Invitation to bid on tender for Colocation Services for DATA Center
Staff in charge of the Acquisition Procurement office AOS.
Inquiries regarding this tender and submission of
bids
Tender Title Colocation Services for DATA Center
Procurement Method Open competitive bidding
Announced Date of the Tender 29th /01/2020
Expiry Date of the Tender 28th /02/2020
INVITATION TO BID:
You are invited to offer a best bid for provision of the above tender as per attached specifications
outlined in the scope of work
Please read the instructions on the tendering procedures carefully. Failure to comply with them
may invalidate your proposal which must be returned by the date and time given below.
Electronic copy of your bid must be submitted to [email protected] no later than 28st ,
February 2020 @6 PM Rwanda Time. Late tenders will not be considered.
Note: upon request from some of international suppliers, the submission period has been
changed from 17th February to 28th February, time and channel of submission remain
unchanged.
Site Visit is voluntary.
The recipient of this invitation is not allowed to pass this invitation on to other companies.
For any additional clarification, please feel free to send your request to [email protected] look
forward to your response.
Yours sincerely,
Seong Woo KIM
Chief Executive Officer
AOS Ltd
Page 2 of 15
Table of Contents
1 Introduction & Background ................................................................................................ 3
2 Scope of Work .................................................................................................................... 4
2.1 Implementation Timeline ................................................................................................ 4
3 Detailed Scope of Work. ..................................................................................................... 4
3.1 Colocation Setup ............................................................................................................. 4
3.2 Cooling & Containment .................................................................................................. 5
3.3 Fire Suppression Requirements ...................................................................................... 5
3.4 Network Requirements & Pathway ................................................................................ 6
3.5 Electrical installation ...................................................................................................... 6
3.6 Facility Management ...................................................................................................... 7
3.7 Implementation Timeline ................................................................................................ 7
3.8 Qualifications. ................................................................................................................. 7
3.9 Proposal Requirement. .................................................................................................... 7
3.10 Proposal Assessment. ...................................................................................................... 8
4 Reporting............................................................................................................................. 8
5 Cost elements: ..................................................................................................................... 8
6 Annex 1 ............................................................................................................................... 9
Annex 2: Floor Plan design..................................................................................................... 15
Page 3 of 15
1 Introduction & Background
Since 2014, AOS has been operating the national datacenter offering IaaS, Colocation, Web and
Mail hosting, Domain name service. Due to a new demand in terms of increase of customers, high
availability and flexibility in service delivery, AOS wishes to revamp majority of its systems.
The current AOS data center facility is a physically controlled facility which hosts and maintains
mission and business-critical information, data, IT equipment, applications, et al for different
customers these include private, civil societies, NGO and government institutions to name a few.
The current date center is among critical GoR’hub of information and network services/resources
which comply with tier 3 data center requirements. This data center is a self-managed, reliable and
secure data center for IT operations and services. The current data center doesn’t have enough
space to provide colocation services requested by so many customers. It’s in line with the above
background that AOS is planning to extend the current data center in order to solve the issue of
colocation space in the data center, the scope of work will include among others: cooling, racks
installation & server’s colocation among others.
AOS is looking for a reliable local, international or a joint-venture company who can supply,
install, Commissioning, testing and IMPLEMENT COLOCATION SERVICES FOR AOS
DATA CENTER in good quality at AOS main site located at Telecom house.
Criteria of Supplier Selection
• Best financial proposal.
• Short Delivery Period.
• Terms of Payment.
• Local suppliers to bid in local currency
• International suppliers to bid in United States Dollars
• Warranty period.
Tender Process
• Suppliers can participate in this tender by submitting required submissions by email to
[email protected] before the expiry date, 6:00PM, 28t
h February 2020.
• The submission after the expiry date will be automatically disqualified.
Page 4 of 15
Other Conditions
• If there is a bad item among supplied in the acceptance test, the supplier must substitute
it.
• If suppliers have any inquiries about this tender, please email to [email protected]
Required Submission documents :
1. Detailed Quotation for supply with DDP(Delivery Duty Paid) and delivery period schedule
2. Introduction of each and every item to be proposed (Datasheet).
3. Manufacturer Authorization certificate / Partnership for main items like PDU,
Rack,CRAC, Fire Suppressions System.
4. Biodata and CV of the technical implementers (National ID or Passport)
5. Valid Tax Clearance Certificate.
6. Copy of Rwanda Social Security Certificate
7. Copy of Trading License
8. Company Profile.
9. Warranty Period for each and every item in scope of work.
Note: required documents no 5 and 6 are not required of international companies.
2 Scope of Work
The scope of work comprises colocation services for the new AOS data center.
