iSpec presentation
A revolution in Tender, Bid and Contract Management Systems
Company background
A revolution in Tender, Bid and Contract Management Systems
Our solutions
Remy InfoSource
• iSpec (Tender, Bid and Contract Management)
• iTech (Artificial Intelligence Diagnostics)
• ICAM (Equipment Logistics System)
A revolution in Tender, Bid and Contract Management Systems
Some of our customers
Remy InfoSource
• Siemens (MagLev)
• HPH (no2 in ports)
• DP World (no3 in ports)
• SABMiller (no2 in beer)
• Bermuda Government
A revolution in Tender, Bid and Contract Management Systems
The issues
A revolution in Tender, Bid and Contract Management Systems
6
The dilemma
Large CAPEX projects
• Complexity. • Decisions made, technical problems solved, financing requirements
assessed, supplier capacities evaluated, legal issues addressed.
• Not even the smallest detail can be overlooked.
• Multiple stakeholders. • Aligning the many functional stakeholders typically involved in large capex
projects is a major task. Finance, procurement, legal and engineering all consider different issues.
• Interfaces. • The combination of functional and international stakeholders and different
segments and procurement packages requires well-managed interfaces. Good communication/collaboration is essential.
A revolution in Tender, Bid and Contract Management Systems
7
Typical CAPEX project management
Document Document managemenmanagemen
t systemt system
Project Project managemenmanagemen
t systemt system
Microsoft Microsoft officeoffice
Outlook/Outlook/exchange exchange
serverserver
Contract Contract managemenmanagemen
t systemt system Workflow Workflow systemsystem
Quality Quality assurance/inassurance/in
spectionsspections
e-Sourcing e-Sourcing systemsystem
Many systems involved - duplication of data/effort
A revolution in Tender, Bid and Contract Management Systems
Where how why when?
The result
• Project information is scattered on computers and in documents throughout multiple organisations and in multiple systems
• Missing/outdated documents
• No Accountability
• Difficult to audit
• No control/authorisation
• No transparency
• High risk
• Many disputes
A revolution in Tender, Bid and Contract Management Systems
9
Filling the gaps
Tech Spec Manageme
nt
Planning systems
Evaluation
MRP
Inventory Manageme
nt
Quality Manageme
nt
Invoice processing
Goods receiving
Approval
Purchase order
PaymentRequisition
Internal business
requirement
Reporting
Contract implement
ed
Contract draft and
review
Negotiation
Sourcing RFx
External info
gathering
Transactional Processing
Strategic Sourcing
Trials & Supplier
Accreditation iSpec
Typical ERP
/eTendering system
Item based procurement - SKUs
A revolution in Tender, Bid and Contract Management Systems
Pressure (time and resources)
Reality• Insufficient resources• Time constraints• Skills shortages• Sequential document
access (long lead time)• Bad collaboration• Geographically
dispersed data and stakeholders
Reality• Incomplete bids• Manual processes• Data mining• Comparative reports• Evaluation• Massive paper/email
trail• Time constraints
Reality• Many design reviews• Many change requests• Many disputes• No proper audit trail• Cost overruns• Much time spent
resolving issues• Delays
A revolution in Tender, Bid and Contract Management Systems
11
Typical intangible risks
Risk management
• Knowledge risk (poor access to information/skills)
• Relationship risk (poor collaboration)
• Process-engagement risk (poor procedural compliance and no transparency)
Intangible risk has a 100% probability of occurring but is ignored by the organisation due to a lack of identification ability. It directly reduces the productivity of knowledge workers, decreases cost effectiveness, profitability, service, quality, reputation, brand value, and earnings quality.
