Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Disclosure to Promote the Right To Information
Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.
इंटरनेट मानक
“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda
“Invent a New India Using Knowledge”
“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru
“Step Out From the Old to the New”
“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan
“The Right to Information, The Right to Live”
“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam
“Knowledge is such a treasure which cannot be stolen”
“Invent a New India Using Knowledge”
है”ह”ह
IS 7363 (1993): Inland vessels - Test and trials forharbour tugs [TED 18: Inland, Harbour Crafts and FishingVessels]
4s 7363 :1s93
( Reaffirmed 1998)II
<(l14wl~*
hdlan Standard
INLAND VESSELS — TESTS AND TRIALS FORHARNNJR TUGS
LIDC 629”12-72:62”1”89
March i993
BU REAL! OF lNDIAN STANDARDSMANA-K LUiAVAN, 9 BAHADUR SHA-H ZAFAR MARCI
WEN DELHI 2000111
PriceGrrmp 3
Inland and Harbour Craft.Sectional Committee, TED 18
FOREWORD
This Indian Standard was adopted by the Bureau of Indian Standards, after the draft finalized by the Shipbuilding Sectional Committee had been approved by the Trancport Engineering Division Council.
This standard lays down tests to be carried out on harbour tugs and was issued in 1974. The present revision of the standard has been taken to align the standard with the current trade practices.
With the increase in size of both tankers and bulk carriers and the advent of specialized ships requiring a short turn around time, it has become necessary to increase the port facilities to meet these requirements. This directly makes it apparent that reappraisal of the requirements of the harbour berthing tug is a necessity, developments are under way to equip some of the larger tonnage ships with special devices for manoeuvring and berthing. These special devices are only complementary to the berthing tugs.
The word ‘tug’ is now used universally in the material handling world to cover units for pushing or towing and these units are readily adapted to suit specialized application.
Nowadays when there is a wide variety of tugs available for selection, a basis for assessing their performance for acceptance will be extremely helpful to tug owners.
The composition of Committee responsible for the preparation of this standard is given at Annex A.
In reporting the results of a test or analysis made in accordance with this standard, if the fmal value, observed or calculated, is to be rounded off. it shall be done in accordance with IS 2 : 1960 ‘Rules for rounding off numerical values (revised)‘.
IS 7363 : 1993
Indian Standard
INLANDVESSELS-TESTSAND HARBOURTUGS ( First Revision )
TRIALSFOR
1 SCOPE
1.1 This standard lays down tests to be carried out on harbour tugs for assessing their performance for acceptance.
2 TESTS BEFORE CONSTRUCTION
2.1 Hull Model Test
Hull model test shall be carried out (unless/otherwise guaranteed by the builder, based on the proven hull form) in any of the approved experiment tank to:
a) confirm the sufficiency of the prime mover with the hull proposed, to obtain the required/ specified free running speed and bollard pull on trials under the limiting condition of draught and displacement proposed and also to consider minor modifications in form likely to increase propulsive efficiency, if necessary, taking into account operations in restricted depths of water.
b) determine the most suitable form of bilge keels. and the positions at which they shall be attached to the hull, to reduce the power absorbed to a minimum.
c) confirm that the propeller proposed is satisfactory under the light and loaded conditions specified for speed as well as static bollard pull.
2.2 Hydrostatic Data
The following information regarding displacement shall be obtained before the construction is started:
a>
b)
c>
Estimated draught of the tug, with maximum allowance of + 50 mm.
Trim diagram to arrive at actual displacement and draught before and after in service conditions.
Hydrostatic curve showing the displacement scale, with curves of tonnes/cm, moment to change trim, longitudinal centre of buoyancy and flotation and vertical and longitudinal position of metacentre and also the co- efficients.
3 Test During Construction
3.1 Test certificates for materials used in the
1
construction of tugs shall be produced by the builder to the inspecting authority if so required by the purchaser.
3.2 If desired by the purchaser, the builder shall ensure that the machinery and the equipment installed on the vessel are duly certified to be in conformity with the requirements of statutory authorities and classification societies.
