.irq o664 PP - 44D - qWP-- Jf4q - kI YONGNAM THERMAL POWER PLANT 489-H-046 MONTHLY REPORT OF PROGRESS NUMBER 43 FOR OCTOBER 1971 PREPARED BY KOREA ELECTRIC COMPANY ENGINEER THE KULJIAN CORPORATION FOR REPUBLIC OF KOREA AND UNITED STATES DEPARTMENT OF STATE AGENCY FOR INTERNATIONAL DEVELOPMENT Submitted by: Project Manager

irqo664 PP-44D -qWP--pdf.usaid.gov/pdf_docs/PDAAD449A1.pdf.irqo664 pp-44d -qwp--jf4q - ki . yongnam thermal . power plant . 489-h-046 monthly . report of progress number 43 for october

  • Upload
    vudat

  • View
    225

  • Download
    1

Embed Size (px)

Citation preview

.irqo664 PP- 44D -qWP--

Jf4q - kI

YONGNAM THERMAL POWER PLANT

489-H-046

MONTHLY REPORT OF PROGRESS

NUMBER 43

FOR

OCTOBER 1971

PREPARED BY

KOREA ELECTRIC COMPANY

ENGINEER

THE KULJIAN CORPORATION

FOR

REPUBLIC OF KOREA

AND

UNITED STATES

DEPARTMENT OF STATE

AGENCY FOR INTERNATIONAL DEVELOPMENT

Submitted by:

Project Manager

MONTHLY REPORT OF PROGRESS

NUMBER 43

CONTENTS

Section

I

II

III

IV

V

SubLoct

Contetits . . . . . . . . . . . . . . . ... . . . . . . . .. . .

Engineering Activities . . . . . . . .................. ....

Construction Activities .........................

Financial Data ............................... #

Personnel ...... ............................

Procurement Activities ..........................

Page

2

5

0

23

28

32

-2­

SECTION I

ENGINEERING ACTIVITIES

SECTION I

ENGINEERING ACTIVITIES

The followings were carried out during the month of October 1971.

ARCHITECTURAL

1. Bid document preparation of heating and plumbing for power. house was commenced

and its present progress is 9596 completed.

2. Status for final payment concerning BC materials

a) Certificates of Acceptance Issued by KECO up to date are as follows

Spec. No. Description Issued Date

6BC8 Fluted Metal wall panels June 12, 1971

8BC5 Insulation June 12, 1971

9BC2 Aluminum Door & Frames Juno 12, 1971

17BC Toilet Compartments June 12, 1971

4BC2 Structural Steel Fabrication July 13, 1971

3BC1A Concrete Additives July 16, 1971

5BC1 Misc. metal Aug. 18, 1971

9BC1 Metal Doors & Frames Aug. 18, 1971

10BC3 Curtain wall Aug. 18, 1971

15BC1 Acoustic ceiling Auq. 18, 1971

16BC Finish Hardware Aug. 18, 1971

27BC Misc. Items Aug. 18, 1971

23BC Plumbing & Drainage Sept. 29, 1971

b) Final payment invoice approved and issued by TKC to the vendors are as

follows

- 4­

Contract Liquidated Spec. No. Description Isued Date Amount Damages Slance Due 17BC Toilet Compartments Aug. 16, 1971 $ 1,400 $ 70 $ 70 9BCI Metal Doors & Sept. 21, 1971 $14,569.40 $364.23 $ 1,092.70

Frames 10BC3 Curtain Wcai4 Sept. 21, 1971 $30,270 $1,513.50 $1,513,50 16BC Finish hardware Sept. 21, 1971 $ 5,451.40 $ 136.20 $ 408.94 68CR Fluted Metal wall Oct. 5, 1971 $52,137 $2,606.85 $ 2,606.85

Paflels

-5­

Civil.

I. Design works for civil facilities concerned had already be,.n complted before

the end of September, 1971.

-6­

MECHANICAL

i. citu,,i i'll- 6BI-Fuel Oil Storage Tunks

6B6- Fu, Oil lunk Suction Heateis

ErtcI ion ccntract 1ta these specifications was executed with Sambu construction

Co., Ltd. on October 5, 1971.