A revolution in Tender, Bid and Contract Management Systems
12
SKU based procurement
Total Cost of Ownership(TCO)
• Inadequate evaluation methods
• Cost implications beyond the sourcing phase not considered/handled
• No consideration of costs external to contract
• No life-cycle approach
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
14
The solution
• Web based solution• Requires only a browser
• Fewer support issues
• Global access• Role-based access
• Full security
• Manages integrated process• Master library
• Tender creation/publication
• Vendor response
• Evaluation and negotiation
• Contract management
• Quality Assurance
A revolution in Tender, Bid and Contract Management Systems
15
iSpec - A-in-1/OTS - fully integrated
ToolsTools Doc MgtDoc Mgt QAQA
WorkfloWorkflow/w/
ApprovaApprovalsls
Proj MgtProj Mgt e-e-SourceSource
Contract Contract mgtmgt
MessagiMessagingng DocsDocs RemindeReminde
rsrs
iSpeciSpec ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Doc MgtDoc Mgt ✔ ✔
QA/inspectionsQA/inspections ✔
Workflow/Workflow/ApprovalsApprovals ✔ ✔
ERPERP ✔
Contract mgtContract mgt ✔
OutlookOutlook ✔ ✔ ✔
OfficeOffice ✔
Proj Mgt.Proj Mgt. ✔ ✔
Initial request through sourcing, contract management and QA
A revolution in Tender, Bid and Contract Management Systems
16
Technical/Engineering• Specifications• QA• Project management• Technical evaluations Only 1 copy of each document
Centralised control, global access
• Only 1 copy - the right one• Global role-based access
• Concurrent editing
• Version control (audit trail)
• Complete contextual audit trail• All email collaborations
• All negotiations
• All vendor responses
• All clarifications
• Contract amendments
• Approvals
• By whom, when, from whereManagement• Approvals• Overview• Programme mgt• KPI
Procurement/legal• Agreement• Terms and conditions• Health and safety• Financials• Vendor KPI• Approvals• Commercial evaluations
Vendors• Bid submissions• Clarifications• Change requests• Delivery tracking
A revolution in Tender, Bid and Contract Management Systems
17
The solution
• Help file
• Training videos
• Wizards on every screen
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Current method
Master documents
• Control
• Authority
• Audit trail
• Outdated documents
• Missing documents
A revolution in Tender, Bid and Contract Management Systems
Create master set
Create a template
• Add template
• Add documents that form part of master set
A revolution in Tender, Bid and Contract Management Systems
Adjust document settings
Create a template
• Add new content
• Add content from library
• Only certain items are editable
A revolution in Tender, Bid and Contract Management Systems
Requirement/response settings
Create a template
• What are requirements?• Delivery dates
• How will responses be scored
• What response is expected?• Delivery dates
• Prices
• Product data
• Responses to questions
A revolution in Tender, Bid and Contract Management Systems
Audit trail
Audit trail - version tracking
• All changes recorded:• By whom
• When
• Compare
• Roll back
A revolution in Tender, Bid and Contract Management Systems
Dedicate resources
Creation of Master Library
• Remy service• Develop specification for library
• Configuration of library
• Creation of master documents
• Vendor response settings
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Current method
Issues for tender preparation
• Correct documents
• Procedural compliance
• Lead times
• Geographically distributed project team
• Audit trail
A revolution in Tender, Bid and Contract Management Systems
User login
User login
• Login takes user to My Workspace
• Lists all outstanding tasks
• Gets daily email with similar summary
A revolution in Tender, Bid and Contract Management Systems
Create a new tender
Add a tender
• Set basic options• Publication dates
• Type - RFx
• Currency
• Business Unit
A revolution in Tender, Bid and Contract Management Systems
Overview
Prepare tender
• Dates
• Status
• Reports
• Open and completed tasks
A revolution in Tender, Bid and Contract Management Systems
Tender preparation phase
Prepare tender
• Documents copied from master template
• Documents requiring attention have alert icons
• Select project team and roles
• Select vendors to invite
A revolution in Tender, Bid and Contract Management Systems
Document preparation
Prepare tender
• Only items with pencils require editing
• Other headings are pre-approved and cannot be changed
• Less work - less checking
A revolution in Tender, Bid and Contract Management Systems
Preparation
Prepare tender
• Orange pencils turn green as items are completed
• Select options as set up in template - no editing required
• Import BOQ from Excel
A revolution in Tender, Bid and Contract Management Systems
Attachments
Upload attachments/addenda
• Upload multiple documents at a time
• Attach drawings, pictures, documents, spreadsheets, etc.
