12
Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public. इंटरनेट मानक !ान $ एक न’ भारत का +नम-णSatyanarayan Gangaram Pitroda “Invent a New India Using Knowledge” प0रा1 को छोड न’ 5 तरफJawaharlal Nehru “Step Out From the Old to the New” जान1 का अ+धकार, जी1 का अ+धकारMazdoor Kisan Shakti Sangathan “The Right to Information, The Right to Live” !ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता ह Bharthari—Nītiśatakam “Knowledge is such a treasure which cannot be stolen” IS 7363 (1993): Inland vessels - Test and trials for harbour tugs [TED 18: Inland, Harbour Crafts and Fishing Vessels]

IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

Disclosure to Promote the Right To Information

Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.

इंटरनेट मानक

“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda

“Invent a New India Using Knowledge”

“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru

“Step Out From the Old to the New”

“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan

“The Right to Information, The Right to Live”

“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam

“Knowledge is such a treasure which cannot be stolen”

“Invent a New India Using Knowledge”

है”ह”ह

IS 7363 (1993): Inland vessels - Test and trials forharbour tugs [TED 18: Inland, Harbour Crafts and FishingVessels]

Page 2: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of
Page 3: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of
Page 4: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

4s 7363 :1s93

( Reaffirmed 1998)II

<(l14wl~*

hdlan Standard

INLAND VESSELS — TESTS AND TRIALS FORHARNNJR TUGS

LIDC 629”12-72:62”1”89

March i993

BU REAL! OF lNDIAN STANDARDSMANA-K LUiAVAN, 9 BAHADUR SHA-H ZAFAR MARCI

WEN DELHI 2000111

PriceGrrmp 3

Page 5: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

Inland and Harbour Craft.Sectional Committee, TED 18

FOREWORD

This Indian Standard was adopted by the Bureau of Indian Standards, after the draft finalized by the Shipbuilding Sectional Committee had been approved by the Trancport Engineering Division Council.

This standard lays down tests to be carried out on harbour tugs and was issued in 1974. The present revision of the standard has been taken to align the standard with the current trade practices.

With the increase in size of both tankers and bulk carriers and the advent of specialized ships requiring a short turn around time, it has become necessary to increase the port facilities to meet these requirements. This directly makes it apparent that reappraisal of the requirements of the harbour berthing tug is a necessity, developments are under way to equip some of the larger tonnage ships with special devices for manoeuvring and berthing. These special devices are only complementary to the berthing tugs.

The word ‘tug’ is now used universally in the material handling world to cover units for pushing or towing and these units are readily adapted to suit specialized application.

Nowadays when there is a wide variety of tugs available for selection, a basis for assessing their performance for acceptance will be extremely helpful to tug owners.

The composition of Committee responsible for the preparation of this standard is given at Annex A.

In reporting the results of a test or analysis made in accordance with this standard, if the fmal value, observed or calculated, is to be rounded off. it shall be done in accordance with IS 2 : 1960 ‘Rules for rounding off numerical values (revised)‘.

Page 6: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

IS 7363 : 1993

Indian Standard

INLANDVESSELS-TESTSAND HARBOURTUGS ( First Revision )

TRIALSFOR

1 SCOPE

1.1 This standard lays down tests to be carried out on harbour tugs for assessing their performance for acceptance.

2 TESTS BEFORE CONSTRUCTION

2.1 Hull Model Test

Hull model test shall be carried out (unless/otherwise guaranteed by the builder, based on the proven hull form) in any of the approved experiment tank to:

a) confirm the sufficiency of the prime mover with the hull proposed, to obtain the required/ specified free running speed and bollard pull on trials under the limiting condition of draught and displacement proposed and also to consider minor modifications in form likely to increase propulsive efficiency, if necessary, taking into account operations in restricted depths of water.

b) determine the most suitable form of bilge keels. and the positions at which they shall be attached to the hull, to reduce the power absorbed to a minimum.

c) confirm that the propeller proposed is satisfactory under the light and loaded conditions specified for speed as well as static bollard pull.

2.2 Hydrostatic Data

The following information regarding displacement shall be obtained before the construction is started:

a>

b)

c>

Estimated draught of the tug, with maximum allowance of + 50 mm.

Trim diagram to arrive at actual displacement and draught before and after in service conditions.

Hydrostatic curve showing the displacement scale, with curves of tonnes/cm, moment to change trim, longitudinal centre of buoyancy and flotation and vertical and longitudinal position of metacentre and also the co- efficients.