4 TESTS AFTER CONSTRUCTION
4.1 Inclining Experiment
Soon after the completion of construction of the tug, the builder shall carry out an inclining experiment in the presence of the owner’s representatives and representative of statutory authorities. The experiment shall be carried out in fair weather and in calm water, preferably in sheltered waters or docks, the tug so placed as to avoid any effects of the wind and waves on the inclination of the vessel. During the experiment, all tanks shall be emptied or accounted for and the bilge shall be dry and no loose weights or materials, liable to shift, shall be on board except the inclining weights and righting weights which may be required to correct any list before the commence- ment of the inclining experiment. A careful check shall be made of the weights used and a complete record of all the weights including the number of persons on board the vessel, during the experiment shall be maintained. Based on the results of this inclining experiment and the hydrostatic data as per 2.2(c), the builders shall supply the final stability curves (stability booklet including cross curves of stability).
5 DOCK TRIALS
5.1 Before the tug leaves her moorings the deck for basins
a)
b)
c)
trials shali be carried out as follows:
Main and auxiliary machinery running easy for 4 hours for testing, adjustment, flushing of pipe system, etc;
Auxiliary generator and compressor unit running for two consecutive hours, carrying out specified duties satisfactorily; and
Testing of electrical installations including main and auxiliary generators.
IS 7363 : 1993
5.2 The following trails may be conducted in lieu of trials indicated in 5.1:
a) Main engine run at 20 percent load;
b) Diesel generator trials consisting of:
i) performance trials at:
30 percent full load - 1/2h 50 percent full load - l/2 h 80 percent full load - lh
100 percent full load - 2h 110 percent full load - 2%h
ii) Governor test
iii) Overload trip test
iv) Testing of paralleling equipment including reverse current protection.
c) Auxiliary units like pumps, compressors, centrifuges shall be run for 1 h (or as agreed upon to carry out specified duties satisfactory,
d) Steering trial consisting of checking of:
i) The operation of the gear and its change- over arrangement.
ii) Synchronisation of rudder indicators.
e) Warning devices.
6 HABBOIJB TBIALS
6.1 Bollard Pull Trial
The bollard pull test shall be carried out in still water with the dynamometer secured to bollard by chain and resting on a smooth surface, preferably a steel plate. Length of the tow rope shall be according to requirements. Dynamometer readings shall be carefully recorded. Pull shall be recorded at four engine settings of 70, 80, 90 and 100 percent of specified full load, for specified rpm at full speed the vessel shall swing over from one side to the other until the tow rope is at least 40° on either quadrant. A duration of two minutes shall be taken for each pull with one minute interval in between. The quick release mechanism shall be demonstrated as well as any other tests as deemed necessary by the purchaser’s representatives present at the trials. Dynamometer shall be calibrated before and after the trials.
6.1.1 Similar tests shall be carried out for ahead pull. All engine driven auxiliaries which normally run shall be operated during bollard trial.
6.2 Auxiliary Engine Trial
All auxiliary engines shall be tested for continuous rumiing at full power as follows:
a) Main and auxiliary generator and compressor sets, six hours continuous rumiing during which records shall be made of full connected load temperatures, overload release, speed and load regulation.
b)
cl
At the termination of the generator tests the insulation resistance of the wiring throughout the vessel shall be checked to ensure compliance with requirements.
Fresh water and sanitary systems shall be thoroughly tested over a period of two hours.
7 SEA TRIALS
7.1 Main Engine Testing
This test shall be carried out as follows:
a>
b)
c>
4
Six hours at continuous rated BHP complete with fluid couplings, gear boxes and controls;
One hour at 10 percent overload immediately following eight hours test;
Governor, between minimum rpm to rated rpm and by throwing off’ load; and
rpm at which overspeed trip operates shall be recorded.
7.2 Auxiliary Set Testing
The main and auxiliary generator, hydraulic pump and compressor sets shall be tested as complete units with generator, air compressor and hydraulic pump rumiing simultaneously.
Derating of diesel engines shall also be effected in a similar manner to the main engines.
These tests shall include:
a> b) c> 4
six hours at continuous rated power,
half an hour governor test,
overload trip to be tested: and
testing of parallel equipment including reverse current trip.
