IGS-Corporation is a multi discipline Construction Company, experienced in the Kazakhstan oil & gas industry, has the

necessary licenses to operate in the West Kazakhstan and expert resources and infrastructure, to provide construction services to

support the construction programs on the facilities and the infrastructure of Oil & Gas fields and associated export pipelines.

IGS-Corporation LLC provides services in a “live plant” environment in the following construction disciplines:

•Civil •Structural

•Piping (above and below ground) •Mechanical (Static and Rotating)

•Electrical •Instrumentation

•Insulation, Fire Proofing and Coatings

IGS Corporation LLC is based in Aksay (West Kazakhstan), has a branch in Atyrau / Tengiz.

History – 30 years in Business

1986 - The Company IGS Intergasstroy was established under the

name Kazakhintergasstroy, 1992 - The Company name shortened to IGS (Intergastroy).

1998 - IGS Intergasstroy created IGS-Sicim LLC -Joint Kazakh- Italian Company with Sicim S.p.A. (Italy) with the purpose to participate

in Karachaganak Development Project (Unit 2 and Unit 3) until this Project were completed.

2004 - The Joint Venture was dissolved, the IGS Intergasstroy acquired an IGS-Sicim LLC. (IGS-Sicim – 100% Kazakh company)

2011- IGS-Sicim gradually changed name on IGS-Corporation. IGS today consists of 2 companies: IGS Intergasstroy – Assets management - Offices in Aksai, Industrial Base,

Fabrication Shops/Labs, Project Support (logistics, accomodations, transportations, etc.)

IGS-Corporation – Construction Services

ISO 9001 - 2008

Aksai

Atyrau

MAIN OFFICE

AKSAI , 090300 , WKO 2, Druzhby Narodov Str. Tel. +7 7113 336 343 / 344 Fax +7 7113 336 343

BRANCH OFFICE

ATYRAU , 060000 Zhety Kazyna mkr. , d.2 , ap.4 Tel. +7 7122 50 83 79 Fax +7 7122 50 83 79

Aral

sea

ISO 9001 - 2008

Our Mission

Our Mission is to provide our Clients with the highest quality construction services, delivered in a safe and professionally managed project

environment. We strive to deliver quality in all that we do while always treating our Clients

with courtesy and respect. We will maintain a workplace that fosters personal growth, career

development, teamwork and financial prosperity for our employees. Our mission is

simple: we are building to be the best

ISO 9001 - 2008

HSE Achievements

ISO 9001 - 2008

SAFETY RECOGNITION AWARD SGI/SGP Project Tengiz, Kazakhstan for Safety

Excellence 3,500 000 Hours Worked with only 1 LTI

Presented by Parson-Fluor-Daniel

CERTIFICATE OF ACHIEVEMENT 30 October 2001

in recognition of 1,000,000 Safe Man-Hours on the KAZAKHSTAN CONSTRUCTION

WORK PROJECT Presented by Tekfen Construction & Installation Company INC.

HSE Achievements

ISO 9001 - 2008

2 June 2001 Award for Safety Performance Presented to Chairman of Intergasstroy Nurlan Kuanshaliyev by Chairman of British Gas Richard

V.Giordano

10 September 2000 – HSE EXCELLENCE Certificate for first class HSE Performance

Karachaganak Project Development Presented by Karachaganak Integrated Organisation

KIO

HSE Achievements

ISO 9001 - 2008

26 May 2001 Karachaganak Project Development HSE Achievement

Certificate for achieving a record of 2.2 million man-hours without a Lost Time Incident

Presented by Karachaganak Integrated Organisation

15 September 2001 Karachaganak Project Development HSE Achievement

Certificate for achieving a record of 1 million man-hours without a Lost Time Incident