3 Test During Construction

3.1 Test certificates for materials used in the

1

construction of tugs shall be produced by the builder to the inspecting authority if so required by the purchaser.

3.2 If desired by the purchaser, the builder shall ensure that the machinery and the equipment installed on the vessel are duly certified to be in conformity with the requirements of statutory authorities and classification societies.

4 TESTS AFTER CONSTRUCTION

4.1 Inclining Experiment

Soon after the completion of construction of the tug, the builder shall carry out an inclining experiment in the presence of the owner’s representatives and representative of statutory authorities. The experiment shall be carried out in fair weather and in calm water, preferably in sheltered waters or docks, the tug so placed as to avoid any effects of the wind and waves on the inclination of the vessel. During the experiment, all tanks shall be emptied or accounted for and the bilge shall be dry and no loose weights or materials, liable to shift, shall be on board except the inclining weights and righting weights which may be required to correct any list before the commence- ment of the inclining experiment. A careful check shall be made of the weights used and a complete record of all the weights including the number of persons on board the vessel, during the experiment shall be maintained. Based on the results of this inclining experiment and the hydrostatic data as per 2.2(c), the builders shall supply the final stability curves (stability booklet including cross curves of stability).

5 DOCK TRIALS

5.1 Before the tug leaves her moorings the deck for basins

a)

b)

c)

trials shali be carried out as follows:

Main and auxiliary machinery running easy for 4 hours for testing, adjustment, flushing of pipe system, etc;

Auxiliary generator and compressor unit running for two consecutive hours, carrying out specified duties satisfactorily; and

Testing of electrical installations including main and auxiliary generators.

Page 7: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

IS 7363 : 1993

5.2 The following trails may be conducted in lieu of trials indicated in 5.1:

a) Main engine run at 20 percent load;

b) Diesel generator trials consisting of:

i) performance trials at:

30 percent full load - 1/2h 50 percent full load - l/2 h 80 percent full load - lh

100 percent full load - 2h 110 percent full load - 2%h

ii) Governor test

iii) Overload trip test

iv) Testing of paralleling equipment including reverse current protection.

c) Auxiliary units like pumps, compressors, centrifuges shall be run for 1 h (or as agreed upon to carry out specified duties satisfactory,

d) Steering trial consisting of checking of:

i) The operation of the gear and its change- over arrangement.

ii) Synchronisation of rudder indicators.

e) Warning devices.

6 HABBOIJB TBIALS

6.1 Bollard Pull Trial

The bollard pull test shall be carried out in still water with the dynamometer secured to bollard by chain and resting on a smooth surface, preferably a steel plate. Length of the tow rope shall be according to requirements. Dynamometer readings shall be carefully recorded. Pull shall be recorded at four engine settings of 70, 80, 90 and 100 percent of specified full load, for specified rpm at full speed the vessel shall swing over from one side to the other until the tow rope is at least 40° on either quadrant. A duration of two minutes shall be taken for each pull with one minute interval in between. The quick release mechanism shall be demonstrated as well as any other tests as deemed necessary by the purchaser’s representatives present at the trials. Dynamometer shall be calibrated before and after the trials.

6.1.1 Similar tests shall be carried out for ahead pull. All engine driven auxiliaries which normally run shall be operated during bollard trial.

6.2 Auxiliary Engine Trial

All auxiliary engines shall be tested for continuous rumiing at full power as follows:

a) Main and auxiliary generator and compressor sets, six hours continuous rumiing during which records shall be made of full connected load temperatures, overload release, speed and load regulation.

b)

cl

At the termination of the generator tests the insulation resistance of the wiring throughout the vessel shall be checked to ensure compliance with requirements.

Fresh water and sanitary systems shall be thoroughly tested over a period of two hours.

7 SEA TRIALS

7.1 Main Engine Testing

This test shall be carried out as follows:

a>

b)

c>

4

Six hours at continuous rated BHP complete with fluid couplings, gear boxes and controls;

One hour at 10 percent overload immediately following eight hours test;

Governor, between minimum rpm to rated rpm and by throwing off’ load; and

rpm at which overspeed trip operates shall be recorded.

7.2 Auxiliary Set Testing

The main and auxiliary generator, hydraulic pump and compressor sets shall be tested as complete units with generator, air compressor and hydraulic pump rumiing simultaneously.