7.2.1 All main auxiliary equipment shall be run during the test.
7.3 Speed Trial
The speed trials shall be carried out in the specified loaded condition soon after the completion of the harbour trials and shall consist of:
a) four rum over an approved measured distance at 80 percent power, two runs with and two runs against the tide; and
b) four runs over an approved measured distance at full power, two runs with the two runs against the tide.
7.4 Manoeuvring and Turning Trials
The diameter of the turning circle shall be measured at the maximum speed under 35’ of helm both port and starboard. The builder shall provided all necessary
2
instruments for the accurate plotting of the turning circle. The time taken for one complete turning circle each way shall be recorded. Turning circle diameter shall not exceed two and a half lengths. Manoeuvring time for the following operations shall be carefully measured and recorded at loaded conditions. In case of twin screw tugs, the effect on turning/manoeuvr- ing by running either of the screw shall also be recorded. Angle of heel during the turning trial shall also be recorded:
a) Ship steaming full speed ahead and the engine rest telegraph pull to full astern:
1) 2) 3)
4)
5)
6)
time taken to stop engines,
time taken to reverse engines,
time taken for engines to reach full astern,
time taken for vessel to stop,
time taken for vessel to gain sternway for stationary position, and
time taken for vessel to gain full sternway from stationary position.
Engine shall be kept at full astern for 1.5 minutes during which time the effect of the helm upon steering shall be tested.
b)
c>
4
On completion of 15 minutes in the astern condition, the procedure shall be reversed and records similarly taken at given in (a) above.
Manoeuvring trials using the propellers shall be carried out and the diameter of the turning circle measured, along with the time taken under different conditions as considered necessary by the purchaser’s representative.
Ability of the vessel to maintain a straight course both in ‘ahead’ and ‘astern’ conditions, without using the rudders shall be tested. It may be waived out for river run.
7.5 Steering Trials
With the vessel steaming full speed ahead, time required for the following operations of the helm shall be recorded:
Midships to hardover starboard,
Hardover starboard to midships,
Midships to hardover port,
Hardover port to midships,
Hardover port to hardover starboard,
Hardover starboard to hardover port, and
Emergency steering/auxiliary steering controls to be tried to satisfaction.
The timings recorded for the above operations shall conform to the statutory regulations.
IS 7363 : 1993
With the vessel at full astern, in which condition the rpm shall be at two-thirds of rpm at full speed ahead, the procedure mentioned above shall be repeated.
7.6 Anchoring Trials
The anchoring test shall be carried out as follows:
a>
b)
c>
4
Lower starboard anchor to water line and let go four lengths of cables (110 m) using the hand-brake.
Lower port anchor to water line and let go four lengths of cables (110 m) using the hand- brake.
Heave two lengths of port anchor cable. The average speed for this operation shall not be less than 9 m per minute .
Heave remaining two lengths of both anchors simultaneously. Note the time for this operation and the average speed assessed shall not be less than 9 m per minute.
NOTE - The depth of water may not permit full suspension of the anchor and cable during the tests, in which case the requirements shall be agreed to between the purchaser and the builder.
7.7 Endurance Trial
One to and fro endurance trial trip shall be carried out between two points as agreed to between the builder and the purchaser. During the trial, the record of fuel consumption and temperature shall be maintained.
8 INSPECTION AFTER TRIALS ANI) TESTS
8.1 The vessel may bc dry docked for thorough inspection, parts of the main and auxiliary machinery, fittings, etc, dismantled, if necessary, for inspection. All defects noticed during trials and subsequent inspection of the vessel shall be made good by the builder.
9 TESTING OF FIKE FIGHTING E~UIPMEN’I AND BILGE PUMPS
9.1 The following timings shall be recorded:
a) Time required to pump at full pressure from receipt of order,
b) Time taken to change over to alternate set of machinery; and
c) Time taken to fit foam nozzles and deliver foam both for monitors and hoses.
9.2 Bilge pump shall also bc tested for proper running.
9.3 Any other tests deemed necessary may be carried out as agreed to between the builder and the purchaser. Accessibility of all stores and equipment ladder may also be tested.