2. Spte.itication No, tC--ILubricunts

Wc: lciw(.ided to TKC lubricant lists available in Korea but TKC is not In a posi­

liun tO complete the IFB documents due to lack of complete information from ven­

dors. We contacted KOCO for procurement of lubricants available therefrom

ltcently. KOCO has started their lubricant survery foi our project to determine

ill-t - 1Il ,kt locul and stote 5idu supply. Afel rec:ipt ,f Iheir survery report,

KEC-. v ill tc.rward to TKC for their review and upproval for final decision for

use.

-7­

ELECTRICAL

Reviewing electrical schematic diagram of plant aux. transformer, C.1 cotinectlons for

differential relays were found Incorrect. According to U.P.C schematic drawing and

rKC cable schedules, above C.T secondaries were to be connected in star which will

subject the differential relay to false operation under external fault. Therefore we

inquired TKC/phila about this matter by telex dated October !4 and revised C.T co­

nnections from star )o delta upon receipt of 1"KC confirmation.

Revised TKC drawing and cable schedules were received lately.

-8­

SECTION II CONSTRUCTION ACTIVITIES

SECTION II

CONSTRUCTION ACTIVITIES

The following site construction work was carried out during the month of October

1971.

ARCHITECTURAL

1. Construction work for the second stage finishing of control room building was

commenced on Dec. 30, 1970 and its work has been stopped since Feb. 13,

1971 due to lack of pipe supply concerning plumbing from TUBECO in the status

of progressing 86.8%.

2. Construction work for switch yard fence was commenced on July 10, 1971 and

completed as of Oct. 6, 1971

3. Construction work for the second stage finishing work for turbine house and heater

bay was commenced on July 21, 1971, and its present progress is 56.862% com­

pleted.

4. Construction work for Painting of boiler frame was contracted on Oct. 21, 1971,

and its present progress is 5.37% completed, however rusting of boiler frame was

not clarified yet by TKC site Engineer

-Jo­

CIVIL

1. Construction work for laying grrvel on the switch yard has been suspe"iecd since

October 2, 1970 due to outstanding arection work for the stuctiia and rorumed

as of October 30, 1971 as the above cleared. Its present progress is 50% com­

pleted.

2. Outstanding minor works such as construction of the diffuser pit, placirg rubble

concrete for the foundation of extended crane rails on the C.W. pump house,

pit work for the gasoline tank for fire fighting .ystrm, etc., are under progress

and planned for completion by December 7, 1971.

" 11­

3

MECHANICAL

1. Erection work for Steam Generating Unit (Specification No. 1B) was commenced

on August 19, 1979 and Its present progress fs 95%

2. Erection work For Turbo-Generator Unit (Spe'ification No. 11, 2T, 7T) was

commenced on November 6. 1970 and its present progress is 78.3%.

Erection work for Equipment and Piping (Specification No. 2B, 2211, 6B3, 11B,

12B, 16B, 1781, 4T2, 21B, 4T), 19B1,19B2, 19B3, 25B, I8B, 9T, 135, 2MS,

5MS and 14.) was commenced on February 25, 1971 and its present progress is

62.7%.

4. Erection work for intake Equipment (Specification No. 3T, 4T3, 6T1, 6T2, 12B

.ec wafer applicatian rdpirn 5BC1, rnd guides only) wasj o!pi , stop gates co­

rimmenced on May 12, 1971 o-c .s present progress Is 64.6%. Erection work for

this item. "as been suspended since July 28, 1971 due to the delay of C.W.

pipe materials and lack of information for C.W. pump coupling alignment.

5. Erection work for Instrumentation and Combustion Control System (Specification

No. 8B1, 882, 9B1, 9B2) was commenced on May 31, 1971 and its present

progress is 50%.

6. Erection work for Insulation of Mechanical Equipment (Specification No. 13B)

was commenced on June 21, 1971 and Its present progress Is 40.9%.

7. Erection work for Elevator (Specification No. 20BCI) was commenced on June

25, 1971 and its present progress Is 98%.

-.12,.

B. Erection work for Fuel oil storage Tanks (Specification No. 6B1, 686) was

commenced on October 5, 1971 and its present progress Is 22.4%.

- 13­

ELECTRICAL

I. Specification No. 13E-5 cable & accessories

13E-7 5KV Busduct

13E-8 Heating strip & miscellaneous materials

1) Present progress is about 60% completed.

