28
10/31/2018 District Irrigation Profiles http://irrigationap.cgg.gov.in/wrd/getDistricts 1/28 IRRIGATION PROFILE OF SRIKAKULAM DISTRICT *Click here for Ayacut Map INTRODUCTION Srikakulam District is the extreme Northeastern District of Andhra Pradesh situated within the geographic Co-ordinates of 18° -20' and 19° -10' of Northern latitude and 83° -50' and 84° -50' of Eastern longitude. The District is skirted to a distance by Kandivalasagedda, Vamsadhara and Bahuda at certain stretches of their courses while a line of heights of the great Eastern Ghasts run from North East. Vizianagaram District flanks in the south and west while Orissa bounds it on the north and Bay of Bengal on the East. The total area of the District is 5,837 Sq. Kms. It has a population of 27,03,114 persons according to the 2011 census. The District derived its name from Srikakulam its headquarters town. Srikakulam District was carved out in 1950 by bifurcating it from Visakhapatnam District, it remained unaffected in its territorial jurisdiction for quite some time. But in November, 1969 the District lost 63 villages from Saluru Taluk and 44 villages from Bobbili Taluk on account of their transfer to the then newly constituted Gajapathinagaram Taluk of Visakhapatnam District. Again in May, 1979, the District had undergone major territorial changes on account of the formation of new District with head quarters at Vizianagaram which involved transfer of Salur, Bobbili, Parvathipuram and Cheepurupalli Taluks to the new District. The Nagavali, Vamsadhara, Survarnamukhi, Vegavathi, Mahendratanaya Gomukhi, Champavathi, Bahuda and Kumbikota gedda are the important rivers of the District. The Vamsadhara river rises in the Eastern Ghats of Orissa State and enters Srikakulam District in Bhamini Mandal and finally falls in to the Bay of Bengal near Calingapatnam. The Nagavali and Survarnamukhi rivers also originate in the Eastern Ghats while Nagavali in Vangara Mandal and the confluence joins the Bay of Bengal at Kallepalli near Srikakulam rising in Pachipenta hills the Vegavathi river flows from west to east, ultimately joining the river Suvarnamukhi, Gomukhi joins Suvarnamukhi at Sirlam village of Vizianagaram District, Mahendratanya, which is Atributory of Vamsadhara joins the later at Komanapalli village in Hiramandalam Mandal. Another river of the same eastern Ghats flows through Mandasa and Sompeta Mandalas and falls into Bay of Bengal at Baruva. The Bhuda river also rises in the eastern Ghats and enters Srikakulam District at Boddabada village of Ichapuram Mandal and flows through Ichapauram and Kaviti, Mandasa and enters into Bay of Bengal at Donkuru. The District has a seacoast of 193 Kms. Classification Of Geographical Area Of Srikakulam District Classification of geographical area Area in Acres Percentage of geographical area Total geographical area 14,42,322.70 100 Forest area 1,69,611.91 11.76

IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 1/28

IRRIGATION PROFILE OF SRIKAKULAM DISTRICT

*Click here for Ayacut Map

INTRODUCTION

Srikakulam District is the extreme Northeastern District of Andhra Pradesh situated within the geographic Co-ordinates of 18°-20' and 19° -10' of Northern latitude and 83° -50' and 84° -50' of Eastern longitude. The District is skirted to a distance byKandivalasagedda, Vamsadhara and Bahuda at certain stretches of their courses while a line of heights of the great Eastern Ghasts run fromNorth East. Vizianagaram District flanks in the south and west while Orissa bounds it on the north and Bay of Bengal on the East. The totalarea of the District is 5,837 Sq. Kms. It has a population of 27,03,114 persons according to the 2011 census. The District derived its namefrom Srikakulam its headquarters town. Srikakulam District was carved out in 1950 by bifurcating it from Visakhapatnam District, itremained unaffected in its territorial jurisdiction for quite some time. But in November, 1969 the District lost 63 villages from Saluru Talukand 44 villages from Bobbili Taluk on account of their transfer to the then newly constituted Gajapathinagaram Taluk of VisakhapatnamDistrict. Again in May, 1979, the District had undergone major territorial changes on account of the formation of new District with headquarters at Vizianagaram which involved transfer of Salur, Bobbili, Parvathipuram and Cheepurupalli Taluks to the new District.

The Nagavali, Vamsadhara, Survarnamukhi, Vegavathi, Mahendratanaya Gomukhi, Champavathi, Bahuda and Kumbikotagedda are the important rivers of the District. The Vamsadhara river rises in the Eastern Ghats of Orissa State and enters SrikakulamDistrict in Bhamini Mandal and finally falls in to the Bay of Bengal near Calingapatnam. The Nagavali and Survarnamukhi rivers alsooriginate in the Eastern Ghats while Nagavali in Vangara Mandal and the confluence joins the Bay of Bengal at Kallepalli near Srikakulamrising in Pachipenta hills the Vegavathi river flows from west to east, ultimately joining the river Suvarnamukhi, Gomukhi joinsSuvarnamukhi at Sirlam village of Vizianagaram District, Mahendratanya, which is Atributory of Vamsadhara joins the later atKomanapalli village in Hiramandalam Mandal. Another river of the same eastern Ghats flows through Mandasa and Sompeta Mandalasand falls into Bay of Bengal at Baruva. The Bhuda river also rises in the eastern Ghats and enters Srikakulam District at Boddabada villageof Ichapuram Mandal and flows through Ichapauram and Kaviti, Mandasa and enters into Bay of Bengal at Donkuru. The District has aseacoast of 193 Kms.

Classification Of Geographical Area Of Srikakulam District

Classification of geographical area Area in Acres Percentage of geographical areaTotal geographical area 14,42,322.70 100Forest area 1,69,611.91 11.76

Page 2: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 2/28

Cultivable area 9,00,375.57 62.43Barren and Un-cultivable area 1,19,616.17 8.29Land put to Non-Agricultural use and other 2,52,719.05 17.52Sown Area 7,50,922.07 52.06Irrigated area 6,47,656.52 44.90Normal Average Rainfall 1162mm ---Cultivable waste 1,487.54 0.10Permanent pastures and other grazing land 2,327.68 0.16Miscellaneous 18,411.42 1.28Other fallow land 36,345.94 2.52Current fallows 89,857.92 6.23Others 1,022.99 0.07Irrigation area % with reference to cultivable area 71.93

Details Of Irrigation Projects

S.No Name of the Projects Total IP created in AcresA Completed ProjectsI Major Irrigation Projects1 Vamsadhara Project Stage-I 1,48,2302 Narayanapuram Anicut 39,4363 Thotapalli Regulator 55,285II Medium Irrigation Projects1 Gorle Sriramulu Naidu Madduvalasa Reservoir Project (Phase-I) 24,700

III Minor Irrigation Projects1 Minor Irrigation schemes--6Nos 11,9582 Minor Irrigation Tanks(Above 1000Ac)--375Nos 69,1833 Open Head Channels, Gedda Systems, Anicuts & Other sources (Above 100 Ac.)--80Nos 40,3394 Minor Irrigation Tanks ( Below 100 Ac.)--478Nos 18,3805 Open Head Channels, Gedda Systems, Anicuts & Other sources (Below 100 Ac.)--21Nos 1,0696 Small Minor Irrigation Tanks (P.R.Tanks)--6937Nos 1,51,5317 Minor Irrigation tanks - SMI Divn.,--546Nos 16,7168 Check Dams SMI Divn--503Nos 14,228

IV Lift Irrigation Schemes under APSIDC1 Lift Irrigation Schemes--45Nos 23,655B Ongoing ProjectsI Major Irrigation Projects1 B.R.R. Vamsadhara Project Phase- I of Stage-II 62,2802 B.R.R. Vamsadhara Project Phase- II of Stage-II 45,0003 Thotapalli Barrage 63,933II Medium Irrigation Projects1 Gorle Sriramulu Naidu Madduvalasa Reservoir Project (Phase-I) 12,5002 Off shore Resevoir on River Mahendra tanaya 24,600

III Minor Irrigation Projects1 Minor Irrigation schemes --4Nos 3,273

IV Lift Irrigation Schemes under APSIDC1 Lift Irrigation Schemes--4Nos 5,910

COMPLETED MAJOR IRRIGATION PROJECTS

1. B.R.R. Vamsadhara Project Stage-I

Page 3: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 3/28

Preamble

B.R.R. Vamsadhara Project Stage-I envisages construction of Barrage across the River Vamsadhara at Gotta (V) inHiramandalam (M) of Srikakulam District to irrigate an ayacut of 1,48,230 acres in 398 villages of 12 Mandals with Left Main Canal for alength of 104.24 Km. and 68 Nos. of distributaries. The project was taken up in 1970 and water was first let out for irrigation in 1977. Theupdated estimated cost of the project is Rs.109.00 Crores with S.S.R. 1997-98.

Salient Features

Location : Gotta (V), Hiramandalam (M),Srikakulam DistLongitude : 83° 58' 0'' ELatitude : 18° 12' 0'' NAyacut : 1,48,230 Acres

Mandals benefited : 12 Nos i.e,Hiramandalam,Saravakota, Jalumuru, Polaki Narasannapeta, Kotabommali,Santabommali, Tekkali, Nandigam, Palasa, Vajrapukoturu & Meliaputti.

Gross Storage : 17329 CumFRL : 38.100 MMDDL : 34.44 M (Sill Level of Left Head Sluice)Dependable netYield : 57.50 TMC (AP Share at Gotta barrage)

Maximum FloodDischarge : 2, 90,000 Cusecs

CanalsLeft Main CanalLength : 104.24 Km.Section : 29.26 X 2.90mWater allocation(Irrigation) : 17.841 TMC

Water allocation(Drinking) : ----

Waterallocation(Industries) : Nil

Cropping Pattern : 1,48,230 Acres for PaddyPresent Stage : Completed and under O&MFunding Details : Normal State PlanProject Starting Year : 1971

Page 4: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 4/28

Project CompletionYear

: 1977

Budget for the Year2015-16 : Plan - 18.0000 Crs. Non-Plan - 0.6000 Crs.

