Involvement of Expert for Technical Design of Decentralized Municipal Solid
Waste Treatment Plant in Udaipur
Terms of Reference
Title Design, Supply, Installation and Commissioning of 2
tons/day capacity Biomethanation Plant Location Badgaon Panchayat (Khasra Number 1036), adjacent to Ward
No. 1, Udaipur Municipal Corporation, Udaipur, Rajasthan
Time Schedule
Bid activity Dates
Availability of the bid
documents:
11 June 2018 to 20 June 2018
Clarifications and
queries:
11 June 2018 to 20 June 2018, to
be addressed to email
Submission of
completed bids:
25 June 2018
Technical Bid
Opening:
26 June 2018
Financial Bid
Opening:
26 June 2018
Intimation of
Selection:
30 June 2018
Commencement of
Work upon
submission of 10%
bank guarantee for
period of construction
and operation of 6
months:
05 July 2018
I. Background:
Swiss Agency for Development and Cooperation (SDC) is supporting the CapaCITIES project in
4 Indian cities including Udaipur. The project aims at strengthening the capacities of Indian
cities to identify, plan and implement measures for achieving lower greenhouse gas emissions
One of the key activities under this project is the ‘Zero Waste Management’ initiative in wards 1
and 41 in Udaipur. In order to improve the waste processing capacity in Udaipur, ICLEI Local
Governments for Sustainability, South Asia (ICLEI South Asia) on behalf of Udaipur Municipal
Corporation and CapaCITIES implementation team invites proposals from eligible bidders for
the design, installation and operation (for 6 months) of a Biomethanation plant of 2 tons per day
of source segregated municipal solid waste from Wards 1 and 41 and other nearby areas. This
plant is to be established in Badgaon Panchayat (Khasra number 1036), adjacent to Ward 1 of
Udaipur Municipal Corporation, Udaipur on a DBOT (design, build, operate and transfer) mode.
II. Scope of Work (DBOT mode):
Clause
No.
Activity / Item of supply
01 The scope of the work for the design, supply, erection and commissioning of 2
tons/day capacity biomethanation plant at Badgaon Panchayat, adjacent to Ward 1 in
Udaipur City will be done as per the system indicated, the process flow and the
dimensions and specifications mentioned at Sl. No. 6 in the following pages. The
scope would cover the following activities and services :
a. Basic designing of the plant and systems along with all the equipment and
systems to the extent applicable in accordance with Sl. No.6.
b. Complete supply, manufacturing and fabrication of the plant equipment and
systems including conducting all shop / routine tests and required supervision.
c. Topographical survey, soil testing, assessing highest water table at the site and
assessing drainage situation at the site – internal as well as external to be
carried out before making engineering drawings, good for construction.
d. Civil and structural works for the construction of the entire biomethanation
plant as indicated in the general layout drawing.
e. Overall drainage of the whole site – internal as well as external (meaning
proper drainage from the site through connection to suitable and operational
drainage outside the site).
f. Packing and transportation from the manufacturer’s works to the site
including all clearances and charges, (if any).
g. Fabrication, pre-assembly, (if any), erection, testing, pre-commissioning and
commissioning and putting into satisfactory operation all the equipment
including successful completion of initial operation.
h. Supply and Laying of Biogas pipeline from biogas holder to the generator
room (as indicated in the drawing).
i. Commissioning and start-up of the digester. Special care is to be taken to
initialize the UASB, so that the granular sludge bed is formed within a
reasonable time period.
j. Period of operation of 6 months. This includes stabilization of the plant,
generation of biogas and running full opreations of the plant for 6 months
before handing over to Udaipur Municipal Corporation.
k. Performance monitoring, post initial 6 months’ operation period till
completion of 24 months,
l. Once the plant is operational, UMC will bid out for O&M of the plant (post 6
months of operation) for a suitable concession period as mentioned later in
this document. The present bidder will also be permitted to bid for O&M.
m. Defects liability period will be 18 months after plant hand over
02 The Agency shall be responsible for providing all material, equipment and services,
specified or otherwise which are required to fulfill the intent of specification and
ensuring operation, maintenance and the reliability of the complete work covered
under this specification
03 Wherever a patented technology is involved, the selected bidder will take necessary
clearance / approval from the patent holder. There should not be any infringement of
patent rights.
04 General / layout requirements
a) The proposed facility of biomethanation plant is shown in the attached
drawings (Annexure 2: figures 1-6).
b) The layout of all equipment and accessories shall be developed in a way to
facilitate easy accessibility, circulation space and maintenance as per actual
site condition.
c) Proper access for maintenance of equipment shall be provided as per system
requirements.
