31
ERTMS Regional Peter Elestedt

IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

Embed Size (px)

Citation preview

Page 1: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

ERTMS Regional

Peter Elestedt

Page 2: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

ERTMS Regional

This is ERTMS RegionalDevelopment/Country AdaptationRoll out EngineeringExperience from The Swedish pilot

2

Page 3: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

3

This is ERTMS Regional!

Eurobalise

Interlocking and Radio block

Eurocab

Level 1Level 2Level 3Integrity

ERTMS Regional A track side ERTMS concept

GSM - R

Object Controller

Page 4: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

4

Balise

Radio link

RBC

ETCS L1/L2VEHICLE

Specification of a wayside traffic control system that uses Class 1 ERTMS/ETCS specifications

TMS

CTC

Interlocking +

PointsDetectors

I/O

Lx

Scope of ERTMS Regional

This is the ERTMS Regional application!

Page 5: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

5

Runs traffic without the need for track occupancy detection (e.g. track circuits)Integrated Interlocking System, RBC and TMS– One generic, unique data model for all sub systems– Less engineering and testingMoving and/or virtual fixed blockRadio controlled objectsOpen interfaces

Differences to traditional legacy systems

Page 6: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

6

Open Interfaces

Traffic Control Centre

External Information System

IF IG ED

IA IB IC ID IE

EA EB

ETCS Train

Electrical Point/Derailer

Level Crossing System

Data Preparation System

OtherTCC

Hand Held TerminalEurobalise

Admninistration System

Juridical Recorder System

Maintenance System

Controller System

Adjacent CTC

External System

Passenger Train Warning System

EE

Detector PC

Adjacent RBC

Adjacent Interlocking

Electrical Point Lock

Generic Input / Output

Track Circuit

IH

EN

Power Supply

EO

OC

EH

OC

EL

OC

EK

OC

EJ

OC

EI

OC

EG

EC

EF

ERTMS-R System

External systems

II

OC

EM

Point Heater

Page 7: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

7

Cost Effectiveness

Utilises the onboard system from ERTMS/ETCSMinimises use of wayside installations by using modern communications technology

Page 8: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

8

Communicates through existing infrastructure rather than installing new systemsUses “Commercial Off the Shelf” COTS components, standard configurations and as much of existing infrastructure as possibleMinimize the engineering effort needed to design, expand and maintain a system (SA)

GSM-R telephone as Hand Held Terminal in ERTMS Regional

Cost Effectiveness

Page 9: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

Development/Country Adaptation Process

9

Page 10: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

UIC Support

Country adaptation of UIC skeleton documents

Create the foundation for a Generic Application(GA according to CENELEC)

• Risk Analysis• Technical mitigations• Operational procedures

10

Page 11: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

11

ERTMS Regional introduction process

Countryadaptation

Operationalrules

Selection ofpilot line Procurement

Education

ETCS

TCC

GSM-R

Time

Page 12: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

12

ERTMS Regional introduction process

Countryadaptation

Operationalrules

Selection ofpilot line Procurement

Education

ETCS

TCC

GSM-R

Selection of line effects cost and time for the pilot installation

Time

Page 13: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

13

ERTMS Regional introduction process

Countryadaptation

Operationalrules

Selection ofpilot line Procurement

Education

ETCS

TCC

GSM-R

Time

Page 14: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

14

ERTMS Regional introduction process

nt

ETCS

TCC

GSM-R

Engineering

Education

Engineering

Education

Engineering

Education

ITC

ITC

ITC

Specification

Time

Page 15: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

15

ERTMS Regional introduction process

nt

ETCS

TCC

GSM-R

Engineering

Education

Engineering

Education

Engineering

Education

ITC

ITC

ITC

Specification

Time

Page 16: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

System Engineering in the roll out phase

16

Page 17: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

17

What will be delivered?

GSM-R

CTC

TCCInterlocking/RBC/TMS

Server

LAN/WAN

EuroBalise

Object controllers

Euroradio

ERTMS Level 3

Handheld terminal

GPRSGPRS

External information system

Object controllers

Page 18: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

18

System structure

Traditional Station setupSignalling a station

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

Page 19: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

19

System structure

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

Line block interface

Traditional Station setupSignalling a line

Page 20: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

20

System structure

Traditional Station setupRunning a line (L0/L1)

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

Line block interface

Traffic Management System

TMS CMI

Page 21: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

21

System structure

Traditional Station setupRunning a line (L2)

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

Line block interface

RBC

Traffic Management System

RBC

TMS CMI

Page 22: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

22

System structure

Traditional Station setupRunning a line (L2)

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

INTERLOCKING

Object Controller

Object Controller

Object Object Object Object Object Object

Line block interface

RBC

Traffic Management System

RBC

TMS CMI

Page 23: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

23

System structure

ERTMS Regional (L3)

Object Controller

Object Object Object

TCC

TMS CMI

Object Controller

Object Controller

Object Object Object Object Object Object

Object Controller

Object Object Object

Page 24: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

24

Design manual and project process for ERTMS Regional projects

Proj

ect I

nitia

lizat

ion

App

rova

ls a

nd fi

naliz

atio

n

Spec

ifica

tion

&C

ontr

act

Ana

lysi

sER

TMS

Reg

iona

l sys

tem

War

rant

yM

aint

enan

ce

Page 25: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

25

ERTMS Regional Implementation Process

“From initial planning to operation”

Page 26: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

26

Project Manual

Page 27: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

27

Project Handbook

Describes the Project Process and in more detail

How to start a Specific Application (SA) project

Design and produce a SA

Build and install a SA

How to test and commission a SA

How to get final safety approval and close the project

Highlights dependencies and deliverables from project start to hand over for operation

Stresses what is unique and different when working with ERTMS Regional

Ensure that the final SA fulfils standards, regulations and legislations

Ensure that all safety classified sub systems fulfils the requirements for CENELEC SIL4

Page 28: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

Project and Pilot Line Status

All wayside equipment is installed and testedExtensive tests with trains have been carried out during the past two years during both summer and winter conditions.The GA is ISA assessed to SIL4The SASC is pending the 6 month trial periodStart of commercial operation is pendingVehicle fitment and Driver education.The original budget of <50% CAPEX, compared to traditional signalling kept.

28

Page 29: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

Results achieved

GASC for SIL4 implementation approved by ISAReliable control of objects over GSM-R GPRS provenControl of objects over open (class 7 ) network testedStandardised and Generic Shelter with Object Controllers

29

Page 30: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

Experiences made to date

Involvement of ALL stakeholders at an early stage necessary– Operators; Who will run the traffic?

• Plan vehicle fitment• Plan driver education

– Operator/Drivers; How will traffic be run?• Design system to allow same or improved traffic patterns• Influence rules and regulations to allow required traffic patterns

– Regulatory body; Rules, Standards and Regulations• Make the rules fit the system capabilities, not the system fit the rules.

30

Page 31: IRSE London 2011P Elestedt London 2011P Elest… · TCC Hand Held Terminal Eurobalise Admninistration System Juridical Recorder System Maintenance Controller System Adjacent CTC External

©B

omba

rdie

r Inc

. or i

ts s

ubsi

diar

ies.

All

right

s re

serv

ed.

Future plans in Sweden with the system.

ERTMS Regional is approved for implementation throughout Sweden according to the frame agreement between BT and TRVERTMS Regional is currently being engineered for two more lines,both to be in operation during 2013.

31