246
ISSUE 96 Catalogue Catalogue of Network Rail Standards NR/CAT/STP/001 ISSUE 96 05 June – 05 September 2015 This document is the property of Network Rail Infrastructure Ltd. It shall not be reproduced in whole or in part, nor disclosed to a third party, without the written permission of the standard owner. Copyright © 2015 Network Rail Infrastructure Ltd. Network Rail Infrastructure Ltd. is part of the Network Rail Group of Companies.

ISSUE 96 Catalogue of Catalogue Network Rail Standards Catalogue issue 96.pdf · ISSUE 96 Catalogue of Catalogue Network Rail Standards NR/CAT/STP/001 ISSUE 96 05 June – 05 September

  • Upload
    vandang

  • View
    407

  • Download
    13

Embed Size (px)

Citation preview

  • I S S U E 9 6Cat a l o g u eCatalogue of

    Network RailStandardsNR/CAT/STP/001 ISSUE 96

    05 June 05 September 2015This document is the property of Network Rail Infrastructure Ltd.It shall not be reproduced in whole or in part, nor disclosed to a third party, without the written permission of the standard owner. Copyright 2015 Network Rail Infrastructure Ltd.Network Rail Infrastructure Ltd. is part of the Network Rail Group of Companies.

  • i.Contacts Search Support Contacts Please note that it will help save time if you have available your System Number and Company Name. Other Information Network Rail Standards Subscriptions SAI Global Network Rail Standards Management SAI Global Publications Manager Nicole Lockwood Phone: 01908 782 481 Network Rail Standards Hard Copy Document Centre SAI Global Railway Group Standards Rail Safety & Standards Board Enquiry Desk Phone: 020 3142 5400 Website www.rssb.co.uk Network Rail Technical Drawings National Records Group Email: [email protected] Distributed under licence by SAI Global, Partis House, Davy Avenue, Knowlhill, Milton Keynes, MK5 8HJ [email protected]: +44 (0) 1344 636300 An App of this catalogue is available as the i2i Network Rail App in iTunes and Google Play

    http://www.rssb.co.uk/mailto:[email protected]

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 3

    Table of Contents

    Table of ContentsTable of Contents

    i.Contacts ........................................................................................................................................................................................................2 1 Guide to this Catalogue .............................................................................................................................................................................6

    1.1 Quick Find Using the Catalogue Index ....................................................................................................................................... 6 1.2 Network Rail Standards ................................................................................................................................................................. 6 1.3 Network Rail Standards Framework .............................................................................................................................................. 6 1.4 Types of Network Rail Standards .................................................................................................................................................. 6 1.5 Other documents related to Network Rail Standards ..................................................................................................................... 6 1.6 Steering Group Codes ................................................................................................................................................................... 7 1.7 Technical Specifications for Interoperability ................................................................................................................................... 7 1.8 Railway Group Standards .............................................................................................................................................................. 7 1.9 Ordering Network Rail Standards .................................................................................................................................................. 7

    2 Changes in this issue .................................................................................................................................................................................9 2.1 New and Up-Issued Standards ...................................................................................................................................................... 9 2.2 Withdrawn and Superseded Documents ......................................................................................................................................13 2.3 Letters of Instruction .....................................................................................................................................................................14

    3 Network Rail Catalogues.......................................................................................................................................................................... 21 3.1 Network Rail Catalogues ..............................................................................................................................................................21

    4 Listing of Network Rail Standards ............................................................................................................................................................ 23 4.1 ASSET INFORMATION ................................................................................................................................................................23 4.2 CIVIL ENGINEERING ...................................................................................................................................................................24

    4.2.1 Civil Engineering ...............................................................................................................................................................24 4.2.2 Railway Estates Policy & Planning ....................................................................................................................................31

    4.3 COMMERCIAL PROPERTY .........................................................................................................................................................32 4.4 COMPETENCE & TRAINING MANAGEMENT ............................................................................................................................33 4.5 CONTRACTS & PROCUREMENT ...............................................................................................................................................38 4.6 ELECTRICAL POWER .................................................................................................................................................................40 4.7 ENGINEERING DESIGN TECHNOLOGY ....................................................................................................................................64 4.8 ENVIRONMENT ...........................................................................................................................................................................65 4.9 ERGONOMICS .............................................................................................................................................................................67 4.10 FIRE SAFETY POLICY ................................................................................................................................................................68 4.11 INFORMATION MANAGEMENT ..................................................................................................................................................69 4.12 INFRASTUCTURE MAINTENANCE ............................................................................................................................................72 4.13 INTEGRATED RISK .....................................................................................................................................................................84 4.14 INVESTMENT PROJECTS ..........................................................................................................................................................85 4.15 NATIONAL DELIVERY SERVICE / NATIONAL SUPPLY CHAIN ................................................................................................91 4.16 OPERATIONS & CUSTOMER SERVICES / PRINCIPLES & STANDARDS ................................................................................93

    4.16.1 OPERATIONS & CUSTOMER SERVICES .......................................................................................................................93 4.16.2 OPERATIONS PRINCIPLES & STANDARDS ..................................................................................................................96

    4.17 RAIL MOUNTED VEHICLE & PLANT ..........................................................................................................................................98 4.18 SAFETY & COMPLIANCE ..........................................................................................................................................................104

    4.18.1 Accident Investigation .....................................................................................................................................................104 4.18.2 Assurance .......................................................................................................................................................................105 4.18.3 Health & Safety Systems .................................................................................................................................................105 4.18.4 Occupational Health & Safety ..........................................................................................................................................105

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    4 or digital formats is permitted.

    Table of Contents

    4.19 SIGNAL ENGINEERING ............................................................................................................................................................111 4.20 SYSTEM ENGINEERING ...........................................................................................................................................................141

    4.20.1 Engineering Programme Management ............................................................................................................................141 4.20.2 Railway System Engineering ...........................................................................................................................................143

    4.21 TELECOMS ENGINEERING ......................................................................................................................................................145 4.22 TRACK ENGINEERING .............................................................................................................................................................161 4.23 Documents Archived in the Last 15 Months ...............................................................................................................................179

    A1 NR/L3/CIV/005 Iss 2; Jun 11.................................................................................................................................................................. 182 A2 NR/L3/CIV/006 Iss 5; Jan 14.................................................................................................................................................................. 182 A3 NR/L3/CIV/140 Iss 10; Sep 10 ............................................................................................................................................................... 183 B1 NR/L2/CTM/012 Iss 3; Sep 11 ............................................................................................................................................................... 188 C1 NR/L2/ELP/27009 Iss 2; Dec 11 ............................................................................................................................................................ 191 C2 NR/L2/ELP/27238 Iss 7; Jul 14 .............................................................................................................................................................. 193 C3 NR/L3/ELP/27406 Iss 2; Dec 11 ............................................................................................................................................................ 194 D1 NR/L3/INI/PG115 Iss 5; Jun 12 .............................................................................................................................................................. 196 E1 NR/L3/MTC/MG0176 Iss 4; Sep 10 ....................................................................................................................................................... 198 E2 NR/L3/MTC/II0219 Iss 1; Sep 10 ........................................................................................................................................................... 198 E3 NR/L3/MTC/MG0213 Iss 6; Jun 11 ........................................................................................................................................................ 198 E4 NR/L3/MTC/PLS0175 Iss 4; Sep 10 ...................................................................................................................................................... 201 E5 NR/L3/MTC/RCS0216 Iss 7; Dec 14 ...................................................................................................................................................... 202 F1 NR/L3/NDS/047 Iss 21; Mar 12 .............................................................................................................................................................. 209 F2 NR/L3/NDS/048 Iss 13; Mar 12 .............................................................................................................................................................. 209 F3 NR/L3/NDS/308 Iss 13; Mar 12 .............................................................................................................................................................. 209 G1 NR/L3/OCS/043 Iss 18; Mar 15 .............................................................................................................................................................. 212 G2 NR/L3/OCS/044 Iss 11; Jun 12 .............................................................................................................................................................. 213 H1 NR/PLANT/0200 Iss 6; May 14 .............................................................................................................................................................. 215 H2 NR/PLANT/0200 Iss 6; May 14 .............................................................................................................................................................. 215 J1 NR/L2/SIG/11201 Iss 9; Sep 14 ............................................................................................................................................................. 219 J2 NR/L2/SIG/17002 Iss 23; Mar 12 ........................................................................................................................................................... 220 J3 NR/L2/SIG/30009 Iss 10; Mar 15 ........................................................................................................................................................... 223 J4 NR/L2/SIG/30014 Iss 9; Sep 14 ............................................................................................................................................................. 224 J5 NR/L2/SIG/30017 Iss 2; Sep 11 ............................................................................................................................................................. 228 J6 NR/L2/SIG/30097 Iss 3; Apr 14 .............................................................................................................................................................. 228 J7 NR/L2/SIG/30099 Iss 1; Jun 12 ............................................................................................................................................................. 229 J8 NR/L3/SIG/11303 Iss 5; Sep 11 ............................................................................................................................................................. 229 J9 NR/L3/SIG/11761 Iss 3; Jun 12 .............................................................................................................................................................. 231 J10 NR/L3/SIG/30082 Iss 2; Dec 10 ............................................................................................................................................................. 231 J11 NR/SIG/10665 Iss 12; Sep 14 ................................................................................................................................................................ 231 K1 NR/L2/TRK/0017; Sep 14 ...................................................................................................................................................................... 234 K2 NR/L2/TRK/6100; Mar 15....................................................................................................................................................................... 234 K3 NR/L3/TRK/0027; Jun 11 ....................................................................................................................................................................... 234 K4 NR/L3/TRK/003 16; Mar 15.................................................................................................................................................................... 237 K5 NR/L3/TRK/3510 2; Sep 11 .................................................................................................................................................................... 239 K6 NR/L3/TRK/3530 1; Jun 12 .................................................................................................................................................................... 240 5 Catalogue Index ..................................................................................................................................................................................... 242

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 5

    1. Guide to this Catalogue

    1Guide to this Catalogue

    1.Guide to Contents 1. Guide to this Catalogue

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    6 or digital formats is permitted.