A revolution in Tender, Bid and Contract Management Systems
Concurrent document access
Team works simultaneously
• Multiple users can access document simultaneously from different geographic locations
• All changes are recorded
A revolution in Tender, Bid and Contract Management Systems
Vendors
Vendor management
• Register
• Assign to Groups• Panels
• Trades
A revolution in Tender, Bid and Contract Management Systems
Dedicate resources
Creation of Tenders
• Remy service• Create and prepare tender
• Customer review and approval
• Remy help desk support
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Current method
Approval issues
• Ensure correct approvals
• Lead times (availability of approvers)
• Avoid unauthorised changes after approval
A revolution in Tender, Bid and Contract Management Systems
Approvals
Obtain approval
• Approvals can only start once all pencils are green
• It is impossible to publish an incomplete document
• Once approval starts all documents are frozen
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Current method
Vendor response issues
• Incomplete submissions
• Different formats
• Difficult data mining
• Unnecessary marketing material
• Administration of clarifications and communications
A revolution in Tender, Bid and Contract Management Systems
Vendor login
Vendor login
• Login takes vendor to My Workspace
• Lists all outstanding tasks
• Gets daily email with similar summary
• Wizard for guidance
A revolution in Tender, Bid and Contract Management Systems
Vendor online submission
Prepare bid and submit
• Vendor sees same basic overview
• Control panel for submitting/withdrawing bid
• Documents with alerts
A revolution in Tender, Bid and Contract Management Systems
Vendor response
Prepare bid and submit
• Red items require attention
• Vendor response for each item is specified and simple• Delivery dates
• Prices
• Compliance
• Documentation
A revolution in Tender, Bid and Contract Management Systems
Clarifications
Clarifications - Audit trail
• All correspondence is recorded in iSpec automatically linked to the heading it relates to
• Creates comprehensive audit trail
A revolution in Tender, Bid and Contract Management Systems
Addenda/clarifications
Modifications/addenda
• Messages/addenda can be sent to one or all vendors
• Part of audit trail
A revolution in Tender, Bid and Contract Management Systems
Response validation
• Vendor cannot submit bid unless all items have been completed
Prepare bid and submit
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Approval status
Open bids
• Track and expedite approvals
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Current method
Evaluation issues
• Incomplete submissions
• Different formats
• Difficult data mining• Pricing comparison
• Non-compliant items
• Different evaluation scenarios• Technical
• Commercial
A revolution in Tender, Bid and Contract Management Systems
Bid evaluation
Compare pricing
• One click pricing comparison
• No data mining required
A revolution in Tender, Bid and Contract Management Systems
Compliance
A revolution in Tender, Bid and Contract Management Systems
Non-compliance details
A revolution in Tender, Bid and Contract Management Systems
Score and negotiate
Evaluate and negotiate
• Enter technical & commercial scores
• Accept or negotiate
A revolution in Tender, Bid and Contract Management Systems
Evaluate
A revolution in Tender, Bid and Contract Management Systems
Negotiation progress
A revolution in Tender, Bid and Contract Management Systems
Final contract
• Prepare final version online
• Electronic version should be legally binding
• Option to print and sign
Sign the contract
A revolution in Tender, Bid and Contract Management Systems
The Solution
A revolution in Tender, Bid and Contract Management Systems
Current method
Contract management issues
• What about contract management?
• Project management
• Variation orders
• Tracking delivery
• Vendor performance
• Forget crucial milestones and follow up
A revolution in Tender, Bid and Contract Management Systems
Resource planning
Project planning
• Generate project plan containing• Deliverables
• Milestones
• Use as basis for project planning
• MS Project or Primavera
A revolution in Tender, Bid and Contract Management Systems
Vendor delivery
Delivery tracking
• Automated reminders
• Vendor reports delivery• Uploads certificates
• Manuals
• Delivery notes
• Customer verifies
A revolution in Tender, Bid and Contract Management Systems
Vendor delivery performance
Delivery schedule
• Track and compare:• Original request
• Agreed per contract
• Actual delivery dates
• Calculate penalties
A revolution in Tender, Bid and Contract Management Systems
Contract management
