1InWEnt | Qualified to shape the future

Capacity Development Programme in

Industrial Disaster Risk Management

Cooperation under the Programme on Advisory Service on Environmental

Management “GTZ/ASEM”

2008 – 2011

Page 2: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

2InWEnt | Qualified to shape the future

The status of capacity building in iDRM

Capacity Building measures are

Sporadic – there is a lack of systematic awareness building measures as well as tailor made training courses

not coordinated,

not standardised and

often not focussed on the right target groups

not linked to a recognised certification system

A network of trainers and training institutions is not in place

Important areas like HIRA, inclusion of spatial planning approaches, concepts for industrial estates etc. are not existing or underdeveloped (see presentations of Dr. Dubey and Mr. Rahgu Babu etc. in coming sessions)

Page 3: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

3InWEnt | Qualified to shape the future

“There is a need to strengthen the existing training institutions and set up additional training institutes in fire, risk assessment, certification, safety audit and emergency planning etc.”

The ‘National Disaster Management Guidelines – Chemical Disasters’ of April 2007 states:

The Status of Capacity Building in iDRM

Page 4: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

4InWEnt | Qualified to shape the future

The Need

Prevention without informed people who understand is useless -> Awareness Building

Informed people without knowledge what to do are helpless -> Knowledge/skill transfer

Knowing what to do without the possibility and the infrastructure to use the knowledge is desperate -> Development of infrastructure, processes and spatial zoning

Page 5: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

5InWEnt | Qualified to shape the future

The Need

The technical and informational infrastructure without key persons to plan, implement, use, and guide is ineffective -> technical and managerial Skills Training

Key persons and institutions without a clear mandate and support from the society and politicians are isolated -> Dialogue, institutional cooperation and participation

Awareness, knowledge and skills not passed to more people and the next generations are not sustainable -> Network of (Training) Institutions

Page 6: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

6InWEnt | Qualified to shape the future

The Response to the Need 1: Up-scalable Capacity Building Programmes

We need not single Training Courses that are implemented sporadically ….. but

Capacity Building Programmes that are:

Standardised

Certified (certifiable) by a national/international Agency

Quality controlled

Capacity Building based on a professional Needs Assessments to make them target groups specific

Not for free

Page 7: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

7InWEnt | Qualified to shape the future

The Response to the Need 1: Up-scalable Capacity Building Programmes

Training Needs AssessmentTraining Needs Assessment

Training

Modules

Training

Modules

Courses Workshops

CBP3 Target Group z

CBP1 Target Group x

CBP2 Target Group y

ToT

ToT

Teaching Methods

Teaching and Resource Material

Rules and demand driven

training requirements

(courses with certification)

Capacity building requirements

Training of Trainers

is part of each

Capacity Building Progr.

combine

combine

Knowledge Base

Page 8: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

8InWEnt | Qualified to shape the future

Under preparation

Areas:

HIRA

On-site emergency plans

Off-site emergency plans

Page 9: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

9InWEnt | Qualified to shape the future

The Response to the Need 2: Information sharing and networking with proper tools and infrastructure

Network of (Training) Institutions needs tools and processes for dialogue, institutional cooperation and participation

Common Platform for all training providers and target groups for

Qualified announcement and documentation of training offers

Sharing of best practices (accident investigation, mock drills, communication, etc.)

Accessible information collection

Coordination amongst like organisation

Quality guidelines for training and mechanisms for control

Page 10: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

10InWEnt | Qualified to shape the future

http://www.hrdp-iDRM.in/

The iDRM management platform for Human Resource Development

… is a Management & Knowledge Information System for capacity building programmes in industrial Disaster Risk Management

… allows to apply a practical, proven HRD management procedures based on World Bank requirements

… is fully open source and easy to handle by non-IT experts

… with public and internal user / authors sections. Ifanos c&p - SNTL Publishing – InWEnt/GTZ-ASEM

Page 11: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

11InWEnt | Qualified to shape the future

…. information for decision makers available

… all key concepts, strategies, best practices, training materials, participants and experts records for authorised users available

…. the knowledge management and coordination of training programmes more efficient

The iDRM management platform for Human Resource Development makes

The iDRM platform is functionally linked to the ASEM HRDP-net platform that contains the knowledge material of more than 300 workshops, conferences and trainings of environmental management in India

Page 12: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

12InWEnt | Qualified to shape the future

The Response to the Need 3: National Knowledge Coordination and Guidance

Knowledge is scattered - information collection and analysis helps to learn form the past

We need a national resource centre for

… the collection of information on best practices / worst practices for single industries and industrial processes

… the establishment and coordination of accident data base

… a comprehensive collection of rules and regulations with comments and guidelines

… knowledge sharing with international organisations

… setting standards for capacity building quality

Upgrading DMI as a Centre of Excellence with adequate human resources and infrastructure

Page 13: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

13InWEnt | Qualified to shape the future

The Response to the Need 4: Putting relevant themes on the agenda

Competency in Hazard Identification & Risk Assessment (HIRA) - Estimation & Evaluation Skills for HIRA for emergency preparedness

Effective communication of HIRA to Community, regulators & Administration for effective management & better preparedness

HIRA based effective & uniform On-site & Off-site Emergency Management Plans throughout the country

Emergency preparedness for Transportation of HAZCHEM - Enforcement at Regional Level

Focus not only on single Industries but on disaster Risk Management and adequate infrastructure of industrial areas and parks and their siting.

Page 14: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

14InWEnt | Qualified to shape the future

Support the development of Capacity Building Programmes with the iDRM-Management platformEstablish a resource centre at national level

We propose: Recommendations of the CIDM Conference

Strengthen the Disaster Management Institute Bhopal to develop into a “national Centre of Excellence” to meet better use its potential and expertise

To concentrate on the development and implementation of Disaster Risk Management in industrial Estates/Parks in the planning, development and management phases.

Page 15: InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory

15InWEnt | Qualified to shape the future

Thank you