2) Laid power cables for the welding receptaces

3) Connected the high valtage cables for the start up transformer 4) Terminated D.C cables for the UPC board & desks

5) Terminated control cables for the M.C.C.

6) Terminated contiol cables for the boiler board & desks 7) Tested and adjusted all protection relays CT. & P.T. for start upfower

system.

8) Checked operation sequence of UoP.C. board and desks

9) Checked operation sequence of 4.16KV sw. gear

10) Checked operation sequence of 480V load center 11) Checked polarity of B.C.T. of start up trans and changed phase connection

of CT(for 86TP) from star to delta.

12) Laid heating strips for mechan:cal pipes

2. remporary start up power system.

1) 100% completed by October 25. 2) Could not receive start up power through the original temporary scheme due

to the malfunction of the 154KV A .B.B. ourdespite of thorough check and repeated test, therefore made tie with the main transformer O.C.B. already

installed.

- 14­

2

3. Specification No. 2E 4.16KV sw. gear

3E 480V Load center

BE station battery

9E Generator bus duct

IT generator neutral grounding sw. gear

1) 100% completed by October 16

2) Finished installation and charging of battery

3) Finished Installation of IPB and NGR cubicle

4) Finished installation of 4.16KV sw. gear and 480V load center by co.,necting

and taping bus connector.

4. Spect"atlon No. 13E-4 Lighting fixtur..s

13E-5 Lighting wire

13E-8 Miscellaneous

1) Mounted "D" type lighting fixtures above the power house entrance

Installed the receptacles of various type at the F.O transfer pump house,

chrolination louse, 'uxiliary boiler room, and the main office building.

~-15 ­

YONGNAM THEHMAL POWER PLANT UNIT NO.I

DESCRIPTION JW

____--

OGRES

CONS TRUCTION___ _____

68

SCHEDULE_______As

69

of OCtob r 3I, 1971

5 MM c tMOT-.r - LA (_qI(SWORSw0 5-?0 -o

-

%

104 i re0P UI MUGlo,,IOEOG-A-

f . NM ET O R O - -T2-II

5 0

ELET!L-TMOLMORN 032

POWER HOUSE SLDTE 02

-E .O0USOE L 062 2T

OREoG 028

-J J

0

F~S~0MTOEOIP OUET3.6 D IN SlrCOOMv

I PLC EM_ OIOM

U ELO l 114_ LI ,5S, OUSE

RODOPOTAL...... LN 4040

00

0 1 0 0-­10 .I

001L-

- --

-

- I

-

,

332A- WRSH.TO PC'OROOMI(O 00 CT-ONT0RLCTIONE02T ER

CAINTAX U ACTUEA

BOILEHrRI FO NATIO

7 TUCRI__/WHANE aDCSIN 1 d APROA16SD NG1R0EUDGN 0 2

4 ; - L Iro.lr t NS 4 S YSTEM

.... NY.. TER....TREATMENTl

....Z. .L,.'L ,Lt

INN

POLEED TNSCOUE

FOUNDATITONa NSo ~ rO .. .

BUSTDAC

- -ELSCTNC E L. "ANTCtLI-ARYEQUIPMENT

ND APPROAMU

WORK CONDITIONENVIRONMENTAL

4 and the lowest 5.1 0 C on Oct. 12.The highest temperature was 25.2°C on Oct.

with the heaviest 4.6 m/m on Oct,During the month, the total rainfall was 5.6 m/m

two days. No. accident has been reported during the month. 22. We had rainfall for

- 17­

Over All View of Yongnam Power PlantUnder Construction.

Boiler Burner being installed.

- 18­

Installation of F.0 tank.

It

AV7t

Installation of Boiler Ignitor.

- 19­

Installation of Soot Blow Control Valve.

Heater Exchanger insulation work.

- 20 ­

Lighting load Center breaker check

4.16 KV Switch gear bus taping.

- 21 ­

SECTION III

FINANCIAL DATE

SECTION III

FINANCIAL SUMMARY

As for the local currency funds for this project, Funds Summary and Status Report is

included Tn the attached sheets

- 23­

LOCAL CUAENCY FUNDS SUMMARY AND STATUSREPORT O St. 191

(A-nt Epo..td In K--) Won) S PA. I d 3

Din.4.Ih.

