ISM Test ISM Test Development Development Task Force Task Force
ReportReportJune 21, 2004June 21, 2004
Overview of status of Test Overview of status of Test DevelopmentDevelopment
Initial phase of matrix testing Initial phase of matrix testing complete.complete.
Additional data generated on two Additional data generated on two tests run to 300 hours.tests run to 300 hours.
Statistical data review of the initial Statistical data review of the initial phase of matrix is complete.phase of matrix is complete.
Test shows discrimination on CHWL, Test shows discrimination on CHWL, but other parameters unclear.but other parameters unclear.
Some of the Data so far…Some of the Data so far…
CHWL (mg) has CHWL (mg) has shown shown discrimination at discrimination at 200 hrs and 5.5% 200 hrs and 5.5% sootsoot
Precision is good, Precision is good, but the spread but the spread between oils between oils remains a concern remains a concern to some.to some.
0
1
2
3
4
5
6
7
8
PE SW LZ
ISMA1004
Some of the Data so far…Some of the Data so far…
OFDP (kPa) data is OFDP (kPa) data is unclear.unclear.
There is some level There is some level of separation, but of separation, but repeatability is of repeatability is of concern.concern.
0
100
200
300
400
500
600
700
800
PE SW LZ
ISMA1004
Some of the Data so far…Some of the Data so far…
Sludge (merit Sludge (merit rating) data is also rating) data is also unclear.unclear.
There seems to be a There seems to be a lab influence and it lab influence and it has also been noted has also been noted that not much that not much separation between separation between 1004 and ISMA is 1004 and ISMA is expected.expected.
0
1
2
3
4
5
6
7
8
9
10
PE SW LZ
ISMA1004
Some of the Data so far…Some of the Data so far…
Injector screw wt. Injector screw wt. loss (mg) data is loss (mg) data is also unclear.also unclear.
There was scuffing There was scuffing observed on many observed on many of the parts even of the parts even on some of the low on some of the low wear parts. wear parts. 0
10
20
30
40
50
60
70
80
90
PE SW LZ
ISMA1004
Some of the Data so far…Some of the Data so far…(300 hr. data)(300 hr. data)
CHWL maintains CHWL maintains discrimination at discrimination at 300 hrs and 300 hrs and increases spread, increases spread, but variability goes but variability goes up as well.up as well.
0
1
2
3
4
5
6
7
8
9
10
PE SW LZ
ISMA1004
Next Steps for ISM Next Steps for ISM DevelopmentDevelopment
Cummins has expressed a desire to Cummins has expressed a desire to move toward a higher level of soot in move toward a higher level of soot in the ISM test (6.0 min)the ISM test (6.0 min) This will require a modification to the This will require a modification to the
original matrix design. Additional tests original matrix design. Additional tests that will help develop a soot correlation that will help develop a soot correlation from 5.5% to 6.5% are now being built into from 5.5% to 6.5% are now being built into a revised matrix plan.a revised matrix plan.
Next phase of testing to begin once Next phase of testing to begin once new matrix if finalized an approved. new matrix if finalized an approved.