III. Facilitation by UMC
• Provide land for installation of plant on token money
• Provide access roads to the site
• Provide fencing of the site and internal roads in the site to ensure safety and security of
the plant
• Provide electricity and water to the site
• Facilitation of necessary statutory clearances/approvals/permissions
IV. Technical Design and Criteria
A. Technology Specification for the Biomethanation Plant
Considering that biphasic process of biomethanation is more efficient and the percentage of
methane in the biogas is higher (almost above 65%), it is considered that this process will be
deployed in the biomethanation plant to be constructed.
The Biphasic process will involve – hydrolysis cum acidic phase and methanogenic phase.
The Biphasic process may have two options:
(i) both phases as suspended particulate matter
(ii) first phase as suspended particulate matter and the second phase as UASB
(Upflow Anaerobic Sludge Blanket) after extracting the leachate from the solid
waste through the process of hydrolysis and acidification.
In this case aqueous extract of the solid waste is prepared in the 1st phase reactor, which is then
subjected to pH correction and then fed slowly and steadily into the 2nd
phase reactor (UASB)
using a peristaltic pump or a dosing pump. The hydraulic residence time in the UASB should be
about is about 24 hours.
B. Proposed Process Flow for Operation of Biomethanation Plant
1. Unloading of the segregated MSW on a raised platform. The height of the platform will
be such that unloading from the commonly used door to door collection system can be
conveniently carried out.
2. To ensure presence of only biodegradable matter in the feedstock for the biogas plant, a
sorting conveyor is provided. Ideally the conveyor should be 7 meter long with two
persons on either side taking out dedicated items and putting them into dedicated bins.
Non-biodegradable material can be sold or given to the waste sorters.
3. The biodegradable waste is passed through a wet grinder, where coarse grinding (2-3 cm
size) is done along with water.
4. In the first phase reaction (hydrolysis and acidification) the material is kept for 6 days for
optimal conversion (optimal time). Approximately 2 tons of feed material along with 2
m3 effluent from the UASB (including wash water from filtration tank T if necessary) is
allowed to ferment for 6 days (optimal time). For facilitating the reactions, either a small
pump is used to re-circulate the liquid or a small stirrer is used to stir occasionally. At
the end of 6 days a slurry pump is used to empty the contents of this tank into a filtration
tank (T). Here the liquid is filtered out from the residual solids using a stainless steel
screen (figure 4).
5. In view of the retention time of 6 days, 6 numbers of similar tanks (D1 – D6) are used.
These tanks are used on subsequent days. When the first tank (D1) is emptied after 6
days, it is again filled up on the next day. This sequence goes on.
6. The filtrate from tank T is piped into a buffer tank (E) fitted with pH probe and pH
correction system. A stirrer is fitted in the buffer tank for mixing the contents which has
high BOD and COD.
7. The liquid from the buffer tank is put into the UASB column (F) slowly and steadily
using a ‘dosing’ pump. The residence period inside the UASB (Upflow Anaerobic
Sludge Blanket) is 24 hours.
8. The effluent from the UASB (2nd phase reactor) is piped into the first phase reactor (D) to
reduce water consumption and recirculation of nutrients.
9. The biogas is stored inside a floating gas holder. Instead of water, the well of the floating
holder can preferably be filled with the effluent of the UASB. Alternatively a flexible
neoprene balloon can be used.
10. A biogas generator of 30 KVA is used to generate electrical power.
The drawings are provided in Annexure 2 (Figures 1-6).
C. Dimension, Material of Construction and Technical Specification
S.
No.
Item Dimension (meters) Material of construction and
specifications
1
Sorting conveyor
(complete set) • Length – 07
• Width of conveyor
belt – 01
• Set up on a
substructure
• Substructure constructed of
angle iron (60 X 60 X 04 mm).
• Height of sorting conveyor
(working surface) – 80 cm
above floor level
2
Wheel barrow – 3
nos. (one standby)
• 100 liters carrying
capacity
• With 4 wheels, capacity to
carry 100 liters at a time
3
Wet grinder Made of polyturf material to resist
even mild acidic media
4
1st phase reaction
tank (for hydrolysis
and acidification) –
6 nos.
• Rectangular RCC
tanks with vitrified
tiles cladding.
• Length – 2.5 m
• Width – 2.0 m
• Depth – 2.0 m
• (internal
measurement)
• RCC tank, with RCC floor laid
over PCC (as per drawing),
vitrified tile cladding on all the
surfaces, joined with acid
resistant grout.
• The removable lid may be of
FRP or HDPE.
5 Slurry pump with
flexible pipe
attachment – 2 nos.
(one standby)
• Manufactured by a
reputed company
with good track
record
• Capable of conveying slurry
containing up to 5 cm solid
pieces, flow rate 500 lpm, set
up on a cart for easy
movement.