    1. Guide to this Catalogue

    1 Guide to this Catalogue Welcome to the Catalogue of the Network Rail Standards. This catalogue is updated on a quarterly basis

    1.1 Quick Find Using the Catalogue Index All Network Rail current standards are listed in this catalogue. Click on the above index to find the document(s) you are looking for. If you can find what you are looking for, or are after a Historical Standard, please contact our service providers.

    1.2 Network Rail Standards Network Rail standards is the generic term for the documents that specify requirements and provide guidance directed towards securing the safe and efficient operation of the rail infrastructure. They support the overall company assurance system by specifying how Network Rail controls its principal health and safety risks, and how the organisation complies with Technical Specifications for Interoperability (TSIs), domestic legislation, Railway Group Standards and Network Rail Business Critical Rules.

    1.3 Network Rail Standards Framework The standards framework, detailed in NR/L2/EBM/STP001, is designed to enable Network Rail Standard Owners to:

    develop requirements that are designed to control and/or help mitigate against identified safety and business risks; align those requirements (risk controls) to the relevant asset management lifecycle stages; and describe those requirements within a hierarchy of Network Rail standards.

    NOTE 1: A standard might not be needed if there are no identified risks to be controlled. NOTE 2: The Bow-Tie risk methodology may be used to identify risks and their controls.

    1.4 Types of Network Rail Standards A Network Rail standard shall be classified as either:

    a) mandatory: a) Level 1; a) Level 2; a) Level 3; a) BCR control documents; or:

    b) (non-mandatory) Guidance Note

    NOTES

    Level 1, Level 2 and Level 3 standards are monitored for compliance on the Network Rail non-compliance database. Level 1 Network Rail standards shall specify the organisations objectives, goals, strategies and policy requirements. Level 1 standards provide the framework for business processes, assurance systems and controls specified at Level 2. Examples of Level 1 standards include Asset Management Policies and the Network Rail Drugs and Alcohol Policy. Level 2 Network Rail standards shall specify what is to be achieved. Level 2 standards outline business processes, assurance systems and controls. They provide the minimum requirements against which Level 3 processes can deliver. Examples of Level 2 standards are specifications, process requirements and product specifications. Level 3 Network Rail standards shall specify the how to tasks to be followed in order to deliver requirements specified in Level 2 standards. Examples of Level 3 standards are work instructions and process instructions. BCR control documents shall describe what needs to be achieved to meet identified controls for mitigating risks, including any tolerances and

    limits if applicable. Guidance Notes shall provide guidance based on best practice. Guidance Notes are non-mandatory and are not monitored for compliance.

    1.5 Other documents related to Network Rail Standards Letters of Instruction (NR/L2/EBM/STP001 previous issue 4, clause 4) - document, authorised by a Standard Owner, that is used to issue

    mandatory instructions directly linked to an existing Network Rail standard where there is an emergency need not otherwise covered; Special Inspection Notices (SINs) (NR/L2/SIG/10072) - A rapid response document, produced in accordance with this specification to rapid

    action throughout the railway industry to identify and obviate defects which may present a hazard.

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 7

    1. Guide to this Catalogue

    1.6 Steering Group Codes Please refer to the table for the current Steering Groups Codes.

    Network Rail Standards Steering Groups as at October 31, 2014 Standards Steering Group Reference Asset Information AIF Buildings & Civils Engineering CIV Competence & Training CTM Electrical Power ELP Ergonomics ERG Fire Safety Policy FIR Information Management INF Integrated Risk RSK Infrastructure Projects INI National Supply Chain NDS/CPR Network Operations OCS/OPS/MTC Property PRO Rail Mounted Vehicle & Plant RMVP Safety & Sustainable Development ENV/INV/OHS/HSS Signals SIG Asset Management & Railway Systems EBM/RSE Telecoms TEL Track TRK

    1.7 Technical Specifications for Interoperability TSIs are European-wide standards and set out essential requirements in eight subsystems. TSIs are mandated in the UK through The Railways (Interoperability) Regulations 2006, and apply to certain projects and routes. Where applicable, TSIs take precedence over all other national standards, including Railway Group Standards and Network Rail standards.

    1.8 Railway Group Standards Railway Group Standards are produced and implemented as specified in the Railway Group Standards Code published by the Rail Safety and Standards Board (RSSB). Railway Group Standards take precedence over Network Rail standards. Deviations against Railway Group Standards are monitored by Network Rail via the non-compliance database.

    1.9 Ordering Network Rail Standards You can order network Rail Standards either as part of an online subscription collection or as individual hardcopies. Most of the Network Rail Standards are priced according to the number of pages in them and are divided into 6 main price bands; these price bands are:

    Price Band A B C D E F

    Price 9 12 23 35 46 69

    There are multiple subscription packages available either in a modular format or custom collection tailored to your requirements. For examples please contact: Enquiries : [email protected] SAI Global, Partis House, Davy Avenue, Knowlhill, Milton Keynes MK5 8HJ www.saiglobal.com

    http://www.saiglobal.com/

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    8 or digital formats is permitted.

    2. Changes in this Issue

    2Changes in this Issue

    2.Changes in this issue 2. Changes in this Issue

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 9

    2.1 New and Up-Issued Standards

    2 Changes in this issue

    2.1 New and Up-Issued Standards 2.1 New and Up-Issued Standards

    Bri

    efi

    ng

    Re

    f

    Pref

    ix

    Document Number Title

    Issu

    e

    Rep

    lace

    s

    Issu

    e D

    ate

    Co

    mp

    lia

    nc

    e D

    ate

    Summary of purpose, significant changes and benefits

    (for full summary please see briefing note)

    1 CIV NR/L3/CIV/00012 Road vehicle incursions: risk assessment of public and non-public bridge and neighbouring sites

    1 NR/GN/CIV/00012 ISSUE 1

    06/06/15 05/09/15 Updated in response to a RAIB investigation following an incident at North Rode. NR/GN/CIV/00012 has been converted to a level 3 standard and extends the scope to include non-public sites.

    2 ELP NR/L2/ELP/21015 Maintenance of negative traction cables and bonding for DC conductor rail systems

    3 ISSUE 2 06/06/15 06/06/16 The frequency has been changed to allow E&PMEs to extend the frequency of the inspections in certain cases. A ten yearly functionally check has also been added.

    3 ELP NR/L2/ELP/21048 Maintenance of positive conductor rail and traction cables for DC conductor rail systems.

    1 NEW 06/06/15 06/06/16 Allow E&PMEs to extend the frequency of the inspections in certain cases to more then 12 months and to reduce it where there is impact on the asset condition. It also includes the need to check the conductor rail drawings at a 10 year frequency on site. Conductor rail heating has been included.

    4 ELP NR/L2/ELP/27032 Management of incidents involving damage to the OLE

    1 NR/GN/ELP/00003 06/06/15 01/06/16 This is a new mandated standard based on the previous guidance note and Route best practice when responding to OLE incidents. It has been produced in response to the learning points from the Margaretting dewirement incident.

    5 ELP NR/L3/ELP/27237 Overhead Line Work Instructions

    9 ISSUE 8 06/06/15 31/01/16 The index has been updated due to the addition of 12 new or modified work instructions to incorporate the new components and the series 2 OLE design range. The detailed changes are shown in the attached table and in the official briefing presentation.

    6 ELP NR/L3/ELP/27250 Conductor rail equipment working instructions.

    1 NR/GN/ELP/27309 ISSUE 3

    06/06/15 06/06/16 New standard contains modules for carrying out tasks on the conductor rail and associated equipment and negative bonding. Updates the requirements for installing, inspecting and maintaining conductor rail, negative bonding and associated equipment.

    7 INF NR/L2/INF/02230 Corporate Archive Policy

    2 NR/L2/INF/02230 ISSUE 1

    06/06/15 31/12/15 Updated in line with recommendations made as part of our Archives Accreditation Award, with Network Rail's reclassification and to reflect our obligations under the Freedom of Information Act, 2000.

