23
IPACC – OBS Update Mental Health Forum Gareth Lawrence 23 rd October 2007

IPACC – OBS Update Mental Health Forum Gareth Lawrence 23 rd October 2007

Embed Size (px)

Citation preview

IPACC – OBS UpdateMental Health Forum

Gareth Lawrence 23rd October 2007

Overview

• IPACC – Strategic Context/Background• What is an OBS? Why an OBS?• IPACC Scope• IPACC OBS Development Process• Progress to date• Planned activities• CMH Progress – Key queries• Any questions….

Strategic Context

• Sept 2006 – report submitted to eHealth Strategy Board– GP IT systems needed improved

functionality to support broader 1ry and community care domain

– New systems acquired via national procurement

• Outline Business Case produced for eHealth Strategy Board – March 2007– Explored options in detail– Wider consultation with service– June 2007 - move to next stage

SEHD Commission – Key points

• Received by NSS July 2007• Preparation of Requirements

– Patient Management System (PMS) and

– Integrated Primary and Community Care (IPACC) Projects

– Governed via current Project Boards – Ensure that common elements were

managed robustly•Hardware assessment•Network assessment•Overlap in functionality•Use of national products

Delivering the Commission

• NSS response approved– August 2007• Proposed the initiation of two distinct but

closely aligned projects• Governance via Project Board and

supporting structures• Baseline plan for delivery of key products –

effort/time/cost• Roadmap of how products will be delivered• Commenced initiation stage

• Final version to be delivered by 31st January 2007

IPACC Scope

• Scope– The core IPACC OBS solution

•GP Practice patient administration and clinical management system (To support full Scottish Enhanced Functionality)

•Wider community health care teams patient administration and clinical management

– Nursing – Allied health professionals – Mental Health Teams– Child Health

•eCare•Primary care registration management

IPACC/PMS Interactions - CMH

• Aware of discussions re fit for Mental Health• Current commission;

– PMS - The core PMS solution;» Mental Health Patient Administration

System» Establish high level functional requirements

for;» The additional optional module list;» Mental Health Clinical

– IPACC - Wider Community health care teams patient administration and clinical management:

» Mental Health Teams (Psychiatric nurses, Clinical psychologists & Psychiatrists);

What is an OBS?

• Specification that focuses on desired requirements of a system or service in business terms rather than technical terms

• Describe the business/clinical area and benefits expected – use scenarios

• Written as a series of outputs– Service improvements (removing

limitations, faster)– Safety (better controls, limited access)– Financial (saving costs, more for the

same)– Measurable, where possible

Why an OBS?

• Supports the ‘Competitive Dialogue Procedure’

• Allows potential suppliers the scope to provide a range of solutions to meet the needs of the customer/client

• Gives the freedom to flex the scope of a procurement to meet the needs of the service

• Allows the customer and supplier maximum freedom to explore solutions prior to detailed contract negotiations

OBS Development Process – Process Outline

Project TeamKey

StakeholdersReference

GroupWider

Consultation

Draft #1 Draft #2 Draft #3QA QA

RD RDRDRD

PD PD PD

RD = Role Description

QA = Quality Assurance

OBS Development Process – Key Stakeholder Groups

• Assist with mapping the patient journey for a limited range of likely scenarios (both current and future)

• Assist with defining and documenting the high level outputs in relation to the principle functions and processes

• Group related requirements together into baseline clinical and business functions

• Provide a high level assessment of the benefits, quantified where possible that would accrue if the defined outputs were implemented

• Identify any major issues and risks if the defined requirements were implemented

OBS Development Process – Key Stakeholder Groups

OBS Development Process – User Reference Group

• Responsible for providing cross-functional representation across all of the work streams within the IPACC scope.

• The main purpose of the Group is to review the detailed draft version of the OBS, covering the draft outputs from all IPACC work streams and ensuring cross work stream dependencies are identified and effectively coordinated.

OBS Development Process – IPACC User Reference Group

USER REFERENCE GROUP PROCESS

Document results

Feedbackto Key

Stakeholders

Feedbackfrom participants

OBS Draft 1 Delivered to URG

(1 Day)

Quality Assurance Process sign off for

Draft 1 from KS Stage

URG review Draft 2(9 Days)

Draft 2 Changes Agreed

Draft 2 URG Sign off

Quality Assurance Process – Draft 2

OBS Development Process – Quality Assurance Group

• Independent of KS and URG functions• Cover same clinical and business areas as

Key Stakeholders• Should not be same people

OBS Development Process – Quality Assurance Group

• The QA Group will provide overall quality assurance to the OBS development process

• It will act as a key focal point ensuring all relevant stakeholders for each IPACC work stream are both involved and provide appropriate material to include within the OBS

• Provide formal authority to proceed through each stage of the OBS development.

• Quality Reviews will be organised and conducted in accordance with the IPACC Quality Plan

OBS Development Process – IPACC Quality Assurance Group

Progress to date

• Initiation workshop held – 18/09/07• PID draft complete• OBS Skeleton Structure developed• Work packages initiated for hardware

audit and data migration report• Ongoing meetings with Key

Stakeholders/QA to pre-brief and gain support from professional bodies

• Review of existing documentation/specs• QA/User Reference Group meeting dates

planned• Project Board scheduled – 1st November

Progress to date

Work stream Project Team

Meeting 1 Meeting 2 Meeting 3

GP GL/GS 18/9/07 2/10/07 – BM5/10/07 – AM

12/10/07

CN GL/GS 25/10/07 02/11/07 TBC

CMH GL/GS 27/09/07 19/10/07 29/10/07

cAHP NN/SH 12/10/07 Virtual review Virtual review

eCare TBC 01/11/07 Virtual review Virtual review

PSD NN 19/10/07 Virtual review Virtual review

Child NN/SH 23/10/07 – VB29/10/07 – SA

13/11/07 – SA+VB

N/A

Drug Misuses Service

TBC 06/11/07

Learning Disabilities

TBC TBC

CAMH TBC TBC

Progress to date

• Hardware audit – Meetings held with sample HBs– Data capture spreadsheet

distributed to sample HBs– Return date – by 30th October

• Data migration report– Work initiated– Report in progress

Planned activities

• QA Meetings – 30/31st October• IPACC Project Board – 1st November• SCIMP Presentation – 6th November• URG Meeting – 8th November• Review of existing GCS requirements• Ongoing key stakeholder meetings – 23/10 –

6/11• Key stakeholder communication events

– E.g. Mental Health Forum • Delivery of first draft of IPACC OBS – November

2007

CMH Progress – Key Queries

• Scheduled meetings complete– Includes content from Feb07 – ‘Draft high

level functional spec for MH Info System’– Draft to be complete by 24/10/2007 for KS

review– Review of existing MH systems requirement

specs to commence– Meetings with CAMH/Learning Disabilities

• Key Queries – Psychology involvement?– Concept of electronic clinical notes?

Any Questions?

[email protected]

07823 532 8020131 275 7459