Mandal-Wise Ayacut Under Right Main Canal, High Level Canal & Flood Flow Canal In Vamsadhara Project

S.No Mandal No. of Villages under Command Ayacut in Acres1 Bhamini 9 70822 Kothuru 14 106973 HLM 7 31174 Sarubujjili 49 84935 LN Peta 39 157696 Burja 28 61847 Amadalavalasa 30 85598 Srikakulam 22 178009 Gara 27 29579

Total 225 107280

B.R.R. Vamsadhara project - stage-I left main canal Mandal-wise ayacut utilized under Khariff 2014-15

S.No Mandal No. of Villages under Command Mandal-wise Registered Ayacut in Acres1 Hiramandalam 12 20082 Saravakota 13 27823 Jalumuru 57 163474 Narasannapeta 44 214635 Polaki 49 227086 Kotabommali 29 88847 Santhabommali 40 263838 Tekkali 35 149479 Nandigam 51 1249210 Palasa 36 836211 Vajrapukotturu 31 1179612 Meliaputti 1 58

Total 398 148230

* Though Pathapatnam Mandal comes to the Left side of the River, there is no command under it under VamsadharaProject

B.R.R. Vamsadhara project - stage-I left main canal Assembly Constituency-wise registered ayacut details

S.No Mandal No. of Villages under Command Mandal-wise Registered Ayacut in Acres1 Pathapatnam 13 20672 Narasannapeta 128 494123 Tekkali 245 942244 Palasa 12 2527

Total 398 148230

B.R.R. Vamsadhara project - phase-I of stage-II right main canal Assembly constituency-wise - Mandal-wise ayacut details

Sl.No.

Name of AssemblyConstituency

Name ofMandal

No. ofVillages Ayacut in Acres Constituency-wise Total ayacut in Acres

1 Pathapatnam Hiramandalam 4 896.51 896.51

Page 5: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 5/28

2 Amadalavalasa Sarubujjili 43 13726.21 34004.16LN Peta 26 8492.66 Burja 13 3227.1 Amadalavalasa 30 8558.19 Sub-Total 112 34004.16

3 Srikakulam Srikakulam 22 17800.52 47379.33Gara 27 29578.81 Sub-Total 49 47379.33

Total 82280

2. Narayanapuram Anicut Scheme

Preamble

The Narayanapuram Anicut across Nagavali River was constructed during the year 1959-1963 in Narayanapuram village ofBurja Mandal to Irrigate an ayacut of 39,179 Acres, through left and right main canals in Burja, Amdalavalasa, Srikakulam , GaraSanthakaviti, Ponduru and Etcherla Mandals of Srikakulam District.

The Right Canal is running for a length of 50.6Km and distributaries running for a length of 162.00 Km to Irrigate an ayacut of18,362 Acres in Santakaviti, Ponduru, Etcherela, Amdalavalasa and Srikakulam Mandal.

The left canal is running for a length of 39.00 Km to irrigate an ayacut of 18691 Acres .

Sailent Features

Longitude : 83° 48' 0'' ELatitude : 18° 23' 0'' NAyacut : 37053 AcresCatchment Area : 5079.62 KM2Yield from catchment : 1,117.57 mm3Average Mansoon Rainfall : 1024 mmDesigned Flood Discharge : 4,876.7 M3/SecMaximum Flood Discharge (5/90) : 6,910.08 M3/SecAnicutAnicutLength of Anicut : 357 Met.Crest level of Anicut : + 28.04 MShutters 118 Nos Size : 3.025M x 1MTop of falling shutter : +28.95 MTop of Flood bank Level : +32.77 M

Page 6: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 6/28

Head Sluice 2 Nos : 8 VentsSize : 2.28 M x 1.05 MSill Level : + 27.13Scovering Sluices 2 Nos : 8 VentsSize : 1.80 M x 2.10 MSill Level : + 26.82 MDown Stream Solid Apron Length : 360 MtsTop Level : 27.14 MCanalsLeft Canal : 39.00 KMLeft high level Canal : 14.70 KMDischarge : 13.28 M3/SecAyacut : 21045 AcresBed Level at Start : + 27.13 MBed Fall : 1 in 4000Depth of Flow : 1.20 MRight side canalLength of Canal : 50.60 KMDischarge : 13.28 M3/SecAyacut : 18362 AcresBed Level at Start : + 27.13 MBed Fall : 1 in 4000Depth of Flow : 1.20 MBudget for the Year 2015-16 : Plan - 1.70000 Crs

Statement Showing The Mandal Wise Ayacut Irrigated During Khariff - 2014 In Respect Of Narayanapuram Anicut

S.No Name of the MandalAyacut localised

Ayaccut Irrigated during Khariff2014Srikakulam

DistrictVizianagaram

District Total

a Narayanapuram left side channelAmadalavalasa 7215.00 --- 7215.00 6421.00Srikakulam 5894.00 -- 5894.00 5776.00Gara 3867.00 -- 3867.00 3790.00Burja 1715.00 -- 1715.00 1681.00Total 18691.00 -- 18691.00 17668.00

b Narayanapuram Right sidechannelSanthakaviti 4221.00 --- 4221.00 4052.00Ponduru 6966.54 -- 6966.54 6827.00Etcherla 7174.41 -- 7174.41 6313.00

18361.95 -- 18361.95 17192.00Total 37052.95 -- 37052.95 34860.00

Statement Showing The Mandal Wise Ayacut Irrigated During Khariff - 2014 In Respect Of Narayanapuram Anicut

S.No Name of the MandalAyacut localised

Ayacut Irrigated during Khariff 2014Srikakulam District Vizianagaram District Total

a Nagavali Left side channelVeeraghattam 14330.00 --- 14330.00 13757.00Palakonda 13080.00 -- 13080.00 12688.00Garugubilli -- 2341.99 2341.99 2248.00Ziyyamavalasa -- 1850.00 1850.00 1776.00

Page 7: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 7/28

27410.00 4191.99 31601.99 30469.00b Nagavali Right side channel

Vangara 4298.00 --- 4298.00 4126.00Baligipeta -- 550.00 550.00 534.00Garugubilli -- 3093.5 3093.5 3000.00

4298.00 3643.50 7941.50 7660.00Total 31708.00 7835.49 39543.49 38129.00

3. Thotapalli Regulator

Preamble

The existing Thotapalli regulator is the first diversion work on river Nagavali, which was constructed with RR masonry duringthe year 1907-1908. The Thotapalli old regulator consisting of mainly the following components:

1. Nagvali Left Main canal of length 37.626 Km with 8 nos of branch canals and distributory system was executed during theyear 1908-1934 including construction of CM & CD works with RR masonry in Surki mortar to feed an ayacut of 31200 acres.

2. Nagavali Right main canal of length 20.016 Km with 11 nos of branch canals and distributory system was executed duringthe year 1934-1958 including construction of CM & CD works with RR masonry in surki mortar to feed an ayacut of 9000 acres.

3. 9 Nos of open head channels on left side of river to feed an ayacut of 10606 acres and 5 nos open head channels on right sideriver to feed an ayacut of 13194 Acres.

As such the total ayacut being irrigated under the above regulatory system is 64000 Acres. It became old and showing signs ofdeterioration. It is proposed to construct a barrage near Thotapalli village across Nagavali River at about 500 mts U/S of existing Thotapalliregulator in order to save the existing ayacut of 64000 Acres and to irrigate additional ayacut of 120000 Ac in Vizianagaram andSrikakulam districts including drinking water supply in 24 villages en-route the proposed Right Main canal.

Sailent Features

Location : Thotapalli (Village) Garugubelli (Mandal)Longitude : 80° 36' 15'' ELatitude : 18° 46' 52'' NAyacut (Stabilized) : 55,285 AcresMandals Benefitted : (1) Veeraghattam (2) Palakonda (3) VongaraDependable Net Yield : 6700 Mcft.Water Allocation : 5.780 TMC.Maximum Flood Discharge : 1,13,200 C/sCanals

Page 8: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 8/28

Length : Left Main Canal : 37.40 KMRight side Canal : 19.80 KM

Discharge : Left Main Canal : 414 C/sRight side Canal : 106 C/s

Ayacut : Left Main Canal : 38,708 AcresRight side Canal : 16,577 Acres

Cropping Pattern : Khariff (Paddy)Villages Benefited : 32 NosRehabilitation : - NIL -

ONGOING MAJOR IRRIGATION PROJECTS

1. B.R.R.Vamsadhara Project Phase-I of Stage-II

Preamble

The Phase-I of Stage-II of Vamsadhara Project is intended to create an Irrigation potential of 62,280 Acres under Right MainCanal. The project components are (1) Construction of head regulator on Right Bank of Vamsadhara River @ 750m U/s of Gotta Barrage(2) Excavation of Right Main Canal for a length of 52.973 Km with distributory net work from1R to 37TE to command the ayacut.

Salient Features

F.S.L of Canal of head reach : + 38.484MBed level of canal at Headreach : + 36.074M

Starting section of canal : 20.25 x 2.41MLength of Canal : 52.973KmDesigned discharge : 1867 Cusecs up to 2.67 Km & 865 Cusecs in D/SEstimated Cost : Rs. 123.936 croresRevised Estimated Cost : Rs. 209.00 CroresMandals benefited : Sarubujjili, Amadalavalasa, Gara,Srikakulam and Burja, L.N.Peta,HiramandalamVillage benefited : 165 NosCropping pattern: : Paddy: 32,280 Acres

Chillies:30,000 AcresTotal:62,280 Acres

Page 9: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 9/28

Irrigation Potential

The project is intended to create irrigation potential to an extent of about 62,280 Acres in 7 mandals of about 165 villages inPathapatnam, Amadalavalasa & Srikakulam Constituencies of Srikakulam District utilizing 7.353 TMC of water.