• Send email from iSpec
• Customer gets mail
Vendor raises issue
A revolution in Tender, Bid and Contract Management Systems
Contract management
• Mark item as read
• Change contract text
Customer sees issue
A revolution in Tender, Bid and Contract Management Systems
Contract management
• Content change is highlighted
• Email sent to vendor to accept
Revision is made
A revolution in Tender, Bid and Contract Management Systems
Contract management
• Vendor can view revision details and accept
Vendor accepts revision
A revolution in Tender, Bid and Contract Management Systems
Contract management
• Manage other revisions• Pricing
• Delivery date
• Units
Other revisions
A revolution in Tender, Bid and Contract Management Systems
Capture MRO data
MRO spares data
• Enter spares data
• Validate
• Interface to ELS (Equipment logistic systems)
A revolution in Tender, Bid and Contract Management Systems
QA
Quality assurance
• Monitoring of status of the works• Checklists of outstanding/faulty
items
• Acceptance tests/inspections
• Performance testing
• Certifications
• Consolidating this information into reports
A revolution in Tender, Bid and Contract Management Systems
Inspection items
Ad-hoc inspections
• Create inspection items
• Attach inspection records to specific items or as general issues
A revolution in Tender, Bid and Contract Management Systems
Inspection items
Ad-hoc inspections
• Take pictures of issues and faults
• Track correction
• Attach to milestones
A revolution in Tender, Bid and Contract Management Systems
73
Work packages as sub-tenders
Main & sub-tenders
• Large project contains separate work packages• Civil works
• Utilities
• Security
• Process control
• Plant
• Work packages can be published/awarded separately
• Roll up overview for evaluation• Automatically generate separate
contracts
• Manage them
A revolution in Tender, Bid and Contract Management Systems
iSpec
Improvement• Standardised approach• Enforced procedural
compliance• Easy collaboration
amongst stakeholders• Proper audit trail• Concurrent document
access• Improved productivity
Do it right Reap benefits• Fewer design reviews• Fewer change requests• Fewer disputes• Full audit trail• Cost savings• Better QA• Improved productivity• Transparency• Reduced tender
management costs
• Online clarifications are part of audit trail
• No incomplete bids• Automated evaluation • Negotiation audit trail• Automated contract
generation• Better contracts• Improved productivity
A revolution in Tender, Bid and Contract Management Systems
Key Performance Indicators
A revolution in Tender, Bid and Contract Management Systems
Bottlenecks/lead times
Project timeline
• Identify bottlenecks
• Analyse lead times
• Send reminders
• Compare to bench-marks
A revolution in Tender, Bid and Contract Management Systems
Vendor performance
• Project review
• On-time delivery
• Quality
• Reliability
• Vendor summary
• Flag vendors and projects
Measure vendor performance
A revolution in Tender, Bid and Contract Management Systems
Vendor contracts
A revolution in Tender, Bid and Contract Management Systems
Vendor participation
A revolution in Tender, Bid and Contract Management Systems
Analysis
A revolution in Tender, Bid and Contract Management Systems
INSPECTIONS
•Online/offline inspections•Can link to items in documents•Quick reports & Punch lists•Ad-hoc and standard inspections
INSPECTIONS
•Online/offline inspections•Can link to items in documents•Quick reports & Punch lists•Ad-hoc and standard inspections
SUPPLIERSSUPPLIERSSUPPLIERSSUPPLIERSBIDS
•No downloading and uploading of documents•All submissions done online and encrypted securely into the database•Attachments allowed•No information visible to the company until after bids have been opened electronically•Negotiate/correspond online•One-click conflict resolution•Track delivery online•Reminders for deliverable items
BIDS•No downloading and uploading of documents•All submissions done online and encrypted securely into the database•Attachments allowed•No information visible to the company until after bids have been opened electronically•Negotiate/correspond online•One-click conflict resolution•Track delivery online•Reminders for deliverable items
INTERNAL USERS/CONSULTANTSINTERNAL USERS/CONSULTANTSINTERNAL USERS/CONSULTANTSINTERNAL USERS/CONSULTANTSTENDERS/
CONTRACTS•Tender is a copy of the latest approved version of a template or newly created•Customise only editable items•Negotiate/correspond with suppliers online•Full audit trail kept with date and time stamps•Approvals at various stages up to contract signature•Built-in pricing comparator, conformance reports and evaluation system (scoring)•Built-in KPI reports•Custom reports using Crystal reporter