Presented by Karachaganak Integrated Organisation

HSE Achievements

ISO 9001 - 2008

1 August 2003 Karachaganak Award - Republic of Kazakhstan Kurmet Order For undertaking excellent performance on construction work in the Karachaganak Field on a

continuous base since 1986. Presented to Nurlan Kuanshaliyev by President of

Republic of Kazakhstan Nursultan Nazarbayev

HSE Achievements

ISO 9001 - 2008

IGS achieved 2.3 million safe work hours without a Lost time Incident during the

Construction of Shanyrak Village 05 June 2004

Presented by Parsons- Fluor-Daniel

2,000,000 SAFE MANHOURS – WITHOUTLOST TIME INJURY ACHIEVED THROUGH EXTREMES OF WEATHER

UNIT 2 Karachaganak Development Project Presented by Karachaganak Integrated Organisation

HSE Achievements

ISO 9001 - 2008

October 2010 – Excellent HS&E performance . Over 2,500 000 man hours expended

without LTI Presented by Karachaganak 4th Train Project Manager.

Outstanding HSE performance on 4th Train Project

ISO 9001 - 2008

Certificate of Achievement Awarded to IGS- Corporation to recognise 1992 - Outstanding

Performance on the 4th Train Project Presented by Karachaghanak Integrated Organisation.

ISO 9001 - 2008

2000-2010 Awards & Recognitions of IGS-Corporation LLC - 16.5 million man-hours

without a Lost Time Incident

IGS has always understood the critical importance of safety,

we constantly work to make safety our first priority. In fact, it’s our No. 1Core Value:

We put safety and quality of life first. Even one incident is still too many and IGS is

committed to working toward zero incidents on its job sites.

QUALITY MANAGEMENT SYSTEM

ISO 9001 - 2008

ISO 9001 - 2008

Since 1986 till now the IGS Companies -

IGS Intergasstroy and IGS Corporation LLC (before IGS-Sicim )

completed works of total amount

USD 1,000,000,000

ISO 9001 - 2008

Projects 1986-2004 years. IGS «INTERGASSTROY» JSC

Client Description of the work being performed by CONTRACTOR Location Project cost

USSR Ministry of Gas Industry

As general contractor of Minneftegasstroy on construction of Uralsk

gas complex facilities (Agreement between the government of USSR

and ChezhSSR)

Aksai –

Kazakhstan $ 448, 952, 800

1986 - 1994

1995

Client Description of the work being performed by CONTRACTOR Location Project cost

General Management of

Construction Committee of

Karachaganak oil and gas

condensate field

Unit-2 at Karachaganak field Gas pipeline branch to the village

Zharsuat.

-Gas Distribution Auto station: Pipeline installation , length 10.5 km

-Working pressure 50 kg-f/cm2

-3 Gas distribution Stations. Construction and Instrumentation works

Aksai –

Kazakhstan $ 1, 145, 236

ISO 9001 - 2008

Client Description of the work being performed by CONTRACTOR Location Project cost

SC ‘Zakazstroygas’ -Aksai-Dzhambeyta pipeline length 155 km. Pipe diametre 352 mm.

-Construction works.

Aksai –

Kazakhstan $ 8, 881, 499

1995 – 1997

1996 - 1997

Client Description of the work being performed by CONTRACTOR Location Project cost

KOS

-Unit-3 at Karachaganak field Gas Ventilating Compressor Building.

- Road repairs, pipe mechanical works, concrete works for pupm

building.

Aksai –

Kazakhstan $ 1, 064, 681

General Management of

Construction Committee of

Karachaganak oil and gas

condensate field

-Unit-2 at Karachaganak field

-Gas pipeline to wells.

-Overhaul repair of pipeline

Aksai –

Kazakhstan

Client Description of the work being performed by CONTRACTOR Location Project cost

‘Kazakhturkmunai’ JV -Above ground facilities construction at Yelemes-Oporny oil pipeline Mangystau $ 3 281 736

ISO 9001 - 2008

September, 1996 – 1997

Client Description of the work being performed by CONTRACTOR Location Project cost

‘Kazakhturkmunai’ JV -Saztube-Yelemes and Yelemes-Oporny pipelines construction Mangystau $ 1 149 105

May, 1997 – 1998

May, 1997 – December, 1998

Client Description of the work being performed by CONTRACTOR Location Project cost

‘Kazakhturkmunai’ JV -Yelemes-Saztube oil field construction Mangystau $ 4 253 404

ISO 9001 - 2008

1998 - 2000

Client Description of the work being performed by CONTRACTOR Location Project cost

KPO b.v.