Components

The project comprised of construction Head Regulator, etc., construction Right Main Canal for a length of 52.973Km with 1R,37TE distributories and field channels.

Status

The Right Main Canal was completed upto 15.466 duly linking, Yeragam, Purushothapuram and Bhyri Open Head Channelsthrough 11L Distributory restoring lower riparian rights for 20,000 Acres under NABARD RIDF-II .The works from Km 15.466 to 52.973including all distributories were taken up under A.I.B.P and Normal State Plan Funds. An expenditure of Rs. 145.906 Cores was incurredunder the Project. An irrigation potential of 62,280 acres was created by Khariff 2012.

Administrative approval was accorded to Project revised estimate by the Government of an amount Rs. 209.00 Crores videG.O. Rt. No. 734, dated 27.12.2011 and the new / additional imperative works like CC lining of Canal at vulnerable reaches, protectionwalls etc. are under progress.

The ayacut under the Right Main Canal of 62,280 acres is being irrigated every year. Further the 20,000 acres proposed underSugarcane in Vamsadhara Project Phase-II of Stage-II is developed for Paddy crop supplemented with the waters diverted from GottaBarrage.

B.R.R. Vamsadhara Project - phase-I of stage-II Right Main Canal (Excluding The Open Head Channels Registered Ayacut) Assembly Constituency-Wise -Mandal-Wise Ayacut Utilized Under Khariff 2014-15

S.No Name of Assembly Constituency Name of Mandal No. of Villages Ayacut in Acres Constituency-wise Total ayacut in Acres

1 PathapatnamHiramandalam 4 746.51

6325.6LN Peta 26 5579.09

2 AmadalavalasaSarubujjili 43 8452.51

16637.07Burja 13 2073.96Amadalavalasa 30 6110.6

3 SrikakulamSrikakulam 22 12104.89

27716.33Gara 27 15611.44

Total 165 50679

The Reconcilation of above irrigation potential created and localization of the above ayacut under Right Main Canal is underprogress by the Project authorities in co-ordination with Revenue & Agricultural Departments.

Mandal-Wise Ayacut Particulars Under R/S Open Head Channels (linked by right main canal of B.R.R. Vamsadhara Project phase-I of stage-II)

S.No Name of Assembly Constituency Name of Mandal No. of Villages Open Head Channel Registered Ayacut in Acres1 Pathapatnam LN Peta 2 415.27

2 AmadalavalasaSarubujjili 16 5053.70Amadalavalasa 3 394.94

3 SrikakulamSrikakulam 7 3495.63Gara 20 10640.00

Total 48 19999.54

Water Uses Associations were already formed for the above ayacut in the year 2000

2. B.R.R. Vamsdhara Project Phase-II of Stage-II

Page 10: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 10/28

Preamble

The Phase-II of Stage-II of Vamsadhara Project is intended to create an Irrigation Potential of 45,000 Acres and stabilizing theexisting ayacut of 2,10,510 Acres under Left & Right Main Canals. The cost of the project is Rs. 933.90 Crores and administrativelyapproved vide G.O.Ms. No. 33, dated 25.02.2005.

The Project Components are:

1) Construction of a side weir on Right bank of Vamsadhara River at Katragada (Village) Bhamini Mandal for diverting the flood watersinto flood flow canal. A regulator for regulatory flows into flood flow canal and silt excluder for diverting excess water into the river.

2) A Flood Flow Canal about 34 Km length with two balancing reservoirs at Singidi and Parapuram Villages en-route irrigating 20,000Acres.

3) Hiramandalam Reservoir with 19.05 Tmc capacity with head sluices for High Level Canal, Link Canal and Spillway regulator.

4) A High Level Canal to irrigate 5,000 Acres.

5) A Link Canal to connect the Right Main Canal @ Ch. 2.670 km from Hiramandalam Reservoir to supplement the deficit requirementunder Left & Right Main Canals.

Salient Features

LocationLatitude : 18° 59' 34'' NLongitude : 83° 48' 12'' E

District : Srikakulam (AndhraPradesh)

Mandal : Bhamini

Village : Near Katragada Village onAlikam - Bathili Road

HydrologyCatchment Area at Katragaa : 7895 Sq.Km (3050 Sq.m)Mean Annual Rainfall : 1194 mm (47'')

Page 11: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 11/28

Average Monsoon Rainfall : 1067 mm (42'')

Maximum Flood Discharge during September 1980 at Neradi site. : 6.00 Lakh cusecs (16,900cumecs)

75% dependable yield at Gotta (115 TMC) agreed by Orissa and Andhra Pradesh : 3256.46 M.CumComponent Features

Description Details As per ApprovedHydraulic Particulars

Side WeirLength : 300 mCrest Level : +70.400 mD/s F.S.L : +70.240 mDischarge : 6400 CusecsAverage Bed Level of River : +69.500 mHead RegulatorCrest Level : +69.500 mFlood Flow Canal (from km 0.000 to km 5.214 i.e., up to Infall Regulator of SingidiBalancing Reservoir)Discharge : 8000 CusecsCanal Section : 36.50 m x 5.084 mBed Fall : 1 in 12,000Canal Bed Level @ km 0.000 : +66.370 mFull Supply Level @ km 0.000 : +71.454 mCanal Bed Level @ km 5.214 : +65.936 mFull Supply Level @ km 5.214 : +71.020 mSingidi Balancing ReservoirT.B.L. : +73.870 mF.R.L. : +70.870 mM.W.L. : +72.370 mStorage Capacity : 0.0686 tmcLength of Earth Bund : 2.10 kmSelf Catchment Area : 12.608 Sq. kmWater Spread Area @ F.R.L. : 0.799 Sq. kmFlood Flow Canal (from km 6.834 i.e., Outfall Regulator of Singidi Balancing Reservoirto km 26.217 i.e., Infall Regulator of Parapuram Balancing Reservoir)Discharge : 8000 CusecsCanal Section : 36.50 m x 4.45 mCanal Bed Level @ km 6.834 : +65.555 mFull Supply Level @ km 6.834 : +70.005 mCanal Bed Level @ km 26.217 : +63.940 mFull Supply Level @ km 26.217 : +68.390 mParapuram Balancing ReservoirT.B.L. : +72.200 mF.R.L. : +68.240 mM.W.L. : +69.750 mStorage Capacity : 0.404 tmcLength of Earth Bund : 2.500 kmSelf Catchment Area : 13.19 Sq. kmWater Spread Area @ F.R.L. : 2.565 Sq. kmFlood Flow Canal (from km 29.127 i.e., Outfall Regulator of Parapuram BalancingReservoir to km 33.107 i.e., Infall Regulator of Hiramandalam Reservoir)Discharge : 8000 CusecsCanal Section : 36.50 m x 4.45 mCanal Bed Level @ km 29.127 : +63.082 mFull Supply Level @ km 29.127 : +67.532 mCanal Bed Level @ km 33.107 : +62.750 mFull Supply Level @ km 33.107 : +67.200 m / 67.050 m

Page 12: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 12/28

Hiramandalam ReservoirT.B.L. : +73.600 mF.R.L. : +67.056 mM.D.D.L. : +45.110 mGross Storage Capacity : 19.359 tmcLive Storage Capacity : 16.685 tmcLength of Earth Bund : 7.20 kmSelf Catchment Area : 79.00 Sq. kmWater Spread Area @ F.R.L. : 31.67 Sq. km

Irrigation Potential

The project is intended to create irrigation potential to an extent of 45,000 Acres and stabilization of existing ayacut under Left& Right Main Canals as follows.

1) Under Flood Flow Canal : 20,000 Acres.

2) High Level Canal : 5,000 Acres.

3) Right Main Canal (Sugarcane Crop) : 20,000 Acres

4) Stabilization Under existing Left & Right Main Canals : 2,10,510 Acres

The new & stabilizing ayacut exists in Palakonda, Pathapatnam, Amadalavalasa, Palasa, Tekkali, Narasannapeta, SrikakulamAssembly constituencies of Srikakulam District.

Land Acquisition and R & R

Total Land Acquisition involved is 11,542 Acres. 4 Nos of L.A Units have been establishment for L.A & R.R. 34 villages areaffected under the proposed reservoirs. Socio Economic Survey is completed. 11,238 Acres of Land has been handed over to theDepartment. An amount of Rs. 233.01 Crores has been incurred towards Land Acquisition and Rs. 95.93 Crores under R&R. Landacquisition for important components has been completed.

3. Thotapalli Barrage Project

Page 13: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 13/28

Preamble

The existing Thotapalli Regulator on River Nagavali was constructed in the year 1908. The Govt. of Andhra Pradesh haveaccorded Revised administrative approval for Rs 774.90 Cr vide G.O Ms No 78, I & CAD PW - M&MI CA.I(2) Dept, Dated 05-11-2012for construction of Thotapalli Barrage Project to provide additional irrigation facilities to new ayacut of 1,35,000 Acres(136191) including15,000 Acs of Gajapathinagaram Branch Canal under the project (9300+47,958+15,000 =72,258 Acres in Vizianagaram District, 13Mandals & 63933 Acres in Srikakulam District,7 Mandals) besides stabilizing existing ayacut of 64,000 Acres (8715 Acres inVizianagaram District & 55285 Acres in Srikakulam District) under Thotapalli regulator and providing drinking water supply to 24 Villagesen route of the canal by feeding 42 Nos. of tanks.