TENDERS/CONTRACTS
•Tender is a copy of the latest approved version of a template or newly created•Customise only editable items•Negotiate/correspond with suppliers online•Full audit trail kept with date and time stamps•Approvals at various stages up to contract signature•Built-in pricing comparator, conformance reports and evaluation system (scoring)•Built-in KPI reports•Custom reports using Crystal reporter
TEMPLATE LIBRARY
•Templates have assigned owners and approvers•Colleagues can correspond regarding changes, etc.•Messages stored with clause as part of the audit trail•Copy and paste a template to create a similar one and just make the changes•Multiple language versions possible•Only fully approved templates can be used to create tenders/contracts
TEMPLATE LIBRARY
•Templates have assigned owners and approvers•Colleagues can correspond regarding changes, etc.•Messages stored with clause as part of the audit trail•Copy and paste a template to create a similar one and just make the changes•Multiple language versions possible•Only fully approved templates can be used to create tenders/contracts
MASTER LIBRARY•Clauses or complete documents•Each with an owner/approver•Changes automatically update any template in which item is used•Comprehensive audit trail•Rollback, compare, approve•Correspondence regarding changes are stored as part of the audit trail•Batch approvals•Multiple language versions•Item can be fixed, fully editable or only have editable fields - giving complete control over change permissions
MASTER LIBRARY•Clauses or complete documents•Each with an owner/approver•Changes automatically update any template in which item is used•Comprehensive audit trail•Rollback, compare, approve•Correspondence regarding changes are stored as part of the audit trail•Batch approvals•Multiple language versions•Item can be fixed, fully editable or only have editable fields - giving complete control over change permissions
Master libraryitemitem
Master libraryitemitem
TemplateTemplate
TenderTender
Master libraryitemitem
Master libraryitemitem
Master libraryitemitem
Master libraryitemitem
Master libraryitemitem
Master libraryitemitem
Master libraryitem
Master libraryitem
TenderTender
TenderTender
TenderTender
TemplateTemplateTenderTender
Supplier 1Supplier 1
Supplier 2Supplier 2
Supplier 3Supplier 3
InspectorInspectorWorkflow, Communications and Workflow, Communications and
Audit trailAudit trailWorkflow, Communications and Workflow, Communications and
Audit trailAudit trail
A revolution in Tender, Bid and Contract Management Systems
82
Concurrent licensing
Unlimited users with iSpec login
Users with iSpec login and password
Users logged into iSpec at any time
Estimate the maximum number of users that would be logged in at any time during the day. This is the number of concurrent licenses you will require.
3 concurrent users in this example
A revolution in Tender, Bid and Contract Management Systems
Benefits
A revolution in Tender, Bid and Contract Management Systems
84
Financial savings
Savings and benefits
• 3%-20% project cost savings
• 60% tender management cost savings
• Reduced audit costs
• Vendor cost savings
A revolution in Tender, Bid and Contract Management Systems
85
• 70% efficiency improvement
• Lead time reduction from 2 weeks to 1 day
• Improved vendor relations
• Better sharing of global expertise
• Improved control and transparency
• Improved management reporting capability
• improved procedural compliance
• Improved risk management
Other benefits
Savings and benefits
A revolution in Tender, Bid and Contract Management Systems
Savings
User observations - $
• “Standardisation of contracts and specifications (using iSpec) has lead to lower prices in general (3% on large projects). Business units not using iSpec are paying higher prices. (1 general case > 20%).” Why - Clear unambiguous tenders. Transparency. Better leverage during negotiations.
• “Because of the transparency vendors can no longer get away with charging different business units different prices for the same equipment.” (or different prices for the same item on different projects)
A revolution in Tender, Bid and Contract Management Systems
User observations - effort
• “Transparency, traceability and keeping the communication/negotiations together are a huge benefit for both parties… The only reason that we can manage so many projects so effectively is because the negotiations and communications are recorded against each item/clause for anybody to read and see what has been discussed/negotiated. That is also valid for the Vendor because they pass the documents from Tender team to Engineering/Project management team. We do the same for 3rd party…..” Paul Jordaan, DPWorld.