6 Pump for filtration
tank
• Manufactured by a
reputed company
with good track
record
• 5 HP along with necessary pipe
length and set up on a cart for
easy movement
S.
No.
Item Dimension (meters) Material of construction and
specifications
7
Filtration tank for
removing the solids
after 6 days of
hydrolysis and
acidic fermentation
(T)
• Cylindrical shape
with removable FRP
lid Diameter – 02
• Height – 2.5
• 5mm thick MS sheet, clad with
3mm thick FRP.
• Alternatively – HDPE tank,
with strength to withstand
pressure equivalent to its being
filled with water. In this case
the removable lid may be of
HDPE.
• A fine SS screen (5mm gap)
would be placed 60 cm below
the rim. A sturdy ring of SS (10
cm wide) would be fitted in the
tank to hold the screen (as per
drawing). All welding would
be continuous and seamless.
8
Buffer tank for pH
correction, fitted
with pH probe and
stirrer.
• With removable FRP
lid
• Diameter – 1.5
• Height – 2.3
• 5mm thick MS sheet, clad with
3mm thick FRP lining.
• Alternatively – HDPE tank,
with strength to withstand
pressure equivalent to its being
filled with water. In this case
the removable lid may be of
HDPE.
9 Stirrer for buffer
tank • Shaft length – 2 • SS stirrer complete with 2 sets
of SS paddles and 0.5 HP
motor
S.
No.
Item Dimension (meters) Material of construction and
specifications
10
2nd
phase reactor –
UASB. This is fitted
with a settler cum
gas separator, which
rests on a deflector.
This assembly looks
like an inverted
funnel. The biogas
outlet is on the top
of the inverted
funnel.
• Cylindrical shape
• Diameter – 1.85
• Height – 3.7
• There is one inlet
pipe at the bottom for
distributing the
screened and pH
adjusted leachate
from the buffer tank
steadily and
continuously by
means of a ‘dosing’
pump.
• 5mm thick MS sheet, clad with
3mm thick FRP.
• The reactor is Insulated from
outside with thermocol
(extended polystyrene).
• The funnel is made of SS 304,
3mm thick, rim diameter of
1.65m and height of 0.65m.
• Diameter of UASB inlet pipe –
25 mm flexible.
11
‘Dosing’ pump for
feeding the UASB
• Manufactured by a
reputed company
with good track
record
• Flow rate – 220 liter per hour
maximum
• Head pressure – 8kg
12
Biogas floating
holder
Set inside a RCC
well with a gap of
10cm and guided by
a guide pipe of 12cm
dia, which is held on
the top by a tripod of
10cm dia
• Diameter – 4.5
• Height – 4.5
• Height of cone – 0.5
• Guide pipe – 0.12 dia,
8.5 length
• Jacket for the holder,
concentric with the
guide pipe – 0.15 dia,
5 length as per
drawing
• 80 m3 gas holder, made of 4
mm thick MS sheet. Before
fabrication, the sheets would be
cleaned thoroughly using sand
paper. After fabrication, the
holder would be cleaned and
dried thoroughly, painted with
zinc chromate primer followed
by corrosion proof black paint
on both sides.
13 Biogas flare (in case
of non-use due to
any reason)
• Capacity to flare 200 liters
biogas per minute.
S.
No.
Item Dimension (meters) Material of construction and
specifications
14
Biogas genset with
canopy
• May vary with
company. Approx :
• Length – 3.3-3.4 m
• Width – 1.1-1.2 m
• Height – 1.6-1.7 m
• Made by reputed manufacturer
with good track record. 30
KVA prime rating at 1500
RPM (ISO 8528),
• 24 KW, 50 Hz,
• power factor 0.8,
• 3 phase, 415 V
• noise level <75 dB (as per
regulation)
• 4 cylinder engine
D. Technical Specifications for Construction Material including Metal Works
Sl.
No.
Item Technical specifications
1
Site preparation • Inspection of the site to find out any problem areas, any
trees which may come in the way of construction
(permission may be required to cut certain type of trees).
• Topographical survey for mapping the undulations.
• Soil test to find out bearing capacity and to work out
remedial measures if needed.
• While clearing the site and doing any excavations, removal
of any material, compliance with Construction &
Demolition Waste Management Rules (2016) is essential.
• For any soil filling and compaction activity, small lifts at a
time should be used. It depends on the soil quality but on an
average 150mm is usually regarded good practice.
2 Brick and
masonry work
• Bricks should be of good quality as per BOQ – first class
bricks. Sand used for the joints as well as pointing should be
screened using screens of appropriate size so that clean sand
is used and soil / dust should not get into the sand cement
mix. All pointing work should be neatly done.
