PCA Forum 2008 and Members MeetingKuala Lumpur, 21-22 October 2008Nils Sandsmark, General Manager

Contents

History and requirementsVision, scope and architectureMaintenance and EnhancementsImplementations

History of ISO 15926

Based the EPISTLE information model from the early 1990iesThe first large scale implementations were ETAP in 1996 and Aasgard in 1997The principals and the technology have since been implemented by a number of software vendor (AVEVA, Bentley, EPMT, IBM, Innotec, Intergraph, Noumenon ---) and been use by many operators (BP, Chevron, Petronas, Shell, StatoilHydro, Total ---) and EPCs (Aker Kværner, Bechtel, Fluor, ---)The development of the ISO 15926 standard started in August 1997The first two Parts were published by ISO as International Standards (IS) in December 2003 and June 2004Phase 1 will be finalized in 2009

Requirements for Integration and Handover

ViikingDB

SAGAS-Div.

ProjectDB

EP ContractorEPC/SuppliersNymo

DB

DB

DB

Suppliers

InstallationContract TLP

TipasDB

•Terminology•Integration•Recognition•Life cycle aspects

•Proprietary applications•Overlapping scope•Proprietary data definitions

Requirements for IO G1 and G2

Traditional facilities

Real-timecollaboration

rooms

Automaticoptimization

Intelligent facilities Oil & gas

ontology

Generation 1• Terminologies for single domains• The basis for XML schemas for

automatic transferal of data between applications in same domain

Generation 2• Complete ontologies

supporting automated reasoning or inference of data using logical rules

• Taxonomies for multiple domains

IO Generation 2• Integrated operation centers of

operators and vendors• Heavily instrumented facilities• Heavy automation and multi-

domain optimization of processes

IO Generation 1• Integrated onshore and

offshore centers• Intra-domain optimization

of work processes

Contents

History and requirementsVision, scope and architectureMaintenance and EnhancementsImplementations

Vision of ISO 15926 - Integration and Life Cycle Aspects

P&I Diagram View

Valve PCV0321

3D CAD View

Data Sheet ViewSimulation, Analysis etc. View

ISO 15926 Original ScopeThe PISTEP Model for Life Cycle Activities

REGULATORYBODIES

CONTROL OPERATIONS& ENGINEERING

ACTIVITIES

OBTAINREGULATORY AGREEMENT

PRODUCEFEASIBILITY

CASE

SETENGINEERINGSTANDARDS

SUPPLIERS&

FABRICATORSPROCURE & CONTROL EQUIPMENT, MATERIALS & SERVICES

DECOMMISSIONPLANT

OPERATEPLANT

COMMISSION & HANDOVER

PLANT

DETAILEDPROCESS

DESIGN

CONCEPTUALPROCESS

DESIGN

DEMOLISH PLANT

MAINTAIN PLANT

CONSTRUCTPLANT

CONCEPTUALENGINEERING

DESIGN

DETAILEDENGINEERING

DESIGN

ISO 15926 Information Model

Conceptual Model (ANSI SPARC)Universal context

Based on logic and formal ontologyGood and consistent theoretical foundation

Consists of:Generic entity model

Reference data

Templates

ISO 15926 Architecture

Data Model

Standard

Classes

Manufactured

Item

Classes

Core

Classes

ISO 15926

ISO/IEC/CEN/ANSI/

etc.

ContentsProviders

The layers of the Semantic Web

URI UnicodeXML NameSpace

RDF model & syntaxRDF schema

OntologiesRules

LogicProof

Trust

basic technologies

how to make a statement

OWLPart 2

Part 4

Semantic Web View on Standards for IO

Contents

History and requirementsVision, scope and architectureMaintenance and EnhancementsImplementations

Maintenance and Enhancement of the Ontology

Submission area

Work In Progress(WIP)

ISO 15926Parts 4, ..

Deliveries fromnew projects

The WIP contenthas been QA by

the SIGs and TAB

The ISO contenthas been QA bythe ISO process

Browser

Web Services

Intelligent Data Sets – Accelerating Deployment of ISO15926

ISO 15926Reference Data

WIP

• Single global source for reference data

• Contains standardized product models

• Extensible• The “inbox” for ISO• Anybody can browse• Certified user can extend• All entries are permanent• Includes browser and SOA interfaces

ISO 15926 RDS/WIP

*) SIGs – Special Interest Groups

PCA’s Organization

Staff

Board of Directors

GeneralManager

Technical AdvisoryBoard (TAB)

SIGModeling,

Methodology & Technology

SIGHealth, Safety, Security

& Environment

SIGDrilling &

Completion

SIGReservoir &Production

SIGDevelopment &Modifications

SIGProcurement & Logistics

SIGOperation &Maintenance

Oil & GasOntology

SIGBasic RDL

Process PlantsOntology

SIGStatic Equipment

SIGElectrical

SIGHeat Transfer

SIGInstrumentation

SIGPiping & Valves

SIGRotating Equipment

SIGSubsea Equipment

17

Standards as Databases

18

Shorter development times: Faster revisions and extensions of existing standards

Standardized content in the form of reference data must increasingly be usable by computer applications

Content is visible beyond individual documents or committees and even during development Increase of consistency

Provision of machine-accessible reference data needed in business applications may become an important business area for standards bodies in the future

19

ISO Procedure for “ Maintenance and development of standards in database format”

New options – initiated by Change Request

Maintenance/withdrawal of some of the content:Normal database procedure [internal to

committee] - Duration: 3 – 6 months

New Work Items/major changes to content Extended database procedure [follows “traditional” ISO process]

Change Requests can be subdivided or consolidated as appropriate

20

Processing a Change Request

Proposer

TC/SC Secretary

MT – Maintenance Team

VT – Validation Team performs technical evaluation

Normal,Extended or Editorial?