A revolution in Tender, Bid and Contract Management Systems
Before
TenderTenderDocumentsDocuments
BidBidDocumentsDocuments
BidBidDocumentsDocuments
BidBidDocumentsDocuments
@
@
@
Evaluation & Evaluation & NegotiationNegotiation
BidBidBidBid BidBid
ContractContract
@
@@
@@@
@ @
@
DeliveryDelivery@
@
@@
@@@
@
@@@
@@
@ @@
@
@@
@
@
A revolution in Tender, Bid and Contract Management Systems
After
1_______1_______1.1___1.1___2_______2___________________________3_______3_______3.1 Aircon3.1 Aircon3.2_____3.2_____4___________4___________________________________
CorrespondenceCorrespondence______________________________________________
Bid responseBid response______________________________________________
NegotiationsNegotiations______________________________________________
Final contractFinal contract______________________________________________
AttachmentsAttachments______________________________________________
CorrespondenceCorrespondence______________________________________________
Bid responseBid response______________________________________________
NegotiationsNegotiations______________________________________________
Final contractFinal contract______________________________________________
AttachmentsAttachments______________________________________________
CorrespondenceCorrespondence______________________________________________
Bid responseBid response______________________________________________
NegotiationsNegotiations______________________________________________
Final contractFinal contract______________________________________________
AttachmentsAttachments______________________________________________
Project team
Supplier 1 Supplier 2 Supplier 3
Suppliers
iSpec
A revolution in Tender, Bid and Contract Management Systems
iSpec users
A revolution in Tender, Bid and Contract Management Systems
Business requirement
Why iSpec?
• Timing and cost
• Flexibility
• Learn and grow
• Deliver value
• Project Management
• Document Management and Version control
• Risk management
A revolution in Tender, Bid and Contract Management Systems
Tool selection
Why iSpec?
• SAP Toolset• Integrated tool lacking in
functionality and ease of use.
• Adjusted timelines
• Other solutions• Various solutions reviewed
• Internal proposal in progress
• iSpec
A revolution in Tender, Bid and Contract Management Systems
Reasons for iSpec
Why iSpec?
• Out of the box ready
• Almost 100% fit to our business requirement
• Rapid implementation
• Standalone flexibility until back-end ready
• Intuitive interface
• Training and help included
• Industry experience - not theoretical model
A revolution in Tender, Bid and Contract Management Systems
Bermuda Government
Case study - Bermuda
• Requirements:• Transparency
• Control
• Audit-ability
• Standardisation
• Skills optimisation
A revolution in Tender, Bid and Contract Management Systems
Implementation
Case study - Bermuda
• Customisations
• Installation
• Training
• Total time - 3 months
A revolution in Tender, Bid and Contract Management Systems
About
Case study - SABMiller
• Second largest brewer in the world
• Operates in 67 countries
• CAPEX expenditure US$900 million per annum
A revolution in Tender, Bid and Contract Management Systems
About
Case study - SABMiller
• SAP user
• Required efficient Tender Management system
• Trial of iSpec as best-of-breed solution
• Contract/spec contains over 6,000 data items to manage for a new brewery
A revolution in Tender, Bid and Contract Management Systems
Issues
Case study - SABMiller
• Internal issues• Speed - LAN issue - issued key
users with 3G cards as interim solution
• Resistance to change (learning curve)
• External issues (vendors)• Data entry slow - new
spreadsheet-like quick entry
• Validation - no incomplete submissions allowed. Vendor education.
A revolution in Tender, Bid and Contract Management Systems
Benefits
Case study - SABMiller
• Productivity improvement of 300%
• Contract price reduction +- 3%
• Transparency and audit trail
• Single point auditing
A revolution in Tender, Bid and Contract Management Systems
Roll out
Case study - SABMiller
• Global roll-out plan• customisations
• roll-out team
• training system
• custom manuals
• global roll-out in progress
A revolution in Tender, Bid and Contract Management Systems
ERP vs iSpec
Case study - SABMiller
• iSpec was 100% fit for our business requirement
• iSpec is out of the box ready to use whereas ERP CRM integration is very difficult. You have to get e-sourcing to talk to the back end and this is very expensive and time consuming
• Rapid implementation of iSpec allowed us to change our process and behaviour without worrying about the tool
• Running iSpec standalone allows us more flexibility - we are not restricted by the back-end as with ERP
A revolution in Tender, Bid and Contract Management Systems
102
Why iSpec?
Case study - SABMiller
• iSpec's user interface is intuitive and easy to use
• iSpec comes with training materials which ERP doesn't - we would have to develop that
• iSpec comes with industry experience which makes implementation easier.