3
IS 7363 : 1993
Chairman
SHRI S. CHANDRA
Members
SHRI S. N. BASSI SHRI S. N. BASSI SHRI S. DANDAPAT
SHRI S. &ATIA ( Alternate I
ANNEX A
( Foreword )
COMMITTEE COMPOSITION
Inland and Harbour Crafts Sectional Committee, TED 18
DIRECTOR (MECHANICAL) ’ Ex-ENGINEER (MECH) ( Alternate )
DR J. P. GHOSE DR R. P. G~KRAN ( Alternate )
SHRI P. R. G~VIL SHRI APURBA RANJAN KAR SHRI R. K. KHATTAR
SHRI S. P. DEOKULIAR ( Altermite ) SHRI MADAN L. KOCHHAR
SHRI P. K. BANER~I ( Alternnte ) . SHRI V. KUMAR
SHRI P. MITRA ( Alternate ) SHRI M. E. MADHUSUDAN
SHRI K. K. TIWARI ( Alternate ) SHkI P. MITRA CAPT P. B. PATNAIK
SHRI ASHOK DEY ( Alternate ) SHRI D. K. SAHA
SHRI S. DU~TA ( Alternate ) SHRI K. SARKAR SHRI A. SENGUPTA
SHRI B. R. K. GUPTA ( Alternate ) SHRI J. D. GROVER ( Alternate )
CAPT D. SENGUPTA SHRI R. Roy CHOUDHURY ( Alternate )
HEAD OF STANDARD CELL HEAD OF FORWARD DESIGNS GROUP I Altertzate j
DY - CHIEF S&EYOR SHRI P. B. WARRIER
SHRI M. C. BHATIA ( Alternate ) CMDE R. K. WING CMDE R. NATH ( Alternate )
SHRI N. S. VUAYARAGHAVAN, Director (TED)
Convener
SHRI GUATAM SEN
Members
CDR R. K. BHATIA, VSM CDR S. SUBRAMANIAN ( Alternate )
SHRI S. K. BHATIA SHRI K. K. TIWARI ( Alternate )
CHIEF SURVEYOR TO THE Govr OF INDIA SHRI A. K. CHOPRA SHRI S. DANDAPAT
SHRI M. S. GANAPATHI ( Alternate )
Representing
Indian Register of Shipping, Bombay
Garden Reach Shipbuilders & Engineers Ltd, Calcutta Confederation of Engineering Industry, New Delhi Inland Waterways Authority of India, New Delhi
Ministry of Surface Transport (Development Wing), New Delhi
Indian Institute of Technology, Kharegpur
Ministry of Surface Transport (Shipbuilding & Shiprepair Wing), New Delhi Hooghly Dock & Port Engineers Ltd, Howarh Bombay Port Trust, Bombay
American Bureau of Shipping, Bombay
Shipyard Association of India, Bombay
Directorate General of Technical Development, New Delhi
Alcock Ashdown and Co Ltd, Bhavnagar Dredging Corp of India, Visakhapatnam
Central Inland Water Transport Corporation Ltd, Calcutta
Ship Consultants, Calcutta Lloyd’s Register of Shipping, Bombay
Calcutta Port Trust, Calcutta
Mazagon Dock Ltd, Bombay
Directorate General of Shipping, Bombay Bureau Veritas, Bombay
Indian Navy, New Delhi
Director General, BIS ( Ex-ofi& Member )
Secretary
SHRI N. S. JUDGE Director (TED), BIS
Port Craft Subcommittee, TED 18: 1
Representing
Calcutta Port Trust, Calcutta
Directorate of Naval Architecture, Naval Headquarters, New Delhi
Directorate General of Technical Development, New Delhi
Directorate General of Shipping, Bombay Indian Register of Shipping, Bombay Inland Waterway Authority of India, Noida (Dist. Ghaziabad)
4
L_..--_.. . . . . _ _,,_ “.____II^ ._.._- _..- - .._.. . ._ . . .I
IS 7363 : 1993
Port Craft Subcommittee, TED 18:l (Con&L)
Members
DIRECTOR (MECHANICAL) Ex ENGINEER (MECH) ( Alrenzate )
SHRI S. K. GHO~H SHRI D. ,L. J. PHILLIPS ( Ahmate )
SHRI N. J. GOSAVI SHRI E. J. CARRI ( Alternate )
SHRI R. K. KHAT~AR SHRI S. P. DEOKULIAR ( Alternate )
SHRI P. SURESH NAYAK SHRI D. K. SAHA
SHRI S. D~T~A ( Alternate ) SHRI C. A. SEB.UXIAN
SHRI V. RAMDADOSS ( Alternate ) SHRI A. SENGUPTA
SHRI J. D. GROVER ( Alternate ) SHRI M. K. SENGUPTA CAPT R. K. VIG
CDR MANMOHAN SINGH ( Alternate )
Representing
Ministry of Surface Transport, New Delhi
Hoogbly Docking & Engineering Co, Howrah
Mazagon Dock Ltd, Bombay
Bombay Port Trust, Bombay