Lad &Lwd RISW _

Ste Pu als

Oolginal

C.0 (I)

49,174,000

Total (2)

39,858,000

39,858,000

Rolstd

1968

34,905, 0

34,905,000

l

1969

4,953,D

4,953,000

1970

-

-

1971 Aolo.I Wool,

I) Sit. 9 el

Co,.gooo

Pd (3)

KECO

Pootlo. (4

_ , S", 59

36,9,4

Ce.Iwd-d

To Own1(5)

A

36.

Co

bo-10

3, 29P, SC

-

Mo. k f0

&V 2 ) DO o

.69","j3

36,oM

.

-3- W. MY

-M453

idiNg & . , , 3V,254 000 291,250 000 139,43 000 722 000 57 554000o 196,447,000 64240e917I 2 3 Z12,0, 742

Twurin Strnthoe 300,000,000 235,435,000 116,609,000 74,690,000 44,136,000. Id Slag* P..H. Fdn. 19 322,700 12,156.423

3)S i age Fal Soon 14,967,000 1,690,707 3) ot Sog. FIoisq . 10,468,000 3,637,515

C4 Itoooo­4) Flo Cot, M-oy, ,8,050,o00 10,156,037 5)OhI. Boo.. F4. Pil1rg 1,403,000 272,158

6) F.O. pmp Ho-.. 2,664,0w 933,930 T-oo67- Pup H" 3.190.000 865.1so Ciaodnotlon Ho 4,27V,000 W95,845 Poooo top Eotoo 8..4 t. Ap-t 907,000 2a5,215 Apot SiSIt. Gadlng 568,00 455,620

II) o n ll Rtoo o A C -I Du ct 1,60 , 1 20,0 0 0 12) Intcornnting Ro to Sold.

M o n Rood 1,6 5 0w 232,98 5113) 2n slog e F nlshlog Ro Toorin e 13o2.d 8,.F.IM9ImTb-45D,000 1,451,668

14 P.H. Fdn. Excoontio 7,766,000 166.000 IS) F.O. Ponp Ho-. Lifting 219,000 -

13-4-. E-1db-I) PIubing & Hoting syortto. P.H. -17) 3,d one FInInM a PH 33,250,000 4,525.305 18) Soltchyo,4 fmca.,.'? 1,2.090 175.990 19) DOblrg. G o d .m ce, n I, 720 3,00 75, 222

31,479,173 16,657,707

14,105,51,

M,206,07 1,673,15 3,597,930 4,05.120 5,164,64S

1.192,215 1,023,620 1 ,920, 0 0

,9 6

V901, 6M8 7,932.00

219,01

37,773,305 1:,395,992,S95,m

-1

-

--

-

-50

-,

-

-44.9

-

-

1,92 -1431,210

9. o

0 2 0w

99

100,000

40,0 305,76I,2 , "

31. 1177. 0 ,314.3W

ls,S0V,340

53.773,644

13,3B2 3.93.Ow 3.49n.71

1,11111:725 182.3

1 8$0,

1,9 4,3 1 2

6.991,27

9'aw

13,604.614

"It.~2.30 1 11

-

Aboold Shop bufli,0,009

Aotld..o Boipw Bulding 12,000,0005,00,00

5,000,000

1,8.00 18,58.00070 P.0

2,568,0W

1,30. 18,12000

-

26,0 275,00,10

4,053,000

-

12,418,000

-

12,100,000

1) Moohno Slop Bldg.I) Am. Boiler Bldg.

iiLightingFWorV..T. Bldg. ut .

12,383,0w5,567,000

4,741,000

5,464,7102,064.449

293,0C0

17,847,7107,631.449

S.034,000

-{2&19-

-

17,64,22Y7,7],94

4,fo,32

sgi tng oo Moolne S Ildg. 4,00,030 1,000,00 ) 1,000 0

2) Eiecti,oo Wool fon Couo FPolitim3) LialIing fot P-o.o Ho-.