• iSpec instantly addressed our business problems
• Remy's commitment to solving our problems and making things work made a difference
A revolution in Tender, Bid and Contract Management Systems
103
DPW
Case study - DP World
• World’s 3rd largest port operator
• Over 50 ports globally
• CAPEX around US$ 3 billion in current projects
A revolution in Tender, Bid and Contract Management Systems
Requirements
Case study - DP World
• Wanted to centralise CAPEX procurement
• Needed an automated system
• Global access 24/7
• All documents up-to-the-minute accurate
A revolution in Tender, Bid and Contract Management Systems
Issues
Case study - DP World
• Internal resistance• DPW bought P&O and they
resented DPW central procurement
• Once they saw benefits they came on board very quickly
• Internet issues• China - ISP blocked
attachments over 5MB - fixed
• Internal LAN bandwidth issues
A revolution in Tender, Bid and Contract Management Systems
Benefits and savings
Case study - DP World
• Customised system
• 1 project manager now handles up to 30 projects (previously only 4)
• Single point auditing
• Standardisation
• Project cost reduction of 3%
A revolution in Tender, Bid and Contract Management Systems
User observations - value
• “iSpec has highlighted weaknesses that existed in our processes as well as our people. Using iSpec now helps us augment tendering and contract management skills in many of our business units.”
• “Project managers are now adding value to the process rather than doing clerical work much of the time”
• “Management reports are available at the click of a button and data contained in them is current - not days or weeks old.”
• “With improved visibility and a bit more time spent on negotiations we have saved in virtually ZERO amendments to contracts after awarding.”
A revolution in Tender, Bid and Contract Management Systems
Summary
• Costs - iSpec avg. savings of 3%-20% on total project cost
• Productivity - iSpec results in 300%+ improvement = $
• Accountability - iSpec’s comprehensive audit trail
• Conflict resolution - iSpec One-Click resolution
• Control - Approved templates and edit/approval control
• Transparency - iSpec audit trail and easy user access
A revolution in Tender, Bid and Contract Management Systems
Thank you
A revolution in Tender, Bid and Contract Management Systems
Technology and security
A revolution in Tender, Bid and Contract Management Systems
Technology
• Microsoft .NET application
• Requires only a browser (IE 8 +, Safari, Firefox, Chrome)
• Secure access
• Database - MS SQL Server 2008+
• Microsoft server 2008+
Technical information
A revolution in Tender, Bid and Contract Management Systems
112
A revolution in Tender, Bid and Contract Management Systems
113
Interfacing
Fin-Link
• Financial links to:• ORACLE
• SAP
• JDE
• PeopleSoft
• Sun
• Thalia
• Sage
• Scala
• Empriz
• DTS or SSIS
• IAS compliant
• $25,000 each + consulting
Tech Spec Manageme
nt
Planning systems
Evaluation
MRP
Inventory Managem
ent
Quality Manageme
nt
Invoice processi
ngGoods
receiving
Approval
Purchase order
PaymentRequisiti
on
Internal business
requirement
Reporting
Contract implemente
d
Contract draft and review
Negotiation
Sourcing RFx
External info
gathering
Transactional Processing
Strategic Sourcing
Trials & Supplier
Accreditation
Typical interfaces
A revolution in Tender, Bid and Contract Management Systems
Typical Security
A revolution in Tender, Bid and Contract Management Systems
eBidding option
A revolution in Tender, Bid and Contract Management Systems
RemyIssuesSolutionTemplatesTenderResponseClarificationsApprovalsBid openingEvaluationDeliveryProject planningContract mgtKPIBenefitsWhy iSpec?SABDPWBermudaTechnology
ImplementationSizingGAP analysis1st Data gatheringTraining1st template1st tenderFeedbackAdjustRoll out planRoll out
InternetLANVendorsInternal resistanceOver-customisationIntegrationERP
These links only work in Keynote
A revolution in Tender, Bid and Contract Management Systems
117
Implementation
A revolution in Tender, Bid and Contract Management Systems
118
Sizing
• Questionnaire• Tenders per annum
• Time zones
• Duration of publication
• Project duration
• Vendors per tender
• Project team size
A revolution in Tender, Bid and Contract Management Systems
119
Sizing
• Hardware• Reverse proxy
• Application server
• Database server
A revolution in Tender, Bid and Contract Management Systems
120
Sizing
• Software• Server 2008
• SQLServer 2008
• Browsers IE 9+, Safari, Firefox, Chrome