Derating of diesel engines shall also be effected in a similar manner to the main engines.

These tests shall include:

a> b) c> 4

six hours at continuous rated power,

half an hour governor test,

overload trip to be tested: and

testing of parallel equipment including reverse current trip.

7.2.1 All main auxiliary equipment shall be run during the test.

7.3 Speed Trial

The speed trials shall be carried out in the specified loaded condition soon after the completion of the harbour trials and shall consist of:

a) four rum over an approved measured distance at 80 percent power, two runs with and two runs against the tide; and

b) four runs over an approved measured distance at full power, two runs with the two runs against the tide.

7.4 Manoeuvring and Turning Trials

The diameter of the turning circle shall be measured at the maximum speed under 35’ of helm both port and starboard. The builder shall provided all necessary

2

Page 8: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

instruments for the accurate plotting of the turning circle. The time taken for one complete turning circle each way shall be recorded. Turning circle diameter shall not exceed two and a half lengths. Manoeuvring time for the following operations shall be carefully measured and recorded at loaded conditions. In case of twin screw tugs, the effect on turning/manoeuvr- ing by running either of the screw shall also be recorded. Angle of heel during the turning trial shall also be recorded:

a) Ship steaming full speed ahead and the engine rest telegraph pull to full astern:

1) 2) 3)

4)

5)

6)

time taken to stop engines,

time taken to reverse engines,

time taken for engines to reach full astern,

time taken for vessel to stop,

time taken for vessel to gain sternway for stationary position, and

time taken for vessel to gain full sternway from stationary position.

Engine shall be kept at full astern for 1.5 minutes during which time the effect of the helm upon steering shall be tested.

b)

c>

4

On completion of 15 minutes in the astern condition, the procedure shall be reversed and records similarly taken at given in (a) above.

Manoeuvring trials using the propellers shall be carried out and the diameter of the turning circle measured, along with the time taken under different conditions as considered necessary by the purchaser’s representative.

Ability of the vessel to maintain a straight course both in ‘ahead’ and ‘astern’ conditions, without using the rudders shall be tested. It may be waived out for river run.

7.5 Steering Trials

With the vessel steaming full speed ahead, time required for the following operations of the helm shall be recorded:

Midships to hardover starboard,

Hardover starboard to midships,

Midships to hardover port,

Hardover port to midships,

Hardover port to hardover starboard,

Hardover starboard to hardover port, and

Emergency steering/auxiliary steering controls to be tried to satisfaction.

The timings recorded for the above operations shall conform to the statutory regulations.

IS 7363 : 1993

With the vessel at full astern, in which condition the rpm shall be at two-thirds of rpm at full speed ahead, the procedure mentioned above shall be repeated.

7.6 Anchoring Trials

The anchoring test shall be carried out as follows:

a>

b)

c>

4

Lower starboard anchor to water line and let go four lengths of cables (110 m) using the hand-brake.

Lower port anchor to water line and let go four lengths of cables (110 m) using the hand- brake.

Heave two lengths of port anchor cable. The average speed for this operation shall not be less than 9 m per minute .

Heave remaining two lengths of both anchors simultaneously. Note the time for this operation and the average speed assessed shall not be less than 9 m per minute.

NOTE - The depth of water may not permit full suspension of the anchor and cable during the tests, in which case the requirements shall be agreed to between the purchaser and the builder.

7.7 Endurance Trial

One to and fro endurance trial trip shall be carried out between two points as agreed to between the builder and the purchaser. During the trial, the record of fuel consumption and temperature shall be maintained.

8 INSPECTION AFTER TRIALS ANI) TESTS

8.1 The vessel may bc dry docked for thorough inspection, parts of the main and auxiliary machinery, fittings, etc, dismantled, if necessary, for inspection. All defects noticed during trials and subsequent inspection of the vessel shall be made good by the builder.

9 TESTING OF FIKE FIGHTING E~UIPMEN’I AND BILGE PUMPS

9.1 The following timings shall be recorded:

a) Time required to pump at full pressure from receipt of order,

b) Time taken to change over to alternate set of machinery; and

c) Time taken to fit foam nozzles and deliver foam both for monitors and hoses.

9.2 Bilge pump shall also bc tested for proper running.

9.3 Any other tests deemed necessary may be carried out as agreed to between the builder and the purchaser. Accessibility of all stores and equipment ladder may also be tested.