4 Lighting ion Out donr

3.97,0002,560,000 4,449,0w0

91,00w130,0D 359,000

3,688,0002,690,000 4, 808 00-

-,,72 -143,21&

3,.7 4,770,001

1 I) Sit. Iloeotigotl- 1,254,00 355,459 1,609,439 - - I,409,89 -

Itake. St5h 2,50,WO 61,750,000 61,750,00

h 5,D,0 1700D6,5,0 2dk) CW P

2 ) CW P-

H-oSinot. xcd

St-t€-

10,621,0007. O.'00

10,621,000)

9,322,3175186,0DD

9,3i2,'175

19,29,177,266,OO0

19,943,175

34,48 --174

U9,7475 7. MO,304 18,912,447

5a

Seem. G-d..g Eq..

Oidw.r Wo lplng

287,600,0 410,0O

331,043,OD0 33,9380wo 4707 13,8Dw 116,210,00 9.9 .....

w 166893 . ..

30949310180739889~I.9

rd *I.Wo wSt..M. T -od.& Plprg 5,00 ,000 1,478,000 ,,42,0 00 36,000 I) Po aie W tor Tonk, & Piping 1,410, O 6 ,800 1,47 ,0 - ,2 3,

l ndoM 9lW ts Slnug. T .9%sFou od wt

Pool OIl SI...g. Too f oundotl,

4,000,000

4,000,0w]O

4,333,000

31,1(0,000

4,333,000

17,752,0w

-

13,378,000 -

I) Idusti l Wat r To k F &d. &

Piping Ii F.O. Stogo TkT, Fdn.

F)Pit. Wo1l lnt F.O. Tool

1,701,000 9,.500,000

2,919,000

2,631,471 13.356.020

2,046,453

4,M32,471 22,056,03D

4,968,453

-(32,i3)

145,67

4,4..14 22,i0,41

4o3S.710

Soll. Pos.t 40,000,000 10,441,0w0 10,441,000 - I) soil., Fd.. Plling 2,955,0w 1,4235,545 4,3D,545 4.4i5.W) -

S totou koll.5,00O,0w 16,205,000 - 16,205,0 0 0 . 2Soil., Poodotlo

I) t Sing. boll F

A 2nd Slog. Boilsr F-

- Er onflo

Erectio

2:160,00S ,0w

5,673,000

2,669,4603,865,215

3,432,392

4,829,460.2,365,215

9,052,392

-

-7.

(13,33)

M2

4.2i9.,7 .-4,330

41.1132

• -me -'%8kn

s i n Lo EgA

F.d Wt. Sy..

NeO 00 Syste.

Aum.llary Itlar Wae. Tn.otom.

InduaftIl Water Tank

.n

ElInmo 1

,d Cost (I)

104,00,000

25,00,000

64,80),000

5,900,000

9,200,020

16,000,0G

Ttal (2)

194 831,000

-

40,a,000

894,000

3,261,000

,T,70D

1968

-

-

-

-

-3,261,000

41ugq Eo.-d in

1969 1970

1,818,000 102.4-6,000

15,197,000

894,000

-

27,70000 -

1971

9C.607,000

25,603,000

A ta ot .- r-.k (3)_

1) 5oD Getrc E p. 60.800.000 2)No-Vwct;) TonIFW277.5o1.n.7

WeldingSto- 5. 167,3q3) Itt Stg.e Com-on Focililn & ripig 3,455,0DO

4) 2nd Stage C omn Fodlilits& Oipirg 5.380,005) Equtpn-z & Piping Vaok 36.5O300DO

6) -klation,.ork ;4.000.0007) Inst-rlotion a. 2,570,0 0) P-,we Souces FanH7S04 79,000

unlaadi.na Pa..ps

F.O. Stno-, Ton. 9,72),000

1) A- .oe Eretio 720,0

i) water rrtmt Eip. 2,317,00O

1) lnduteol Woto Ton. 17,883,000

KECC Pottk 14

24,e40,l

381,00s

9,011,814

21050,6255,.V2,000

667.4:W'00W6:I.J469,000

-9,-)

25,315,003

174,-O-

1,041.000

8.322,000

CK.,.r. r0 Dae.() -

as.o2,C)O5

5,.54,)"1

12.4466814

7,430,62542,172,152,57.;-o9 ,517,10

9

35°135,300

894,000

3,35800-

26,205.000

Cat _oI,.o.d 16)

-

-

. .