Salient features:

Source : River Nagavali (Langulya)Location : Thotapalli(v), Garugubilli (M),Vizianagaram DistrictCatchment area : 4455 sqkm.Latitude : 18° 47' 30'' NLongitude : 83° 25' 24'' ETotal available yield from catchment area : 44.000 TMC.Yield allocated for Andhra Pradesh as per Inter state Agreement : 16.000 TMCProposed yield to be utilised in this Thotapalli Barrage Scheme : 15.895 TMCStorage capacity of Barrage at FRL/MWL (+105.00 Mts) : 2.509 TMC (71.05 M.Cum)C.C.A. Under this Project : 1,84,000 AcersExisting Ayacut (Khariff Paddy) : 64,000 AcresProposed additional Ayacut (Ground nut in Khariff) : 1,20,000 AcresSpillwayType of spillway : OgeeTotal length : 117 MtsNo.of Radial Gates : 8 No.sSize of vent : 12.00Mts x 7.00MtsCrest level : +98.00MtsDesigned Discharge : 3234CumecsFoundation level : +87.50MtsEarth DamTotal Length : 8.20Km (Both sides)Top width : 6.00MtsMaximum height : 20.20Mts (R/S Earth Dam)F.R.L/M.W.L : +105.00MtsT.B.L : +109.00MtsM.D.D.L. : +100.00MtsLeft Head Sluice

Page 14: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 14/28

Sill level : +97.00 MtsNo.of vents : 2 No.s (Size 2.00Mx2.25M)Right Head SluiceSill level : +97.40 MtsNo.of vents : 2 No.s (Size 4.30Mx2.50M)Discharge : 34.23 CumecsLength of Right Main Canal : 107.00 Kms

BRIEF NOTE ON THOTAPALLI BARRAGE PROJECT

The existing Thotapalli Regulator on River Nagavali was constructed in the year 1908. The Govt. of Andhra Pradesh haveaccorded Revised administrative approval for Rs 774.90 Cr vide G.O Ms No 78, I & CAD PW - M&MI CA.I(2) Dept, Dated 05-11-2012for construction of Thotapalli Barrage Project to provide additional irrigation facilities to new ayacut of 1,35,000 Acres(136191) including15,000 Acs of Gajapathinagaram Branch Canal under the project (9300+47,958+15,000 =72,258 Acres in Vizianagaram District, 13Mandals & 63933 Acres in Srikakulam District,7 Mandals) besides stabilizing existing ayacut of 64,000 Acres (8715 Acres inVizianagaram District & 55285 Acres in Srikakulam District) under Thotapalli Regulator and providing drinking water supply to 24Villages en route of the canal by feeding 42 Nos. of tanks.

New ayacut proposed 63,933 Acres

Existing ayacut stabilization 55,285 acres.

The total Mandals benefited are :Benefited Mandals : Regidi Amadalavalasa, Vangara, Rajam, Santhakaviti, G.Sigadam, Laveru and Ranastalam.Benefited villages : 132 Nos in Srikakulam District.Total Ayacut in Vizianagaram District (80973 Acres)Stabilized : 8715 AcresProposed New Ayacut : 72258 AcresTotal Ayacut in Srikakulam District (119218 Acres)Stabilized : 55285 AcresProposed New Ayacut : 63933 Acres

The total yield available from catchment area at site is 32 TMC and the yield proportionally allocated to Andhra Pradesh stateas per Inter State agreement dated: 15.12.1978 is 16.00TMC.

The Utilization is 15.890TMC

Description As per allocation of CWC As G.O.Ms. No .83 I&CAD PW Dt 15.11.2012

Irrigation 13.985TMC 15.485TMCDrinking water 0.320TMC 0.320TMCIndustrial Demand 0.640TMC NotionalEvaporation 0.945TMC 0.985TMCTotal 15.890 TMC 16.790 TMC

Surplus water of Nagavali from the run of the river to be drawn during the flood season above FRL of Thotapalli Barrage(Phase 1 - M/S Alfa infraprop) 1.25TMC

Package-2

The Right Main Canal and distributory system from Km 52.45 to km 117.89 is awarded to M/s Maytas - NCC (JV) Hyd videAgmt no. 5/2004-2005 for Rs. 170.02 Crores.

(A)WorksRevised Estimate Amount : Rs. 179.56 CroresAgreement Value (PA&SE/TTPRC/5/2004-05 : Rs.170.02 Crores

Page 15: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 15/28

Dated 25.10.2004)Original Estimate Amount : Rs.178.56 Crores

Cumulative Expenditure up to 31.05.2013 : Rs.132.344 Crores (Including escalation, Seignorage Re-imbursement,NAC, Labour cess)

Value of work done up to 10.06.2013 : Rs. 132.928 Crores (Including escalation)Value of work done up to 10.06.2013 : Rs 120.716 Crores (Excluding escalation)Expenditure incurred during this year : Rs 0.865 CroresFurther funds required : Rs 49.304 Crores (Excluding escalation)Bills pending at PAO : RS. 1.81 CroresAs per RevisedEPC Package 2 works : 179.56 Crores.Additional itemsPOL s, Cement, Steel : Rs 9.98 CroresLabour Cess : Rs 1.76 CroresNAC/CMRF : Rs 0.1578 CroresSeignorage Re imbursement : Rs 0.8749 CroresTotal excluding LA : Rs 192.333 Crore(B)Land Acquisition: SKLM VZM TOTALRequired : 1921Ac. 2529Ac. 4450 Ac.Requisitioned : 1819 Ac 2436 Ac 4255 AcRequisition to be Submitted by the agency : 100 Ac 92 Ac 192 AcAcquired : 1449 Ac 2019 Ac 3468 AcNetwork (tentative) : 81511

COMPLETED MEDIUM IRRIGATION PROJECT

1. Sri Gorle Sriramulu Naidu Madduvalasa Reservoir Project

Preamble

Madduvalasa Reservoir Project is a Medium Irrigation Project for which envisages formation of Reservoir acrossSuvarnamukhi river a tributary of Nagavali River. The project is intended to serve an ayacut of 24,700 acres in 6 Mandals in SrikakulamDistrict under Stage ( which was completed in the year 2002 and water is being supplied to the contemplated ayacut.

Salient Features

Name of the Project : Sri Gorle Sriramulu Naidu MadduvalasaReservoir ProjectLocation : Near Madduvalasa Village,Vangara Mandal,Srikakulam DistrictLongitude : 83° 37' 20'' ELatitude : 18° 35' 30'' N

Page 16: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 16/28

River : SuvarnamukhiBasin : NagavaliCatchment Area : 2536 sq.kmMaximum Flood Discharge : 5590 cumecMax Designed discharge of spillway : NAMean Annual Rain fall : 950 mmYield available : 123.34 M.cum (4.356 TMC)Capacity of the Reservoir : 95.51 M.cum (3.372 TMC)Water spread area : 26.73 Msq.m ( 6600 Acers)Total Length of Dam : 2325.00 MetersTop width of Earth Dam : 5.00 MetersFull Reservoir Level : + 65.00 MetersCrest Level of Spillway Ogee : + 57.37 MetersLowest Bed Level : + 52.30 MetersGross Storage : 95.51 M.cum (3.372 TMC)Dead Storage up to MDDL : 1.83 M.cum ( 68M.cft)Live Storage : 93.58 M.cum ( 3305 M.cft)Gates : 11 Nos of Radial Gates of size 12.00Mt X 7.63 MtSill Level of Gate : + 57.16 MetersTop Level of Gates : + 65.096 MetersLength of Spillway : 159.50 mtBucket invert Level : +46.00 MetersLip wall Level : +47.60 MetersSurplus course Level : +52.31 MetersWidth of Road way : 4.25 mt

Iteam LMC RMC R.M.C.ExtnCanal Length : 1.672 km 50.704 km 5.000 kmAyacut : 385 Ha(950 Ac) 9615Ha(23750Ac) 5058Ha.(12500Ac)Discharge at Head : 0.712 cumec 16.80 cumec 3.89 cumecSluice No & Size of Vents : 1(0.60mt X1.00mt) 2(1.50mt X2.20 mt) ------Sill Level : +58.050 mt +56.850 mt +48.145 mtBed Width : 1.50mt 12.20 mt 4.00 mtF.S.Depth : 0.63mt 2.15 mt 1.30 mtBed Fall at Head : 1 in 4000 1 in 9000 1 in 4500F.S.L.at Head : +58.780 mt + 59.000 mt +49.445 mtVelocity at Head : 0.376 m/sec 0.6406 m/sec 0.544 m/sec

Budget for the Year 2015-16 : Plan - 5.0000 Crs.Total I.P created in Acres : 24,700

1.Madduvalasa Reservoir Project Stage-II:-

Preamble

Additional water requirement to Irrigate 12,500 Acres in stage II was calculated as per modified Penman method is 0.862 TMCand the total requirement is arrived as 4.730 TMC for entire ayacut will be within the limits of yield allocated by C.W.C. to MadduvalasaProject i.e. 4.960 T.M.C. It is proposed to create an additional ayacut of 12,500 acres duly extension of Right Main Canal for 5.00 KMdistance and excavation of 2 distributories, benefiting 4 Mandals i.e. G.Sigadam(1395 Acres), Ponduru (4,933 Acres), Laveru(5010 Acres)and Etcherla(1075 Acres) total 12,500 Acres.

2. Offshore Reservoir Scheme on River Mahendratanaya:-

Mahendratanaya River is a tributary to the Vamsadhara River. The Mahendratanaya River takes its origin near Tuparasingi (V)in Orissa State. The river Mahendratanaya travels 27 km in the state of Andhra Pradesh and joins Vamsadhara River at about 4 km abovethe Gotta Barrage at Gulumuru village. Out of 27 km, the river flows 19 km in Andhra Pradesh and about 8 km as common boundarybetween Andhra Pradesh & Orissa.

