Upload
doanminh
View
223
Download
0
Embed Size (px)
Citation preview
ISO9001‐2015 QMS EXPLOSION PROOF HVAC AIR CONDITIONER COOLER
Designed for Oil Rigs, Tankers, Mines
Pressurized to NFPA Standard 0.1‐0.2 in w.c Proven Quality – Years of satisfied operation at Offshore oil platform
Non Hot‐Work / no Welding piping installation on site Fully Knock‐Down construction / Easy installation in tight space
CL 1 Div 1 Safe to operate in hazardous environments Use only Environment Friendly/Green Refrigerant
Built To Last Corrosion resistance SUS316L structure HVAC For Hospital & Pharmaceutical Industry
QUALITY & EXLELLENCE – PIONEER IN NON‐WELDING SITE INSTALLATION
T
Certificate of Inspection , Certificate of Origin , Certificate of conformance traceable to NIST standard , Manufacture Certificate , Painting report , Psychrometric chart
HVAC & INDUSTRIAL COOLER SYSTEM
Research and Development division. Advance production machineries :
‐ Precision Fin press ‐ Tube expanders ‐ Aluminium / Copper or SUS Fin Heat Exchanger ‐ Corrosion resistance coating ‐ Painting / Coating booth ‐ State‐of‐the‐Art refrigerant cooling capacity tester. ‐ NC Metal sheet processing ‐ Digital measurement tools ( Noise level, Air flow,
Infra red , Thermometer , Hygrometer, Insulation tester, AVO meter , Amp‐meter, Vibration )
Experienced Design Engineers , Assemblers and Field Technician.
Technology : ‐ Full Knock‐Down Hvac unit structure. ‐ Non Welding Knock‐Down Piping construction ,
easy Compressor/Coils replacement on‐site without a single brazing / welding.
‐ Corrosion resistance frame SUS 316L.
Products & Services : ‐ Explosion proof HVAC system ‐ Air Conditioner for Office / Hotel / General ‐ Pressurized Switchgear ‐ Pressurized Living Quarters ‐ FIRE & GAS SYSTEM
‐ HVAC Hospital & Pharmaceutical Industry ‐ Industrial Cooler System ‐ Pressurize Fan system ‐ SCADA ‐ Precision Air Conditioner ‐ Turbine Control Retrofit
C
HVAC QUALITY INSPECTION BY INDEPENDENT SURVEYOR
FIELD ENGINEERING SURVEY , DESIGN ,FABRICATE , FAT AND INSTALLATION
CERTIFICATE OF INSPECTION
CONTROL PANEL
PHE ONWJ FOXTROT PCR DURING FABRICATION
HVAC COMPLETION INSTALLED AT OIL RIG HVAC DURING FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
Manufactured to ASHRAE and NFPA Standards
PT MASTERINDO UNGGUL SEJAHTERA Perkantoran Mutiara Palem Lestari Blok B5 No. 35 Tel : 29020046 Fax : 29020045 Website www.marinemm.com Email : [email protected] Email : [email protected] Workshop 1 : Delta Silicon 1 , Jalan Kruing 2 No. 1 Lippo Cikarang – Jawa Barat
FACTORY ACCEPTANCE TEST & SITE ACCEPTANCE TEST
All HVAC System had passed our internal QA/QC and
Witnessed by our customer / end‐user to ensure that all
Designs requirements has meet the Standards of
ASHRAE and NEC/UL , Cooling capacity is plot on
Psychrometric chart . Unit packed in sea‐worthy wooden
packing and deliver to customer. Completion report is
issued upon successful Site‐Acceptance‐Test.