    8 INI NR/L1/INI/PM/GRIP/102 GRIP for Programmes

    1 NEW 06/06/15 05/09/15 This Standard introduces a common governance framework for the delivery of infrastructure programmes in Network Rail. This Standard applies to all new programmes subsequent to September 2015.

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    10 or digital formats is permitted.

    2.1 New and Up-Issued Standards

    Bri

    efi

    ng

    Re

    f

    Pref

    ix

    Document Number Title

    Issu

    e

    Rep

    lace

    s

    Issu

    e D

    ate

    Co

    mp

    lia

    nc

    e D

    ate

    Summary of purpose, significant changes and benefits

    (for full summary please see briefing note)

    9 MTC NR/L3/MTC/MG0221 Network Operations non-operations staff management self assurance procedure

    3 ISSUE 2 06/06/15 05/09/15 Updated to: 1) reflect organisational changes since it was last published; 2) incorporate Works Delivery and Network Operations Delivery Services; 3) amend the processes to be consistent with the devolved organisation; 4) reference additional standard maintenance forms published since the standard was last updated; and 5) permit customisation of forms and materials used based on risk and local circumstances and management processes.

    10 MTC NR/L3/MTC/RCS0216 Risk Control Manual

    8 ISSUE 7 06/06/15 06/06/15 Task risk control sheet updated: GA25

    11 OCS NR/L3/OCS/041 Operations Manual - Contents & Responsibilities Matrix

    35 ISSUE 34 06/06/15 06/06/15 The standards change mitigates the risk of operational staff not working to aligned procedures. UPDATED: 2.10 Security and Storage of Detonators

    12 OCS NR/L3/OCS/044 Managed Station Manual - Contents, Procedures & Responsibilities Matrix

    12 ISSUE 11 06/06/15 05/09/15 The standards change mitigates the risk of operational staff not working to aligned procedures. UPDATED: MS-07 Control of Work on Managed Stations, MS-07 Appendices A-H Control of Work on Managed Stations

    13 OCS NR/L2/OCS/095 High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas and for Low Rail Adhesion

    4 ISSUE 3 06/06/15 01/08/15 The standards change mitigates the risk of operational staff not working to aligned procedures

    14 OHS NR/L2/OHS/0047 Application of the Construction Design and Management Regulations to Network Rail Construction Projects

    6 ISSUE 5 06/06/15 06/06/15 Updates made to bring the document inline with the chnages introduced by the CDM Regulations 2015. Introduction of Section 11: CDM Management Procedures which makes it explicit that the director of each business unit (route, function, major programme or region) is accountable for the CDM management procedures in that area.

    15 SIG NR/L2/SIG/11201 Signalling Design Handbook

    10 ISSUE 9 06/06/15 05/09/15 NEW: Module X39 - Overlay Miniature Stop Light arrangements

    16 SIGELP NR/L2/SIGELP/27408 Product Specification for Signalling Power Distribution Cables

    2 NR/L2/ELP/27408 ISSUE 1

    06/06/15 06/06/16 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    17 SIGELP NR/L2/SIGELP/27409 Product Specification for Functional Supply Points (FSP)

    2 NR/L2/ELP/27409 ISSUE 1

    06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 11

    2.1 New and Up-Issued Standards

    Bri

    efi

    ng

    Re

    f

    Pref

    ix

    Document Number Title

    Issu

    e

    Rep

    lace

    s

    Issu

    e D

    ate

    Co

    mp

    lia

    nc

    e D

    ate

    Summary of purpose, significant changes and benefits

    (for full summary please see briefing note)

    18 SIGELP NR/L2/SIGELP/27410 Specification for Class II based Signalling Power Distribution Systems

    2 NR/L2/ELP/27410 ISSUE 1

    06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    19 SIGELP NR/L2/SIGELP/27419 Product Specification for Distribution Interface Transformer Assemblies (DITA) for Signalling Power Distribution Systems

    1 NEW 06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    20 SIGELP NR/L2/SIGELP/27421 Product Specification - Flexible Conduits for Class II Based Signalling Power Distribution Systems

    1 NEW 06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    21 SIGELP NR/L2/SIGELP/27422 Product Specification - Cable Glands for use in Class II Based Signalling Power Distribution Systems

    1 NEW 06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    22 SIGELP NR/L2/SIGELP/30007 Product Specification for Power Transformers for Signalling Systems

    3 NR/L2/SIG/30007 ISSUE 2

    06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    23 SIGELP NR/L2/SIGELP/50000 Working on or near 650V Signalling Power Supplies

    1 NEW 06/06/15 06/06/16 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    24 SIGELP NR/L3/SIGELP/27420 Target Earth Calculation Methodology for Signalling Power Systems

    1 NEW 06/06/15 06/06/15 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    25 SIGELP NR/L3/SIGELP/50001 Working on or near 650V Signalling Power Supplies (Work Instructions Index)

    1 NEW 06/06/15 06/06/16 This new standard was developed as part of a new suite of documentation in response to ORR improvement notices with regards to maintenance and management of 650V Signalling Power Supplies.

    26 TRK NR/GN/TRK/7001 Index of Track Work Information Sheets (TWI)

    6 ISSUE 5 06/06/15 NA TWIs UPDATED: 2C037, 2G018, 2G020 TWIs NEW: 2P043b

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    12 or digital formats is permitted.

    2.1 New and Up-Issued Standards

    Bri

    efi

    ng

    Re

    f

    Pref

    ix

    Document Number Title

    Issu

    e

    Rep

    lace

    s

    Issu

    e D

    ate

    Co

    mp

    lia

    nc

    e D

    ate

    Summary of purpose, significant changes and benefits

    (for full summary please see briefing note)

    27 TRK NR/L3/TRK/003 Index of Track Engineering Forms

    17 ISSUE 16 06/06/15 05/09/15 TEFs UPDATED: TEF 3029 ISSUE 7, TEF 3054 ISSUE 7, TEF 3203 ISSUE 5, TEF 3244A ISSUE 2,TEF 3244B ISSUE 2 NEW: TEF 3225, TEF 3226, TEF 3227, TEF 3251

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 13

    2.2 Withdrawn and Superseded Documents

    2.2 Withdrawn and Superseded Documents 2.2 Withdrawn and Superseded Documents

    Document Number Title Is

    sue

    Replaced By

    Com

    plia

    nce

    Dat

    e

    Reasons for withdrawal (for full summary please see briefing note)

    NR/GN/CIV/00012 Road Vehicle Incursions: Risk Assessment of Bridge and Neighbouring Sites

    1 NR/L3/CIV/00012 ISSUE 1

    05/09/2015 Withdrawn following the publication of NR/L3/CIV/00012 which has been updated in response to a RAIB investigation following an incident at North Rode. NR/GN/CIV/00012 has been converted to a level 3 standard and extends the scope to include non-public sites.

    NR/GN/ELP/00003 A.C. Electrified Lines Management of Incidents Involving Damage to Overhead Line Equipment

    2 NR/L2/ELP/27032 ISSUE 1

    01/06/2016 Withdrawn following the publication of NR/L2/ELP/27032 which is based on n the previous guidance note and Route best practice when responding to OLE incidents. It has been produced in response to the learning points from the Margaretting dewirement incident.

    NR/GN/ELP/27309 DC Electric Track Equipment Drawing Index

    3 NR/L3/ELP/27250 ISSUE 1

    06/06/2016 Withdrawn following the publication of NR/GN/ELP/27309 which has contains modules for carrying out tasks on the conductor rail and associated equipment and negative bonding. Updates the requirements for installing, inspecting and maintaining conductor rail, negative bonding and associated equipment.

    NR/L2/INI/CP0069 Route Requirements Management and Production of Project Requirements Specification

    3 WITHDRAWN 02/03/2015 Withdrawn following changes to the Network Rail organisation and Requirements Management process and products. The introduction of new requirements management process and products (Client Requirements Document (CRD), Route Requirements Document (RRD) and Detailed Route Requirements Document (DRRD)).

    NR/L3/MTC/MG0233 Infrastructure Maintenance IRSE Assessing Agency Network Rail

    1 WITHDRAWN 06/06/2015 Withdrawal will not affect the business nor will the operation of the Assessing Agency be effected. It allow the opportunity to update the current documentation for IRSE licensing, providing a more streamlined approach for the business, and enabling the compliance of NR/L2/SIG/10160 sooner and the Route TNCs to be closed.

    NR/L2/OCS/096 Determining High Risk Sites for Low Rail Adhesion

    3 NR/L2/OCS/095 ISSUE 4

    01/08/2015 Withdrawn as integrates NR/L2/OCS/096. Both wrong side track circuit failures and low rail adhesion sites have similar identification criteria.

    NR/L3/OCS/096 Low rail adhesion sites - risk assessment process

    2 NR/L2/OCS/095 ISSUE 4

    01/08/2015 Withdrawn as supersedes NR/L3/OCS/096 with both wrong side track circuit failures and low rail adhesion sites adopting an adhesion risk ranking process. The standard now also remits the need for a removal plan; previously high / low risk sites had been determined without a requirement for any actions to be taken.

    2.2 Withdrawn and Superseded Documents

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    14 or digital formats is permitted.