Page 17: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 17/28

The basin has a total drainage area of 1233 Sq.km till its confluence with Vamsadhara River. The Catchment Area is mostlyhilly. The basin receives abundant supply under the influence of both the South-West and North-East monsoons with an average annualrainfall being 1126 mm (47'). Rainfall in this Catchment is erratic and high peaks of discharge occur for a few days in the monsoon periodaccounting for substantial part of the yield during the sub peaks. For effective utilization of the water, it is proposed to divert the flows in toa diversion channel, taking off from the River near Chapara Village of Meliaputti Mandal in Srikakulam District.

The Mahendratanaya River flows through a very backward region in Orissa and Andhra Pradesh states. The development ofirrigation under this river is very meager till its confluence with Vamsadhara River.

There are no Inter State Agreements on utilization of water in Mahendratanaya River and there are no restrictions to utilize theshare of water in the Vamsadhara basin.

However, for beneficially utilizing the waters in Vamsadhara Basin, the States of Orissa and Andhra Pradesh have agreed in1962 that the yield of the river at Gotta will be about 115 TMC and that these waters shall be shared on half and half basis (vide D.O. Lr.No. Nil, dated 03.10.1962 from Sri B. Patnaik, Honorable Chief Minister of Orissa addressed to Sri N. Sanjeeva Reddy, Honorable ChiefMinister of Andhra Pradesh).

Salient Features

Name of Work :

Excavation of Flood Flow Canal taking off from Mahendratanaya River near ChaparaVillage of Meliyaputti Mandal in Srikakulam Dist. Formation of off-Shore Reservoirnear Regulapadu Village and Formation of Canal net work from reservoir includingDistributory network.

Administrative Approval : G.O.Ms No.1, Dt. 04.01.2007 for Rs. 127.00 CroresName of the Executing agency : M/s SVEC-INDU(JV), HyderabadAgreement No / Value : 46SE/2007-08,Dt.18.02.2008/Rs.123.25 CroresAyacut contemplated : 46SE/2007-08,Dt.18.02.2008/Rs.123.25 Crores

Components of the Scheme :

1) Excavation of Flood Flow Canal to develop an ayacut of 24600 Ac includingconstruction of CM & CD works distributory System. 2) Construction of HeadRegulator 3) Formation of Reservoir with Spillway etc. at Regulapadu and canaldistributory system.

Length of the Flood Flow Canal : 13.60 kmDesign Discharge of the F.F.C : 1200 CusecsNo. of villages benefited : 108 villages in Nandigam, Meliaputti, Palasa & Tekkali MandalsRegulapadu ReservoirLength of the Earthen Bund : 2.485 KmF.R.L. of the Reservoir : + 52.500 MT.B.L. of the Reservoir : + 55.600 MCapacity of the Reservoir : 1.860 TMCSelf Catchment of the Reservoir : 0.465 TMCWater UtilizationIrrigation Requirements : 1.890 tmcDrinking Water Supply : 0.108 tmcTotal : 2.000 tmcTotal Water Availability75% Divertible Yield fromMahendratanaya River : 1.631 tmc

Self Catchment Yield ofRegulapadu Reservoir : 0.465 tmc

Total : 2.096 tmcLand AcquisitionTotal Land required : 2500 AcCumulative Expenditure up to5/2015 : 53.93 Crs

Budget for the Year 2015-16 : Plan - 6.0000 Crs.

Mandal-Wise Ayacut Particulars Of Offshore Reservoir Scheme On River Mahendratanaya

Page 18: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 18/28

S.No Name of the District Name of the Mandal Contemplated Ayacut in Acres1

Srikakulam District

Meliaputti 3890 Acres2 Nandigama 12090 Acres3 Tekkali 1820 Acres4 Palasa 6800 Acres

Total 24600 Acres

Water User Associations (WUAs)

ABSTRACTS.No Name of the Project Name of the District Number of DC's Number of WUA's Ayacut in AcresI Major Irrigation

a BRR Vamsadhara Project Srikakulam 08 54 145244b Narayanapuram Anicut Srikakulam 05 25 37053c Thotapalli Old Regulator Srikakulam & Vizianagaram 05 25 39544

total 18 104 221841II Medium Irrigation

a Pydigam Project Srikakulam -- 5 4986III Minor Irrigation

a M.I.Tanks/ Sources Srikakulam -- 398 135944Grand Total 18 507 362771

Capacity Table of Gotta Barrage

Page 19: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 19/28

S.No Elevation(m)

Area(Sq.m)

MeanArea

(Sq.m)

ContourInterval

(m)

Capacity in betweenContours (Cubic

meters)

Cumulative Capacity(Million Cubic

meters)

CumulativeCapacity (Million

Cubic Feet)

Capacity(TMC)

1 34.00 1,28,00010,88,000 1.00 10,88,000

2 35.00 20,48,000 1.088 38.42 0.03824,83,200 1.00 24,83,200

3 36.00 29,18,400 3.571 126.11 0.12649,89,600 1.00 49,89,600

4 37.00 60,60,800 8.560 302.29 0.30287,68,000 1.00 87,68,000

5 38.00 1,14,75,200 17.329 611.97 0.6121,41,34,400 1.00 1,41,34,400

6 39.00 1,67,93,600 31.463 1111.11 1.1111,90,97,600 1.00 1,90,97,600

7 40.00 2,14,01,600 50.560 1785.51 1.7902,35,87,200 1.00 2,35,87,200

8 41.00 2,57,72,800 74.147 2618.48 2.6202,79,48,800 1.00 2,79,48,800

9 42.00 3,01,24,800 102.095 3605.45 3.605

Mahendratanaya Reservoir Project Offshore Reservoir At Regulapadu Contour Capacities

Contour Interval(m)

Area(sqm)

Cumulative area(sqm)

Mean area(sqm)

Quantity(cum)

Capacity inmcft

Capacity intmc

Cumulativein tmc REMARKS

1 2 3 4 5 6 7 8 9 1032.00033.000 1 40925.537 40925.537 0.000 0.000 0.000 0.0000 0.000034.000 1 89449.949 130375.486 85650.512 85650.512 3.025 0.0030 0.003035.000 1 206757.612 337133.098 233754.292 233754.292 8.255 0.0083 0.011336.000 1 276524.708 613657.806 475395.452 475395.452 16.789 0.0168 0.028137.000 1 315167.347 928825.153 771241.480 771241.480 27.236 0.0272 0.055338.000 1 270069.462 1198894.615 1063859.884 1063859.884 37.570 0.0376 0.092939.000 1 262243.935 1461138.550 1330016.583 1330016.583 46.970 0.0470 0.139840.000 1 252429.475 1713568.025 1587353.288 1587353.288 56.057 0.0561 0.195941.000 1 253600.239 1967168.264 1840368.145 1840368.145 64.993 0.0650 0.260942.000 1 264831.396 2231999.660 2099583.962 2099583.962 74.147 0.0741 0.335043.000 1 276360.225 2508359.885 2370179.773 2370179.773 83.703 0.0837 0.418744.000 1 305193.823 2813553.708 2660956.797 2660956.797 93.972 0.0940 0.512745.000 1 321171.896 3134725.604 2974139.656 2974139.656 105.032 0.1050 0.617746.000 1 396596.499 3531322.103 3333023.854 3333023.854 117.706 0.1177 0.735547.000 1 380678.208 3912000.311 3721661.207 3721661.207 131.430 0.1314 0.866948.000 1 377759.688 4289759.999 4100880.155 4100880.155 144.823 0.1448 1.011749.000 1 417459.505 4707219.504 4498489.752 4498489.752 158.864 0.1589 1.170650.000 1 482926.447 5190145.951 4948682.728 4948682.728 174.763 0.1748 1.345351.000 1 483584.500 5673730.451 5431938.201 5431938.201 191.829 0.1918 1.537252.000 1 504178.440 6177908.891 5925819.671 5925819.671 209.270 0.2093 1.746452.500 1 282911.674 6460820.565 6319364.728 3159682.364 111.584 0.1116 1.8580Gross Capacity at +52.500 FRL is 1.858 TMC

Capacity Table Of Hiramandalam Reservoir (Dead Storage Level=45.110M, FRL= 67.056M)

Page 20: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 20/28

S.No Reservoir Elevation (m) Water spread Area (sqm) Water spread Area (Acres) Cumulative capacity in TMC1 33 827585 204.502 34 2019569 499.05 0.0493 35 2936614 725.65 0.1364 36 3765774 930.54 0.2545 37 4447698 1099.05 0.3996 38 5216516 1289.03 0.5697 39 5979256 1477.51 0.7678 40 6873361 1698.44 0.9939 41 7821375 1932.70 1.25310 42 8730762 2157.42 1.54511 43 9669704 2389.44 1.87012 44 10770463 2661.44 2.23013 45.11 11863322 2931.49 2.67414 46 12573032 3106.86 3.05815 47 13654961 3374.21 3.52116 48 14734485 3640.97 4.02217 49 15559254 3844.78 4.55718 50 16454251 4065.93 5.12219 51 17437685 4308.95 5.72020 52 18316723 4526.16 6.35221 53 19136852 4728.82 7.01322 54 19832107 4900.62 7.70123 55 20421987 5046.38 8.41224 56 21297237 5262.66 9.14825 57 22364529 5526.40 9.91926 58 23138747 5717.71 10.72327 59 23841223 5891.30 11.55228 60 24615835 6082.71 12.40829 61 25470321 6293.85 13.29230 62 26288314 6495.98 14.20631 63 27264989 6737.33 15.15232 64 28241031 6978.51 16.13233 65 29254888 7229.04 17.14734 66 30439914 7521.87 18.20135 67.056 31673177 7826.61 19.359