Subcontractor of IGS-Sicim -Unit-3 at Karachaganak Early works.

Aksai –

Kazakhstan $ 6 749 472

1999

Client Description of the work being performed by CONTRACTOR Location Project cost

KPO b.v.

Subcontractor of IGS-Sicim

-Unit-3 Pipeline chemical cleaning.

-Work of Flowlines

Aksai –

Kazakhstan $ 28 447

ISO 9001 - 2008

Client Description of the work being performed by CONTRACTOR Location Project cost

Agip - British Gas -Regional Hospital reconstruction Aksai –

Kazakhstan $ 1 304 652

1998 – 2000

Client Description of the work being performed by CONTRACTOR Location Project cost

KPO b.v.

Subcontractor of IGS-Sicim

-Unit-3 Wells construction.

-Collection satellite of early oil, gas and condensate.

Aksai –

Kazakhstan

$ 2 761 019

1998

1999

Client Description of the work being performed by CONTRACTOR Location Project cost

Agip - British Gas -Karachaganak field construction

-Pavement plates supply

Aksai –

Kazakhstan

ISO 9001 - 2008

1999 – 2000

Client Description of the work being performed by CONTRACTOR Location Project cost

KPO b.v.

Subcontractor of IGS-Sicim -Unit-2 Early works (earthworks, foundation installation)

Aksai –

Kazakhstan $ 5 055 199,74

KPO b.v.

Subcontractor of IGS-Sicim

-Unit-3 interconnecting pipelines

-Main construction earthwork, welded joints quality control work,

isolation work

Aksai –

Kazakhstan

$ 1 918 712,23

2000 - 2001

Client Description of the work being performed by CONTRACTOR Location Project cost

KPO b.v.

Subcontractor of IGS-Sicim -Unit 2 Programme of 2000 year

Aksai –

Kazakhstan $ 8 193 737,56

KPO b.v.

Subcontractor of IGS-Sicim -Unit-3 Upgrade

Aksai –

Kazakhstan $ 3 179 066

2000 - 2001

Client Description of the work being performed by CONTRACTOR Location Project cost

Caspian Pipeline Consortium

-Atyrau pump station construction, reconstruction of existing Tengiz

pump station and pipeline work within the framework of Caspian

Pipeline Consortium.

Atyrau $ 8 506 430

KPO b.v.

Subcontractor of IGS-Sicim

-

Water tank lifting.

Aksai –

Kazakhstan

$ 340 000

ISO 9001 - 2008

2002 – 2004

Client Description of the work being performed by CONTRACTOR Location Project cost

PFD International LLC

KPO b.v.

Subcontractor of IGS-Sicim

-TCO Asset Development Projects Construction Camp Contract

N 571500-3-1029 for EPC and Commissioning

Reconstruction works – Airport in Uralsk

Atyrau

Uralsk –

Kazakhstan

$ 121 437 563

$ 658,604

KPO b.v.

Subcontractor of IGS-Sicim

-Karachaganak Gas Condensate Field Development Project . -

painting, isolation work

Aksai –

Kazakhstan

$ 1 054,063

2000 - 2004

Client Description of the work being performed by CONTRACTOR Location Project cost

Caspian Pipeline Consortium

-Atyrau pump station construction, reconstruction of existing Tengiz

pump station and pipeline work within the framework of Caspian

Pipeline Consortium.

Atyrau $ 2,822,078

KPO b.v.

Subcontractor of IGS-Sicim

- Karachaganak Gas Condensate Field Development Project .

Pipeline Udoman River- Unit 3

Aksai –

Kazakhstan

$ 1,203,868

ISO 9001 - 2008

2008 34 396 708 USD

2009 44 315 867 USD

2010 35 478 963 USD

2011 8 732 157 USD

2012 6 526 967 USD

2013 8 194 814 USD

2014 14 852 375 USD

2015 10 007 044 USD

Current contract Aksai

2016-2019 81 480 712 USD

TURNOVER LAST 8 YEARS OF IGS CORPORATION LLC.

