PIEDMONT LITHIUM PROJECT
FIGURE 1
0 2MilesO
LEGEND
IP Project Boundary(971 ac.)
PROJECT LOCATION
Gaston County,North Carolina
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\01_PIEDMONTLITHIUM_PROJVIC.MXDUSER: KTHAMES - DATE: 12/26/2018
INDIVIDUAL PERMIT
DATA SOURCE: Esri, OpenStreetMap contributors, and the GIS User Community
HephzibahChurch Road
Whitesides Road
NC-279 W
1 in = 2 miles
PIEDMONT LITHIUM PROJECT
FIGURE 2(CLIENT LOGO)
0 2,000Feet
O
LEGEND
IP Project Boundary (971 ac.)Gaston County Parcels
GASTON COUNTY PARCEL IDS
PATH: \\CLTSMAIN\GIS_DATA\GIS \PROJECTS\71135_PIEDMONTLITHIUM\1008964 0_PIEDM ONTLITHIUM\7 .2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\02_PIEDMONTLITHIUM_TAXPARCELS.MXD - USER: KTHAMES - DATE: 12/26/2018 INDIVIDUAL PERMIT
DATA SOURCE: http://www.bing.com/maps
1 215731 36108510992 213460 36109600503 213461 36109550094 159240 36200324005 215730 36108329486 198928 36108349137 198472 36108369808 205287 36109325269 159640 361082693210 159641 361092072011 159642 361092350412 159638 361082426413 159639 361081471714 159637 361081872415 218752 361090370016 223454 361090136417 209087 361090009018 160753 361080426619 218192 361071845620 216007 361062563521 218191 361074200422 216006 361053769123 159632 361052060524 159633 361052096225 159634 361053113626 159628 361053139827 159635 361053257728 159631 361054308329 159177 361054556030 159176 361054392131 159173 361055318132 159171 361054897333 159168 361065047434 159167 361055456135 159166 361055551936 159165 361055568737 159164 3610556754
Parcel # on Map
Parcel Identification Number (PID)
Property Index Number (PIN)
38 159162 361055789639 159160 361055992840 159159 361066001741 159155 361066026742 159156 361066119643 159153 361065595944 198919 361066242145 198920 361066431246 159154 361066355247 159178 361044746248 159179 361044764449 159181 361044774750 159182 361045802751 159184 361045445452 226475 361046600253 226474 361046812354 159186 361055061155 159187 361055076656 159188 361055193057 159157 361056202358 159150 361046130759 159152 361056395860 157923 361057990961 214055 361067067862 157925 361067313463 157922 361067671964 159195 361067915665 159194 361066755866 159199 361066842967 159192 361076388468 226286 361076016469 226287 361076237470 159196 361076726371 159191 361075468272 159190 361075764173 157917 361098416374 223135 3620070197
Parcel # on Map
Parcel Identification Number (PID)
Property Index Number (PIN)
1 inch = 2,000 feet
PATH: V:\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\03_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_PROPOSEDIMPACTS_PREFALT.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 3PREFERRED ALTERNATIVE SITE LAYOUT
INDIVIDUAL PERMIT
(CLIENT LOGO)
0 1,400FeetO
1 inch = 1,400 feet
Preferred Site Layout Approximate ImpactsDelineated Features Desktop Features Impacts
Feature Type Waste Area Pit Shell Access Roads Waste Area Pit Shell BMPs TotalIntermittent Streams (lf) 2,283 1,983.50 0 0 281 0 4,547.5 lfPerennial Streams (lf) 81 249 178 700 0 55 1,208 lfWetlands (ac.) 0.14 0 0 0 0.14 ac.Ponds (ac.) 0.16 0 0 0 0.16 ac.
Total Stream Impacts 5,810.5 lfTotal Wetland Impacts 0.14 ac.
Total Pond Impacts 0.16 ac.
