Irving Water Sewer Update 2010-07-07

Embed Size (px)

Citation preview

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    1/23

    Water and Sewer System UpdateGoal 8: Sound Governance

    Goal 9: Enhance and Sustain InfrastructureCity Council Work Session

    July 7, 2010

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    2/23

    Bottom Line

    Additional Revenue is Needed:

    1. To Maintain Lowest Interest Rates (Bonds) Pay

    Less for Capital

    2. For Increased Cost State Mandated/Treatment

    3. For the Lake Chapman Booster Pump Station

    4. For Ongoing Pipe Replacements

    2

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    3/23

    3

    Overview

    Whats Needed?

    Why Invest in Infrastructure?

    Capital Improvement Plan Financial Update

    Recommendation

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    4/23

    4

    Team

    Ramiro Lopez, IGS and Public Works Team Dir

    Max Duplant, Chief Financial Officer

    Todd Reck, Water Utilities Director Bret Starr, Asst Chief Financial Officer

    Aimee Kaslik, Business Manager

    David Cardenas, Water Business Manager

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    5/23

    5

    Whats Needed?

    NEED ANNUAL CIP INVESTMENT OF $24-$40M

    Replace Failing Infrastructure

    Goal: 40 to 60 yr life

    Master Plan for Growth Water Supplies and Pipeline Capacity

    Water Reuse

    Operations and Maintenance

    CURRENT CIP FUNDING OF $12M NOT ADEQUATE

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    6/23

    Importance of Water and Sewer

    Infrastructure

    6

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    7/23

    7

    Why Invest in Infrastructure?

    Aging and Becoming Less Reliable Almost 1500 miles total

    Unlined Cast Iron

    35 to 60 yrs old

    140 miles Breaks easily

    Water quality issues

    Cement Pipe

    28 to 40 yrs old 130 miles

    Breaks easily

    Concrete Sewers

    Corrosion failures

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    8/23

    Water Infrastructure Grades

    8

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    9/23

    News Video

    9

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    10/23

    Water Infrastructure Problem

    10

    ..out-of-sight, out-of-mind predicament

    ..is in dire need of repair or replacement

    ..more that any single bond election

    could ever cover

    Failure examples: Dallas County Records Bldg Stemmons Freeway Los Angeles 43 breaks in a month

    So, the alarm has been sounded againand again.

    Major Irving failure - Riverside Sewer

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    11/23

    Dallas/Irving Comparison

    City of Dallas City of Irving

    Water System Size 5,000 miles 700 miles

    Pipe over 50 yrs old > 10% > 10%

    Pipe Replacement Budget $127 M $9 MPipe Replacement Rate $25,400/mile $12,900/mile

    Water Main Repairs 1,849 360

    Water Main Repair Rate 37/100 miles 51/100 miles

    11

    Irving has more repairs, but replaces pipes at half therate

    Lean Six Sigma projects increasing repair capabilities

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    12/23

    12

    Neighborhood Line Replacement

    History and Projection

    $3.4 $4.5

    $11.0

    $6.7

    $4.4

    $5.3

    $8.0

    $5.6$7.6

    $11.0

    $4.0$1.2

    $14.0$15.0 $15.1 $15.3

    $0

    $10

    $20

    $30

    Water and Sewer ReplacementsMillions

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    13/23

    13

    Failing Pipe Impacts

    Pipe Breaks Cartwright St (55 yrs old), 12 repairs in 2 yrs

    Pennington St (46 yrs old), 9 repairs in 2 yrs

    Red Water Fowler St (54 yrs old) Marie Ln (55 yrs old)

    Sewer Overflows

    Impacts: Loss of service (frustration) Cost (overtime and repair)

    Regulatory

    Flushing

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    14/23

    Band Aid Repairs-Britain 5/2/10

    14

    Three pipe failures

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    15/23

    Water Supply Investment Needed

    Proposed Booster Pump Station

    - $40M Total- $20M Irvings cost

    Princeton Pump Station

    - Future Improvements

    Intake Pump Station- $2M Total Upgrade- $1M Irvings Cost

    Participate: Maximize and maintain control of $150M+ pipelineDont participate: Lose some drought protection and may haveto buy Dallas water sooner

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    16/23

    16

    Capital Improvement Plan

    $1M - 54 Customer Way Sewer

    $6.5M - Delaware Creek Sewer

    $1M Facility Security

    $0.5M Hackberry Pump Station Improvement

    Required TXDOT utility relocations

    $1.2 M Residential water pipe replacements

    Total: About $12M

    No funding for Water Supply Booster Pump Station

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    17/23

    17

    Finances

    System Fund needs to stand on its own

    Rates have to supply adequate revenue

    Avoid General Fund bailout as in 2007 ($4M)

    Water revenues down almost 9.8%

    Cash reserve projection down $3.6M

    Will not meet debt service coverage goals Bond ratings are at risk higher rates

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    18/23

    Costs Trending Up

    TCEQ Fees and Requirements up $500,000

    Water Treatment (Dallas)

    Last 4 years up $1.045M (18% Increase)

    Wastewater Treatment (TRA)

    Last 4 yrs up $3.975M (39% Increase)

    Development Costs (TXDOT, DART) Maintenance Costs

    18

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    19/23

    Public Communications

    Audit and Finance Committee

    10/2009, 12/2009 and 5/2010

    Public Works Committee

    10/2009 City Council Work Session

    10/21/2009, 12/2/2009, 1/13/2010

    City Council Meeting

    1/14/2010

    City Spectrum

    11/2009, 1/2010, 2/2010, 6/2010

    Website Video and 5-yr Plans for Pipe Replacements19

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    20/23

    20

    Voice of the Customer

    Customer complaints for the last 2 years

    Leaks concerns 1,418

    Water Quality (dirty, discolored) 420

    Low pressure concerns 255

    Sewer backups, slow drainage 2,609

    TOTAL 4,702

    Average of 6 complaints per day

    Each complaint can impact a few or up to hundreds of people

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    21/23

    Recommendation

    Adopt a 5% Rate Increase

    Helps meet legal debt service coverage commitments

    Helps cover FY 2009-10 operations

    Doesnt fund the water supply booster pump station Doesnt fund new CIP (highest priorities only)

    Impact to Residential Customer

    $2.66/month increase ($53.37 total) typical

    Rates still lowest among 20 plus member cities (Dallas)

    Lowest rate among the cities in (North Texas in) the

    study (The Celina Record Star- McLain Decision Support

    System rate study)21

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    22/23

    No Rate Increase Option

    Would not sell water and sewer bonds

    Limited, if any, CIP for FY 2010-11

    High risk of bond rating downgrade Evaluate going from 20 to 30 year debt

    Would not participate in Lake Chapman

    Booster Pump Station 32% future capacity loss (75 MGD vs. 110 MGD)

    Loss of pipeline operational control and drought

    flexibility22

  • 8/9/2019 Irving Water Sewer Update 2010-07-07

    23/23

    23

    Questions