NO
REGISTRATION
DATE ISSUED
VALIDITY
NO
1 Akte Pendirian Pertama Notaris R. Johanes Sarwono S.H
16 Nov 1999 32
2 SK Kehakiman 25 Juni 2003 C‐14604 HT.01.01TH.2003
3 Akte Perubahan Anggaran dasar Notaris Michael S.H.,ST.,Mkn
2 Juli 2018 03
4 Pengesahan Perubahan Anggaran Dasar Perseroan
3 Juli 2018 AHU‐0085124.AH.01.11
5 NPWP 25 Nov 1999 01.892.131.2‐047.000
6 DOMISILI 18 Oct 2016 18 Oct 2021 230/27.1BU.1/31.73.01.1006/‐071.562/e/2016
7 TDP 27 Oct 2016 05 Oct 2021 1540/24.3PT.1/31.73/‐1.824.27/e/2016
8 SIUP (BESAR ) 27 Oct 2016 27 Oct 2021 166/24.1PB/31.73/‐1.824.27/e/2016
9 IUJK 2‐902218‐3174‐1‐04177
10 SBU Jasa Pelaksana Konstruksi Grade M1 EL001 / EL004 Grade M1 MK001/MK007
30 Mar 2017 24 Jul 2019 0‐3174‐09‐023‐1‐09‐910718 EL001 Jasa konstruksi pembangkit semua daya EL004 Jasa konstruksi jaringan transmisi tegangan tinggi/ekstra tinggi MK001 Jasa konstruksi AC dan Ventilasi MK007 Jasa konstruksi thermal,bertekanan,minyak,gas,geothermal
11 SKT MIGAS 13 Apr 2017 13 Apr 2023 442/SKT‐02/DMT/2017 Jasa konstruksi Air Conditioner
12 Kwalifikasi Prosedur Las & Juru Las Dirjen MIGAS 001/WPS/ASME/MUS/2016
21 Juni 2016 No Reg : 3649/10.12/DMT/2016
13 MEMBER NFPA Member National Fire Protection Agency
14 REGISTERED HVAC BRAND MASTERMARINE®
10 Okt 2011 DOO2011039925
15 ISO9001‐2015 QUALITY MANAGEMENT SYSTEM
28‐7‐2018 27‐7‐2021 KAN No : 169‐QR‐180728
16 LOCAL CONTENT ASSESSMENT TKDN Achievement 59.9%
2018 SURVEYOR INDONESIA
17 Kwalifikasi CSMS ( Contractor Safety Management System )
2 Agustus 2018 Reg No: 887/E14400/2018‐SQ PT.Pertamina ( Persero ) RU Cilacap
18 PML ( Prefered Manufacture List ) PT. Pertamina PHE ONWJ
Reg No : PHEONWJ‐G‐VPI‐0001
19 PMFL ( Prefered Manufacure and fabricator List ) Santos B.V
NO CONTRACT DATE
PROJECT IN RELATED FIELD
CUSTOMER
1 22/3/2011 EPCI HVAC for NGLA CR 2 X 150,000 Btu/h Floor standing
PHE PERTAMINA HULU ENERGY ONWJ LTD
2 4/5/2011 EPCI HVAC for LIMA LQ02 ELECTRICAL & HVCA 2 X 400,000 Btu/h
PHE PERTAMINA HULU ONWJ LTD
3 23/5/2011 EPCI Hvac for EPROCESS ELECTR & HVAC REPLA 2 X 75,000 Btu/h
PHE PERTAMINA HULU ONWJ LTD
4 2013 EPCI for HVAC MMSLQ 2 X 400.000 BTU/H MMS-SWGR 2 X 150.000 BTU/H ZULU LQ 2 X 300.000 BTU/H C/W OFFSHORE INSTALLATION, CABLE RACK , CABLE , PIPING TESTING COMMISSIONING
PT PERTAMINA HULU ENERGY OFFSHORE NORTH WEST JAVA
5 2013 EPCI for HVAC CENTRAL QUARTERS NGL LQ 2 X 250,000 Btu/h Pressurzing system
PT PERTAMINA PHE ONWJ
Control Panel 6 May 2014 EPCI for FOXTROT PCR
30’ X 12’ X 12’ C/W 50Kva Power Transformer Fire & Gas system Hvac 2 X 100,000 Btu/h Hvac Control Panel Pressurzing system 0.15” w.c Power distribution board MCT Multi Cable Transit
PT PHE ONWJ
7 2013 Heat Exchanger for Turbine INDONESIA POWER Semarang
8 Nov 2014 EPCI ZULU BRAVO HVAC Zulu NURA Reactivation 2 x 120,000 Btu/h Pressurizing System
MSM / PHE ONWJ
9 2015
EPCI HVAC and Pressurizing system for Bravo B1C , Bravo Service switchgear 4 x 80,000 btu/h Zulu Alpha , Zulu Delta , Zulu Golf Switchgear 3 x 100,000 btu/h
Pertamina PHE ONWJ
10 2015 Ducting and Fire damper for Pump Room Project Bangka Topside Chevron
Chevron
11 2016 Hvac Control Panel Project Bangka Topside Chevron
Chevron
12 2016
EPCI for HVAC CPP2 Platform PHE WMO 2 X 100 kW with 2 X 100% Filter Coalescer 1 X Pressurizing system to 50 Pa C/W Fire damper for all Room ( Electrical , Instrument , Control and Air lock ) Redundant PLC control system. MCC panel for Hvac
PT Guna Nusa Fabricator
13 2017 ACCU Air cool Condenser unit for Anoa oil Platform Natuna Offshore At Natuna sea. 2 x 30 TR 2 x 35 TR
Premier Oil Ltd
14 2018 EPCI Hvac and Pressurizing system for E & I Room Jangkrik Complex Project Lean gas pipeline Phase 1
PT ENI MUARA BAKAU B.V
15 2019 in progress
Upgrade AC system to Hvac and Pressurize system Zone 2 to NFPA Standard for FOC 1 & FOC 2 Switchgear and Control room refinery
PT Pertamina RU IV Cilacap
PHOTO REFERENCE
ARCO ARDJUNA FLOATING TANKER MASTERMARINETM 2 X 400.000 BTU/H
ROOFTOP UNIT UNDER FACTORY TEST
30 Ton Hvac 2 X 100% for CPP2 Platforms PHE WMO Offshore madura
32 Ton ACCU for Anoa LQ Premier Oil Natuna
HVAC PHE WMO OFFSHORE
CENTRAL PLANT PHE
FOXTROT LIVING QUARTERS MASTERMARINETM 4 X 200.000 BTU/H