• Damp proof course (DPC) should be used wherever
recommended.
Sl.
No.
Item Technical specifications
• All plaster work should be cured for the recommended
period (dependent on weather).
3 PCC (plain
cement concrete)
• The shuttering material for form work, moulds etc. should
have smooth surface (MS, marine plywood or seasoned
timber). Practically, MS is the safest bet. All shuttering
material and moulds need to be cleaned of any previous dry
plaster or concrete.
• Appropriate mix of concrete is of utmost importance even
proportion of water must be according to the recommended
ratio. The coarse aggregates (stone chips) must be of
recommended quality and size grade. Sand must be cleaned
and screened so that uniformity is maintained.
• Appropriate size of vibrator must be used to remove any
gaps, voids, holes etc. This is especially important where
water tightness and air tightness is essential.
• The concrete surface must be finished smooth.
• Curing for the recommended period (as per relevant IS
code) is essential for the concrete to reach its desired
strength and other characteristics.
4 RCC (reinforced
cement concrete)
• All the points mentioned for PCC is relevant for RCC as
well.
• In addition, the steel bars must be of the recommended size
and quality. The bars must be clean and free from rust.
While embedding steel bars in a concrete mass, care should
be taken to maintain the recommended thickness of concrete
cover on either side of the steel bars.
• The surface should be smooth on all sides.
5
Metal works • All metal surfaces must be cleaned and rust removed before
welding.
• Again the surface must be thoroughly cleaned before
applying primer and then paint. Zinc Chromate primer
should be used after cleaning. When the primer coat is
thoroughly dry, the paint coats are applied. Initial paint
coats are lean and thicker coats are subsequently used
Sl.
No.
Item Technical specifications
towards the final coat. Total 3 coats are necessary for
durability.
6 Environmental
and health related
compliance
• All compliances related to the environment and health
should be regarded as mandatory for responsible work
culture.
• All workers need to be trained about safety issues at the site.
Protective gear (helmet, apron with fluorescent markings,
hand gloves, gum boots etc.) must be issued to each worker
and the site supervisor should check that every one use the
safety gear while at the site.
• The first aid box at the site should be regularly inspected to
check that necessary medicines, supplies etc. are present in
the box.
V. Qualification and Experience
The following criteria for eligibility would be considered:
• The bidder may be one of the following entities:
a) Private company (registered under Companies Act)
b) Public Sector entity
c) NGO (registered)
• The bidder must have adequate qualification and experience of installation and operation
of biomethanation (biogas) plant, preferably biphasic biomethanation plant of one ton per
day capacity. At least 2 such plants should have been successfully run for 2 years
continuously. Experience of biphasic biomethanation plant of minimum 2 years would be
given additional marks.
• The bidder must have completed projects worth minimum Rs. 50 lakh annually for the
last 2 years (as shown in their audited balance sheet).
VI. Bid Process
The bid is in two parts – technical and financial (price bid). The technical bid will have 70%
marks and financial bid will have 30% marks. Overall weightage will be calculated accordingly.
A. Technical Bid
The tenderer should provide detailed technical information of the plant to be constructed
including a detailed explanation of the technology, operational process and in-depth details
of all unit processes deployed within the plant. All operational and maintenance aspects of
each of the unit processes should be included in the technical proposal. Conceptual designs
should be provided considering a feed rate of 2 TPD segregated biodegradable municipal
solid waste. A detailed BoQ should be provided, considering the template provided as
Annexure 1. This format may be suitably modified to fit the purposes of the suggested
designs.
B. Financial bid
1. Total Price
Sl.
No.
Description Unit Quantity Quoted price
(INR)
1 Biphasic
biomethanation plant,
complete with all
structures, equipment,
infrastructure and
accessories
Lump sum
01
……………
….
2 Necessary civil work
as per drawing
including electrical
and plumbing work
Lump sum 01 ……………..
2. Bill of Quantities
A detailed costing as per the BOQ provided as part of the technical proposal should be included
in the financial proposal. The financial proposal should also include, as a separate inclusion, the
anticipated monthly O&M costs for the operation of the plant.
3. List of Documents to be included along with financial proposal
(i) The unique transaction reference of RTGS / NEFT against EMD and Bank Guarantee
(ii) Certificates of Work Experience.
(iii) Certificate of financial turnover from CA including profit/ loss statement for last 2
years.
(iv) Bank Solvency Certificate.
(v) Scanned copy of proof of payment made for e- tendering processing fee charges as
applicable.
(vi) Certificate of Registration for Sales Tax / VAT and acknowledgement of up to date
filed return, if required.