741.00

(7.16 a

7d2),2 70.3;.as

314.6S5

41,130

(I),23 )

(

k

I

De (q

3It 177

2.33761

17.917 2 3.7799

351.172

27.182,046

a".-%?

2,46,919

2S. 45

aJ 36)16.

%aft

-

-34

(

Elet -

lo - i

P-on G..oflng Ep p-t

Tubln. Fouandtlon

175,600,(00

108,00,1

68,104,000

26,770,000

26,770,000

26,770,00

34,798, 6,61,0

I) T/G Foundolan 46,39,00 15,45D,000

0

II,319,520 65,3,825 26,769,000

3,466,175 -

1.351,330 47.297, 26293,610­

,1

Codewmlng Tuohln G-n.atoe

Irnioko Eqluipmn

AoII.y Fo-llIlles

fliaddemi Cotatl Romam

14,400,000 36,00,000

9,50,000

I1,70,000

6,000,000

-30,100,000

5- 0D,0

6,934,000

-

.-

-

425,000

-

-

40,000

26,12D,000

5,00,000

-

3,678,000

3,555,000

2,806,000

1) T/G & Corndonog EquIp.

1) Intk. Eqipetnt

1) I.myttQWok of SW. G- & -.­ a Bu Duot Z Loylp Work of VarrlaoEloftelol Ceefral Snllcihorn

24,250,000

3,211.000

2,673,000

735,000

5,841,300

763,460

710,000

384,625

30.091,300

3,974,400

3,3M3,000

1,119,625

-

-451.352

-

48.00

120,0'10

330.00

16,860.W4

.6"2.

2. 37

3F7,130

Awoogmwyletfol IqWte.

on.... &a

CW*dLaylngOut

0ndornt Syt-m

26,300,000

1,000,0 20,O00,000

1,500,000

30,307,00O-

24,034,00

6,273,00)

9,4,D

-

7,534,00

2,315,000

1518 -

13,735,000

1,382,2000

540 -

2,765,000

15,SD0,0

1) Conu. - 4,490,000k

2) Loy og Work ForCob. &loat omteil 7,430.000

3) L.Yfng -Iok f-r ddltl( a cobli, --)li-tur~igst

1) lit Stage Gron0log Sytt 5,5,000

1,129,000

425,

586,000

118.001

16,629,000

4,91,

8,016,000

3,670,000

13,678

-

6,2m5

3,

,

99, m~ 5,223

-

9,92

26

2.671,547

3,628 ,417 5,3m

3,704,02

P3),292

am Uqtl e 3,00,00, -0,

mbuull.so InAgm!ottT/0 €- Canmo

13,3D0,000 3,000,000

7,33D000 1,756,000

-,

-5614, WO

1,367,000 1,76,600

389,000 -) C1 (Moch.onJel)

2) Pow. lo . Cron.(Elootlo)

000

1ower.u.0 1, -60, ODO

115,500

7n7,935

107,ODO 93,000

7,396,415

01,367,00 40,3500

(46,45

-

95,861 9,99,66

401.2

1,336,317

-

ir

Ccme.Wd Air Syst- & Mix,. Flit Iha18i, Eqlpot

Wahk Slup E19A, & MIsc.

2,000,000

2,5o0,0

3,000,000

3.00,000

1,347,000

3,522,000

725.

-

-

-

- -

3,522,000

25.0

1,347,000

-

-

-

-)

1) El1ant," Enooton

I) Outdno Firs Ptet.Tlon

Wtlk SlnnpET.ip.

I,075,00

3,.5Moy)

535,00

107,500

205,695

194,74

1,162..'%1

3,713.49 3

;74,75)

855*20

(29,135)

35,301

93.3

3.542.7"8

54.3532

.

-

LOCAL CLURRLNCY FUNDS SUMMARY AND STATUS REPORT

(Aon ,., In1.KdKm.o Won) O o-;- 31, 1971

I

twvdk

Fmdgtw

O rigina l

EIft.mCn~s(o

M, 00,

200, ,000

To(o)

2,5,0

29,651,00

1968

2,093,000

2,093,000

R e vi1 e E tl r. td C oo t

IC 1969

13,300,000

13,300,000

1970 1971

1492,c

134,259,000

Atral Work

1) Furniture

Controd--

--

KECO Cco;ntLaenoDole_4)_

3.52.68IA

V.997,6852,-

U .- . iwtt l

____-n _d(_)

6 ~Ai

C. ."

MothNo.43.