Karachaganak Project 1998 - 2011

General information

ISO 9001 - 2008

KARACHAGANAK DEVELOPMENT PROJECT Previous Work Experience

ISO 9001 - 2008

Primary contracts on Karachaganak Project

Total Contract Amount USD 183,261,817

Executed Man-hours MH 7,120,000

Executed Equipment-hours MH 1,250,000

ISO 9001 - 2008

Earth works m3 800,000

Concrete works m3 50,000

Steel structures ton 12,000

Equipment manufacturing & installation ton 500

Piping fabrication works ” dia 50,000

Piping erection works ” dia 100,000

Road works km 15

Roads and rivers crossings No 100

SCOPE OF WORKS – PREVIOUS PROJECTS 1998-2005

ISO 9001 - 2008

Pipelines km 185

Piping m 14,000

E&I km 300

Tank works 2000 m3 each No 7

Insulation m2 15,000

Painting m2 36,000

Auger Piling 600mm dia No 358

ISO 9001 - 2008

SCOPE OF WORKS – PREVIOUS PROJECTS 1998-2005

Total Contracts Amount USD 70,996,817

Executed Man-hours MH 4,175,000

Executed Equipment-hours MH 750,000

ISO 9001 - 2008

Contracts on Karachaganak Project 2008-2011

Piping prefabrication works inch dia 97,358

Piping erection ton 2,895

Repairs rate % 1,7

Pipe Supports ton 237

Equipment installation ton 3118

Tanks erection No 2

ISO 9001 - 2008

SCOPE OF WORKS – PREVIOUS PROJECTS 2008-2011

Kashagan Development Project 2004 – 2010

General information

ISO 9001 - 2008

KASHAGAN DEVELOPMENT PROJECT

PREVIOUS WORK EXPERIENCE

ISO 9001 - 2008

Total Contracts Amount USD 146,929,346

Executed Man-hours MH 11,255,280

Executed Equipment-hours MH 2,353,000

KASHAGAN DEVELOPMENT PROJECT

ISO 9001 - 2008

SCOPE OF WORKS SITE PREPARATION

Piling installation No 28,800

Concrete works m3 11,360

Site Preparation m3 291,000

Earth work m3 114,000

Backfilling m3 106,000

Road works m 7,100

Road crossings (p/sleeve & d/bank) No 172

Grouting ton 155

Fencing m 12,000

ISO 9001 - 2008

SCOPE OF WORKS UTILITY PROJECT

Piling installation No 3,250

Concrete works m3 20,000

Excavation m3 151,000

Backfilling m3 151,000

Grouting ton 55

U/G network manholes No 179

ISO 9001 - 2008

Road crossings (p/sleeves & d/banks) No 62

Structural steel erection ton 2,000

Equipment erection works ton 1,240

Boilers assembling & erection No 3

Piping works ” dia 60,000

Painting works m2 24,000

Insulation works m2 5,400

SCOPE OF WORKS UTILITY PROJECT

ISO 9001 - 2008

BOILERS ERECTION A/B/C

ISO 9001 - 2008

SOUR WATER STRIPPER LIFTING

ISO 9001 - 2008

SCOPE OF WORKS – UTILITY PIPING PROJECT

Piping works ” dia 220,000

Piping Fabrication ton 1,600

Piping Erection ton 3,100

Repairs rate % 2,2

Pipe Supports ton 300

Painting works m2 6,000

ISO 9001 - 2008

Piling installation No 21,700

Auger Bore Piles 450mm dia No 105

Concrete m3 22,000

Rebar ton 1,850

Excavation m3 140,530

Backfilling m3 140,530

SCOPE OF WORKS – PLANT MAIN WORKS. CIVIL WORKS.