    2.3 Letters of Instruction

    2.3 Letters of Instruction A Letter of Instruction (LOI) is document, authorised by a Standard Owner, that is used to issue mandatory instructions directly linked to an existing Network Rail standard where there is an emergency need not otherwise covered.. 2.3 Letters of Instruction Historic letter of instructions (where text has been crossed out) will be removed in the next Publication. Some LOIs may stay current after the stated Expiry Date.

    Reference Number Title Is

    sue

    Pu

    bli

    ca

    tio

    n D

    ate

    Expi

    ry D

    ate

    Standard Owner Relevant Standard

    NR/BS/LI/352 Standard affected: NR/L2/OHS/133 (Issue 1), Code of Practice for Planning and Delivering Safe Work (PDSW)

    1 17/04/2015 17/04/2015 Occupational Health & Safety

    NR/L2/OHS/133 Issue 1

    NR/BS/LI/349 Standards affected: NR/L2/CIV/003 Engineering Assurance of Building and Civil Engineering Works [Issue 4]

    1 02/02/2015 02/03/2015 Civil Engineering NR/L2/CIV/003 Issue 4

    NR/BS/LI/348 Requirements for undertaking the roles of Lead Examiner and Examining Engineer for the examination of Tunnels.

    1 23/02/2015 When Standard is next updated

    Civil Engineering NR/L3/CIV/006 Part 4A Issue 1 NR/L3/CIV/006 Part 4B Issue 1 NR/L3/CIV/006 Part 1D Issue 1

    NR/BS/LI/347 Standard affected: NR/L2/CTM/028 (Issue 2), Competence and Training in OLE Construction Engineering

    1 16/01/2015 When Standard is next updated

    Occupational Health & Safety

    NR/L2/CTM/028 Issue 2

    NR/BS/LI/346 Standard affected: NR/WI/ELP/27051 (Issue 4) Work Instruction for D.C. Electrified Lines in the Liverpool area

    1 16/12/2014 When Standard is next updated

    Electrical Power NR/WI/ELP/27051 Issue 4

    NR/BS/LI/345 Standard affected: NR/L2/RSE/100/02 (Issue 2), Safety Verification

    1 24/11/2014 When Standard is next updated

    Safety Technical Engineering

    NR/L2/RSE/100/02 Issue 2

    NR/BS/LI/340 Standard affected: NR/L3/TRK/4004 (Issue 2), Switch and crossing assemblies

    1 07/01/2015 When Standard is next updated

    Track Engineering NR/L3/TRK/4004 Issue 2

    NR/BS/LI/336 Protractor Gauges Specification and P8 Profiles Changes on Track Gauges.

    1 15/10/2014 30/11/2015 Track Engineering NR/L3/TRK/4900 Issue 1

    NR/BS/LI/331 Requirements for parapet heights on over bridge and footbridge structures spanning overhead line electrification equipment. Standards affected: NR/L3/CIV/020 (issue 1), Design of Bridges

    1 22/04/2014 When Standard is next updated

    Civil Engineering NR/L3/CIV/020 Issue 1

    NR/BS/LI/328 Standard affected: NR/SP/ELP/21104 (ISSUE 2), Design and Installation of Electric Track Equipment for DC Electrified Lines

    1 28/03/2014 When Standard is next updated

    Electrical Power NR/SP/ELP/21104 Issue 2

    NR/BS/LI/327 Systems of Work for OTP Working in Electrified - Standard affected: NR/PLANT/0200/Module P501 (Issue 1), Systems of Work

    2 01/05/2014 When Standard is next updated

    Rail Mounted Vehicle & Plant

    NR/PLANT/0200/Module P501 Issue 1

    NR/BS/LI/326 Standard affected: NR/L2/OHS/050 (Issue 4), Sentinel Scheme Rules

    1 16/042014 When Standard is next updated

    Occupational Health & Safety

    NR/L2/OHS/050 Issue 4

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 15

    2.3 Letters of Instruction

    Reference Number Title Is

    sue

    Pu

    bli

    ca

    tio

    n D

    ate

    Expi

    ry D

    ate

    Standard Owner Relevant Standard

    NR/BS/LI/324 Standard affected: NR/SIG/10663 (Issue 04), Signal Maintenance Specifications (SMS)

    1 11/03/2014 01/12/2015 Signal Engineering NR/SIG/10663 Issue 4

    NR/BS/LI/323 Standard affected:NR/L2/SIG/10064 (Issue 04), General Instructions to Staff Working on S&T Equipment & NR/GI/E022 (Issue 02), Rectification of Power Supply Earth Faults Protected by Automatic Disconnection

    1 11/03/2014 01/12/2015 Signal Engineering NR/L2/SIG/10064 Issue 1

    NR/BS/LI/322 NR/BS/LI/322, Issue 1 Framework for the consistent assessment of fencing repairs based on risk

    1 28/03/2014 02/05/2014 Track Engineering NR/L2/TRK/5100 Issue 2

    NR/BS/LI/309 Standards affected: NR/PLANT/0200/Module P501 (Issue 1), Systems of Work & NR/PLANT/0200/Module P509 (Issue 1), Trailers and Attachments

    1 17/09/2013 When Module P501 is next updated

    Rail Mounted Vehicle & Plant

    NR/PLANT/0200

    NR/BS/LI/308 Standard affected: NR/L2/SIG/11704 (Issue 3), Signalling Requirements for the Application Design and Management of Points

    2 30/11/2014 30/04/2015 Signal Engineering NR/L2/SIG/11704 Issue 3

    NR/BS/LI/306 Standard affected: NR/L1/CIV/032: The Management of Structures [Issue 2]

    2 26/09/2014 When Standard is next updated

    Civil Engineering NR/L1/CIV/032

    NR/BS/LI/305 Standards affected: - NR/L2/TRK/001, Issue 6 - NR/L2/TRK/2102, Issue 6 - NR/L2/TRK/3038, Issue 5 - NR/L2/TRK/0032, Issue 5 - NR/L2/AIF/02106, Issue 4 - NR/L2/TRK/0132, Issue 6 - NR/L3/CIV/005/3A, Issue 1 - NR/L3/CIV/005/3B, Issue 1 - NR/L3/TRK/3230, Issue 2

    1 23/09/2013 End of plain line track trial period - BCRP

    Asset Management - NR/L2/TRK/001 - NR/L2/TRK/2102 - NR/L2/TRK/3038 - NR/L2/TRK/0032 - NR/L2/AIF/02106 - NR/L2/TRK/0132 - NR/L3/CIV/005/3A - NR/L3/CIV/005/3B - NR/L3/TRK/3230

    NR/BS/LI/304 Standard affected: NR/L2/EBM/STP001 [Issue 5] Managing Standards

    4 29/09/2014 End of plain line track trial period

    Asset Management NR/L2/EBM/STP001 Issue 5

    NR/BS/LI/298 Standard affected: NR/L3/OCS/044 Managed Stations Manual Procedure MS-02 (Issue 3)

    2 16/06/2014 When Standard is next updated

    Operations and Customer Services

    NR/L3/OCS/044 Issue 3

    NR/BS/LI/296 Standard affected: NR/L3/OCS/043 National Control Instructions Procedure 5.2 (Issue 4), Procedure For The Planned Response to GSM-R System Failures

    2 16/06/2014 When Standard is next updated

    Operations and Customer Services

    NR/L3/OCS/043 Issue 4

    NR/BS/LI/292 Standard affected: NR/L3/TRK/1010 (Issue 2), Management of responses to extreme weather conditions at structures, earthworks and other key locations

    1 18/07/2013 When Standard is next updated

    Buildings & Civils NR/L3/TRK/1010 Issue 2

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    16 or digital formats is permitted.

    2.3 Letters of Instruction

    Reference Number Title Is

    sue

    Pu

    bli

    ca

    tio

    n D

    ate

    Expi

    ry D

    ate

    Standard Owner Relevant Standard

    NR/BS/LI/290 Standard affected: NR/L3/OCS/043 National Control Instruction - Procedure 7.1 (Issue 6), Weather & Seasonal Management

    1 25/04/2013 26/04/2014 Operations Principles and Standards

    NR/L3/OCS/043 Issue 6

    NR/BS/LI/285 Standard affected: NR/PLANT/0200/Module P501 (Issue 1), Systems of Work

    2 11/06/2013 On Compliance Date of NR/PLANT/0200/module P501 (issue 1)

    Rail Mounted Vehicle & Plant

    NR/PLANT/0200/Module P501 Issue 1

    NR/BS/LI/284 Standard affected: NR/L2/TRK/0053 (Issue 5) Inspection and repair to reduce the risk of derailment at switches

    3 19/09/2014 19/09/2015 Track Engineering NR/L2/TRK/0053 Issue 5

    NR/BS/LI/282 Standard affected: NR/WI/ELP/3091 (Issue 2), DC Electrified Lines Working Instructions

    1 24/01/2013 23/01/2014 Electrical Power NR/WI/ELP/3091 Issue 2

    NR/BS/LI/281 Standard affected: NR/SP/ELP/21060 (Issue 2), Issue of Safety Documentation for Work on 650/750 V dc Apparatus