E pentle

to_D

22.9,98S,6

irwmhh.. Met.PoediN.. OVijlW Sv.tksirdFwmdwaol

UJm SA Coalon Fowdatlon

Ouwld Swityawd imndilmn

IWeanS,/ Connectin Eqip.nt

12,100,000 5,500,000

;, 00o,0

2,800,000

1,300,000

1084 4,680,000

3,284,ooo

2,670,000

.

-

9,144,000 4,680,000

3,294,000 1,180,030

-

1-1690j00,573

1,690,000

SwitchyardFoundation

in Tr. Foundation

L Oylvrove on Switohy79 Tr. Eretion

1) OutdoorWolahryd

3,460,000

7900

SMMl3,540,000

1,45,000

1,821,031 364 0

77500

824,0 0 3291,.

304,0

6,7,3 1.024.30

1,32,521

1,749,000

2.06'3,99

-

-

26, ,61," - ,749,m

so 2,344,06

0,,44000s20 49 100,030 1,661:1$2

104,20X21,921

, , 6

Tuem.bann. Piant Came Equip ad 20K0000 317,- 375w -----

Yoa.,,

Tlo e

SA-U3.

ton

Tm..io

od930,

0 n Line.

~-28,000,O00

60,000,000

3,571,000

3,o.5062,00

91,20000

3,571,000

46900

.

3,021.000

000

-

1,7,0

87330,000

Guy U..;.k Fdn.

Guy DOri*d, R.Ion on3) R.IoaIlon of El.ntorh Sy""­

fo Guy Delick Guy And., 94n. Tmporny Partition- f3SrCon tlRo o1

6) Terpo" y Partition m r for S.!W, G e Roco,

7) Olllon F3Forlygro Offl3TernporaryP-owo fo,Coonn Foilitlem Llg,1lng fa,T-p.orory Woe.ho,o

10 Co-11 33 Tenpory Par-ton Wok For

row, House 25Ternporay Stont--p Pow

R eceivig Systen 3 Twtpomry Pow. 220V

OutdoorStonag. Area

6,848,020

1,190,000

2,050,000

139,500 149,()W 380,000

30,000 21,00

177,500

187,000 2,724,02

--

2,464,874

562m843 358,000

88,695 -

--

80,000 31.171 -

108,566 1,235,599

-

3636388

9,312,874

1,752.843

2,408,000

139,500 W37695

180,00 0

30,0O 21,000

257,500 31,171 -

295.5 6

3,959,5991 -

36261,885

(4201

-

-

54 998 115

171,98

.139,30.

)2000

151,"s

10,914,9%3

1.654,76z

2.136,102

239,326 29 o284

2,846,160

2 ,40 2.64,,000

215,96

746,446

145.536 I ,600

36 361 115

.7.

(,S,

-

.20m

&ind.t C h

a r ge

_m.---ry& Ala,, S.

lem Ify !C~ohuctla

c

50.00D.000

11,D

534 000,WD0

378 256 000

537S182,OD0

228&V000

18699,000

154 613 000

73,8M 000

112,0O00

128,76, _-

110,896,

8, 000

20;,745,000

371689

323,606736

293,53,29

629,S38,._

323,6W, 54,649,4. .

293,U)85,871,471 4,330,34

629538431 (54 3 )5643 3.

323,067

293,5335s

62903152431 543

,

";'-rieks. .Inc--- --

-(2,75987)

S1 344L 531344 24

(2,759,8073

,+l344 264)

2,759,807

( 575 353).

4 9

319

51,344,264

2590

(51,344,

273

T.. 409°o 501,996,000 601,443,00 906,675,000 490.747,200 1,580,00L 327 2,070,75q527 252,772,473 59,834,905 3907200 2 3%,32k

TI, €onononLlnk tnfund. SorUnit No., .m3h,folno'irgPwonod noquimPmet;ito| inolod4 om e;ng e uthla.ifIoc cre,1 N.ttncyona Unit No, 2 toppl;odundergonrmanloon i, to In. lnloIlnd 50;Onto It.. oploion of Unit No I.