(vii) Certificate of registration for Service Tax and acknowledgement of up to date filed
return, if required.
(viii) Affidavit as per provisions of clause 1.2.2 of form 6 (NIT).
(ix) An undertaking that “The Physical proof of RTGS / NEFT UTRs shall be deposited by
me / us with the ICLEI in case I / we become the lowest bidder within a week of the
opening of financial bid otherwise the bid may be rejected.
VII Guarantees
1. Performance guarantee of 10% of total contract value shall be deducted at the onset of the
payment and shall be refunded after the completion of commissioning of the plant.
2. The selected bidder should provide a bank guarantee of 10% of total cost of construction
at the time of acceptance of work order, which shall be returned to the tenderer after
commissioning the plant.
3. Upon commissioning, a second bank guarantee of 10% of the total cost of the plant shall
be provided to Udaipur Municipal Corporation, to be refunded after successful operation
until the defect liability period of 24 months.
VIII Schedule of Payment
Payments shall be based on specified milestones as shown in the table below:
S.No Deliverables Schedule of
payment
Responsibility
1. Mobilization advance upon
commissioning of work and
submission of bank guarantee 1
30% of total
cost of
construction
ICLEI South
Asia
2. Bills to be raised end of every month
as per progress of construction, to be
paid by 15th
of subsequent month, upto
50% of the total construction cost
3. Installation and Commissioning of
Plant and submission of bank
guarantee 2
20% of total
cost of
construction
IX Date of Submission and Notification
Bidders are requested to submit their bids by 20 June 2018. The selected bidder would be
notified through email latest by 30 June 2018
X Force Majeure
Where the performance by the Bidder of its obligations under this Contract is delayed, hindered
or prevented by an event or events beyond the reasonable control of the Bidder and against
which an experienced Bidder could not reasonably have been expected to take precautions, the
Bidder shall promptly notify the Client in writing, specifying the nature of the force majeure
event and stating the anticipated delay in the performance of this Contract.
XI Legal Provision
In case of any disputes/differences between the parties, the matter will be subjected to resolution
through amicable talks. In case of failure to resolve amicably, matter will be subjected to
arbitration. Dispute will be subjected to jurisdiction of courts in New Delhi
ICLEI South Asia/ UMC reserve the right to reject any bid and to annul the bidding process and
rejects all bids at any time without thereby incurring any liability to affected bidders or any
obligation to inform the affected bidders of the grounds for such decisions.
XII List of Annexures
A. Annexure 1: Bill of Quantities (BoQ) Format
A BoQ format has been prepared for the plant to be constructed, which is to be filled in and
submitted along with the technical proposal (quantities) and financial proposal (rates).
Should modifications to the items be necessitated based on the requirement of the plant and
specific technology being offered, such modifications may be made by the bidder. A detailed
explanation of the process is to be included in the technical proposal, along with the BoQ.
B. Annexure 2
Figure 1 Schematic of the process
Figure 2 General layout
Figure 3 1st phase reactor (hydrolysis + acidification)
Figure 4 Filtration tank for solids residue from 1st phase reactor (D1-D6)
Figure 5 Buffer tank (FRP clad MS) with pH probe and pH correction
arrangement
Figure 6 Upflow Anaerobic Sludge Blanket (UASB) Reactor – insulated
Contact Information
For Further information, please contact:
Ms. Soumya Chaturvedula
Deputy Director
ICLEI - Local Governments for Sustainability, South Asia
C-3, Lower Ground Floor
Green Park Extension
New Delhi-110016, India
Tel: +91 11 49747200; +91-9866168713
Fax: +91 11 49747201
Email: [email protected]
Annexures
Annexure 1: Bill of Quantities
S.
No.
Description Unit Quantity Rate
1.00 CIVIL WORKS
1.10 Earthwork in excavation and refilling in foundation, Trenches & plinth in all
kinds of soil to the required size & depth, including dressing of sides &
pumping and bailing out of water from the trenches & pits & timbering &
shoring etc., as may be required. Item includes handling, re-handling etc. as
may be required for refilling available earth into the trenches, spaces between &
around the building, sides of foundation or in plinth and under floors etc.
consolidating each deposited layer by watering and ramming in layers of 20cm
in depth, and/ or disposal/ stacking of surplus soil as directed within a lead of
150 meters from the furthest point of the site. Item includes dressing &
levelling of the perimeter of the site with surplus earth up to a width of 6 mts all
around (Measurement shall be done for the lowest layer of PCC / RCC as per
drawing & as per initial & finished levels on site. Nothing extra shall be paid
for working space requirement and / or angular / stepped cutting etc.)
mechanical means and manual labour as required. All kinds of soils for all
leads, lifts depths, complete in all the respects as per Architect's drawing &
direction.