LEGEND: MINE FEATURESConcentrator Plant SitePit ShellWaste Rock AreasExisting RoadsProposed Access Roads
Setback Buffers100 Ft Lot Line Setback200 Ft Structure Setback300 Ft Residential Setback
LEGENDIP Project Boundary(971 ac.)HDR DelineatedStreamsHDR DelineatedWetlandsHDR Delineated Ponds
100-Year FEMAFloodplainCulverts APPROXIMATE IMPACTS
Delineated StreamImpactsDelineated WetlandImpactsDelineated PondImpactsDesktop StreamImpacts
DESKTOP JD FEATURESDesktop StreamsDesktop NWI Wetland
existing bridgecrossing of
Whitesides Rd
proposed road crossing(utlizing arch span bridge;
no impact to FEMA floodplain)
Concentrator Plant SiteFigure 5
proposed road crossing(utilizng footprint
of existing culvert)
existing bridgecrossing of
Hephzibah Church Rd
Pit BMPs
Pit BMPs
Waste Rock BMPs
Waste Rock BMPs
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\04_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACTOVERVIEW.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 4PROPOSED IMPACTS - OVERVIEW
INDIVIDUAL PERMIT
(CLIENT LOGO)
0 1,400FeetO
LEGENDIP Project Boundary(971 ac.)HDR DelineatedStreamsHDR DelineatedWetlandsHDR Delineated Ponds
100-Year FEMAFloodplainCulverts
1 inch = 1,400 feet
APPROXIMATE IMPACTSDelineated StreamImpactsDelineated WetlandImpactsDelineated PondImpactsDesktop StreamImpacts
DESKTOP JD FEATURESDesktop StreamsDesktop NWI Wetland
Preferred Site Layout Approximate ImpactsDelineated Features Desktop Features Impacts
Feature Type Waste Area Pit Shell Access Roads Waste Area Pit Shell BMPs TotalIntermittent Streams (lf) 2,283 1,983.50 0 0 281 0 4,547.5 lfPerennial Streams (lf) 81 249 178 700 0 55 1,208 lfWetlands (ac.) 0.14 0 0 0 0.14 ac.Ponds (ac.) 0.16 0 0 0 0.16 ac.
Total Stream Impacts 5,810.5 lfTotal Wetland Impacts 0.14 ac.
Total Pond Impacts 0.16 ac.
LEGEND: MINE FEATURESConcentrator Plant SitePit ShellWaste RockExisting RoadsProposed Access
Setback Buffers100 Ft Lot Line Setback200 Ft Structure Setback300 Ft Residential Setback
existing bridgecrossing of
Whitesides Rd
existing bridgecrossing of
Hephzibah Church Rd
proposed road crossing(utlizing arch span bridge;
no impact to FEMA floodplain)
Impact 1(Figure 5)
Impact 2(Figure 6)
Impacts 3and 4
(Figure 7)Impact 5(Figure 7)
Impacts 6and 7
(Figure 8)
Impacts 8and 9
(Figure 9)
Impacts 11, 12, and 13(Figure 10)
Impact 10(Figure 10)
Impacts 14,15, and 16(Figure 11)
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\05_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACT1.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 5IMPACT 1
INDIVIDUAL PERMIT
(CLIENT LOGO)
6
mpact
ctts
c.)
