    ISO 9001:2008 Revisions from ISO 9001:2000

    Introduction:

    ISO 9001 is now in its fourth edition. Starting with the 1987 initial edition, it changed in 1994and again in 2000. The 2000 change was pretty extensive. It introduced the concept of process

    auditing and added a lot of emphasis to the importance of top management to the effectiveness of

    quality management systems. In November 2008, the fourth edition was released.

    Discussion:

    On November 13, 2008, the fourth edition of ISO 9001 became official. It is referred to as ISO9001:2008. The good news is that it contains no substantive changes or new requirements. The

    changes that were made were done for two reasons: 1) clarifications to the requirements of ISO

    9001:2000; 2) to improve alignment with ISO 14001:2004.

    The ANSI-ASQ National Accreditation Board (ANAB) has issued two Heads-up documents that

    deal with the changes and transition process for moving from ISO 9001:2000 to ISO 9001:2008.These can be accessed from the ANAB web page www.anab.org. Refer to Heads-up numbers

    129 (migration) and 135 (where/how to buy the standard.)

    The transition/migration process has the following requirements:

    Twelve months after the release of ISO 9001:2008, all new and re-certification auditsmust be done to the ISO 9001:2008 standard. Twenty-four months after release of ISO 9001:2008, all ISO 9001:2000 certificates will

    be invalid.

    Upgrading from ISO 9001:2000 to ISO 9001:2008 requires a surveillance or re-certification audit to be conducted.

    If you are certified to ISO 9001:2000, you can continue with that revision level for a period of

    time depending where your organization is within its current three-year certificate cycle. Eachcertification/registration body (CRB) will have its own practices/rules regarding when and underwhat conditions an existing certification can be upgraded to ISO 9001:2008. However, in all

    cases, there must be either a surveillance or re-certification audit executed before an ISO

    9001:2000 certificate can be upgraded to ISO 9001:2008.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    2/16

    How to Use the Checklist:

    First and foremost obtain at least one copy of ISO 9001:2008. (See ANAB Heads-upNo. 135 for directions on how to obtain a copy.)

    Next, determine if the existing documented QMS and actual practices meet therequirements of ISO 9001:2008. The checklist has three categories:

    o Meets this requiremento Needs some modificationo Clause not applicable.

    (If you check this box, remember that only sub-clauses in section 7 can beclaimed to be not applicable, and your scope statement and related

    documentation must contain justification for such exclusions.)

    For each clause/sub-clause, use the Comments/Notation cells to annotate where therequirement is met. This may be a reference to a document, policy, procedure, work

    instruction, process document, etc.

    When completed, notify your CRB that you are ready to be audited in accordance withthe requirements of ISO 9001:2008. The completed checklist will provide one form of

    objective evidence (at the minimum, it will be a solid audit-trail) that your organization

    has completed an analysis of ISO 9001:2008 and, if applicable, made required changes to

    its QMS.

    About Smithers Quality Assessments

    Smithers Quality Assessments was established in 1993 as an accredited third-party registrar,

    providing manufacturers and service providers quality and environmental management systemcertification services to ISO 9001, ISO 14001 and other industry-specific standards. SQA is

    consistently ranked as a leader in customer satisfaction by independent surveys of registered

    companies. www.smithersregistrar.com

    About J&S Sedlak, LLC (Sedlak Consulting)

    For over fifteen years, John Sedlak led Smithers Quality Assessments, a leading

    certification/registration body located in Akron, OH. Since retirement, he has established a

    training/consulting practice, J&S Sedlak, LLC, specializing in the ISO standards and theiri l i Y l b i h b dl k l i

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    3/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    ISO 9001:2000 vs. ISO 9001:2008 Analysis Tool* ISO 9001:2008 was released on November 13, 2008

    * On or after November 13, 2009, all new certifications and re-certifications must be to ISO 9001:2008.

    * On or after November 13, 2010, any existing certification to ISO 9001:2000 will no longer be valid.

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    4.1 a Very slight change inwording.

    4.1 e "where applicable"added to "measure"

    these processes.

    Provides some

    leeway to

    organization - not all

    process need to be

    "measured."

    4.1 plus

    Notes 1,

    2 & 3

    If process(es) that

    affect quality of

    product are

    outsourced,

    organization must

    define controls.

    More emphasis on

    the need for the

    organization to retain

    control for

    outsourced

    processes, and not

    rely solely on the

    controls of the

    organization to which

    the process was

    outsourced;

    "processes" not

    limited to product

    realization processes.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    4/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    4.2.1

    c&d

    "Records" now

    included in these

    sub-clauses.

    Slight shift in

    emphasis to indicate

    "procedures" and

    "records" are related.