S.
No.
Description Unit Quantity Rate
1.20 Providing and laying plain cement concrete (PCC) of specified grade as bed
concrete under foundation, column footing, beams, under floors, Correction
course etc and other locations as called for etc. laid, consolidated and cured etc.
complete and including side forms as requiredas per specification and drawing
including the cost of centring and shuttering with aggregate 20 mm for 1:2:4 &
!:3:6 and 40 mm & down for 1:4:8 & 1:5:10, complete in all the respects as per
Architect's drawing & direction. PCC mix 1: 2 : 4 (1 Cement : 2 Coarse Sand :
4 Aggregate)
1.30 Providing and laying & testing M25 grade reinforced cement concrete in
lintels, ties, counter shelves, slabs, including making / leaving openings /
cutouts etc., at all heights & levels Including preparation concrete surfaces to
receive plaster or any other finishes complete in all the respects as per
Architect's drawing & direction.
S.
No.
Description Unit Quantity Rate
1.40 Supply , Straightening, cutting, bending and binding with binding wire of
annealed steel wire 0.9 to 1.69mm thickness and placing in position
reinforcement bars, to correct shape and size as per detailed drawings,
specifications , for all reinforced cement concrete work in substructure and
super structure work such as footings, walls, columns / stub columns, beams,
slabs, rafts and pile caps etc.; with correct size with approved concrete cover
blocks of same grade as of concrete, all depths, leads and heights ( heights even
in a single floor) to the satisfaction of the Project- in - charge. Wastages, laps,
rolling margin & binding wire etc. shall not be measured or paid extra,
complete in all the respects as per Architect's drawing & direction.
1.50 Providing & fixing Centring and shuttering including strutting, propping etc.
and removal of form for slabs, balconies, lintels, staircase, shelves, columns,
beams, Arches Etc. complete in all the respects as per Architect's drawing &
direction.
1.60 Providing and laying 230mm Brick Walls with well burnt good quality of first
class designation 75 in cement mortar 1:4 (1cement:4 coarse sand) including
scaffolding, curing, rubbing the surface, racking out the joints etc., complete as
directed and specified for walls, parapet, platform supports etc.at all floor
heights & levels.
S.
No.
Description Unit Quantity Rate
1.70 Providing and fixing 15 mm Wall plaster, Cement, average thickness of 15mm
in 1:4 ratio (Grey Cement : Sand) in plumb line, from top of wall to the finished
floor level
Total of CIVIL WORKS
S.
No.
Description Unit Quantity Rate
2.00 SHED WORKS
Quoted rate shall be for all heights & depths applying a priming coat of approved steel primer (Zinc Chromate) and two or more
coats of synthetic enamel paint of approved make & shade including cost of scaffholding complete in all the respects.
2.10 Providing and fixing M.S. works in truss / gratings / ladders / louvers / gates /
grills / hold fast / manhole cover/ boundary wall railing etc. in built up sections
including using drawn out bars etc. as required and cutting, fabrication,
welding, machining, grinding, hoisting & fixing in position, M.S. lugs and
cutting holes & grouting in cement concrete 1:2:4 etc./ fixing with rawl plugs,
anchor/ chemical fastners etc & applying a priming coat of approved steel
primer (Zinc Chromate) and two or more coats of synthetic enamel paint of
approved make & shade etc. including cost of scaffholding complete in all the
respects as per Architect's drawing & direction.
S.
No.
Description Unit Quantity Rate
2.20 Providing and fixing sheeting on Truss of Hi-Rib trapezoidal profiled sheet
manufactured out of 0.50mm TCT (Total Coated Thickness) of spectec
inovative buildings or equivalant, permanently colour coated galvanized steel
(Z-120gsm. Zinc alloy coating total of both sides as per IS:513) having 240
Mpa yield strength. The color coating shall comprise RMP coated finish
(Regular Modified Polyester). The sheet shall have 1000-1005 mm cover
width, 30mm high ribs spaced at 200-250 mm centers fixed with self drilling
fasteners. The sheet shall have wide pans with small 2/3 stiffening ribs for
effective water shedding and special male/female ends with full return legs or
side laps for purlin support. The male end of the sheet shall have anti-capillary
flute at side lap to prevent leakages. The sheet shall be passivated and given a
clear resin \coated. The sheets shall be fixed by means of polyester coated
galvanised self-drilling fasteners (12-14 x 55 with EPDM seals) including all
the fittings used in the fixing, including cost of scaffholding complete in all the
respects as per Architect's drawing & direction.