MINOR IRRIGATION

Minor Irrigation Statement Showing The Mandal Wise Ayacut Irrigated During Khariff- 2014 In respect of M.I.tanks/ sources and small M.I (P.R) tanks

S.No Name of theMandal

M.I. Tanks/ Sources Small M.I. (P.R) TanksNo. of

SourcesRegd. Ayacut

in AcresIrrigated Ayacut in acres

during Khariff 2014No. ofTanks

Regd. Ayacutin Acres

Irrigated Ayacut in acresduring Khariff 2014

1 Itchapuram 20 7462.76 7015.00 129 2585.78 1778.002 Kaviti 5 758.00 705.00 103 2195.46 1537.003 Kanchili 40 4531.24 4259.00 204 5312.35 3718.004 Sompeta 22 10250.26 9840.85 39 1045.38 1004.005 Mandasa 22 11930.62 11214.15 117 2786.65 2557.006 Palasa 14 2161.69 2075.00 90 2104.67 1999.007 Vajrapukotturu 3 254.23 244.00 169 3688.04 3523.00

Page 21: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 21/28

8 Santhabommali 3 397.50 374.00 179 4772.85 4486.009 Kotabommali 25 2833.12 2606.00 309 9471.00 8619.0010 Nandigam 15 2024.90 1660.00 386 9460.52 7663.0011 Tekkali 8 1441.87 1240.00 214 4873.95 4192.0012 Meliaputti 22 6554.33 5374.06 196 3850.20 3119.0013 Pathapatnam 27 5357.70 4393.00 233 5235.90 4293.0014 Saravakota 24 5324.09 4685.00 325 7431.18 6435.0015 Hiramandalam 19 1862.02 1527.00 143 2822.30 2286.0016 Kotturu 82 8247.79 7341.00 304 6738.42 4852.0017 Bhamini 74 6652.46 5721.00 182 4506.71 858.0018 Seethampeta 5 891.67 731.41 175 2667.11 2160.0019 Palakonda 4 2932.59 2874.00 34 679.89 659.0020 Burja 123 8632.82 8546.22 169 3278.83 3213.0021 Santhakavity 23 5649.72 5593.00 249 6061.33 5940.0022 Rajam 54 5403.57 5187.00 277 5865.88 5631.0023 Regidi 29 8655.67 8309.00 451 6787.35 6448.0024 Vangara 6 1727.22 1178.00 218 3826.72 3635.0025 Veeraghattam 1 309.46 300.00 89 1439.89 1382.0026 L.N.Peta 20 3385.59 2945.00 148 5048.20 4392.0027 G.Sigadam 93 7281.04 5534.00 227 3672.35 2754.0028 Etcherla 5 728.59 306.00 105 1935.65 794.0029 Laveru 65 5447.62 2258.00 218 4215.03 1728.0030 Ranasthalam 46 2936.24 1263.00 314 5457.58 2339.0031 Ponduru 13 1092.33 393.00 121 2420.20 861.0032 Polaki -- -- -- 132 2988.03 2928.0033 Narasannapeta -- -- -- 85 2451.03 2402.0034 Gara 4 481.39 472.00 71 1214.95 1191.0035 Srikakulam 9 1179.67 1144.00 139 3436.72 3368.0036 Amadalavalasa 4 1096.46 877.00 228 4412.58 3530.0037 Sarubujjili 23 3964.96 3410.00 67 2162.23 1860.0038 Jalumuru 8 1088.34 1067.00 98 2628.88 2576.00

TOTAL 960 140930 122662 6937 151531 122710

Statement Showing The Particulars Under Minor Irrigation (M.I. Tanks/ Sources & Schemes)

S.No Constituency Name of the MandalM.I. Sources/ Schemes P.R.Tanks TOTALNos Ayacut in Acres Nos Ayacut in Acres Nos Ayacut in Acres

1

Ichapuram

Itchapuram 20 7462.76 129 2585.78 149 10002.762 Kaviti 5 758.00 103 2195.46 108 2953.463 Kanchili 40 4531.24 204 5312.35 244 9843.594 Sompeta 22 10250.26 39 1045.38 61 11295.64

87 23002.26 475 11138.97 562 34095.455

PalasaMandasa 22 11930.62 117 2786.65 139 14717.27

6 Palasa 14 2161.69 90 2104.67 104 4266.367 Vajrapukotturu 3 254.23 169 3688.04 172 3942.27

39 14346.54 376 8579.36 415 22925.908

Tekkali

Santhabommali 3 397.50 179 4772.85 182 5170.359 Kotabommali 25 2833.12 309 9471.00 334 12304.1210 Nandigam 15 2024.90 386 9460.52 401 11485.4211 Tekkali 8 1441.87 214 4873.95 222 6315.82

Page 22: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 22/28

51 6697.39 1088 28578.32 1139 35275.7112

Pathapatnam

Meliaputti 22 6554.33 196 3850.20 218 10404.5313 Pathapatnam 27 5357.70 233 5235.90 260 10593.6014 Hiramandalam 19 1862.02 143 2822.30 162 4684.3215 Kotturu 82 8247.79 304 6738.42 386 14986.2116 L.N.Peta 20 3385.59 148 5048.20 168 8433.79

170 25407.43 1024 23695.02 1194 49102.4517

Palakonda

Bhamini 74 6652.46 182 4506.71 256 11159.1718 Seethampeta 5 891.67 175 2667.11 180 3558.7819 Palakonda 4 2932.59 34 679.89 38 3612.4820 Veeraghattam 1 309.46 89 1439.89 90 1749.35

84 10786.18 480 9293.60 564 20079.7821

Rajam

Santhakavity 23 5649.72 249 6061.33 272 11711.0522 Rajam 54 5403.57 277 5865.88 331 11269.4523 Regidi 29 8655.67 451 6787.35 480 15443.0224 Vangara 6 1727.22 218 3826.72 224 5553.94 112 21436.18 1195 22541.28 1307 43977.4625

Etcherla

G.Sigadam 93 7281.04 227 3672.35 320 10953.3926 Etcherla 5 728.59 105 1935.65 110 2664.2427 Laveru 65 5447.62 218 4215.03 283 9662.6528 Ranasthalam 46 2936.24 314 5457.58 360 8393.82

209 16393.49 864 15280.61 1073 31674.1029

Narasanna peta

Saravakota 24 5324.09 325 7431.18 349 12755.2730 Polaki 0 0 132 2988.03 132 2988.0331 Narasannapeta 0 0 85 2451.03 85 2451.0332 Jalumuru 8 1088.34 98 2628.88 106 3717.22

32 6412.43 640 15499.12 672 21911.5533

Amadala valasa

Burja 123 8632.82 169 3278.83 292 11911.6534 Ponduru 13 1092.33 121 2420.20 134 3512.5335 Amadalavalasa 4 1096.46 228 4412.58 232 5509.0436 Sarubujjili 23 3964.96 67 2162.23 90 6127.19

163 14786.57 585 12273.84 748 27060.4137

SrikakulamGara 4 481.39 71 1214.95 75 1696.34

38 Srikakulam 9 1179.67 139 3436.72 148 4616.39 13 1661.06 10 4651.67 223 6312.73 TOTAL 960 140930 6937 151531 7897 292461.00

NOTE ON SPECIAL INVESTIGATION DIVISION, SRIKAKULAM

The Government have sanctioned an amount of Rs.310.00 Crs G.O.Ms.No.01, I&CAD, Date.03-01-2007 for formation ofNagavali & Vamsadhara flood banks and entrusted the Vamsadhara flood banks packages- I, II, III & IV to this division for execution.

Name of the Agency :-

Vamsadhara Pkg -I, II & III : M/s Ramky Infrastructure Ltd, Hyd

Vamsadhara Pkg -IV : M/s. A.P.R. Construction, Hyderabad.

The details of works and its present status as follows:-

Major Irrigation Sector:-

1) Vamsadhara Package-I:- Formation of Flood Bank on Vamsadhara River on right margin from Bathili (V) to Keesari (V)of Bhamini (M) and Sirusuvada to Akulatampara (V) of Kotturu (M) in Srikakulam Dist. SE's Agt. No.5SE/2007-08, Dt.20.06.2007 for

Page 23: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 23/28

Rs.4477.00 Lakhs @ 15.30% Less than ECV. 9.42% of work completed and stopped since 06/2010. The Expenditure incurred sofar is Rs.385.29 Lakhs as on 02/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 460.68 Acres, Land Acquired 82.40 Acres, Land to be acquired378.08 Acres.

2) Vamsadhara Package-II:- Formation of Flood Bank on Vamsadhara River Left margin from Rugada to Karakavalasa (V)and Right margin from Gulumuru (V) to Scotpeta (V) of L.N.Peta (M) of Srikakulam Dist. SE's Agt. No.06SE/2007-08, Dt.20.06.2007 forRs. 2729.00 Lakhs @ 15.311% Less than ECV. 3.76% of work completed and stopped since 03/2011. The Expenditure incurred sofar is Rs.93.71 Lakhs as on 08/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 229 Acres, Land Acquired 32.12 Acres, Land to be acquired 196.88Acres.

3) Vamsadhara Package-III:- Formation of Flood Bank on Vamsadhara river right margin from Scotpeta in L.N. Peta (M) toSevakulapeta (V) of Amudalavalasa (M) and Navanambadu (V) in Srikakulam (M) to Kalingapatnam (V) in Gara (M) of Srikakulam Dist.SE's Agt. No.07SE/ 2007-08, Dt.20.06.2007 for Rs.4916.00 Lakhs @ 20.09% Less than ECV. 2.45% of work completed and stopped since07/2010. The Expenditure incurred sofar is Rs.104.88 Lakhs as on 02/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 353 Acres, Land Acquired 167.94 Acres, Land to be acquired 185.06Acres.