    4.2.1,

    Note 1

    Slight elaboration on

    meaning of

    "Documented

    procedure"

    Can be: a stand

    alone procedure; one

    document containing

    more than one

    procedure; one

    procedure may be

    expressed in more

    than one document.

    4.2.3 f External documents

    determined to be

    important must be

    controlled

    Reduces the need to

    control all external

    documents.

    However, places

    extra responsibility

    on the organization

    to define thoseexternal documents

    that are important.

    4.2.4 Records are to be

    controlled.

    Added emphasis

    from previous

    "maintained."

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    5/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    5.5.2 Management

    representative to be

    a member of

    organization's

    management.

    Emphasis on the fact

    that the

    management

    representative needs

    to be employed bythe organization and

    be a member of the

    organization's

    management team.

    6.2.1 Persons that affect

    product conformity

    requirements to be

    competent

    "Affecting product

    quality

    requirements"

    applies to any taskwithin the QMS, not

    just direct

    manufacturing or

    service provision

    6.2.2

    a ,b

    Determine

    competency of

    personnel affecting

    productrequirements;

    provide training to

    achieve needed

    competence.

    Removed the word

    "quality" to indicate

    that all requirements

    are important, notjust "quality

    requirements."

    Emphasis on need to

    "achieve" and not

    just "satisfy"

    competency

    requirements.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    6/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    6.3 Added "information

    systems" (IS) to

    support services.

    Recognized the

    importance of IS in

    today's environment.

    6.4 Added a note to

    explain "workenvironment."

    Physical factors and

    others, e.g., noise,temperature,

    humidity, lighting,

    weather.

    7.1 b Restructure of

    grammar.

    Grammar only.

    7.1 c Added

    "measurement" as an

    action to beconsidered.

    "Measurement"

    added to be sure that

    this action is includedwhen considering

    elements of the QMS

    needed to achieve

    conformity with

    requirements.

    7.2.1 c Added word

    "applicable."

    Added to clarify the

    "statutory" as used

    applies only toproduct

    requirements.

    7.2.1 d "Determined"

    changed to

    "considered

    necessary."

    Slight shift in

    emphasis from

    simply taking action

    to taking

    responsibility.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    7/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    7.2.1 New Note. Explains what is

    meant by "post

    delivery activities."

    7.3.1 New Note. Elaborates on thedifferences and

    similarities between

    design "review,"

    "verification" and

    "validation;" may be

    separate or

    combined depending

    upon needs ofproduct or

    organization.

    7.3.2

    2nd

    para

    "These" changed to

    "The."

    Grammar only.

    7.3.3

    1st para

    Changed "in a form

    that enables " to "ina form suitable for"

    verification.

    Emphasis placed on

    suitability of designbeing verified not

    simply an arbitrary

    acknowledgement

    that it can be

    verified.

    7.3.3 b Eliminated "for." Grammar only.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    8/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    7.3.3 New Note Information can

    include details on

    preservation of

    product.

    7.3.7

    1st &

    2nd

    para

    No text changes -

    paragraphs merged.

    Grammar only.

    7.5.1 d "Devices" changed to

    "equipment."

    Recognition that

    measurements can

    be taken with a wide

    variety of options.

    7.5.1 f Added "product"

    before "release."

    Clarified that the

    subject was release

    of product.

    7.5.2 Slight change in

    wording to

    emphasize the needfor process controls

    for "special

    processes."

    The word

    "consequences" adds

    emphasis to theresponsibility of the

    organization to

    establish process

    controls for "special

    processes."

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    9/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    7.5.3

    2nd

    para

    Expanded

    requirement for

    inspection

    (monitoring and

    measuring) statusthroughout the

    product realization

    process.

    Clarified that it is

    important for

    product to be

    identified relative to

    its conformancestatus throughout

    the product

    realization process.

    7.5.3

    3rd para

    Regarding

    "traceability:"

    changed "record" to

    "maintain records."

    Emphasis shift from

    simple recording to

    maintenance of such

    records.

    7.5.4

    1st para

    Regarding damaged

    or unsuitable

    customer supplied

    product, minor

    rewording.

    No substantive

    change.

    7.5.4

    Note

    Added "and personal

    data."

    Slight addition to

    indicate that theremay be times when

    organizations come

    into possession of

    personal data from

    folks that are not

    their employees.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    10/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    7.5.5

    1st para

    Regarding

    preservation of

    product, added

    words to convey that

    this applies to"conformity to

    requirements."

    Expanded to convey

    intent of

    requirement.

    7.6 "Devices" changed to

    "equipment."

    Recognition that

    measurements can

    be taken with a wide

    variety of options.

    7.6 a Added "or both" to"verified or

    calibrated."