ISO 9001 - 2008

KARACHAGANAK DEVELOPMENT PROJECT 2016 - 2019

Current Work Load

ISO 9001 - 2008

Item No

Company Name

Description of the work being performed by CONTRACTOR

Location

1 KPO BV Provision of Mechanical, Piping and associated

services – Call off basis

Aksai -

Kazakhstan

Indirect personnel Resources 7

7

14

7

4

4

27

28

44

5

10

10

13

5

6

10

13

19

5

9

PROJECT MANAGER

CONSTRUCTION MANAGER

SUPERINTENDENT

PLANNING ENGINEER

QUALITY MANAGER

QC CO-ORDINATOR

QUALITY ENGINEER

QA/QC INSPECTOR

LABORATORY ASSISTANT

SAFETY MANAGER

SAFETY ENGINEER

TECHNICAL ENGINEER

SITE ENGINEER

SURVEYOR

DOCTOR/NURSE

DOCUMENT CONTROLLER

TIME KEEPER

SECRETARY

TRANSLATOR

MATERIAL CO-ORDINATOR

STORE KEEPER/ MATERIAL MAN

SITE SUPERVISOR

PROJECT MANAGER 7

CONSTRUCTION MANAGER 7

SUPERINTENDENT 14

PLANNING ENGINEER 7

QUALITY MANAGER 4

QC COORDINATOR 4

QUALITY ENGINEER 27

QA/QC INSPECTORS 28

LABORATORY ASSISTENTS 4

HSE MANAGER 4

HSE ENGINEER 9

TECHNICAL ENGINEER 5

SITE ENGINEER 10

SURVEYOR 10

DOCTOR/NURSE 1

DOCUMENT CONTROLLER 3

TIME KEEPER 5

SECRETARY 6

TRANSLATOR 10

MATERIAL COORDINATOR 5

STORE KEEPER 13

SITE SUPERVISORS 19

54

8

5

15

13

335

7

10

10

7

3

2

0

9

3

0

2

3

5

2

12

15

2

5

3

2

3

1

1

1

2

4

2

1

1

3

9 2 36

1

IGS Corporation IGS JSC

ISO 9001 - 2008

Peak of MP involvement ___________________________________________

Total: 1870

Manpower Resources

84

108

62

48

58

73

17

28

25

80

956792

45

368

222

21 16

159

FOREMAN 84

WELDER 108

PIPE FITTER 62

INSULATOR 48

FABRICATOR 58

STEEL ERECTOR 73

ELECTRICIAN 17

BLASTER 28

PAINTER 25

SCAFFOLDER 80

EQ. OPERATOR / DRIVER 159

CARPENTER 95

STEEL FIXER 67

MASON 92

RIGGER 45

UNSKILLED 368

SEMI SKILLED 222

MECHANIC 21

SECURITY 16

FOREMAN 84

WELDER 108

PIPE FITTER 62

INSULATOR 48

FABRICATOR 58

STEEL ERECTOR 73

ELECTRICIAN 17

BLASTER 28

PAINTER 25

SCAFFOLDER 80

EQ. OPERATOR 159

CARPENTER 95

STEEL FIXER 67

MASON 92

RIGGER 45

UNSKILLED 368

SEMI SKILLED 222

MECHANIC 21

54 23 42 4838

4871415

35

125

75679235

358

2026 6

`

30

85

20

2025101410

45

34

20

1010

2015 10

`

IGS Corporation IGS JSC

ISO 9001 - 2008

Plants & Equipment Resources

3

11

4

8

4

5

9

2

BATCHING PLANTS 3

SHELTERS 11

OFFICES 4

STEEL HANGERS 8

PAINT SHOPS 4

MECHANICAL REPAIR SHOPS 5

STORES 9

CANTEENS 2

BATCHING PLANTS 3

SHELTERS 11

OFFICES 4

STEEL HANGERS 8

PAINT SHOPS 4

REPAIR SHOPS 5

STORES 9

CANTEENS 2

110

21

18

21164

8

7

14

4

5

331

31

13

12

35

15

15

WELDING M/C