This scope will be:
− Colocation services which can accommodate 22 racks, including cooling, network, fire
detection and suppression systems, monitoring and containment system.
2.1 Implementation Timeline
− 3 months
3 Detailed Scope of Work.
3.1 Colocation Setup
The current IP operation room and monitoring for AOS IDC will be transformed and become the
new collocation. Some civil works will be needed to customize this room to meet standards for
DataCenter Colocation room.
Below are the minimum works to be conducted by the successful bidder:
− The room will accommodate 22 racks with their associated peripherals,
Page 5 of 15
− The supplier will provide and install the 22 racks to be used the colocation, this including
powering them with appropriate PDU (preferably IEC-309 Blue type)
− Precision air conditioner will be provided to the colocation room
− Ductwork with appropriate environmental controls for IT equipment will be provided
− No water sources traversing, entering or residing in or directly above the colocation room
− No sinks, furnaces or other moisture-producing devices
− Supply an automatic fire detection and suppression system
3.2 Cooling & Containment
− Supply, delivery, installation and commissioning of Environmental protection system for
Data Center
− The system should be Cold Aisle containment to maximize airflow efficiency
− The containment system should provide a flexible solution which can be easily upgraded
as demand in cooling increases
− Supply and install mechanical Systems as needed, the vendor is expected to include all
auxiliary works like ducting, inlet and drain piping, piping between indoor and outdoor,
cabling acoustic and thermal insulation etc with related civil works as per the site
requirements
− The heating and cooling capable of controlling and sustaining a constant temperature
between 15-21 degrees Celsius, dry-bulb temperature between 10-35 degrees Celsius
− Adequate equipment to control, maintain and sustain humidity range between 48-52% with
maximum dew point of 15 degrees Celsius with humidifier capacity of 5kg/hour
− Humidity and temperature monitoring and control (with console alerts if possible)
− Sound/noise control of the HVAC system and adequate insulation of ductwork
− Having a local or regional maintenance and support presence
3.3 Fire Suppression Requirements
The successful will supply and install a cabinet types for fire detection and suppression system. A
total of 2 fire suppression cabinets with 3 gas bottles will be supplied, 1(one) 1B/T type and 1(one)
2B/T type.
The fire detection and suppression systems will have the following functionalities:
− Fire detection and early warning system and should be a cabinet type with two cylinders
of gas inside. The below will be the minimum requirements:
o Fire detector, discharger, discharge inducing duct, extinguishing power storage,
receiver and operator.
o Ability to detects fire and smoke and automatically sprays extinguishing powder.
o In case of a blackout, it switches to backup power (DC24V) and will performs the
same function.
o Having a fire alarm with siren and voice alarm
Page 6 of 15
o Discharge time from 10 sec min to 30 sec maximum
o Independent external connection parts
− External input will be connected to the insulated circuit to minimize external noise and
interference
3.4 Network Requirements & Pathway
The data center’s wired local area, and storage area networks must link with the existing data
center. Before the actual implementation, the successful bidder will provide a plan for designing,
installing and maintaining the system pathway plan based to the colocation room layout
specifications. The systems pathway plan must be provided in both AutoCad and PDF format.
The system pathway plan is subject to final approval by AOS.
The system pathway plan must include one or more diagrams which display the building’s
proposed floor plans with the physical different wiring system elements. The wiring system
elements include but are not limited to horizontal wiring and distribution system cables, intra-
building wiring (if needed), backbone wiring, equipment location/disposition in the rooms,
operation and monitoring rooms, building main distribution frame (MDF), entrance facility (EF),
demarcation point with the existing date center, wiring support racks with central points, patch
panels, cross-connects, raceways, conduit, sleeves, lan & network fiber, data management
connections (outlets/drops/jacks), cctv system connections and power poles/drop.
For LAN cabling UTP cables (Cat6A or CAT7) will be required of the proposed facility. The type,
size, rating, location, spacing, placement, fill rate, tracking, continuity, origin, construction,
fastening, grounding, administration, installation and labeling of all rooms, , support racks, wiring,
cable, fiber, conduit, patch cord, ports, interfaces, cross connects, outlets, jacks, faceplates, and all
related hardware must meet the specifications and requirements for data center tier III.