3

Page 9: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

IS 7363 : 1993

Chairman

SHRI S. CHANDRA

Members

SHRI S. N. BASSI SHRI S. N. BASSI SHRI S. DANDAPAT

SHRI S. &ATIA ( Alternate I

ANNEX A

( Foreword )

COMMITTEE COMPOSITION

Inland and Harbour Crafts Sectional Committee, TED 18

DIRECTOR (MECHANICAL) ’ Ex-ENGINEER (MECH) ( Alternate )

DR J. P. GHOSE DR R. P. G~KRAN ( Alternate )

SHRI P. R. G~VIL SHRI APURBA RANJAN KAR SHRI R. K. KHATTAR

SHRI S. P. DEOKULIAR ( Altermite ) SHRI MADAN L. KOCHHAR

SHRI P. K. BANER~I ( Alternnte ) . SHRI V. KUMAR

SHRI P. MITRA ( Alternate ) SHRI M. E. MADHUSUDAN

SHRI K. K. TIWARI ( Alternate ) SHkI P. MITRA CAPT P. B. PATNAIK

SHRI ASHOK DEY ( Alternate ) SHRI D. K. SAHA

SHRI S. DU~TA ( Alternate ) SHRI K. SARKAR SHRI A. SENGUPTA

SHRI B. R. K. GUPTA ( Alternate ) SHRI J. D. GROVER ( Alternate )

CAPT D. SENGUPTA SHRI R. Roy CHOUDHURY ( Alternate )

HEAD OF STANDARD CELL HEAD OF FORWARD DESIGNS GROUP I Altertzate j

DY - CHIEF S&EYOR SHRI P. B. WARRIER

SHRI M. C. BHATIA ( Alternate ) CMDE R. K. WING CMDE R. NATH ( Alternate )

SHRI N. S. VUAYARAGHAVAN, Director (TED)

Convener

SHRI GUATAM SEN

Members

CDR R. K. BHATIA, VSM CDR S. SUBRAMANIAN ( Alternate )

SHRI S. K. BHATIA SHRI K. K. TIWARI ( Alternate )

CHIEF SURVEYOR TO THE Govr OF INDIA SHRI A. K. CHOPRA SHRI S. DANDAPAT

SHRI M. S. GANAPATHI ( Alternate )

Representing

Indian Register of Shipping, Bombay

Garden Reach Shipbuilders & Engineers Ltd, Calcutta Confederation of Engineering Industry, New Delhi Inland Waterways Authority of India, New Delhi

Ministry of Surface Transport (Development Wing), New Delhi

Indian Institute of Technology, Kharegpur

Ministry of Surface Transport (Shipbuilding & Shiprepair Wing), New Delhi Hooghly Dock & Port Engineers Ltd, Howarh Bombay Port Trust, Bombay

American Bureau of Shipping, Bombay

Shipyard Association of India, Bombay

Directorate General of Technical Development, New Delhi

Alcock Ashdown and Co Ltd, Bhavnagar Dredging Corp of India, Visakhapatnam

Central Inland Water Transport Corporation Ltd, Calcutta

Ship Consultants, Calcutta Lloyd’s Register of Shipping, Bombay

Calcutta Port Trust, Calcutta

Mazagon Dock Ltd, Bombay

Directorate General of Shipping, Bombay Bureau Veritas, Bombay

Indian Navy, New Delhi

Director General, BIS ( Ex-ofi& Member )

Secretary

SHRI N. S. JUDGE Director (TED), BIS

Port Craft Subcommittee, TED 18: 1

Representing

Calcutta Port Trust, Calcutta

Directorate of Naval Architecture, Naval Headquarters, New Delhi

Directorate General of Technical Development, New Delhi

Directorate General of Shipping, Bombay Indian Register of Shipping, Bombay Inland Waterway Authority of India, Noida (Dist. Ghaziabad)

4

Page 10: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

L_..--_.. . . . . _ _,,_ “.____II^ ._.._- _..- - .._.. . ._ . . .I

IS 7363 : 1993

Port Craft Subcommittee, TED 18:l (Con&L)

Members

DIRECTOR (MECHANICAL) Ex ENGINEER (MECH) ( Alrenzate )

SHRI S. K. GHO~H SHRI D. ,L. J. PHILLIPS ( Ahmate )

SHRI N. J. GOSAVI SHRI E. J. CARRI ( Alternate )

SHRI R. K. KHAT~AR SHRI S. P. DEOKULIAR ( Alternate )