    1 24/01/2013 23/01/2014 Electrical Power NR/SP/ELP/21060 Issue 2

    NR/BS/LI/280 Standards affected: NR/SP/ELP/29987, Issue 03 Working on or about 25kV A.C. Electrified Lines (The Green Book)

    2 04/12/2012 Not stated Electrical Power NR/SP/ELP/29987 Issue 3

    NR/BS/LI/276 Standard affected: NR/SP/TRK/055 (Issue 1A), Rail Testing: Ultrasonic Procedures - U15, U16 and U17 Testing

    1 24/10/2012 Not stated Track Engineering NR/SP/TRK/055 Issue 1A

    NR/BS/LI/275 Standard affected: NR/L3/SIG/10179 (Issue 3), The Installation and Maintenance of 35mm Square Section Adjustable Stretcher Bars

    2 11/02/2014 10/02/2015 Signal Engineering NR/L3/SIG/10179 Issue 3

    NR/BS/LI/273 Standard affected: NR/L3/OCS/043 National Control Instruction - Procedure NR/L3/OCS/043/5.11 (Issue 1), Emergency Services Personnel On or Near the Line

    4 41830 On update of standard

    Operations & Customer Services

    NR/L3/OCS/043/5.11 Issue 1

    NR/BS/LI/269 Standard affected: NR/L1/ELP/27000 [Issue: 1] Asset management policy for Electrical Power assets

    2 18/04/2013 17/04/2014 Electrical Power NR/L1/ELP/27000 [Issue: 1]

    NR/BS/LI/263 Standard affected: NR/L2/TRK/001 6 Module 2 Clause 5.4

    6 31/03/2015 When Standard is next updated

    Track Engineering NR/L3/TRK/001 Issue 6

    NR/BS/LI/263 Standard affected: NR/L2/TRK/001 6 Module 2 Clause 5.4

    5 31/03/2014 31/03/2015 Track Engineering NR/L3/TRK/001 Issue 6

    NR/BS/LI/244 Standard affected: NR/SP/ELP/29987 (Issue 3) Working On or About Electrified Lines

    1 21/10/2011 Not stated Electrical Power NR/SP/ELP/29987 Issue 3

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 17

    2.3 Letters of Instruction

    Reference Number Title Is

    sue

    Pu

    bli

    ca

    tio

    n D

    ate

    Expi

    ry D

    ate

    Standard Owner Relevant Standard

    NR/BS/LI/210 Standards affected: NR/L2/NDS/205 (Issue 2), Rail Delivery and Recovery Systems Overview and NR/L3/NDS/305 (Issue 2), Rail Delivery and Recovery Process

    4 13/02/2014 13/02/2015 NDS NR/L3/NDS/305 Issue 2 NR/L2/NDS/205 Issue 2

    NR/BS/LI/193 NR/L3/CIV/006 Part 11A: Reporting and recording examinations of Structures in CARRS [Issue 2]

    2 03/09/2014 On update of standard

    Civil Engineering NR/L3/CIV/006 Issue 2

    NR/BS/LI/174 DC Electrified Lines Working Instructions

    1 18/04/2010 Not stated Electrical Power NR/WI/ELP/3091 Issue 2

    NR/BS/LI/163 Acceptance Requirements for On Site Mobile Flash Butt Welding of Rails

    2 01/10/2010 01/10/2011 Track Engineering RT/CE/S/130 Issue 1

    NR/BS/LI/154 Use Of The Geismar THR542 Lightweight Stressing Equipment In Tandem, Standard affected: NR/L2/TRK/3011 (Issue 6)

    1 18/01/2010 Not stated Track Engineering NR/L2/TRK/3011 Issue 6

    NR/BS/LI/153 Measurement of Defect Depth Using U5, U5a Calculation Standard affected: NR/SP/TRK/055 (Issue 1A)

    1 10/01/2010 Not stated Track Engineering NR/SP/TRK/055 Issue 1A

    NR/BS/LI/152 Electrical Tripping Midland Mainline Headspan Area

    1 09/11/2009 09/11/2010 Electrical Power NONE

    NR/BS/LI/146 Standard affected: NR/L2/TRK/5100 (Issue 2), Management of fencing and other boundary measures

    1 31/10/2009 31/09/2010 Track Engineering NR/L2/TRK/5100 Issue 2

    NR/BS/LI/132 Standard Affected: NR/SP/ELP/29987 (Issue 3), Working on or about 25kV AC Electrified Lines

    1 02/03/2009 01/12/2010 Operations & Customer Services

    NR/SP/ELP/29987 Issue 3

    NR/BS/LI/131/Forms

    Blocking of Lines for Electric Traction Purposes

    1 11/03/2009 01/12/2010 Electrical Power NR/BS/LI/131

    NR/BS/LI/131 Standard Affected: NR/SP/ELP/29987 (Issue 3), Working on or about 25kV AC Electrified Lines

    2 08/04/2009 01/12/2010 Electrical Power NR/SP/ELP/29987 Issue 3

    NR/BS/LI/120 Standard affected: NR/SP/ELP/29987 (Issue 3), Working on or about 25kV A.C. Electrified Lines

    4 25/03/2015 24/03/2016 Operations and Customer Services

    NR/SP/ELP/29987 Issue 3

    NR/BS/LI/120 Standard affected: NR/SP/ELP/29987 (Issue 3), Working on or about 25kV A.C. Electrified Lines

    3 11/03/2015 15/03/2015 Operations and Customer Services

    NR/SP/ELP/29987 Issue 3

    NR/BS/LI/120 Standard affected: NR/SP/ELP/29987 (Issue 3), Working on or about 25kV A.C. Electrified Lines

    2 19/05/2010 19/05/2011 Operations and Customer Services

    NR/SP/ELP/29987 Issue 3

    NR/BS/LI/119 Standard affected: NR/WI/ELP/3091 (Issue E2), DC Electrified Lines Working Instructions

    1 12/12/2008 08/12/2009 Operations and Customer Services

    NR/WI/ELP/3091 Issue E2

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    18 or digital formats is permitted.

    2.3 Letters of Instruction

    Reference Number Title Is

    sue

    Pu

    bli

    ca

    tio

    n D

    ate

    Expi

    ry D

    ate

    Standard Owner Relevant Standard

    NR/BS/LI/118 Standard affected: NR/WI/ELP/3091 (Issue E2), DC Electrified Lines Working Instructions

    3 21/04/2011 Not stated Operations and Customer Services

    NR/WI/ELP/3091 Issue E2

    NR/BS/LI/106 Standard affected: NR/L2/ELP/40045 (Issue 06), Electric point heating

    2 01/09/2011 31/08/2012 Electrical Power NR/L2/ELP/40045 Issue 06

    NR/BS/LI/101 Standard affected: RT/CE/S/077 Storage, Installation &Testing of TSR &ESR AWS

    1 08/09/2008 Not stated Track Engineering NR/SP/TRK/077 Issue 1

    NR/BS/LI/099 Changes to NR/WI/ELP/27051 1 16/09/2008 Not stated Electrification & Plant Engineering

    NR/WI/ELP/27051 Issue 4

    NR/BS/LI/097 Standard affected NR/WI/ELP/27052 Work Instructions for DC electrified lines in the Northern city line

    1 04/06/2008 Not stated Operations and Customer Services

    NR/WI/ELP/27052 Issue 4

    NR/BS/LI/096 Standard affected NR/WI/ELP/27051 - Work Instructions for DC electrified lines in the Liverpool area

    1 04/06/2008 Not stated Operations and Customer Services

    NR/WI/ELP/27051 Issue 4

    NR/BS/LI/095 Standard affected NR/WI/ELP/3091, DC electrified lines and working instructions

    1 04/06/2008 Not stated Operations and Customer Services

    NR/WI/ELP/3091 Issue 1

    NR/BS/LI/091 Use of CEMBRE Rail Web Connection Systems on DC Conductor Rail

    1 27/05/2008 Not stated Electrical Power NR/GN/ELP/27020 Issue 2

    NR/BS/LI/090 Standard affected: NR/WI/ELP/3091, DC electrified lines working instructions, Issue E2

    4 07/06/2008 Not stated Operations and Customer Services

    NR/WI/ELP/3091 Issue E2

    NR/BS/LI/084 Project D686: Western Territory 650 V Cable Renewals

    1 18/08/2008 Not stated Electrical Power NONE

    NR/BS/LI/083 Rail Defect Classification Codes & Summary of Changes

    1 15/05/2008 Not stated Track Engineering NR/SP/TRK/057 Issue 4

    NR/BS/LI/078 Overhead power lines in the vicinity of the railway precautions against induced voltages

    1 12/12/2008 Not stated Electrification & Plant Engineering

    NR/SP/ELP/29987 Issue 3

    NR/BS/LI/074 DC Certificates of Isolation associated with circuit breaker

    1 25/10/2007 Not stated Electrification & Plant Engineering

    NR/WI/ELP/3091 Issue E2

    NR/BS/LI/072 STL Auxiliary Transformer Failures at Traction Substations or Switching Stations