Cummins ISMCummins ISM
UPDATED Testing Plan to UPDATED Testing Plan to Determine Correlation with Determine Correlation with
the M11-EGRthe M11-EGR
Cummins ISM Test PlanCummins ISM Test Plan
Test in StagesTest in Stages Use Decision PointsUse Decision Points Use a Range of Oils – Quality Use a Range of Oils – Quality
Determined by Test Results/ModelsDetermined by Test Results/Models Poor (1004)Poor (1004) Borderline (1005)Borderline (1005) Good (830)Good (830) Great (ISMA)Great (ISMA)
Cummins ISM Test PlanCummins ISM Test Plan
STAGE1STAGE1COMPLETCOMPLETEE
SwRISwRI PEPE LZLZ
10041004 √√5.5% 5.5% SootSoot
√√5.5% Soot5.5% Soot
√√5.5% 5.5% SootSoot
ISMAISMA √√5.5% 5.5% SootSoot
√√5.5% Soot5.5% Soot
Cummins ISM Test PlanCummins ISM Test PlanSTAGE2STAGE2
PLANPLANSwRISwRI PEPE LZLZ
10041004√√
6.5% 6.5% SootSoot
ISMAISMA√√
6.5% 6.5% SootSoot
830830√√
6.5% Soot6.5% Soot√√
6.5% 6.5% SootSoot
10051005√√
6.5% 6.5% SootSoot
√√6.5% Soot6.5% Soot
Cummins ISM Test PlanCummins ISM Test Plan
Is the Correlation Similar to the M11 Is the Correlation Similar to the M11 EGR?EGR? No: Stop the MatrixNo: Stop the Matrix Somewhat: Complete Matrix by Somewhat: Complete Matrix by
Running the Reference Oil Twice in Running the Reference Oil Twice in Each Lab (6 Tests)Each Lab (6 Tests)
Yes: Complete Matrix by Running the Yes: Complete Matrix by Running the Reference Oil Once in Each Lab (3 Reference Oil Once in Each Lab (3 Tests)Tests)
Cummins ISM Test PlanCummins ISM Test Plan
SummarySummary Minimum Number of Tests for a Minimum Number of Tests for a
Successful Matrix: 14 (Previously 12)Successful Matrix: 14 (Previously 12) Maximum Number of Tests for a Maximum Number of Tests for a
Successful Matrix: 17 (Previously 16)Successful Matrix: 17 (Previously 16) Number of Tests in which Cummins Number of Tests in which Cummins
Provides Parts and Fuel in Stage 1 and Provides Parts and Fuel in Stage 1 and Stage 2: 11 (Previously 8) Stage 2: 11 (Previously 8)
Cummins ISM Test PlanCummins ISM Test Plan
New Lab Requirements (1New Lab Requirements (1stst Stand) Stand) 2 Runs on ISMA at 6.5% Soot Target2 Runs on ISMA at 6.5% Soot Target 1 Run on 1004 at 6.5% Soot Target1 Run on 1004 at 6.5% Soot Target
Next Steps for ISM Next Steps for ISM DevelopmentDevelopment
Questions remain about the ability of the Questions remain about the ability of the ISM to be a full replacement test for the ISM to be a full replacement test for the M11-EGR and M11 HST. Pending the M11-EGR and M11 HST. Pending the outcome of phase 2 of the test matrix, outcome of phase 2 of the test matrix, there are two paths forward.there are two paths forward. Path 1 – data shows appropriate Path 1 – data shows appropriate
discrimination and correlation such that the discrimination and correlation such that the ISM is a suitable replacement for the M11-ISM is a suitable replacement for the M11-EGR/HSTEGR/HST
Path 2 – Continue to use M11EGR for current Path 2 – Continue to use M11EGR for current category and use ISM for PC10. category and use ISM for PC10.
Items still pending in ISM Items still pending in ISM developmentdevelopment
Formalized test procedureFormalized test procedure Further operational review and Further operational review and
refinements. (activities planned for refinements. (activities planned for later this month)later this month)
Review of Test parts and Test KitsReview of Test parts and Test Kits
Current timing for the ISM Current timing for the ISM Development and start of Development and start of
MatrixMatrix 6/21/04 Review revised matrix plan.6/21/04 Review revised matrix plan. 6/28/04 (week of) operational data 6/28/04 (week of) operational data
reviewed from matrix runsreviewed from matrix runs 7/5/04 (week of) Begin phase 2 of 7/5/04 (week of) Begin phase 2 of
matrix testingmatrix testing 8/16/04 (week of) review data phase 8/16/04 (week of) review data phase
2 matrix testing.2 matrix testing. Make recommendation on path forward Make recommendation on path forward
for ISM (PC10 or replacement test)for ISM (PC10 or replacement test)
Final Items of NoteFinal Items of Note
The ISM Test Development Task Force plans The ISM Test Development Task Force plans to make the decision to proceed with the to make the decision to proceed with the phase 2 matrix testing, once the S.P. has phase 2 matrix testing, once the S.P. has agreed to the plan. agreed to the plan.
The ISM Test Development Task Force will The ISM Test Development Task Force will keep the Cummins Surveillance Panel keep the Cummins Surveillance Panel informed of our activities and meetings. informed of our activities and meetings.
Task Force will provide recommendations on Task Force will provide recommendations on data review, but we will need final S.P. data review, but we will need final S.P. direction on discrimination data and direction on discrimination data and correlation data. correlation data.
Questions or Questions or Comments from Comments from the Surveillance the Surveillance
PanelPanel