A revolution in Tender, Bid and Contract Management Systems
121
Implementation
• Startup meeting• Resources
• Training
• Project Plan
• 3 sites - production, UAT (test), training
A revolution in Tender, Bid and Contract Management Systems
122
Typical project plan
A revolution in Tender, Bid and Contract Management Systems
123
GAP analysis
• Master documents
• Tender process
• Delivery process
• Contract Management
• No customisation yet
A revolution in Tender, Bid and Contract Management Systems
124
Data gathering
• Business hierarchy
• Templates
• Roles
• Approvals
• Configuration
A revolution in Tender, Bid and Contract Management Systems
125
Data gathering
Typical RFQ structure
RFQ Sections Plant A Plant B Plant C Plant D
Memorandum of Agreement Same conditions
O H & S Same conditions
Commercial Terms and Conditions ($) $$$$$$$ $$$$$$$ $$$$$$$ $$$$$$$
General Conditions Same conditions
Special Conditions Same conditions
Employer’s Requirement (FIDIC) ####### ####### ####### #######
Eskom Standards and Specifications Same conditions
Drawings
Executive Summary
Milestone Schedule
A revolution in Tender, Bid and Contract Management Systems
126
Training
• Training plan
• 1st training
• 1st template
A revolution in Tender, Bid and Contract Management Systems
127
Training
• Administrator
• Template editors
• Project team
• Vendor introduction
A revolution in Tender, Bid and Contract Management Systems
128
Training
• Custom Quick Guides
• Custom training videos
• Implement
A revolution in Tender, Bid and Contract Management Systems
129
First tender
• Prepare - smaller tender
• Publish
• Evaluate/negotiate
• Award
• Manage contract
• Feedback
A revolution in Tender, Bid and Contract Management Systems
130
Analyse first tender
• Issues identified during each phase (internal messaging)
• Adjustment/customisation
• Apply new methods and customisations
A revolution in Tender, Bid and Contract Management Systems
131
Roll out plan
• Finalise Data gathering input plan
• Finalise Support plan
• Finalise Hosting plan
• Finalise Training plan
• Roll out plan to divisions and business units
A revolution in Tender, Bid and Contract Management Systems
132
Roll out plan
• Centre of Excellence: • Role allocation & Definition of
competency requirements
• Master template management
• Roles definition
• Interface with Remy-IS and GIS
• Help Desk functionality
• Knowledge sharing and capability building
A revolution in Tender, Bid and Contract Management Systems
133
Roll out plan
• Departments/regions: • Role allocation & competency
requirements
• Template management
• Roles allocation at project level
• Help Desk requirements
A revolution in Tender, Bid and Contract Management Systems
134
Possible issues
A revolution in Tender, Bid and Contract Management Systems
135
Attachments the main issue
Internet
• iSpec Attachments
• ISP limits file size for uploading
• Request ISP to increase file size limit
A revolution in Tender, Bid and Contract Management Systems
136
Issues
LAN
• Slow performance
• 90% of the time the problem is LAN bottleneck not internet
• Separate LAN segment with high QOS
A revolution in Tender, Bid and Contract Management Systems
137
Vendors
Vendor issues
• Validation - must submit all requested data• Lazy - will do work if they get
contract
• Want an opportunity to negotiate after bid opening
• Draw back• You can’t evaluate properly
without sufficient data
• Fix• Condition of doing business
• Long term benefit
• Decide which data is important for evaluation purposes
A revolution in Tender, Bid and Contract Management Systems
138
Resistance
Internal resistance
• Resistance to change
• Training
• New system - takes time
• Have to change habits
• Requires discipline initially
• Soon realise benefits of improved productivity and transparency
A revolution in Tender, Bid and Contract Management Systems
139
To customise or not
Over-customisation
• Enthusiastic users want everything up front
• Won’t work if we don’t have XX
• Customisation/re-working is expensive and causes delays and errors
• Try before you customise - see what you REALLY need
A revolution in Tender, Bid and Contract Management Systems
140
Interfacing
Integrate/interface with ERP
• Do all divisions/business units have the same back-end?
• Is your back-end mature and fully rolled out?
• How will customisations affect integration?
• Get immediate benefit, customise when sure, then integrate (quicker return, lower cost, less frustration)