21

The normal database procedure

22

The Validation Team

A permanent, “executive”, group of individuals appointed by and acting as delegates on behalf of their National Bodies, A-liaison organizations and committee-internal liaisons to validate proposed items and vote for their release as part of a database standard

All P-members, A-liaison organizations and committee-internal liaisons can appoint one member to the team.

minimum of 5 P-members

P-member representatives have the right to vote

A-liaisons and committee-internal liaison representatives may submit comments

Deputies should be appointed to avoid delays

Duration of appointment and any supporting network of experts at national level to be established by nominating bodies

Contents

History and requirementsVision, scope and architectureMaintenance and EnhancementsImplementations

Three methods of implementing ISO 15926

Standardise on templates and object models:Software vendors can produce functionality and test against standardised data exchanges

Owners and Contractors may ask for compliance against specific standardised templates calling up aspects of ISO 15926

Use ISO 15926 as a tool for mapping between systems Implement within a database

Instead of starting from scratch, use it as a single integrated model

E N G I N E E R I N G T H E F U T U R EE N G I N E E R I N G T H E F U T U R E

E N G I N E E R I N G & T E C H N O L O G Y E X C E L L E N C E

Frank MatthewsonCorporate Engineering Manager

POSC Caesar – Driving Change

26 8 0 5 92007 - POSC Caesar 10 Year Anniversary

E N G I N E E R I N G T H E F U T U R EE N G I N E E R I N G T H E F U T U R E

Interoperability Architecture

web service

WIP

WCF / WF

ProjectWiseExchange

StagingTable

ISO 15926Information Models

DataBrokerSmartPlantFoundation

ProjectWiseLifecycle

Server

XMpLantcXML AEX / GVCC(cfiXML)EDI

BizTalkServer

ProjectFinancial

Data

FinancialSystems

BSAP

BSAP

BSAP

T T T

TTT T

Bec

htel

Inte

rnet

SP

SP

SP

ReportingService

ISO 15926Reference Data

SharePoint

Project Portal

CIS/2 / IFC

T

T

T

ISO 15926

Asset Hub

T

ISO 15926

Bechtel

Microsoft

Intergraph

Bentley

Noumenon

T Adapter

Legend

Standard

NRX Global

T

Main Objectives

• The primary objective of the project is to develop:

A demonstrated reliable digital platform for Integrated Operation Generation 2 (IO G2) in the High NorthIO G2 pilots within drilling, R&P, O&M in the High NorthDecision Support for drilling, R&P, O&M

• IO G2 for the High North shall facilitate operations in remote and hazardous conditions, the use of limited operational personnel and “zero footprint” solutions

Roadmap

Year 1Requirements and

digital platform outline

Year 2Proof of concept for drilling, R&P, O&M

Year 3Consolidated

digital platform

Year 4IOG2 pilots for

drilling, R&P, O&M

• Business and system requirements

• System architecture and risk analysis

• Complete DPR, MPR and PRODML ontology

• Description of existing infrastructure in the High North

Main deliverables:1. Demonstrated

reliable digital platform for IOG2 in the High North

2. IOG2 pilots within drilling, R&P, O&M in the High North

3. Decision Support for drilling, R&P, O&M

ConceptualizationIndustrialization / Take-up

• Proof of concept for autonomous drilling control

• Proof of concept for autonomous QA of R&P data

• Proof of concept for condition based maintenance for sub-ice operations

• 1st increment of digital platform

• Pilot of highly automated drilling rigs

• Pilot of production regularity system

• Pilot of highly integrated O&M processes for sub-ice conditions

• Recommended practices for IOG2

• Final report

• Consolidated ontologies

• Dependable platform for shared data and services

• Gap analysis of IOG2 infrastructure for the High North

• Smart agent software for drilling control and production regularity

• IT Security and safety risk management guide

Summary (1)ISO 15926 is a standard for:

Representation of data

Defining consistent terminology, independent of use

Exchanging data using this terminology

Integrating data across applications

Integrating data across the life cycle

ISO 15926 is not a standard for:What to represent

• This is a user responsibility, you can represent what you choose

Standardising products• This is for the domain technical standardisation committees

Presentation formats for data• This is the responsibility of the actual system owners

Summary (2)The ISO 15926 principals and the technology have over the last 10 years been implemented by a number of software vendor and been use by many operators and EPCsPhase 1 of ISO 15926 will be completed in 2009 A better understanding of the data integration and quality challenge has increased the interest for dictionaries, taxonomies and ontologies including ISO 15926Users of reference data libraries are interested in feeding own extensions and improvements back into the standard. This includes ISO Technical CommitteesThe semantic web technology represents a great opportunity for improvements and acceleration of the development and implementationPOSC Caesar is an active organization in this development Co-operation is necessary in order to accelerate the work