Present status:-

Vamsadhara packages-I,II & III:-

M/s Ramky Infrastructure Ltd, Hyderabad have represented to the government to pre-closure of EPC Agreements andproposals submitted to government Vide Chief Engineer, North Coast, Visakhapatnam letter No.CE/ NC/ VSP/ DEE1/ AEE5/NCFB/Vol.12/ Dt.10.04.2013. (Package-I) & CE/ NC/ VSP/ DEE1/ AEE5/ NCFB/ Vol.13/1/ Dt.24.12.2013 & (Package-II & III)for takingfurther necessary action.

Final notice issued to the agencies to resume the balance works vide letter Nos.183-M, 184-M & 185-M/Dt.19.04.2015, 263-M, 264-M & 265-M/Dt.27.05.2015 and 280-M, 281-M &282-M/ Dt.02.06.2015for resuming the balance works in accordance with theG.O.Ms.No.22/ Dt.23.02.2015 and as per instructions of the Principal Secretary to Government, Water Resources (Reforms) Dept.,Hyderabad vide Memo No.3810/Reforms/ A1/ 2015-2/ Dt.04.04.2015. But, agencies were not resumed the balance works till to day andreport submitted to the higher authorities for taking further necessary action. Action will be initiated to re-call the tenders as per instructionsof the higher authorities. The EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbilivide this office Lr.No.306-SE, 307-SE & 308-SE/Dt.19.06.2015 for approval.

4) Vamsadhara Package-IV:- Formation of Flood Bank on Vamsadhara river left margin from Karakavalasa (V) of Jalumuru(M) to Pallipeta (V) of Polaki (M) in Srikakulam Dist. SE's Agt. No.38SE/2009-10 for Rs.5660.01@ 4.5691% Excess over ECV. 14.2% ofwork completed. At present the work is in progress. 6th EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer,Irrigation Circle, Bobbili vide letter No.305-SE/Dt.19.06.2015 for accorded approval from the Government. The Expenditure incurred sofaris Rs.789.27 Lakhs.

The EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide this officeLr.No.305-SE/Dt.19.06.2015 for approval.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 381.88 Acres, Land Acquired 90.15 Acres, Land to be acquired291.73 Acres.

Linking of Nagavali left main canal from Korukonda Distributory to voni gedda canal & improvements to Voni gedda canal forsupplementation to the 7000 Acres ayacut under existing Vonigedda canal system

Administrative approval: Administrative approval was accorded by the Government vide G.O.Rt.No.286/ I&CAD/PW-M&MIA1(2) Department/ Dt.09.05.2013 for Rs.699.90 Lakhs.

Technical Sanction: Technical sanction was accorded by the Chief Engineer, North coast, Visakhapatnam for Rs.699.90 Lakhsvide CE(I) No.06/2013-14/ Dt.23.05.2013.

Agreement: The work was entrusted to M/s Harsha Constructions, Hyderabad vide Superintending Engineer, Irrigation Circle,Bobbili Agmt. No.06SE/2013-14/ Dt.12.02.2014 for Rs.538.11 Lakhs @ 12.34% Less than the ECV of Rs.6,13,86,760/- with an agreementperiod of 12 months. EOT granted upto 29.02.2016.

Page 24: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 24/28

Land Acquisition: The LP Schedules for an extent of 4.849 Acres of land were submitted to the Joint Collector, Srikakulamvide letter No.5R/Dt.06.02.2015.

Expenditure Incurred sofar: Rs.297.22 Lakhs.

Present Stage: At present the work is in progress.

HUD-HUD Cyclone - Major & Minor Irrigation October-2014: (G.O.Rt.No.727/Dt.10.11.2014.)

Administrative approval was accorded by the District Collector, Srikakulam vide proceedingsNo.2495/2014/D.3/Dt.10.01.2015 to take up 5 Nos. of Permanent Restoration for Rs.29.70 Lakhs. 3 works completed and balance 2 worksare in progress.

Neeru-Chettu Programe:

Administrative approval was accorded by the District Collector, Srikakulam to take up 417 Nos. of De-silting & Improvementsworks to the MI.Tanks, Open head channels, Gedda systems, and Removal of Encroachments in foreshore areas to the MI.Tanks, De-silting& Improvement works to the Main & Branch channels of NLS system under Major Irrigation Sector having an ayacut of more than 100Acres and less than 100 Acres (PR tanks) for Rs.2927.10 Lakhs. 100 works completed and balance works are in progress out of 164 workstakenup. The Expenditure incurred under these works is Rs.503.10 Lakhs.

Minor Irrigation Schemes:

S.No Name of thework

EstimateValue/Ayacut

Sanction No.Agrt.No/Value

& Name ofthe agency

Exp.Incurred

sofarPresent stage

1

Formation ofNew M.I. tank

acrossRaikhillogedda

near Devupuram(V) Mandasa(M) of Palasa

Assemblyconstituency

O.E -Rs.214.84

LakhsR.E -

Rs.436.86Lakhs860

Acres

G.O.Ms.No.60/ I&CADDept./ Dt.31.03.2003vide CE(I) No.256/

2003-04/ Dt.01.08.2003.

14-SE/2003-04Rs.156.51Lakhs M/s.

VenkataPondurangaConst., VSP

Rs.325.59Lakhs

Head works completed. The Revised Estimateproposals for the balance works with SSR 2014-

15 were submitted to the CE/MI/HYD videSE/IC/Bobbili Lr.No.667CE/ Dt.21.11.2014 for

Rs.436.86 Lakhs for obtaining Revisedadministrative approval from the Govt.

2

Formation ofReservoir across

Kadagandigedda near

Jambada (V)L.N.Peta (M) of

PathapatnamAssembly

constituency

O.E-Rs.195.16

LakhsR.E.

Rs.406.00Lakhs580

Acres

G.O.Ms.No.100/I&CAD Dept.

/Dt.20.09.2004 CE(I)No.316/ 2004-05/

Dt.29.12.2004

02SE/2005-06/Dt.19.04.2005

Rs.105.56Lakhs M/s

B.PrabhakaraReddy, Hyd.

Rs.175.72Lakhs

Head works completed. The balance works i.e.,Surplus course, Canals, CM&CD works etc.,were stopped by the contractor due to Landacqusition problem. The Revised Estimate

Proposals for the balance works with SSR 2014-15 submitted to the Government by the CE,MI,

A.P., Hyderabad for Rs.406.00 Lakhs foraccording Revised administrative approval.

3

Formation ofReservoir across

Kondaloyagedda near

Bhamini (V) &(M) of

PalakondaAssembly

constituency.

O.E.Rs.377.00

LakhsR.E.

Rs.890.00Lakhs

988Acres

G.O.Rt.I&CAD(MI)No.17/ Dt.28.01.2006.CE(I) No.18/ 2006-07/

Dt.04.05.2006.

36SE/2006-07/Dt.29.03.2007

Rs.307.45Lakhs M/s

RatnaConstructions,

Hyderabad

Rs.162.55Lakhs

40% of work completed and stopped by theagency since 09/2012 and not submitted the

further EOT proposals for completion of the workeven after issuing several notices. The Revised

Estimate proposals for the leftover quantites weresubmitted with SSR 2014-15 to the CE/MI/HYD

vide SE's Lr.No.152-CE/ Dt.20.03.2015 forRs.890.00 Lakhs for obtaining Revised

administrative approval from the Govt. and forissuing instructions to determine the contract.

4 Conversion ofGangasagaramtank into MiniReservoir near

Jalantrakota (V)Kanchili (M) of

ItchapuramAssembly

constituency

O.E-Rs.611.00

LakhsR.E-

Rs.766.40Lakhs845

Acres

G.O.Rt.No.1084/I&CAD(MI-1)/ Dt.26.06.09CE(I) No.131&132/

2009-10 /Dt.19.01.2010(578.60 (W) + 32.40

(L.A.)

13SE/2010-11/Dt.01.06.2010.

Rs.418.82Lakhs M/s

R.Subba Raju,Contractor,Tilak Nagar,Rajahmundry

Rs.180.78Lakhs

Contractor has completed 46.72% as on 05/2011and stopped due to non-handing over of therequired land and other bottlenecks such as

shifting of eletrical lines etc. Report submitted toCE,MI,HYD vide SE's Lr. No.203-CE/

Dt.16.04.2015. Revised Estimate proposalssubmitted to the SE/IC/Bobbili vide this office

letter No.293-SE/ Dt.04.06.2015 and returned thesame by the SE.,I.C., BBL vide Memo.No.129-

SI/Dt.25.06.2015. The contract for the above

Page 25: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 25/28

work was closed by the Govt. videMemo.No.9618/Dt.01.07.2015.

Mandal wise abstract of M.I. Tanks - Ayacut Irrigated during khariff 2014 in respect of SMI division, Seethampeta

S.No Mandal No. of M.I. tanks Ayacut ( in Acres) Ayacut irrigated 20141 Seethampeta 107 3395 29882 Palakonda 4 101 893 Veeraghattam 29 885 7884 Bhamini 22 869 7915 Burja 12 435 4136 Sarubujjili 7 295 2747 Kotturu 30 792 7298 L.N.Peta 5 201 1919 Hiramandalam 32 1065 99010 Pathapatnam 31 893 83911 Meliaputti 93 2677 232912 Saravakota 36 970 82513 Jalumuru 3 85 6814 Tekkali 20 608 51715 Nandigam 22 727 58216 Palasa 23 552 49717 Mandasa 53 1590 141518 Sompeta 7 185 16319 Kanchili 10 391 332

546 16716 14819

Mandal Wise Abstract Of Ayacut Partiulars of SMI Division, Seethampeta

S.No Mandal No. of M.I.tanks

Ayacut ( inAcres)

No. of Checkdams

Ayacut (inAcres)

Total(MI Tanks & Checkdams)

Total(Ayacut inAcres)

1 Seethampeta 107 3395 273 7897 380 112922 Palakonda 4 101 4 155 8 2563 Veeraghattam 29 885 11 295 40 11804 Bhamini 22 869 15 571 37 14405 Burja 12 435 7 185 19 6206 Sarubujjili 7 295 8 197 15 4927 Kotturu 30 792 12 316 42 11088 L.N.Peta 5 201 7 208 12 4099 Hiramandalam 32 1065 32 864 64 192910 Pathapatnam 31 893 27 677 58 157011 Meliaputti 93 2677 46 1161 139 383812 Saravakota 36 970 12 317 48 128713 Jalumuru 3 85 1 22 4 10714 Tekkali 20 608 8 207 28 81515 Nandigam 22 727 6 165 28 89216 Palasa 23 552 11 228 34 78017 Mandasa 53 1590 16 581 69 217118 Sompeta 7 185 4 91 11 27619 Kanchili 10 391 3 91 13 482

546 16716 503 14228 1049 30944

Page 26: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 26/28

A.P.S.I.D.C.- Srikakulam District Details Of Commissioned Lift Irrigation Schemes - Assembly Constituency wise.