SC(H
DELINEATED FEATURESHDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
Culverts
0 100Feet
O1 inch = 100 feet
1Impact 1 - Perennial Stream 2178 lf delineated(culvert installation)NCSAM: HighProposed Mitigation Rato: 2:1356 stream credits
Existing Culvert77 lf
Bridge footprint
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock
Existing RoadsProposed Access
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\06_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACT2.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 6IMPACT 2(CLIENT LOGO)
0 200FeetO
1 inch = 200 feet
DELINEATED FEATURESHDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
Culverts
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock Areas
Existing RoadsProposed Access Roads
100 Ft Lot Line Setback200 Ft Structure Setback300 Ft Residential Setback
1
Existing Culvert63 lf
Existing Culvert22 lf
Impact 2 - Intermittent Stream 3809 lf delineated281 lf desktop 1,090 lf(removal for pit construction)NCSAM: HighProposed Mitigation Ratio: 1:11,090 stream credits
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\07_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACTS3-5.MXD USER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 7IMPACTS 3 - 5
INDIVIDUAL PERMIT
(CLIENT LOGO)
DELINEATED FEATURESHDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
Culverts
0 100Feet
O1 inch = 100 feet
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock Areas
Existing RoadsProposed Access Roads
Intermittent/Perennial
Breakpoint
Impact 4-2 - Intermittent Stream 8211 lf delineated(removal for pit construction)NCSAM: MediumProposed Mitigation Rato: 0.5:1105.5 stream credits
Impact 5 - Intermittent Stream 976.5 lf delineated(removal for pit construction)NCSAM: LowProposed Mitigation Rato: 00 stream credits
Impact 3 - Perennial Stream 8249 lf delineated(removal for pit construction)NCSAM: HighProposed Mitigation Rato: 2:1498 stream credits
Impact 4-1 - Intermittent Stream 8337.5 lf delineated(removal for pit construction)NCSAM: MediumProposed Mitigation Rato: 0.5:1168.75 stream credits
Wetland
5
Stream 8Stream 9
Stream 8
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\08_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACTS6-7.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 8IMPACTS 6 AND 7
INDIVIDUAL PERMIT
(CLIENT LOGO)
Impact 7 - Intermittent Stream 1130 lf delineated(removal for pit construction)NCSAM: HighProposed Mitigation Rato: 1:130 stream credits
Impact 6 - Intermittent Stream 10520 lf delineated(removal for pit construction)NCSAM: HighProposed Mitigation Rato: 1:1520 stream credits
Beaverd
am Creek
DELINEATED FEATURESHDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
Culverts
0 100Feet
O1 inch = 100 feet
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock Areas
Existing RoadsProposed Access Roads
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\09_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACTS8-9.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 9IMPACTS 8 AND 9
INDIVIDUAL PERMIT
(CLIENT LOGO)
Impact 8-2 - Intermittent Stream 15813.5 lf delineated(discharge for waste rock storage)NCSAM: MediumProposed Mitigation Rato: 0.5:1406.75 stream credits
Impact 9 - Perennial Stream 1581 lf delineated(discharge for waste rock storage)NCSAM: HighProposed Mitigation Rato: 2:1162 stream credits
Intermittent/PerennialBreakpoint
Impact 8-1 - Intermittent Stream 15312 lf delineated(discharge for waste rock storage)NCSAM: LowProposed Mitigation Rato: 00 stream credits
DELINEATED FEATURESHDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
Culverts
0 150Feet
O1 inch = 150 feet
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock Areas
Existing RoadsProposed Access Roads
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\10_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACTS10-13.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 10IMPACTS 10 - 13
INDIVIDUAL PERMIT
(CLIENT LOGO)
DELINEATED FEATURESHDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
CulvertsDESKTOP JD FEATURES
Desktop StreamsDesktop NWI Wetland
0 200FeetO
1 inch = 200 feet
Impact 10 - Pond 30.08 ac. delineated(discharge for waste rock storage)no mitigation required
Impact 11 - Intermittent Stream 12917 lf delineated(discharge for waste rock storage)NCSAM: MediumProposed Mitigation Rato: 0.5:1458.5 stream creditsIntermittent/Perennial
Breakpoint
Impact 12 - Perennial Stream 12700 lf desktop(discharge for waste rock storage)NCSAM: HighProposed Mitigation Rato: 2:11,400 stream credits
Impact 13 - Perennial Stream 1255 lf desktop(discharge for waste rock storage)NCSAM: HighProposed Mitigation Rato: 2:1110 stream credits
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock Areas
Existing RoadsProposed Access Roads
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
PATH: \\CLTSMAIN\GIS_DATA\GIS\PROJECTS\71135_PIEDMONTLITHIUM\10089640_PIEDMONTLITHIUM\7.2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\11_PIEDMONTLITHIUM_IP_8.5X11_ONSITE_PREFALT_IMPACTS14-16.MXDUSER: KTHAMES - DATE: 12/26/2018
PIEDMONT LITHIUM PROJECT
FIGURE 11IMPACTS 14 - 16
INDIVIDUAL PERMIT
(CLIENT LOGO)
LEGEND: MINE FEATURESConcentrator Plant Site
Pit Shell
Waste Rock Areas
Existing RoadsProposed Access Roads
100 Ft Lot Line Setback200 Ft Structure Setback300 Ft Residential Setback
PROPOSED IMPACTSDelineated Stream Impacts
Delineated Wetland Impacts
Delineated Pond Impacts
Desktop Stream Impacts
DELINEATED FEATURESIP Project Boundary (971 ac.)