Goa Barrage Owners’ Association, Vasco-da-Gamma (Goa) Central Inland Water Transport Corp Ltd, Calcutta
Madras Port Trust, Madras
Lloyd’s Register of Shipping, Bombay
Garden Reach Shipbuilders & Engineers Limited, Calcutta Directorate of Standardization, Ministry of Defence (NHQ), New Delhi
5
Standard Mark
The use of the Standard Mark is governed by the provisions of the Br~eau Q/” Ztuliurl Stmtlurtls Act, lY86 and the Rules and Regulations made thereunder. The Standard Mark on products covered by an Indian Standard conveys the assurance that they have been produced to comply with the requirements of that standard under a well defined system of inspection, testing and quality control which is devised and supervised by RIS and operated by the producer. Standard marked products are also continuously checked by BIS for conformity to that standard as a further safeguard. Details of conditions under which a licence for the use of the Standard Mark may be granted to manufacturers or producers may be obtained from the Bureau of Indian Standards.
Bureau of Indian Standards
BIS is a statutory institution established under the Bureau of Indian Stnndards Act, 1986 to harmonious development of the activities of standardization, marking and quality certification and attending to connected matters in the country.
Copyright
promote of goods
BIS has the copyright of all its publications. No part of these publicdtions may be reproduced in any form without the prior permission in writing of BIS. This does not preclude the free use, in the course of implementing the standard, of necessary details, such as symbols and sizes, type or grade designations. Enquiries relating to copyright be addressed to the Director ( Publications ), BIS.
Review of Indian Standards
Amendments are issued to standards as the need arises on the basis of comments. Standards are also reviewed periodically; a standard along with amendments is reaffirmed when such review indicates that no changes are needed; if the review indicates that changes are needed. it is taken up for revision. Users of Indian Standards should ascertain that they are in possession of the latest amendments or edition by referring to the latest issue of ‘BIS Handbook’ and ‘Standards Monthly Additions’. Comments on this Indian Standard may be sent to BIS giving the following reference :
Doc:No. TED 18 (767)
Amendments Issued Since Publication
Amend No. Date of Issue Text Affected
BUREAU OF INDIAN STANDARDS
Headquarters:
Manak Bhavan. 9 Bahadur Shah Zafar Marg, New Delhi Telephones : 331 01 31, 331 13 75
I 10002
Regional Offices:
Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg NEW DELHI 110002
Eastern : l/14 C. 1. T. Scheme VI1 M, V. I. P. Road, Maniktola CALCUTTA 700054
Northern : SC0 445-446, Sector 35-C, CHANDIGARH 160036
Southern : C. 1. T. Campus, IV Cross Road, MADRAS 600113
b Western : Manakalaya, E9 MLDC, Marol, Andheri ( East )
BOMBAY 400093
Telegrams : Manaksanstha ( Common to all Offices )
Telephone
I
331 01 31 331 I3 75
1
37 84 99, 37 85 61 37 86 26, 37 86 62
1
53 38 43, 53 I6 40 53 23 84
{ 235 02 16, 235 04 42 235 15 19, 235 23 I5
632 92 95, 632 78 58 632 78 91, 632 78 92
Branches : AHMADABAD. BANGALORE. BHOPAL. BHUBANESHWAR. COIMBATORE. FARIDABAD. GHAZIABAD. GUWAHATI. HYDERABAD. JAlPUR. KANPUR. LUCKNOW. PATNA. THIRUVANANTHAPURAM.
Printed at Printrade, New Delhi, India