ISE 6 Phase 2 Demo Scenario. Sept 11, 2008 NSWC CD. Current Issues. Confirm data exchange scenario Define level of NSWC PHD / Raytheon participation Discuss details of IPT CAD modeling Start to define demo data HVAC system HVAC system PLCS logistics data HVAC system S1000D modules. - PowerPoint PPT Presentation

Citation preview

Page 1: ISE 6 Phase 2 Demo Scenario

ISE 6 Phase 2 Demo Scenario

Sept 11, 2008

NSWC CD

Page 2: ISE 6 Phase 2 Demo Scenario

2

Current Issues

• Confirm data exchange scenario

• Define level of NSWC PHD / Raytheon participation Discuss details of IPT CAD modeling

• Start to define demo data– HVAC system

– HVAC system PLCS logistics data

– HVAC system S1000D modules

Page 3: ISE 6 Phase 2 Demo Scenario

3

ISE 6 Phase 2 Demo Scenario• Dual Band Radar, provided by NSWC PHD, is incorporated into LPD 17

and DDG 1000 design.

• Export selected Dual Band Radar system from LPD IDE as PLCS data with S1000D data modules

• PLCS data modified to allow importation into DDG 1000 IDE

• PLCS data imported into DDG 1000 IDE

• New Mod of Dual Band Radar is developed and authorized for use

• New radar cabinets generate more heat, require additional cooling in the space

• New cooling requirements passed to Shipyard Engineering

• HVAC system is redesigned

• Affected S1000D data modules for HVAC system IETM are updated

• HVAC system IETM updated

• Updated design passed to LEAPS

Page 4: ISE 6 Phase 2 Demo Scenario

4

PLCS & S1000D: Functional Scenario

Shipyard B Design(3D CAD Data)

Shipyard B IDE(Update Tech Pub)

Navy IDE(Design & Analysis)

Shipyard A IDE(Design, Logistics, Support)

Data Prep & QA(Design, Logistics, & CAD)

Navy ISEA(GFE Change)

Page 5: ISE 6 Phase 2 Demo Scenario

5

TeamcenterDDG 1000 IDE Software

LEAPSNavy Design & Analysis

Repository

ShipConstructor2006

ShipConstructor2008

Design

Navy IDEAIM/SIR

LPD 17 IPDE Software

Shipyard A IDE

Shipyard B IDE

episTreeKnowledge Management

Software

3D Design

New Support Requirements

AP 239 + S1000D

AP 227HVAC

AP 227HVAC

AP 239 + S1000D

Common Source DB

NAVSEA / Navy ISEA

Ship AltChanges

PLCS & S1000D: Exchange Scenario

AP 239 Radar data

Page 6: ISE 6 Phase 2 Demo Scenario

6Updated

Requirements

PLCS & S1000D: Data Scenario

DM 1.1

DM 1.2

DM 1.3

Chillers

Duct 1

Chiller 2

Duct 2

HVAC SysDrawing2

DM 2.3

DM 2.2

HVAC SysIETM 1

HVAC SysIETM 2

ISEA IDE (Radar)

DM 1.1

DM 1.2

Mod 1RadarIETM

Mod 1

DM 1.3Mod 2

DM 2.1

Mod 2RadarIETM

DM 2.2

Chiller 1

HVAC Sys

HVAC Ducts

HVAC SysDrawing1

Shipyard Design & IDE

Page 7: ISE 6 Phase 2 Demo Scenario

7

Demo Data

• HVAC system PLCS data– Similar to last year’s demo

– Equipment – chiller?

– AP 227 implications

• HVAC system Tech Manual / Data Modules– Need to define minimal TM content, divide into DM

– Define DMC structure

– Define necessary metadata

Page 8: ISE 6 Phase 2 Demo Scenario

8

Backup

Page 9: ISE 6 Phase 2 Demo Scenario

9

AIM/SIRLPD 17 IPDE Software

TeamcenterDDG 1000 IDE Software

episTreeKnowledge Management

Software

LEAPSNavy Design & Analysis

Repository

CATIA(V4 AEC)

ShipConstructor2006

ShipConstructor2008

AP 227

AP 227

AP 239

AP 214

Design Navy IDE

Shipyard A - IDE Shipyard B - IDE

3D Design

Design & Logistics

Design & Logistics

AP 214

AP 239

Design & Logistics,including 3D Design

AP 239

AP239/PLCS (ISE-6 Phase 1) Demo Scenario

Page 10: ISE 6 Phase 2 Demo Scenario

10

PLCS & S1000D: Functional Scenario

Shipyard A Design(3D CAD Data)

Shipyard A IDE(Update Tech Pub)

Navy IDE(Design & Analysis)

Navy Depot(Design, Logistics, Support)

Data Prep & QA(Design, Logistics, & CAD)

Navy ISEA(GFE Change)