3.5 Electrical installation
− Assess the current electrical installation and recommend any improvement if required for
− Provide appropriate electrical provisions and protections for the 22 racks to be installed in
the colocation room
− Provide adequate electrical supply for equipment racks not limited to power distribution
modules for PDUs
− Supply and install appropriate circuits breakers & panels serving the new colocation room
and must be located within the controlled space of the colocation room and any panel not
serving the data center must not be located within the controlled space of the colocation
room
− Provide appropriate lightings for the colocation room
− Cable trays
Page 7 of 15
− Emergency lighting of room and related access hallways with rechargeable batteries with
no less than 90 minutes of backup power per 2000 IBC
3.6 Facility Management
− Water Detector Sensor
− Appliance System
− Temperature & Humidity Sensor
− Development
− Sensor Port
N.B: Supplier are free to provide better and more efficient facility management system
3.7 Implementation Timeline
− 3 months including delivery and implementation after AOS issues a purchase order
3.8 Qualifications.
− At least 3 references of the work scope 4.1, 4.2, 4.3 and 4.4 in Rwanda or any other country
over the last five years
− Stable Financial status for the last 3 years
− Preferably the bidder or bidder’s partner (third party) has a local presence or partnership with
local company
3.9 Proposal Requirement.
− Technical Proposal
o General Information
▪ Company introduction (including financial performance of three years)
▪ Partners (third parties) company information
▪ Project experience relevant to the work scope (including its proofs)
o Implementation plan
▪ Key milestones and implementation timeline
▪ Equipment arrangement plan of 4.1, 4.2 and 4.3 (CAD)
▪ Network connection plan of 4.4 not only for new colocation but also for the
connection to main center
o Manpower allocation plan (Manager and engineers)
▪ Brief CV of allocated manager and engineers (including experiences relevant
to the work scope)
Page 8 of 15
o Skills transfer plan of equipment maintenance
o Project management plan (Reporting plan, quality assurance plan etc.)
o Warranty and technical support plan
− Financial proposal (including detailed bill of material)
3.10 Proposal Assessment.
− Technical Proposal (70%)
o Project experience: 30%
o Quality of allocated manpower (manager and engineers): 20%
o Implementation plan: 10%
o Skills transfer plan of equipment maintenance: 5%
o Project management plan: 5%
− Financial proposal (30%)
4 Reporting
− The successful bidder will report to the Director of AOS IDC
− Provide a weekly report during the implementation of the project
− The successful bidder shall provide as-built drawing for electrical wiring, network, topology
and pathway design after the installation
− These reports may be furnished electronically, but a paper copy will be used during acceptance.
5 Cost elements:
For international companies that wish to participate in the this tender, the following are costs that
will associate with their offer:
Transportation costs, insurance costs during transit, customs clearance costs, delivery
costs and cost for the living in case an expert from another country comes to Rwanda:
flight costs e.g. air ticket, accommodation, local transport, food and etc.
In regard to the incoterm DDP,(Delivery duty paid) below is its explanations:
DDP – Delivered Duty Paid
The seller delivers the goods when the goods are placed at the disposal of the buyer,
cleared for import on the arriving means of transport ready for unloading at the named
place of destination.
The seller bears all the costs and risks involved in bringing the goods to the place of
destination. They must clear the products not only for export but also for import, to pay
any duty for both export and import and to carry out all customs formalities.
Page 9 of 15
6 Annex 1
MODEL SPECIFICATION Unit Q'ty
1. Electric/ Fire Protection
1.1 1st Power Cabling SET 2
MAIN Distributor Panel UPS OUTPUT, Power
Meter SET 1
Normal Distributor Panel CRAC & Normal Power,
Power Meter SET 1
Main Cable & Tray Old Center to New Center
(Only Ground Floor) M 640
Power Cable
0.6/1kv F-CV 1C×70 ㎟
[L-UPS OUT A/B MAIN]
Average length 80m
Standard A, B or
equivalent
M 60
Power Cable 0.6/1kv F-CV 4C×25 ㎟
[CRAC INPUT] 2 lines M 300
Ground Cable 35㎟ [GROUND] EA 40
Terminal lug Copper 1 HOLE 70 ㎟ EA 40
Terminal lug Copper 1 HOLE 35 ㎟ EA 20
Terminal lug Copper 1 HOLE 25 ㎟ EA 20
Terminal lug Copper 1 HOLE 35 ㎟
1.2 Cable Tray(New center) M 21
Mesh Tray STRAIGHT,
W300x150Hx1.2t EA 2
Mesh Tray Accessories HOR. ELBOW, W300 x
H150 EA 2
Mesh Tray Accessories HOR. TEE, W300 x H150 EA 70
Mesh Tray Accessories JOINER SET, W300 x
H75 SET 1
Tray Support Accessories W300-1way M 21
Mesh Tray STRAIGHT,
W500x150Hx1.2t EA 4
Mesh Tray Accessories HOR. ELBOW, W500 x
H150 EA 70
Page 10 of 15
MODEL SPECIFICATION Unit Q'ty
Mesh Tray Accessories JOINER SET, W500 x
H75 SET 1
Tray Support Accessories W500-1way M 21
Mesh Tray STRAIGHT,
W100x60Hx1.2t EA 4
Mesh Tray Accessories HOR. ELBOW, W100 x
H60 EA 70
Mesh Tray Accessories JOINER SET, W100 x
H75 SET 1
Tray Support Accessories W100-1way
1.3 2nd Power Cabling M 600
Power Cable
0.6/1kv F-CV 3C×6 ㎟
[SERVER RACK UPS
POWER A/B]
EA 40
Receptacle Open-type 32A 250V 3P EA 10
Consent Closed-type, 250V 2hole EA 150
Terminal lug 6 ㎟ SET 1
Cable Label Port No.