    Clarified thatorganization must

    decide all actions,

    not just one or the

    other.

    7.6 c Regarding evidence

    of "calibration status'

    only a slight re-wording.

    Grammar only.

    7.6

    4th para

    Made a separate

    paragraph of one

    sentence.

    Grammar only.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    11/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    7.6

    Note

    Completely

    rewritten.

    Expanded

    explanation of

    confirmation and

    validation of

    computer software;included in actions

    associated with

    configuration

    management.

    8.1 Conformity "of the

    product" changed to

    "to productrequirements."

    Change made to

    clarify that there may

    be other productrequirements that go

    beyond those that

    simply define the

    product.

    8.2.1

    new

    Note

    Customer

    satisfaction.

    Offers hints at

    sources for

    monitoring customersatisfaction.

    8.2.2

    2nd

    para

    Added the word

    "The" at the

    beginning of 3rd

    sentence.

    Grammar only.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    12/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    8.2.2

    new

    para

    Actually, just a total

    rewording dealing

    with the need for a

    documented

    procedure.

    Grammar only.

    8.2.2

    4th para

    Simply a move of

    part of "old" 3rd

    paragraph to a

    separate paragraph -

    dealing with need to

    maintain records.

    Grammar only.

    8.2.2

    5th para

    Move of some words,

    and added "anynecessary corrections

    and corrective."

    Clarification of

    required actions onthe part of persons

    responsible for area

    audited to take

    action.

    8.2.2

    Note

    Deleted references

    to obsolete

    documents (ISO

    10011-1, -3) andadded reference to

    ISO 19011.

    Organizations should

    obtain a copy of ISO

    19011, review and

    assess impact oninternal audit

    process.

    8.2.3

    1st para

    Deleted "to ensure

    conformity of the

    product."

    This should be self-

    evident; also actions

    may be taken to

    correct the system.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    13/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    8.2.3

    new

    Note

    Deals with selection

    of monitoring and

    measurement

    techniques for

    processes.

    Provides latitude to

    management, but

    also places onus of

    proof that the

    defined monitoringand measuring are

    the results of a well

    executed thought

    process.

    8.2.4

    1st para

    Added need to

    provide evidence ofproduct conformity.

    Just good record

    keeping; allowsorganization to use

    data for

    improvement

    actions.

    8.2.4

    2ndpara

    Emphasis on

    identification ofperson authorizing

    release of product to

    the customer.

    Someone needs to

    say "okay to ship."

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    14/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    8.2.4

    3rd para

    Slight change in

    word-order dealing

    with release of

    product to the

    customer and suchaction not being

    taken until all

    required actions are

    taken.

    No substantive

    change.

    8.3

    1st para

    Slight change in

    wording of second

    sentence dealing

    with need for aprocedure for control

    of nonconforming

    product.

    No substantive

    change.

    8.3

    2nd

    para

    "Where applicable"

    added to start of

    second applicable.

    Recognizes that there

    are a myriad of

    circumstances that

    affect disposition of

    nonconformingproduct.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    15/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    8.3 d

    new

    Addresses those

    situations where

    nonconforming

    product may be in

    the hands of thecustomer.

    Actually, not a new

    requirement - simply

    a move of the

    requirement from

    paragraph status tobullet point "d."

    8.3

    3rd &

    4th

    paras

    Some paragraph

    positions changed.

    No substantive

    change.

    8.4 b Deleted reference to

    7.2.1; added

    reference to 8.2.4.

    No substantive

    change.

    8.4 c Added references to

    8.2.3 and 8.2.4

    No substantive

    change.

    8.4 d Added reference to

    7.4.

    No substantive

    change.

    8.5.2

    1st para

    Changed "cause"

    (singular) to "causes"

    (plural).

    Recognized that

    there may be one or

    more causes for

    problems.8.5.2 f Added "the

    effectiveness"

    Emphasis on the

    need for corrective

    actions to be

    effective - e.g., not

    repeat or cause other

    issues/problems.

  • 8/4/2019 ISO9001-2008Revisions SQA SedlakConsulting

    16/16

    Smithers Quality Assessments 2009: www.smithersregistrar.com Phone: 1-866-688-0134

    J&S Sedlak, LLC 2009: www.sedlakconsulting.com Phone: 330-936-3436

    Current QMS Documentation & Practice ----

    Clause Summary of

    change(s)

    Comment on

    Change(s)

    Meets this

    Requirement

    Needs some

    Modification

    Clause is not

    Applicable

    Comments / Notations

    8.5.3 e Added "the

    effectiveness"

    Emphasis on the need

    for preventive actions

    to be effective - e.g.,

    truly prevent the

    identified potentialproblem and cause