing

the

suit

abili

ty o

f an

in

vest

ment

in S

NC

F R

ése

au s

ecu

riti

es)

bas

ed

up

on y

our

ow

n j

ud

gm

ent

and

ad

vice

fro

m s

uch

ad

vise

rs a

s yo

u d

eem

nece

ssar

y an

d n

ot

up

on a

ny

view

exp

ress

ed

in t

his

do

cum

ent.

No

rep

rese

nta

tio

n o

r w

arra

nty

, exp

ress

or

imp

lied

, is

mad

e a

s to

, an

d n

o r

elia

nce

may

be p

lace

d f

or

any

pu

rpo

ses

what

soe

ver

on,

the f

airn

ess

, ac

cura

cy,

com

ple

teness

or

corr

ect

ness

of

the i

nfo

rmat

ion o

r o

pin

ions

con

tain

ed

here

in.

No

ne o

f SN

CF R

ése

au,

or

any

of

its

affilia

tes,

ad

vise

rs o

r re

pre

senta

tive

s sh

all

hav

e a

ny

liab

ility

what

soeve

r (in

neg

ligence

or

oth

erw

ise)

for

any

loss

ho

wso

eve

r ar

isin

g f

rom

any

use

of

this

do

cum

ent

or

its

co

nte

nts

or

oth

erw

ise a

risi

ng

in c

onnect

ion w

ith t

his

do

cum

ent.

Cert

ain S

tate

ments

in t

his

do

cum

ent

are f

orw

ard

-loo

king

, in

clud

ing

Sta

tem

ents

co

nce

rnin

g S

NC

F R

ése

au’s

pla

ns,

o

bje

ctiv

es,

go

als,

str

ateg

ies,

futu

re e

vents

, fu

ture

reve

nues

or

perf

orm

ance

, ca

pital

exp

end

iture

s, f

inan

cing

need

s,

pla

ns

or

inte

ntio

ns

rela

ting

to

acq

uis

itio

ns,

co

mp

etitive

str

eng

ths

and

weak

ness

es,

busi

ness

str

ateg

y an

d t

he t

rend

s SN

CF R

ése

au a

ntici

pat

es

in t

he i

nd

ust

ries

and

the p

olit

ical

and

leg

al e

nvi

ronm

ent

in w

hic

h i

t o

pera

tes

and

oth

er

info

rmat

ion t

hat

is

no

t his

torica

l in

form

atio

n.

By

their n

ature

, fo

rwar

d-lo

oki

ng

Sta

tem

ents

invo

lve i

nhere

nt

risk

s an

d u

nce

rtai

nties,

bo

th g

enera

l an

d s

peci

fic,

and

ris

ks e

xist

that

the p

red

ictio

ns,

fo

reca

sts,

pro

ject

ions

and

oth

er

forw

ard

-loo

king

Sta

tem

ents

will

no

t b

e a

chie

ved

. SN

CF R

ése

au d

oes

no

t m

ake a

ny

rep

rese

nta

tio

n,

war

ranty

or

pre

dic

tio

n t

hat

the r

esu

lts

antici

pat

ed

by

such

fo

rwar

d-lo

oki

ng

Sta

tem

ents

will

be a

chie

ved

, an

d s

uch

fo

rwar

d-

loo

king

Sta

tem

ents

rep

rese

nt,

in e

ach c

ase,

only

one o

f m

any

po

ssib

le s

cenar

ios

and

sho

uld

no

t b

e v

iew

ed

as

the

mo

st l

ikely

or

stan

dar

d s

cenar

io.

Such

fo

rwar

d-lo

oki

ng

Sta

tem

ents

sp

eak

only

as

of

the d

ate o

n w

hic

h t

hey

are

mad

e.

Any

op

inio

ns

exp

ress

ed

in t

his

do

cum

ent

are s

ub

ject

to

chan

ge w

itho

ut

no

tice

and

SN

CF R

ése

au d

oes

no

t und

ert

ake a

ny

ob

ligat

ion to

up

dat

e o

r re

vise

any

forw

ard

-loo

king

Sta

tem

ent,

wheth

er as

a resu

lt o

f new

info

rmat

ion,

futu

re e

vents

or

oth

erw

ise. N

ot

for

dis

trib

utio

n in

to t

he U

nited

Sta

tes.