2.30 Providing and fixing gurters on eve & end of the sheeting of truss/ junctions of
350 (sides) x 350 (base) of Hi-Rib trapezoidal profiled sheet manufactured out
of 0.50mm TCT (Total Coated Thickness) of spectec innovative buildings or
equivalant, permanently colour coated galvanized steel (Z-120gsm. Zinc alloy
coating total of both sides as per IS:513) having 240 Mpa yield strength. The
color coating shall comprise RMP coated finish (Regular Modified Polyester).
The sheet shall have 1000-1005 mm cover width, 30mm high ribs spaced at
200-250 mm centers fixed with self drilling fasteners. The sheet shall have
S.
No.
Description Unit Quantity Rate
wide pans with small 2/3 stiffening ribs for effective water shedding and
special male/female ends with full return legs or side laps for purlin support.
The male end of the sheet shall have anti-capillary flute at side lap to prevent
leakages. The sheet shall be passivated and given a clear resin \coated. The
sheets shall be fixed by means of polyester coated galvanised self-drilling
fasteners (12-14 x 55 with EPDM seals) including all the fittings used in the
fixing, including cost of scaffholding complete in all the respects as per
Architect's drawing & direction.
2.40 Providing & fixing 100mm dia PVC (PRAKASH make) 6kg pressure, for
down take of rain water pipe in vertical as per IS 1729 including cost of fixing
the pipe with gurter, cutting the gurter sheet, cost of rubber gasket & silicon
sealant. All fittings including cost of scaffholding complete in all the respects
as per Architect's drawing & direction.
Total of Steel Works
S.
No.
Description Unit Quantity Rate
4.00 FINISHING WORKS
Quoted Rates shall be for works up to all leads, lifts/ heights in a single floor, for all levels and to include making grooves and
drip course as directed, providing and fixing chicken wire mesh on the junctions of RCC and brick walls both for internal and
external plaster works including all scaffolding and curing, hacking etc.
4.10 Providing and finishing wall with exterior grade water proofing cement paint of
"Snowcem-Plus" of M/S Snowcem India or equivalent approved brand and
manufacture and of required shade to give an even shade: New work three or
more coats complete in all the respects as per Architect's drawing & direction.
4.20 Providing and laying Vitrified tiles cladding inside first phase recation tank on
tanks floor & walls ( of approved color and size) laid over 20 mm thickness of
cement mortar 1 : 4 (1 cement : 4 coarse sand) mix jointed with acid resistant
grout, complete as per design and drawing. (Basic rate of tiles @ 65 Rs/Sqft.)
Total of FINISHING WORKS
S. No. Description Unit Quantity Rate
5.00 EQUIPMENT WORKS
Quoted rate shall be for all heights & depths applying a priming coat of approved steel primer (Zinc Chromate) and two or more
coats of synthetic enamel paint of approved make & shade including cost of scaffholding complete in all the respects
5.10 Providing and fixing Sorting conveyor complete set Length–07
Width – 01
Set up on a substructure. Substructure constructed of angle iron (60 X 60 X 04
mm). Height of sorting conveyor (working surface) – 80 cm above floor level.
5.20 Providing Wheel barrow With 4 wheels, capacity to carry 100 liters at a time.
5.30 Providing and fixing Wet grinder Made of polyturf material to even resist mild
acidic media
5.40 Providing & fixing Slurry pump with flexible pipe attachment. Capable of
conveying slurry containing up to 5 cm solid pieces, flow rate 500 lpm, set up
on a cart for easy movement.
5.50 Providing & fixing Pump for filtration tank 5 HP along with necessary pipe
length and set up on a cart for easy movement
5.60 Providing & fixing Filtration tank for removing the solids after 6 days of
hydrolysis and acidic fermentation (T). Cylindrical shape with removable FRP
lid Diameter – 02 Height – 2.5. 5mm thick MS sheet, clad with 3mm thick FRP.
Alternatively – HDPE tank, with strength to withstand pressure equivalent to its
S. No. Description Unit Quantity Rate
being filled with water. In this case the removable lid may be of HDPE. A fine
SS screen (5mm gap) would be placed 60 cm below the rim. A sturdy ring of
SS (10 cm wide) would be fitted in the tank to hold the screen.
5.70 Providing & fixing Buffer tank for pH correction, fitted with pH probe and
stirrer. with removable FRP lid Diameter – 1.5 Height – 2.3 5mm thick MS
sheet, clad with 3mm thick FRP. Alternatively – HDPE tank, with strength to
withstand pressure equivalent to its being filled with water. In this case the
removable lid may be of HDPE.
