IRIS Infrastructure Product Presentation
Patrick Hartkorn Ed. Züblin AG
© 2011-05 • IRIS Product Presentation • Hartkorn 2
IRIS.Tunnel
One integrated solution for data management, visualization and analysis
© 2011-05 • IRIS Product Presentation • Hartkorn 3
Purpose
> Integration of
risk and
information
management
> Internet based
> Risk assessment
> Cost analysis
Integrated Risk Information System
> Data analysis
> Data management
> Communication
> Transparency
> Data platform
> Life cycle
management
4
IRIS.Web > Global access
> IRIS is a 100% web application
> Global access to local projects – central server / local internet browser
– central data management and central support
– no local installation, no local support
> fast reaction time – reduced costs for operation and maintenance
© 2011-05 • IRIS Product Presentation • Hartkorn 5
IRIS Product Presentation
Introduction
IRIS Tunnel program overview
Data input
Reporting
Visualization
Analysis
References
6
Application > Program workflow
Log in 1
Data acquisition 2
Process data (asynchronus import) a
Actual State data („real time“) b
Reports 3
Analysis 4
Standard modules a
Advanced modules b
Service modules c
© 2011-05 • IRIS Product Presentation • Hartkorn 7
IRIS Product Presentation
Introduction
IRIS Tunnel program overview
Data input
Reporting & Inventory lists
Visualization
Analysis
References
© 2011-05 • IRIS Product Presentation • Hartkorn 8
Data acquisition
project space project space project space
© 2011-05 • IRIS Product Presentation • Hartkorn 9
Data acquisition > Process data > automated and user driven
Advance
Ring installation
Stand still
301 Extension supply pipe
302 Extension water/air supply
303 Extension bentonite supply
304 Track works
305 High voltage works
306 Extension air ventilation
© 2011-05 • IRIS Product Presentation • Hartkorn 10
IRIS Product Presentation
Introduction
IRIS Tunnel program overview
Data input
Reporting
Visualization
Analysis
References
© 2011-05 • IRIS Product Presentation • Hartkorn 11
Reporting > Information Export
Import via IRIS, Field Bus, OPC, FTP
PDF export
© 2011-05 • IRIS Product Presentation • Hartkorn 12
Reporting > Work shift data
Standard weekly report
© 2011-05 • IRIS Product Presentation • Hartkorn 13
Reporting > TBM process data
> Risk assessment of environment
> Decision management
Advance rate [mm/min]
Revolution of cutter head [1/min]
Color background: Geology
Data selection in IRIS Export of diagram (PDF)
© 2011-05 • IRIS Product Presentation • Hartkorn 14
IRIS Product Presentation
Introduction
IRIS Tunnel program overview
Data input
Reporting & Inventory lists
Visualization
Analysis
References
© 2011-05 • IRIS Product Presentation • Hartkorn 15
Visualization > Maps Viewer
> Map viewer
© 2011-05 • IRIS Product Presentation • Hartkorn 16
Visualization > GS-Viewer
> Guidance system (GS viewer)
© 2011-05 • IRIS Product Presentation • Hartkorn 17
Visualization > ITV
> Interactive Tunnel Viewer (ITV)
© 2011-05 • IRIS Product Presentation • Hartkorn 18
Visualization > ITV
> Online TBM Data Viewer
© 2011-05 • IRIS Product Presentation • Hartkorn 19
IRIS Product Presentation
Introduction
IRIS Tunnel program overview
Data input
Reporting & Inventory lists
Visualization
Analysis
References
© 2011-05 • IRIS Product Presentation • Hartkorn 20
Analysis > Modular structure
Standard modul
Advanced modules
Environment G
Service module
Cutter wear > Site data / prognosis tools 1
Segment Management > Site data / damage records 2
Consumable record > Electricity, Water, Mortar etc. 3
Target-Performance analysis > Jack forces, advance etc. 4
Slurry plant > Mass balance, bentonite volume 5
Settlement > Surface Settlement Evaluation 6
Data Interpretation > State and Process analysis 1
Interaction-Analyse > Recommendations / Decisions 2
© 2011-05 • IRIS Product Presentation • Hartkorn 21
Analysis > Target-Performance comparison
> Prognosis – Comparison with Performance-Data
– Update of prognosis with TBM-advance
Real performance + updated prognosis
Initial prognosis
Daily performance
Modules: + G 4
© 2011-05 • IRIS Product Presentation • Hartkorn 22
Analysis > Settlement evaluation
Visualization of settlement points
Visualization of
settlement
Visualization of
key TBM data
Modules: + G 6
© 2011-05 • IRIS Product Presentation • Hartkorn 23
Analysis > Settlement evaluation
Visualization of settlement points
Visualization of
settlement
Visualization of
key TBM data
TBM face pressure
recommended pressure range
critical pressure range
© 2011-05 • IRIS Product Presentation • Hartkorn 24
Analysis > Settlement evaluation
Real time monitoring
• geotechnical monitoring
• building monitoring
• geo-environmental monitoring
• ground improvement records
• etc.
TBM control
• face pressure
• tail grouting
• cutter head revolution
• volume control
• etc.
© 2011-05 • IRIS Product Presentation • Hartkorn 25
Analysis > Settlement evaluation