In t

he U

nit

ed

Kin

gd

om

, th

is d

ocu

ment

is b

ein

g d

istr

ibute

d o

nly

to

, an

d i

s d

irect

ed

at

(a)

pers

ons

who

hav

e

pro

fess

ional

exp

eri

ence

in m

atte

rs r

ela

ting

to

inve

stm

ents

fal

ling

wit

hin

art

icle

19(5

) of

the F

inan

cial

Serv

ices

And

M

arke

ts A

ct2000 “

FSM

A”

(Fin

anci

al P

rom

oti

on)

Ord

er

2005 (

the “

Ord

er”

) o

r (b

) hig

h n

et

wo

rth e

nti

ties

falli

ng

w

ithin

art

icle

49 o

f th

e O

rder,

and

oth

er

pers

ons

to w

ho

m i

t m

ay b

e l

awfu

lly b

e c

om

munic

ated

or(

c) q

ual

ified

in

vest

ors

as

defin

ed

in s

86(7

) o

f th

e F

SM

A (

all

such

pers

ons

tog

eth

er

bein

g r

efe

rred

to

as

“Rele

vant

Pers

ons”

).

Any

pers

on w

ho

is n

ot

a R

ele

vant

Pers

on s

ho

uld

no

t ac

t o

r re

ly o

n t

his

do

cum

ent

or

any

of

its

conte

nts

.

In F

rance

, th

is d

ocu

ment

will

be n

ot

dis

trib

ute

d o

r ca

use

d t

o b

e d

istr

ibute

d a

nd

will

no

t b

e d

istr

ibute

d o

r ca

use

d

to b

e d

istr

ibute

d t

o t

he p

ub

lic i

n F

rance

, an

d a

ny

dis

trib

uti

on o

f th

is d

ocu

ment

hav

e b

een a

nd

will

be m

ade i

n

Fra

nce

only

to

(a)

pro

vid

ers

of

inve

stm

ent

serv

ices

rela

ting

to

po

rtfo

lio m

anag

em

ent

for

the a

cco

unt

of

third

p

arti

es,

and

/or

(b)

qual

ified

inve

sto

rs (

inve

stis

seurs

qual

ifiés)

, o

ther

than

ind

ivid

ual

s, a

ll as

defin

ed

in,

and

in

acco

rdan

ce w

ith, A

rtic

les

L.411-1

, L.

411-2

, an

d D

.411-1

to

D.4

11-3

of

the F

rench

Co

de m

onéta

ire e

t fin

anci

er.

This

do

cum

ent

is a

n a

dve

rtis

em

ent

and

no

t a

pro

spect

us

for

the p

urp

ose

s o

f ap

plic

able

meas

ure

s im

ple

menting

D

irect

ive

2003/7

1/E

C (

“Pro

spect

us

Dire

ctiv

e”)

. N

either

this

do

cum

ent

no

r an

y co

py

there

of

may

be t

aken o

r tr

ansm

itte

d o

r d

istr

ibute

d, d

irect

ly o

r in

dire

ctly

, into

the U

nited

Sta

tes

or

to a

U.S

.Pers

on [a

s d

efin

ed

in R

ule

902 o

f R

eg

ula

tio

nS u

nd

er

the S

ecu

rities

Act

of 1933, a

s am

end

ed

(the “

Secu

rities

Act

”)].

The d

istr

ibutio

n o

f this

do

cum

ent

in o

ther

jurisd

ictio

ns

may

be r

est

rict

ed

by

law

and

pers

ons

into

to

who

se p

oss

ess

ion t

his

do

cum

ent

com

es

sho

uld

in

form

them

selv

es

abo

ut,

and

ob

serv

e a

ny

such

rest

rict

ion.

Any

failu

re t

o c

om

ply

with t

hese

rest

rict

ions

may

co

nst

itute

a v

iola

tio

n o

f th

e la

ws

of

any

such

oth

er

jurisd

ictio

n. T

his

do

cum

ent

do

es

no

t co

nst

itute

or

form

a p

art

of

any

off

er

or

solic

itat

ion t

o p

urc

has

e o

r su

bsc

rib

e f

or

secu

rities

in t

he U

nited

Sta

tes.

Secu

rities

may

no

t b

e o

ffere

d

or

sold

in t

he U

nited

Sta

tes

abse

nt

reg

istr

atio

n o

r an

exe

mp

tio

n f

rom

reg

istr

atio

n u

nd

er

the S

ecu

rities

Act

. Neither

this

do

cum

ent

no

r an

y co

py

there

of m

ay b

e r

eta

ined

by

you o

r re

pro

duce

d, r

ed

istr

ibute

d o

r p

asse

d o

n, i

n w

ho

le o

r in

par

t, t

o a

ny

oth

er

pers

on. B

y at

tend

ing

the p

rese

nta

tio

n y

ou a

gre

e t

o b

e b

ound

by

the f

ore

go

ing

rest

rict

ion

s.D

esi

gn a

nd

execu

tio

n:

.P

rinti

ng

: P

arag

on. O

cto

ber

2017.

This

do

cum

ent

is p

rinte

d u

sing

100%

recy

cled

pap

er.

46

SN

CF

SE

AU

G

RE

EN

BO

ND

S R

EP

OR

T 2

01

647