5.80 Providing & fixing Stirrer for buffer tank SS stirrer complete with SS paddles
and 0.5 HP motor
5.90 Providing & fixing 2nd phase reactor – UASB. This is fitted with a settler cum
gas separator, which rests on a deflector. This assembly looks like an inverted
funnel. The biogas outlet is on the top of the inverted funnel. There is one inlet
pipe at the bottom for distributing the screened and pH adjusted leachate from
the buffer tank steadily and continuously by means of a ‘dosing’ pump.
Cylindrical shape Diameter – 1.85 Height – 3.7 5mm thick MS sheet, clad with
3mm thick FRP. The reactor is Insulated from outside with thermocol
(extended polystyrene). The funnel is made of SS 304, 3mm thick. Diameter of
UASB inlet pipe – 25 mm flexible.
5.10 Providing & fixing Dosing pump for feeding the UASB Flow rate – 220 liter
per hour maximum Head pressure – 8kg
S. No. Description Unit Quantity Rate
5.11 Providing & fixing Biogas floating holder Dimension Approx : Height – 4.5 m
Dia – 4.5 m 80 m3 capacity, material of construction – 4 mm thick MS sheet.
Before fabrication, the sheets would be cleaned thoroughly using sand paper.
After fabrication the holder would be cleaned and dried thoroughly, painted
with zinc chromate primer followed by corrosion proof black paint on both
sides.
5.12 Providing & fixing Biogas flare (in case of non-use due to any reason) Capacity
to flare 200 liters biogas per minute.
5.13 Providing & fixing Biogas genset with canopy Dimension May vary with
company. Approx : Length – 3.3-3.4 m Width – 1.1-1.2 m
Height – 1.6-1.7 m 30 KVA prime rating at 1500 RPM (ISO 8528),
24 KW, 50 Hz, power factor 0.8, 3 phase, 415 V noise level <75 dB (as per
regulation) 4 cylinder engine
Total of EQUIPMENT WORKS
Unloadingon a raisedplatform
SortingConveyor7 m long
WetGrinder
with Water
Biodegradablewater
B C
Non-Biodegradeableto be sold/given to
the sortess
A
Coarsegrinding(2-3 CmParticle
size)
1st Phase reaction(Chydrolysis +acidification)
D32 Ton Waste +2 m
Wash Water
Small Pumpfor mixing once a day (6 Nos)
4m3Buffer Tank with pH probe and pHCorrectionArrangement
E
At the end of 6 days
drain outall leachate
T
BiogasGeneratorfor power
generation(15 KVA)
BiogasHolder
I
MoistureTrap
H
2H SRemoval
G
UASB
UASBEffluent
F
J
Figure 1 : Schematic of the process
2m 3m 7m 2m 4m 3m
EmergencyGate
3 A B C
M NS1
S3 S4
S2
3
3 J
L
K3
G 1m
H 1m
T2m
F
2m
1.5 mE
Composting AreaU
4 m
15 m
3m
3
4.5 m
I
R
1.5 m
1.5
D1
D2
D3
D4
D5
D6
13 m
34
Figure 2 : General Layout
Legend
A - Unloading Platform
B - Sorting Conveyor - 7m Long , 1 m
Wide
C - Wet Grinder / Crusher
D - 1st phase reactor (D, to D6)
(Hydrolysis and acidification)
E - Buffer tank with pH probe
and pH correction arrangement
F - 2nd phase reactor
(biomethanation) UASB
G - H2S Removal
H - Moisture Trap
I - Biogas holder (Floating Holder)
J - Biogas Generators 3.0 KVA
K - Fire safety tools and kits
L - Electrical switch room
M - Temporary store for regregated dry
waste
N - Store cum office
R - Biogas Flare
S - Segregated collectionbins (S1 to
S4)
T - Tank for Filtration of residues from
1st phase reactor (D1-D6)
Gate3m
3m
Removable Lid
2.5 m
2.0m
Solid Mesidue For Composting
Filtratepumped tobuffer tank
SS Fine Screen 5 MM Gap
SS ring for Holding Screen10 Cm Wide
Figure 3 : 1st phaseReactor (Hydrolysis + acidification)
Figure 4 : FilterationTank for Solid Residue from 1st
Phase Reactor (D1-D6)
StirrerAlkali
------------Screen
pH Probe
1.5 m
2.3 m
StainlessSteel Strips
StainlessSteel Ring
Openingfor StirrerRod
Layout of the screen and support
Figure 5: Buffer Tank (FRP Clad MS) withpH Probe and pH Correction
Length : Width = 2:1
UASB
Biogas
Settlercum gasseprator
Deflector
SuldgeBlanket
Inlet
Figure 6 : Upflow AnaerobicSludge Blanket
(UASB) Reactor Insulated
3.7 m
1.85 m
SladgeRemoval
Outlet
EffluentOutlet