    4 19/10/2007 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/061 Dangerous Incident Notification: 11Kv indoor switchgear type YSF6 manufactured by Yorkshire Switchgear

    1 23/11/2006 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/060 Traction electrical distribution sites with compromised earthing due to theft of cables

    1 23/11/2006 Not stated Electrification & Plant Engineering

    NR/SP/ELP/21032 Issue 2

    NR/BS/LI/058 Train Based Grinding Specification for Switches and Crossing Grinding

    1 26/09/2006 Not stated Track Engineering NONE

    NR/BS/LI/057 Train Based Grinding Specification For Plain Line Grinding

    1 26/09/2006 Not stated Track Engineering NONE

    NR/BS/LI/056 Permali Bushings: Access Restrictions

    1 11/09/2006 Not stated Electrification & Plant Engineering

    NONE

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 19

    2.3 Letters of Instruction

    Reference Number Title Is

    sue

    Pu

    bli

    ca

    tio

    n D

    ate

    Expi

    ry D

    ate

    Standard Owner Relevant Standard

    NR/BS/LI/054 Maintenance and Operation of WS Switchgear

    1 04/08/2006 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/047 E&P

    Bimold Connections on Rectifier Transformers at DC Traction Substations

    1 05/05/2006 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/045 Monitoring Track Over Or Adjacent To Civil Engineering Works: Procedure And Intervention Levels

    2 23/04/2007 Not stated Civil Engineering NR/CS/CIV/044 Issue 1

    NR/BS/LI/040 650 V D.C. Traction Power Cables Support Systems

    1 20/12/2005 Not stated Electrification & Plant Engineering

    NR/SP/ELP/27224 Issue 2

    NR/BS/LI/037 Letter of Instruction re Neutral Section trippings at Hayes

    1 10/11/2005 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/034 Programme to replace components in d.c. circuit breakers comprising asbestos containing materials

    1 31/10/2005 Not stated Electrification & Plant Engineering

    NR/L3/ELP/00110 Issue 2

    NR/BS/LI/032 Labelling of Track Isolating Switches (T.I.S)

    1 17/10/2005 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/028 Segregation of D.C. Track Feed Cables

    1 22/08/2005 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/025 Paralleling of EDFE Supply Points New Cross Croydon, Wimbledon, Northfleet: Restrictions

    3 07/01/2008 Not stated Electrification & Plant Engineering

    NONE

    NR/BS/LI/011 Substation Entry Restrictions for Locations Containing ASEA Minimum Oil 25 kV Switchgear

    6 17/10/2006 Not stated Electrification & Plant Engineering

    NONE

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    20 or digital formats is permitted.

    3. Network Rail Catalogues

    N3etwork Rail Catalogues

    3.Network Rail Catalogues 3. Network Rail Catalogues

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 21

    3.1 Network Rail Catalogues

    3 Network Rail Catalogues

    3.1 Network Rail Catalogues 3.1 Network Rail Catalogues NR/CAT/STP001 Catalogue of Network Rail Standards Issue 95; Mar 15 Replaces Issue 94; Dec 14

    The Network Rail Standards Catalogue, formerly known as The Line Standards Catalogue, lists Standards issued by Engineering, Safety & Environment, and Contract & Supply.

    Price Band: phone RT/LS/CAT004 Index of Network Rail Documents Relating to Signalling and Communications Replaces Equipment: Part 2 Signalling Structure Drawings Issue 4; Feb 00 Iss 3

    This catalogue lists documents (drawings) relating to signalling equipment Signalling Structure Drawings.

    Price Band: phone NR/L3/SIG/CAT003 Index of Network Rail Documents Relating to Signalling Compliance Replaces Equipment: Part 1 Mechanical & Electrical Drawings 06/06/15 RT/LS/CAT003 Iss 7; Jun 11 Issue 8; Mar 15

    This catalogue lists documents (drawings) relating to signalling equipment Mechanical and Electrical Drawings.

    Price Band: phone NR/GN/SIG/CAT005 Index of Network Rail Documents Relating to Signalling & Communications Replaces Equipment Issue 48; Mar 15 Iss 47; Jun 14

    The purpose of this standard is to provide signal engineers a standardised approach to signalling design. This prevents additional costs being incurred when a design solution already exists and assists maintainers when fault finding.

    The standard includes a listing of typical circuits for signalling and level crossing applications.

    Price Band: phone NR/GN/SIG/CAT006 Index of NR Documents Relating to Signalling and Communications Replaces Equipment Issue 11; Jun 12 RT/LS/CAT006 Iss 10; Aug 04 This catalogue lists documents (drawings) relating to signalling equipment Equipment and Systems Specifications. The standards shown in catalogue 6 are for reference purposes only, they may not reflect todays requirements nor Network Rails future asset strategy.

    Price Band: phone RT/LS/CAT007 Direct Maintenance Supplementary Instruction Catalogue Issue 11; Aug 06 Replaces Iss 10

    This catalogue contains Supplementary Instructions when maintenance is directly managed internally within Network Rail the existing Network Rail Standard to which it pertains will not be wholly appropriate. The changes required are minor and there is no material change to the technical requirements of the Standard. The changes are to be considered made to the existing Standard published by Business Standards only where maintenance is undertaken directly by Network Rail employees.

    Price Band: phone

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    22 or digital formats is permitted.

    4. Listing of Network Rail Standards

    Listin4g of Network Rail Standards

    4.Listing of Network Rail Standards 4. Listing of Network Rail Standards

    --`,```,,,,,```,,``,,,,,,`,`,```-`-`,,`,,`,`,,`---

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 23

    4.1 ASSET INFORMATION

    4 Listing of Network Rail Standards

    4.1 ASSET INFORMATION Level 2

    NR/L2/AIF/001 Asset Data Management Issue 1; Sep 10 Compliance Replaces 04/12/10 NR/L2/AMG/02250 (NR/L3/INF/AK025) Iss 3

    This standard allocates key responsibilities associated with the management of Network Rails asset registers and the different types of data contained therein.

    Price Band: C

    4.1 ASSET INFORMATION Level 3

    NR/L3/AIF/002 Changing Reference Data in Asset Registers Issue 1; Sep 10 Compliance Replaces 04/12/10 NR/L3/AMG/AK0025 (NR/L3/INF/AK025) Iss 2

    This standard specifies the processes to be followed when changing reference data within Network Rail asset registers.

    Price Band: C

    NR/L3/AIF/003 Asset Data Management for Ellipse and GEOGIS Compliance Replaces Issue 1; Sep 10 04/12/10 NR/L2/EBM/MG0027 (NR/L3/MTC/MG0027) Iss 2 NR/L3/EBM/AM0001 NR/L3/TEL/AM0001 Iss 2

    This standard specifies the processes that are used to manage changes to data concerning the infrastructure assets of Network Rail.

    Price Band: C

    NR/L3/AIF/005 Management of Asset Data and Information in the Rail Vehicle Compliance Replaces Asset Register Issue 2; Sep 11 03/09/11 NR/L3/AIF/005 Iss 1; Sep 10

    This standard implements the requirements of NR/L2/AIF/001, Asset data management for assets contained in the Rail Vehicle Asset Register (RVAR).

    Price Band: B

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    24 or digital formats is permitted.

    4.2 CIVIL ENGINEERING

    4.2 CIVIL ENGINEERING 4.2.1 Civil Engineering Company Standards

    RT/CE/P/044 Managing Structures Works Issue 1; Apr 04

    The purpose of this Network Rail Standard is to define the requirements for works to new and existing structures on, over or under Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their Design or construction.

    Responds to GC/RT5180, GC/RT5203 and GK/RT0033

    Price Band: D 4.2 CIVIL ENGINEERING Specifications (including Procedures)

    RT/CE/S/035 Assessment of Structures Issue 2; Feb 04 Replaces RT/CE/S/035 Iss 1; Jun 01 RT/CE/P/010 Iss 2; Dec 97

    This document defines the Specification to be followed for the Assessment of Structures for which Network Rail has responsibility, either as owner of the Structure or as a result of a specific agreement.

    Price Band: E

    RT/CE/S/044 Undertrack Crossings Issue 2; Aug 04 Replaces RT/CE/S/044 Iss 1; Apr 98

    The purpose of this document is to define the requirements for the design and construction of undertrack crossings.

    Responds to GC/RT5110 (Issue 2), GI/RT7008 (Clauses B4.1.1 & B6.3).

    Price Band: D

    RT/CE/S/080 Management of Existing Bridges and Culverts Issue 1; Apr 04 Replaces RT/CE/P/023 Iss 3; Feb 99 RT/CE/S/222 Iss 1; Feb 99

    The purpose of this Specification is to define the requirements for the management of existing Bridges and Culverts on, over or under Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or location.

    Price Band: D

    RT/CE/S/082 Management of Existing Retaining Walls Issue 1; Apr 04 Replaces RT/CE/P/023 Iss 3; Feb 99 RT/CE/S/222 Iss 1; Feb 99

    The purpose of this Specification is to define the requirements for the management of existing Retaining Walls on Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or location.