HDR Delineated Streams
HDR Delineated Wetlands
HDR Delineated Ponds
100-Year FEMA Floodplain
Culverts
0 150Feet
O1 inch = 150 feet
Impact 15 - Pond 40.08 ac. delineated(discharge for waste rock storage)no mitigation requiredImpact 16 - Intermittent Stream 13
240 lf delineated(discharge for waste rock storage)NCSAM: HighProposed Mitigation Rato: 1:1240 stream credits
1
Impact 14 - Wetland 90.14 ac. delineated(discharge for waste rock storage)NCWAM: HighProposed Mitigation Rato: 1:10.5 acre wetland credit
Wetland 10
St re am 13
FIGURE 12(CLIENT LOGO)
0 2,000Feet
O
LEGEND
Piedmont Lithium(971 ac.)Gaston CountyParcels
ADJOINING PROPERTY OWNERSPATH: \\CLTSMAIN\GIS_DATA\GIS \PROJECTS\71135_PIEDMONTLITHIUM\1008964 0_PIEDM ONTLITHIUM\7 .2_WORK_IN_PROGRESS\MAP_DOCS\MXD\IP\DRAFT_20181225\12_PIEDMONTLITHIUM_ADJPROPOWNERS.MXDUSER: KTHAMES - DATE: 12/26/2018 INDIVIDUAL PERMIT
DATA SOURCE: http://www.bing.com/maps
1 157896 3610-98-98772 157874 3610-58-71923 157877 3610-79-32954 159148 3610-36-19245 159151 3610-34-49756 159203 3620-06-63257 159206 3620-05-67018 159621 3610-52-43449 159208 3620-05-5979
10 159644 3610-90-697411 160762 3610-90-550412 157897 3620-08-161913 157899 3620-08-347514 157901 3620-08-436715 157985 3610-38-714416 159623 3610-51-845117 160683 3610-60-713718 160757 3519-99-555519 206528 3610-88-338320 208719 3620-06-840521 211499 3610-58-493622 218014 3519-98-1755
Parcel # on Map
Parcel Identification Num ber (PID)
Property Index Num ber (PIN)
23 218217 3519-79-834024 218218 3519-89-219225 223136 3620-08-820126 224400 3610-42-067227 224401 3610-43-044728 225770 3620-00-197829 204183 3620-01-281030 204184 3620-02-506331 215160 3610-47-998332 157886 3610-99-509833 157898 3620-08-251834 159207 3620-04-995635 159211 3620-16-595236 207977 3620-23-497937 208720 3620-06-761738 211500 3610-69-004039 214150 3610-43-950240 217859 3519-79-054541 217863 3519-79-440942 221723 3610-61-642843 223454 3610-90-1364
Parcel # on Map
Parcel Identification Num ber (PID)
Property Index Num ber (PIN)
PIEDMONT LITHIUM PROJECT