SHRI P. SURESH NAYAK SHRI D. K. SAHA

SHRI S. D~T~A ( Alternate ) SHRI C. A. SEB.UXIAN

SHRI V. RAMDADOSS ( Alternate ) SHRI A. SENGUPTA

SHRI J. D. GROVER ( Alternate ) SHRI M. K. SENGUPTA CAPT R. K. VIG

CDR MANMOHAN SINGH ( Alternate )

Representing

Ministry of Surface Transport, New Delhi

Hoogbly Docking & Engineering Co, Howrah

Mazagon Dock Ltd, Bombay

Bombay Port Trust, Bombay

Goa Barrage Owners’ Association, Vasco-da-Gamma (Goa) Central Inland Water Transport Corp Ltd, Calcutta

Madras Port Trust, Madras

Lloyd’s Register of Shipping, Bombay

Garden Reach Shipbuilders & Engineers Limited, Calcutta Directorate of Standardization, Ministry of Defence (NHQ), New Delhi

5

Page 11: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

Standard Mark

The use of the Standard Mark is governed by the provisions of the Br~eau Q/” Ztuliurl Stmtlurtls Act, lY86 and the Rules and Regulations made thereunder. The Standard Mark on products covered by an Indian Standard conveys the assurance that they have been produced to comply with the requirements of that standard under a well defined system of inspection, testing and quality control which is devised and supervised by RIS and operated by the producer. Standard marked products are also continuously checked by BIS for conformity to that standard as a further safeguard. Details of conditions under which a licence for the use of the Standard Mark may be granted to manufacturers or producers may be obtained from the Bureau of Indian Standards.

Page 12: IS 7363 (1993): Inland vessels - Test and trials for ... › pub › in › bis › S13 › is.7363.1993.pdf · IS 7363 : 1993 5.2 The following trails may be conducted in lieu of

Bureau of Indian Standards

BIS is a statutory institution established under the Bureau of Indian Stnndards Act, 1986 to harmonious development of the activities of standardization, marking and quality certification and attending to connected matters in the country.

Copyright

promote of goods

BIS has the copyright of all its publications. No part of these publicdtions may be reproduced in any form without the prior permission in writing of BIS. This does not preclude the free use, in the course of implementing the standard, of necessary details, such as symbols and sizes, type or grade designations. Enquiries relating to copyright be addressed to the Director ( Publications ), BIS.

Review of Indian Standards

Amendments are issued to standards as the need arises on the basis of comments. Standards are also reviewed periodically; a standard along with amendments is reaffirmed when such review indicates that no changes are needed; if the review indicates that changes are needed. it is taken up for revision. Users of Indian Standards should ascertain that they are in possession of the latest amendments or edition by referring to the latest issue of ‘BIS Handbook’ and ‘Standards Monthly Additions’. Comments on this Indian Standard may be sent to BIS giving the following reference :

Doc:No. TED 18 (767)

Amendments Issued Since Publication

Amend No. Date of Issue Text Affected

BUREAU OF INDIAN STANDARDS

Headquarters:

Manak Bhavan. 9 Bahadur Shah Zafar Marg, New Delhi Telephones : 331 01 31, 331 13 75

I 10002

Regional Offices:

Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg NEW DELHI 110002

Eastern : l/14 C. 1. T. Scheme VI1 M, V. I. P. Road, Maniktola CALCUTTA 700054

Northern : SC0 445-446, Sector 35-C, CHANDIGARH 160036

Southern : C. 1. T. Campus, IV Cross Road, MADRAS 600113

b Western : Manakalaya, E9 MLDC, Marol, Andheri ( East )

BOMBAY 400093

Telegrams : Manaksanstha ( Common to all Offices )

Telephone

I

331 01 31 331 I3 75

1

37 84 99, 37 85 61 37 86 26, 37 86 62

1

53 38 43, 53 I6 40 53 23 84

{ 235 02 16, 235 04 42 235 15 19, 235 23 I5

632 92 95, 632 78 58 632 78 91, 632 78 92

Branches : AHMADABAD. BANGALORE. BHOPAL. BHUBANESHWAR. COIMBATORE. FARIDABAD. GHAZIABAD. GUWAHATI. HYDERABAD. JAlPUR. KANPUR. LUCKNOW. PATNA. THIRUVANANTHAPURAM.

Printed at Printrade, New Delhi, India