    Price Band: D

    RT/CE/S/084 Management of Existing Tunnels Issue 1; Apr 04 Replaces RT/CE/P/023 Iss 3; Feb 99 RT/CE/S/222 Iss 1; Feb 99

    The purpose of this Specification is to define the requirements for the management of existing tunnels within Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or location.

    Price Band: D

    RT/CE/S/087 Management of Existing Buildings and Station Structures Issue 1; Apr 04 Replaces RT/CE/P/023 Iss 3; Feb 99 RT/CE/S/222 Iss 1; Feb 99

    The purpose of this Specification is to define the requirements for the management of existing Buildings and station structures on, over or under Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or location.

    Price Band: D

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 25

    4.2 CIVIL ENGINEERING

    RT/CE/S/089 Management of Existing Coastal, Estuarine and River Defences Issue 1; Apr 04 Replaces RT/CE/P/023 Iss 3; Feb 99 RT/CE/S/222 Iss 1; Feb 99

    The purpose of this Specification is to define the requirements for the management of existing Coastal, Estuarine and River Defences on Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their condition.

    Price Band: D RT/CE/S/091 Management of Existing Ancillary Structures Issue 1; Apr 04 Replaces RT/CE/P/023 Iss 3; Feb 99 RT/CE/S/222 Iss 1; Feb 99

    The purpose of this Specification is to define the requirements for the management of existing Ancillary Structures on, over or under Network Rails infrastructure such that there is no unacceptable risk to safety as a result of their condition, use or location.

    Price Band: D

    Level 1

    NR/L1/CIV/032 The Management of Structures Issue 2; Sep 09 Compliance Replaces 05/12/09 RT/CE/P/032 Iss 1; Apr 04

    The purpose of this standard is to define the essential procedures that have to be followed so that no unacceptable risk to the safe use or performance of railway infrastructure will arise from the stability, load-bearing capacity, condition or use of existing structures.

    Price Band: D

    Level 2

    NR/L2/CIV/003 Engineering Assurance of Building and Civil Engineering Compliance Replaces Works Issue 4; Jun 12 01/09/12 NR/L2/CIV/003 Iss 3; Jun 11

    The purpose of this standard is to define the Engineering Assurance requirements for the design and construction of works undertaken on Building and Civil Engineering infrastructure.

    Price Band: D

    NR/L2/CIV/086 Management of Earthworks Issue 4; Sep 14 Compliance Replaces 01/10/14 NR/L2/CIV/086 Iss 3; Jun 11

    The purpose of the standard is to define the requirements for managing Earthworks, so that when meeting these requirements there would be no unacceptable risk to the safe operation or performance of rail infrastructure.

    This standard contains requirements supplementary to those given in NR/L1/CIV/032: The management of structures.

    Price Band: D

    Level 3

    NR/L3/CIV/004 Index of Building and Civil Engineering Forms Issue 1; Jun 12 Compliance Replaces 02/06/12 New as Issue 84

    This standard lists the forms that are referenced in extent standards that are managed by the Building and Civil Engineering Standards Steering Group.

    Price Band: B

    NR/L3/CIV/005 Railway Drainage Systems Manual Issue 2; Jun 11 Compliance Replaces 03/09/11 NR/L3/CIV/005 Iss 1; Dec 10

    The purpose of this Manual is to define the requirements and provide recommendations for: The management of Drainage Systems (Part 1). The design and installation of Drainage Systems (Part 2). The Inspection and Maintenance of Drainage Systems (Part 3). Recording information on Drainage Systems (Part 4). Drainage Management Plans (Part 5).

    Price Band: Phone Please see Appendix A for details of modules and pricing

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    26 or digital formats is permitted.

    4.2 CIVIL ENGINEERING

    NR/L3/CIV/006 Handbook for the Examination of Structures Issue 5; Jan 14 Compliance Replaces 07/06/14 NR/L3/CIV/006 Iss 4; Dec 10

    The purpose of this handbook is to define the requirements and provide recommendations for the examination of Structures.

    Price Band: Phone Please see Appendix A for details of modules and pricing

    NR/L3/CIV/00012 Road vehicle incursions: risk assessment of public Compliance Replaces and non-public bridge and neighbouring sites Issue 1; Jun 15 05/09/15 NR/GN/CIV/00012 Iss 1 Updated in response to a RAIB investigation following an incident at North Rode. NR/GN/CIV/00012 has been converted to a level 3 standard and extends the scope to include non-public sites.

    Price Band: Phone

    NR/L3/CIV/020 Design of Bridges Issue 1; Mar 11 Compliance Replaces 04/06/11 RT/CE/S/007 Iss 1; Jun 10

    The purpose of the standard is to define the requirements for the structural Design of Bridges and Bridge-like structures

    Price Band: E NR/L3/CIV/028 The management of Reports of Safety-Related Events on Compliance Replaces Civil Engineering infrastructure Issue 4; Sep 11 03/12/11 NR/L3/CIV/028 Iss 3; Dec 10

    This standard defines (a) the process for rating Safety-Related Events, and (b) the requirements for recording, reporting and reviewing the details of such Events.

    Price Band: C

    NR/L3/CIV/030 Platform Components and Prefabricated Construction Compliance Replaces Systems Issue 3; Sep 11 03/12/11 RT/E/PS/00030 Iss 2; Jun 05

    This specification provides specification requirements for manufactured platform components and pre-fabricated platform systems to be installed at Network Rail owned stations.

    Price Band: D

    NR/L3/CIV/037 Managing the Risk Arising from Mineral Extraction and Compliance Replaces Landfill Operations Issue 3; Dec 08 01/03/09 NR/SP/CIV/037 Iss 2; Apr 04 (RT/CE/P/037)

    The purpose of this standard is to define the procedures and responsibilities for managing the risks that Mineral Extraction and Landfill operations pose to Network Rails operations and infrastructure

    Price Band: B

    NR/L3/CIV/038 Managing the Potential Effects of Coal Mining Subsidence Compliance Replaces Issue 1; Dec 08 01/03/09 NR/SP/CIV/037 Iss 2; Apr 04 (RT/CE/P/037)

    The purpose of this standard is to define the procedure for managing the potential effects of subsidence arising from coal mining, so that in following this procedure (a) such effects will not produce an unacceptable risk to the integrity, safe use or performance of the rail infrastructure, and (b) the cost of Works to manage such effects or for requiring Reservation of Support are determined and, respectively, recovered or paid.

    Price Band: C

    NR/L3/CIV/039 Specification for the Assessment and Certification of Compliance Replaces Protective Coatings and Sealants Issue 5; Mar 09 05/12/09 RT/CE/S/039 Iss 4; Feb 02

    The purpose of this standard is to define the procedures and test methods that shall be followed when assessing and certifying coatings and sealants for use on Network Rails infrastructure.

    Price Band: E

    NR/L3/CIV/040 Specification for the use of Protective Coating Systems Compliance Replaces Issue 1; Mar 09 05/12/09 New at Issue 71

    The purpose of this standard is to define the requirements for the selection, application and reapplication of protective coating systems to Network Rails infrastructure.

    Price Band: E

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 27

    4.2 CIVIL ENGINEERING

    NR/L3/CIV/041 Waterproofing Systems for Underline Bridge Decks Compliance Replaces Issue 3; Aug 08 06/06/09 RT/CE/S/041 Iss 2; Aug 01

    This specification provides the performance criteria for waterproofing systems proposed to be used on Network Rails underline bridge decks and provides recommendations for tests to be carried out to prove compliance with the performance requirements.

    Responds to GC/RT5110

    Price Band: E

    NR/L3/CIV/065 Examination of Earthworks Issue 5; Dec 14 Compliance Replaces 06/12/14 NR/L3/CIV/065 Iss 4; Sep 14

    The purpose of this standard is to define the requirements for:

    1. Undertaking, recording and reporting the findings of examinations on Earthworks.

    2. Identifying those actions from the findings of an examination that need to be implemented so that there is no unacceptable risk to the safe operation or performance of railway infrastructure.

    Price Band: D

    NR/L3/CIV/071 Geotechnical Design Issue 4; Jun 11 Compliance Replaces 03/09/11 NR/L3/CIV/071 Iss 3; Mar 10

    The purpose of the standard is to define the requirements for geotechnical designs undertaken for Network Rail.

    Price Band: D NR/L3/CIV/076 Management of the risk of Bridge Strikes from Road Vehicles Compliance Replaces and Waterborne Vessels Issue 4, Sep 08 04/12/10 NR/L3/CIV/076 Iss 3, Jun 08 The purpose of this Network Rail standard is to:

    define the requirements for the management of Underline and Overline Bridges on Network Rails infrastructure such that there is no unacceptable risk to safety as a result of Bridge Strikes;

    reduce the risks to the operational railway from Bridge Strikes, as far as is reasonably practicable, by assessing the safety risks at each Bridge and implementing mitigating measures as necessary;

    reduce train delays resulting from Bridge Strikes, as far as is reasonably practicable, without compromising the safety of train operations.

