Issue Tracker 131230

Embed Size (px)

Citation preview

  • 8/11/2019 Issue Tracker 131230

    1/1

    Legend: Critical Issues Pending

    Completed In Progress

    S.

    No.Issue

    Action

    Initiated

    on

    Target

    Date

    Actual

    DateAction By Remarks

    19-DecClient: Mr.

    Pinto

    Contact Ashish at SOPAN

    Engineering (09405291918)

    20-Dec Sopan: Ashish Pipes are to be laid along the walls

    2 Route of pipelines27-Dec 30-Dec 30-Dec Client

    The pipelines will be above the false

    ceiling

    3Electrcial cable route and specifications for

    industrial wiring27-Dec 30-Dec

    Mr. Manish

    Trinitron

    The vendor will provide the shop

    drawings for cables and cable tray

    4Electrcial cable route and specifications for point

    wiring26-Dec 26-Dec Architect

    RCP along with electrical fixtures

    has been sent to client for

    confirmation

    5 Route of data/voice cables 21-Dec Client Meeting to be arranged with HP

    6 Route of security system cables 21-Dec Client Vendor to be finalised

    7 Route of fire detection system cables 27-Dec Architect Vendor to be finalised

    8 Loading of floor for deciding on the Epoxy Paint' 19-Dec 19-DecClient: Mr.

    Pinto

    Movement of Manpower & Electrical

    Fork lift model upto 1.5 Tons,

    Godrej make

    9Arrangement of Fans for thermal comfort in Non-

    Ac areas19-Dec Architect

    Sthapati is asked to provide withoptions/combination of split/cassette

    for AC

    10Arrangement of ACs , wall mounted ACs have a

    throw of 20' maximum27-Dec 30-Dec Client

    3.0 TR high wall-mounted industrial

    ACs to be used

    11 Alternatives for material of the partitions with

    painted finish19-Dec 30-Dec Client

    Gypsum partition and false ceiling

    will be used

    12 Initial drawings for partitions & ceilings with

    proposed material24-Dec 24-Dec 26-Dec Architect Drawings sent

    13 Electrical drawings 19-Dec 19-DecClient: Mr.

    PintoSent Electrical drawings

    14

    High, low pressure piping & electrical

    wiring/cables needs to be dropped down to the

    machine location. Organise a teleconference.

    21-Dec 23-Dec Architect Conference call done

    15 Heat being generated in each machine for ACloads

    23-Dec 1-Jan-14 Client

    Client confirmed there is no heat

    load from the machines thus the

    dwgs already sent holds good

    Issue Tracker Sheet

    Project : KLR, Factory, Gurgaon

    Load of Piping and the pipe rack of the proposed

    lines

    1