CRANES

CRANE – 300 TON

TRAILERS

GENERATORS

COMPRESSORS

SAND BLASTING

PAINTING SETS

PIPE BENDING

PUMPS

EXCAVATORS

DOZERS

LOADERS

GRADERS

CONCRETE PUMPS

CEMENT CARRIERS

CONCRETE MIXERS

WATER TANKERS

BUS/MINI BUS

PICK/CARS

TRUCKS

OTHER

WELDING MASHINES 110

CRANES 21

CRANE 300 T 1

TRAILERS 8

GENERATORS 21

COMPRESSORS 16

SAND BL. MASHINES 4

PAINTING SETS 8

PIPE BENDING MASH. 7

PUMPS 14

EXCVAVATORS 15

DOZERS 4

LOADERS 5

GRADERS 3

CONCRETE PUMPS 3

CEMENT CARRIERS 1

CONCRETE MIXERS 3

WATER TANKERS 1

BUSSES/MINIBUSSES 13

PICK-UPS/CARS 15

TRUCKS 12

OTHERS 35

ISO 9001 - 2008

Equipment

Plants

IGS Corporation future goals HSE ACHIVEMENTS

a. ZERO INCIDENTS/ ACCIDENTS

b. ZERO ENVIRONMENTAL POLUTION

c. 100% GOOD HEALTH OF EMPLOYEES

d. OHSAS 18001 HSE MANAGEMENT SYSTEM QUALIFICATION

MANPOWER & EQUIPMENT

a. INCREASING EQUIPMENT/ MANPOWER

b. TRAINING OF NATIONAL PERSONNEL

ISO 9001 - 2008

PROFESSIONAL ACHIVEMENTS

TO BE PRE-QUALIFIED FOR MEDIUM PROJECT WORKS BETWEEN 100 TO 150 MILLION USD

a. U/G AND A/G - CIVIL, STRUCTURAL, MECHANICAL, E&I PROJECTS

b. PIPING AND PIPELINE MAJOR PROJECTS.

c. HIGH PRESSURE PIPING/PIPELINE HYDROTESTING UP TO 1000 BARS

d. PILE DRIVING WORKS.

e. SCAFFOLDING, PAINTING, FIRE PROOFING AND INSULATION WORKS

f. BREAK WATER WORKS

g. CONSTRUCTION OF STORAGE TANKS

h. HEAVY LIFTING OPERATIONS

IGS Corporation future prospects

ISO 9001 - 2008

PROJECTS PHOTO GALLERY

ISO 9001 - 2008

Karachaganak field. Unit 3. INSTALLATION OF STEEL STRUCTURES AND DEGASSERS UNIT 3 ADMINISTRATION BUILDING

UNIT 3 METERING UNIT CONSTRUCTION OF FLOW LINES MANIFOLD 700ATM

ISO 9001 - 2008

Karachaganak field. Unit 2. ERECTION OF FIN FANS COOLERS RE-INJECTION GAS COMPRESSORS FOUNDATIONS

CONSTRUCTION OF PIPERACKS FOUNDATIONS CONSTRUCTION OF CHIMNEY FOUNDATIONS

ISO 9001 - 2008

Karachaganak field. Unit 2.

FOUNDATION PLINTHS FOR PIPERACKS STRUCTURES

CASTING OF BLINDING CONCRETE ERECTION OF STEEL STRUCTURES FOR PIPERACKS

ISO 9001 - 2008

WELDING CREWS

Pipelines Projects. WELDING CREWS

INTERNAL LINE-UP CLAMP LOWERING OF PIPELINE STRING

ISO 9001 - 2008

SEMI-AUTOMATIC AND MANUAL WELDING.

Pipelines Projects.

ISO 9001 - 2008

Construction of elevated water tank in Aksai for KPO b.v.

ISO 9001 - 2008

Construction of elevated water tank in Aksai for KPO b.v.

ISO 9001 - 2008

ISO 9001 - 2008

4th Stabilization & Sweetening Train – EQUIPMENT & PIPEWORK ERECTION PROJECT

ISO 9001 - 2008

4th Stabilization & Sweetening Train – EQUIPMENT & PIPEWORK ERECTION PROJECT

Thank you for attention !

ISO 9001 - 2008