    Price Band: C

    NR/L3/CIV/140 Model Clauses for Civil Engineering Works Issue 10; Sep 10 Compliance Replaces 04/12/10 NR/L3/CIV/140 Iss 9; Jun 10

    The purpose of the standard is to define the requirements for the production and use of Model Clauses for specifying Civil Engineering Works.

    Price Band: Phone Please refer to Appendix A for details of revisions to sections within this document

    NR/L3/CIV/142 The Management of the Movement of Abnormal Road Loads Compliance Replaces Issue 2; Sep 10 04/12/10 RT/CE/S/142 Iss 1; Aug 04

    The purpose of the standard is to define the requirements for the management of the movement of Abnormal Road Loads over bridges owned by Network Rail.

    Price Band: C

    NR/L3/CIV/151 Engineering Assurance of Standard Designs and Details for Compliance Replaces Building and Civil Engineering Works Issue 6; Mar 12 03/03/12 NR/L3/CIV/151 Iss 5; Mar 11

    The purpose of the standard is to issue Standard Designs and Details for Building and Civil Engineering Works, along with supplementary information to that given in NR/L2/CIV/003 on the process for their application.

    Price Band: D

    Associated document... NR/L3/CIV/151/F010 Index of Standard Designs and Details for Building and Civil Compliance Replaces Engineering Works Issue 6; Mar 12 03/03/12 NR/L3/CIV/151/F0101 Iss 5; Mar 11

    This document provides lists of Drawings (in Part A), Engineering Assurance Forms (in Part B) and Technical User Manuals (in Part C).

    Price Band: D

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    28 or digital formats is permitted.

    4.2 CIVIL ENGINEERING

    NR/L3/CIV/160 The Design of Car Parks for Railway Stations and Depots Compliance Replaces Issue 1; Jun 09 05/12/09 New at Issue 72

    The purpose of the standard is to provide direction and guidance on the design of car parks for railway stations and depots.

    Price Band: F

    NR/L3/CIV/162 Platform Extensions Issue 2; Sep 11 Compliance Replaces 03/12/11 NR/L3/CIV/162 Iss 1; Mar 10

    This Standard provides requirements and guidance on works to extend existing platforms at stations; for example, those involved in the Longer Trains Programme.

    Price Band: D

    NR/L3/CIV/164 Legionnaires Disease The Control of Legionella Bacteria Compliance Replaces in Water Systems Issue 1; Sep 11 03/12/11 New at issue 81 The purpose of this Standard is to raise awareness of legionella risks and obligations of employers under HSE regulations. Responsible persons are identified, and requirements provided to reduce the growth of legionella and subsequent infection risks to passengers and employees on

    Network Rail Property

    Price Band: C

    NR/L3/CIV/176 Management of Reports on Bridge Strikes Issue 4; Sep 10 Compliance Replaces 04/12/10 NR/L3/CIV/176 Iss 3; Jun 06

    The purpose of this Network Rail standard is to define the processes and the responsibilities for reporting information on Bridge Strikes.

    Price Band: C NR/L3/CIV/300 Managing Complaints About Pigeons Issue 1; Jun 07 Compliance Replaces 02/06/07

    The purpose of this Work Instruction is to define:

    1. The procedure for managing complaints and Legal Notices concerning the nuisance caused by pigeons

    2. The roles and responsibilities of Network Rail employees in managing such complaints and Notices.

    The procedure is designed to deliver an amicable, timely and cost-effective solution that satisfies all legal obligations.

    Price Band: D

    Guidance Notes (including Codes of Practice)

    NR/GN/CIV/001 Waterproofing Underline Bridge Decks Issue 3; Aug 08 Replaces RT/CE/C/001 Iss 2; Aug 01

    The purpose of this standard is to supplement NR/GN/CIV/041: Waterproofing systems for Underline Bridge decks by providing information on; the types of Waterproofing Systems, and their components, the selection of a Waterproofing System for a particular bridge deck, the detailing of a Waterproofing System, the application of a Waterproofing System, the performance criteria for a Waterproofing System.

    Price Band: D

    NR/GN/CIV/002 The Use of Protective Treatments and Sealants Issue 5; Mar 09 Replaces RT/CE/C/002 Iss 4; Feb 02

    The purpose of this standard is to support NR/L3/CIV/040: Specification for the use of protective coating systems by providing guidance and information on the selection, application and reapplication of such systems to Network Rail infrastructure.

    Price Band: F

    NR/GN/CIV/025 The Structural Assessment of Underbridges Issue 3: Jun 06 Replaces RT/CE/C/025 Iss 2; Feb 04

    The purpose of this document is to provide recommendations for applicable standards and analytical methods which may be used to determine the load carrying capacity of existing Network Rail underbridges.

    Price Band: Phone

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 29

    4.2 CIVIL ENGINEERING

    NR/GN/CIV/163 Management of Water Supply Issue 1: Dec 10 Replaces New at Issue 78

    The purpose of this document is to establish roles and responsibilities for the monitoring, reporting, tracking and repair of water leaks, as well as the process for claims resulting from water leaks, leading to the proactive management of water consumption.

    Price Band: C

    NR/GN/CIV/165 De-icing of Operational Property Assets Issue 1: Dec 10 Replaces New at Issue 78

    This Guidance Note provides recommendations and guidance on the use of de-icing products on all Network Rail Operational Property. This includes both Franchised Stations and Managed Stations, Depots and lineside buildings.

    Price Band: B

    NR/GN/CIV/166 R22 Refrigerant Systems Phasing out Issue 1: Dec 10 Replaces New at Issue 78

    This guidance is provided for phasing out of R22 refrigerant systems currently in use on all Network Rail Operational Property, in accordance with EU Regulations for reduction of greenhouse gases and gases which are likely to cause damage to the ozone layer. Guidance is provided for suitable cost effective alternatives to R22. This guidance applies to all R22 refrigerant systems present in Stations, Depots and all lineside buildings.

    Price Band: C

    NR/GN/CIV/201 Managing bridge strike incidents - Good Practice Guide for Bridge Strike Replaces Nominees Issue 4; Jun 08 NR/GN/CIV/201 Issue 3; Apr 06 The purpose of NR/GN/CIV/201 is to provide guidance and additional information on the processes to be followed by Bridge Strike Nominees during examinations of Bridges following a reported bridge strike, and gives examples showing the damage limits to a bridge following a bridge strike up to which Bridge Strike Nominees are authorised to permit train movements.

    Price Band: C NR/GN/CIV/202 Management of the Risk of Bridge Strikes Issue 3; Sep 10 Replaces NR/GN/CIV/202 Issue 2; Jun 08

    The purpose of this Guidance Note is to provide guidance and information to those within Network Rail, and its suppliers, contractors and consultants who have responsibilities for complying with the requirements of NR/L3/CIV/076 Management of the risk of Bridge Strikes from road vehicles and waterborne vessels.

    Price Band: F

    NR/GN/CIV/203 Evaluation and Assessment of Earthworks Issue 1; Oct 07 Replaces

    The purpose of this document is to provide guidance on the Evaluation and Assessment of Earthworks. The objectives of these key activities of the asset management cycle are (a) to determine or confirm the stability of existing Earthworks, and (b) to assess the risk posed by the continued use of an Earthwork. The information from (a) and (b) may be used in the design of remedial works to the Earthwork.

    Price Band: B

    NR/GN/CIV/801 The Application of the Observational Approach to the Design of Remedial Replaces Works to Earthworks Issue 3; Mar 09 NR/L3/CIV/801 Iss 2; Apr 07 The purpose of this Guidance Note is to supplement NR/SP/CIV/071: Design of earthworks, earthwork remediations and geotechnical aspects of foundations for structures by providing advice on the application of the Observational Approach (OA) to the design of remedial works to embankments and soil cuttings.

    Price Band: C

    RT/CE/C/015 The Assessment of Underbridge Capacity Issue 1; Nov 95 Replaces Defines parameters and methods for the assessment of underbridges owned by Network Rail.

    Responds to GC/RT5100

    Price Band: F

  • NR/CAT/STP/001 ISSUE 96 Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    30 or digital formats is permitted.

    4.2 CIVIL ENGINEERING

    Special Inspection Notices

    NR/SIN/136 Special Inspection of Architectural Features Attached to Compliance Replaces Station Train Shed Roofs Issue 1; Aug 14 19/02/15 New at Issue 94 This Special Inspection Notice (SIN) applies to all station train shed roofs which have decorative or functional architectural features attached to them. This SIN is issued following an incident at Temple Meads Station on the 151h of June, 2014 and requires Route Asset Managers (RAMs) responsible for train shed roofs as part of the Operational Property portfolio to:-

    Identify if the above features are present on train shed roofs. Instruct and manage a detailed additional inspection I examination of these features by utilising the current CEFA contractor or a competent

    surveyor.

    Price Band: B

  • 1 2 NR/CAT/STP/001 ISSUE 96

    Publication date: 05/06/2015 05/09/2015

    All contents and digital formats Network Rail 2015. No unauthorized use of the content

    or digital formats is permitted. 31

    4.2 CIVIL ENGINEERING

    4.2.2 Railway Estates Policy & Planning Guidance Note