SECTION IV

PERSONNEL

SECTION IV

PERSONNEL

Force Report

I) TKC at Site

Name (Spec. No.) Jol Titl Arrival Date Departure Date

H.I. Stewart C.L. Pon H.T. Jones

J.E. Lowd

R.Schulze

Resident Engineer Resident Engineer Assist, Res, Engr.

(Mech.) Assist. Res. Engr.

(Elec.)Field Engineer

7/2/68 2/16//T 1/9/7010/26/718/3170

11/1/67

12/'20/69

9/23/71

8/29/71

5/30/68

2) J G. White at Site

J.R. Mills .).C. Coleman L.B. Lonq C.M. DenningD.W, Shaffer

Chief Advisor Material Advisor Rigging & Mech Advisor lec. Advisor

Piping & Welding Advisni

4/3/696/15/69 8/16/70 11/29/697/21/7n

4/29/717/21/71

TLK, Naone Welding Supervisor 1/1/71

3) MAN at Site

W.Heinloth K.Rensen

Turbine Erector Elec. Erector

10/5/70 6/23/71 10/11/71

4) Vendors at Site

P.W. Davenport (18) C.M. Cargile (18) F.C. Engel (78) C.W Vanier (2T)

Erection Supervisor Welding Supervisor Erection Supervisor Erection Supervisor

5/14/70 8/21/70 7/9/70

(11/16/70

3/16/71 8/31/70 1/20/71

J.C. D.J. K.B.

Gentry (2E) Mclaughlin (3E)Stroud (4E)

Elec. Engineer Elec. EngineerErection Engineer

2/15/7110/18/71 10/20/71 1/7/71

2/18/71

2/9/71

5) tECO Consruction Camp.

-28­

SectionSec----

Mech. & Elec. Section

Structural Section

TitleT

Superintendent Assist. Superintendent (const.)

Section Chief Managing Sub-sect. Chief

Clerical Personnel Engineering Sub-sect. ChiefEngineering Administrator Mechanical Sub-sect. Chief Mechanical EngineerElectrical Sub-sect. Chief Electrical Engineer Electrician

Section Chief Civil Sub-sect. Chief Civil EngineerArchitectural Sub-sect. ChiefArchitect

Total

PlannedManpower

I I

I I

14 I 2 I

10 1 6 1

1 1 2 1 2

47

PresentManpower

1 1

1 1

12 I 2 1

15 1 6 I

I 1 4 I 3

53

-29­

6) Local Contractor

Job-Title PresentMan Power

Administrator & Engineer 26

Foreman 29

Iron Worker 30

Welder 25

Carpenter 12

Electrician 72

Mechanic 73

Piping worker

Plasterer 15

Driver 2

Painter i8

Laborer & Helper 96

Total 493

The man power of KECO Construction Camp is all engaged in the construction of

Yongnam Unit No.], and Unit No.2, while the Present Man Power of Local Con­

tractor reported here is engaged only In the construction of Unit No. I.

- 30 ­

SECTION V

PROCUREMENT ACTIVITIES

SHIPPING STATEMENT THIS MONTH

Spec. No. Vessel Name

20BCI Export Champion

7T Steel Executive

17B Steel Executive

12B1,2,3 Export Challenger

12B1,2,3 Steel Executive

12B1,2,3 Export Challenger

19B3 Export Builder

8B, 9B Export Builder

IB Export Builder

IB Export Buyer

12B1,2,3 Export Buyer

12B 1,2, 3 Export Buyer

12Bp, 2, 3 Export Buyer

8B1,98 Export Bay

12B1,2,3 Steel King

19B3 Steel King

12B 1,2,3 Export Champion

9T Export Banner

12B 1,2, 3 Export Courier

14B Export Banner

- 32-

Shipping

Dote

7/2/71

7/6/71

7/6/71

7/15/7]

7/16/71

7/23/71

8/4171

8/4/71

8/4/71

E/17/71

8/17/71

8/17/71

8/17/71

9/2/71

9/12/71

9/3/71

9/2/71

9/30/71

9/30/71

9/3041

As of October 31, 1971

Arrival

Port Site Remark

9/1/71 10/27/1

8/21/71 10/27/71

9/20/71 10/20/71

9/20/71 10/2141

9/20/71 10/21/71

10/341 10/19/71

10/1971 10/26/71