Sl.No

Name of theScheme Source Mandal

EnvisagedAyacut inAcres

Est. cost(Rs.inlakhs)

Date ofCommissioning Present stage Proposed

under

1 2 3 4 5 6 7 8 9A) TEKKALI Constituency:

1 Sripuram VLMC Kotabommali 600 93.47 Nov.2006 Working -2 Kurudu VLMC - do - 1650 225.12 Sep.07 - do - -3 Pedabammidi BC of VLMC - do - 1000 429.15 Sep.2012 - do - -4 Nimmada local pond - do - 50 3.50 July.03 - do - -5 Podugupadu VLMC - do - 1000 840.39 July, 2013 - do - -

6 Narayanavalasa VLMC - do - 1500 175.51 Sep.02 Partially working

RevivalWorksunderprogress

7 Kothapeta VLMC - do - 800 838.29 Oct.14 Working -Sub-total:- 6600 2605.43

B) NARASANNAPETAConstituency:

1 Lingalavalasa VLMC Jalumuru 1500 376.48 July.10 Working -2 Jalumuru VLMC - do - 500 140.05 July.10 - do - -3 Ramachandrapuram VLMC - do - 1300 330.05 July.10 - do - -

4 Tekkalipadu N'peta B.C. ofVLMC Jalumuru 1250 766.53 Oct.14 - do - -

5 Bhadri VLMC Saravakota 600 149.88 July.10 - do - -6 Thogiri VLMC - do - 1000 637.50 Sep.11 - do - -

7 Cheedipudi VLMC - do - 450 20.35 Jun-94 - do -

RevivalWorksunderprogress

8 Odipadu BC.of VLMC Polaki 50 11.00 Oct.07 - do - -9 Geddayyapeta BC.of VLMC Narasannapeta 90 49.04 July.11 - do - -

10 Bydalapuram VLMC - do - 400 12.31 Oct-91 Partially working

RevivalWorksunderprogress

Sub-total:- 7140 2493.19C) ITCHAPURAM Constituency:

1 Pothangi Mahendratanaya Sompeta 200 68.89 Aug.2011 Working -2 Kuthuma Beela (swamp) Kanchili 250 63.70 Sep.11 Working -

3 Benkili - do - - do - 200 11.32 Sep-95 Not working. Fit forRevival

RevivalWorksunderprogress

4 Rushikudda - do - - do - 300 11.01 Nov-93 - do - - do -5 Edupuram Bahuda Itchapuram 1200 127.37 Nov.03 - do - - do -

Sub-total:- 2150 282.29D) PALAKONDA Constituency:

1 Mukundapuram Peddagedda Seethampeta 190 62.12 Aug.2011 Working TSP

2 Addakulaguda Isukagedda - do - 120 4.11 Apr-85 Partially working

RevivalWorksunderprogress

5 Kuddapali - do - - do - 75 11.91 Jul-00 - do - - do -

Page 27: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 27/28

3 Manda Kambagedda - do - 200 5.92 Nov-87 - do - - do -4 Engupeta Cheepurugedda - do - 100 6.29 Jun-92 - do - - do -

6 Neradi Vamsadhara Bhamini 500 13.85 Dec-92 Not working. Fit forRevival - do -

7 Chinamangalapuram Nagavali Palakonda 200 3.28 Sep-88 - do - - do -

8 Manapuram Rellagedda - do - 100 6.58 Apr-92Abandoned. Ayacutcovered underCheck Dam.

-

9 Kothakota - do - - do - 100 6.70 Jun-92 -

10 Liviri Vamsadhara - do - 100 5.00 June.02Abandoned. Totalschemes washedaway in floods.

-

11 Pasukudi - do - - do - 100 9.00 Sep.02 -Sub-total:- 1785 134.76 - -

E) RAJAM Constituency:1 Geethanapalli Suvarnamukhi Vangara 80 4.00 Aug.09 Working -

2 Kinjangi Vegavathi - do - 450 3.43 Jun-05 Not working. Fit forRevival

RevivalWorksunderprogress

3 Voni Nagavali - do - 300 12.07 Oct-93Abandoned. Ayacutcovered under othersource

-

4 RegidiAmadalavalasa - do - Regidi 650 32.07 Aug-97 -

Sub-total:- 1480 51.57

F) AMADALAVALASAConstituency:

1 Laxminarasupeta Vamsadhara L.N.Peta 500 11.30 May-95 Working -

2 Naira AgricultureCollege,IFW's - do - - do - 200 39.00 July.2002 working. -

Sub-total:- 700 50.30 sub-totalG) PATHAPATNAM Constituency:

1 Kittalapadu VLMC Hiramandalam 600 439.00 Aug.2012 Working -2 Rugada Vamsadhara - do - 900 502.30 Sep.2012 - do - -3 Makanapalli Mahendratanaya Meliaputti 200 29.62 Dec.2005 - do - -

4 Peddapadmapuram - do - - do - 350 25.60 Aug-94 Not working. Fit forRevival

To besanctioned

5 Pathapatnam - do - Pathapatnam 250 10.00 Jul-99 Not working. Fit forRevival

RevivalWorks takenup

Sub-total:- 2300 1006.52H) SRIKAKULAM Constituency:

1 Ponnam Vamsadhara Srikakulam 500 25.00 Jun-94Abandoned. Ayacutcovered under othersource

-

2 Ronanki - do - - do - 1200 60.00 Jul-99 -Sub-total:- 1700 85.00

45 GRAND TOTAL 23855 6709.06

A.P.S.I.D.C.Division, Srikakulam. Srikakulam District - Mandal Wise Ayacut Details Under Lift Irrigtion Scheme

S.No. Constituency Mandal No. oF L.I.S's Ayacut in Acres1 Tekkali Kotabommali 7 6600

Page 28: IRRIGATION PROFILE OF SRIKAKULAM DISTRICTapcada.in/APIIATP/Apiiatp_Ref_Files/Documents/SRIKAKULAM_irrigation... · 10/31/2018 District Irrigation Profiles 1/ 28 IRRIGATION PROFILE

10/31/2018 District Irrigation Profiles

http://irrigationap.cgg.gov.in/wrd/getDistricts 28/28

2 Narasannapeta Jalumuru 4 4550Saravakota 3 2050Narasannapeta 2 490Polaki 1 50

3 Itchapuram Sompeta 1 200Kanchili 3 750Itchapuram 1 1200

4 Palakonda Seethampeta 5 685Palakonda 5 600Bhamini 1 500

4 Rajam Vangara 3 830Regidi 1 650

5 Amadalavalasa L.N.Peta 1 500

6 Pathapatnam Hiramandalam 2 1500Meliaputti 2 550Pathapatnam 1 250

8 Srikakulam Srikakulam 2 1700TOTAL :- 45 23655

Status of Budget & Expendiutre for the years 2013-14, 2014-15 & 2015 -16 inrespect of Chief Engineer, North Coast, Visakhapatnam

S.No Name of The Proejct Name ofComponent

Budget2014-15

ExpenditureIncurred 2014-15

Budget2015-16

Expenditure IncurredUpto 31.08.2015

FundsAvailable

1 MH : 106 Vamsadhara ProjectStage -I Works 1895.69 1194.02 1780.00 677.56 1102.44

Lands 10.00 -- 20.00 0 20.00 Total :- 1905.69 1194.02 1800.00 677.56 1122.44

2 MH : 131 Neradi BarrageVamsadhara Stage-II Works 488.00 166.07 3000.00 138.24 2861.76

Lands 301.00 63.67 2501.00 137.38 2363.62 R&R 1494.27 1385.04 779.00 726.41 52.59 Buildings 10.00 -- 20.00 0 20.00 Total :- 2293.27 1614.98 6300.00 1002.03 5297.973 MH: 143 Madduvalasa Project Works 304.99 172.01 300.96 73.62 227.34 Lands 250.00 7.12 199.00 67.55 131.45 R&R 0.04 -- 0.04 0 0.04 Total :- 555.03 179.13 500.00 141.17 358.83

4 MH: 245 Mahendratanaya RiverFlood Flow Canal Works 398.70 188.65 399.00 0 399.00

Lands 600.00 387.57 150.00 339.02 -189.02 R&R 101.00 -- 51.00 0 51.00 Total :- 1099.70 576.22 600.00 339.02 260.98

NON - PLAN5 MH: 115 Vamsadhara Stage-I Works 90.00 1.75 60.00 10.08 49.92 Total :- 90.00 1.75 60.00 10.08 49.92

6 MH: 129 Neradi BarrageVamsadhara Stage-II Works 20.00 4.04 6.00 0.39 5.61

Total :- 20.00 4.04 6.00 0.39 5.61