1.4 RACK ATS EA 2
RACK Auto Transfer Switch
for single Power
system(Supply Power
Capacity 32A)
1.5 Fire Protection SET 1
HFC227ea Package 68L/50KG*2B/T SET 1
HFC227ea Package 68L/50KG*1B/T EA 1
Self control Panel DC-24V EA 1
Led Lamp display DC-24V EA 1
Siren DC-24V EA 2
Detector Differential Temperature
detector EA 2
Detector Smoke detector EA 2
Leading Light Medium SET 1
Solenoide Velve Control Panel DC-24V M 100
Page 11 of 15
MODEL SPECIFICATION Unit Q'ty
Flexible(SF) 16C M 100
Flexible(SF) 22C EA 20
Outlet BOX Box type 54mm M 600
Power Cable HFIX 1.5sq M 900
Power Cable HFIX 2.5sq M 100
Power Cable F-CV 4SQ/3C SET 2
Crac Interlock SET 1
F.M.S Interlock
1 - Sub Total
2. Rack/ Containment/ Access
Floor EA 20
2.1 SERVER RACK
W600 x D1200 x
H2030(42U), Vertical
Cable Management Kit
EA 20
Horizontal Cable
Management Kit, 1U EA 200
1U Blank panel EA 2
2.2 NETWORK RACK
W800 x D1200 x
H2030(42U), Vertical
Cable Management Kit
EA 2
Horizontal Cable
Management Kit, 1U EA 200
1U Blank panel
2.3 Containment Frame M 20
Top Frame Aluminum/ Powder
Coating M 20
Bottom Sub Frame Aluminum/ Powder
Coating SET 1
Accessories Material
2.4 Containment Finish SET 2
Auto Sliding Door
Aluminum/ Powder
Coating / Sub Battery
Included / W1800mm
SET 4
Basic Top Box Frame 1600*900mm SET 2
Page 12 of 15
MODEL SPECIFICATION Unit Q'ty
Different Size Frame Different Size Frame EA 2
Top Sliding Window 1694*900mm EA 4
Space Panel
2400*600mm 4T PC
Compounding
Panel+Aluminium Frame
2.5 Control Panel Installation SET 1
Control Panel 1 Containment Group 1
Control Panel EA 1
Sliding Motor SET 1
Sliding Motor Interlock Sliding Install & Sliding
Guide EA 44
2.6 Power Distributor Unit
P.D.U Metered 32A/3P
CEE C13(36), C19(6)
AP8853, Network
monitoring
2.7 Access Floor ㎡ 60
Wood Type 600*600*38T(H400mm) EA 22
Air Grating Panel Steel / Poudercoating EA 22
Koldlok Cable Hole End Material SET 1
SLOOP Moving Sloop
2 - Sub Total
3. CRAC/ Access Control/
CCTV
3.1 CRAC INDOOR UNIT SET 2
Indoor Unit 10R/T Down Floor TYPE
or equivalent
M/f AR
Model PA010-A2ST
Power : 3P4W 400V 50㎐
Cooling : Air Cooled
System
Capacity : 35.1kW
Compressor : 2
Ref. Circuit : 2
Page 13 of 15
MODEL SPECIFICATION Unit Q'ty
Max Air Volume :
110CMM
Electric Reheater : 15kW
Humidifier : 8lit/Hr SET 4
Outdoor Unit Cap : 5R/T
Model CD005-A Input Power :
1Ph/220V/60Hz
3.2 CRAC Installation M 200
Gas Pipe 10R/T IN/OUT SET 2
Base Frame steel / Underfloor SET 1
Drain & water pump Drain(stainless steel) SET 1
Supply Water Pipe Humidification
3.3 Access control EA 2
BIOSTATION L2 CARD + F/P + Number
Lock Reader EA 2
Power Adapter 12V 5A EA 2
Lock Accessory MAGNETIC EA 2
Lock Bracket LZ
3.4 CCTV EA 10
IP Dome Camera 2Mpixel , Infrared ray ,
4mm EA 1
Switch Hub Gigabit POE 24PORT EA 1
NVR Recorder
16CH , ( Include HDD
4TB, Monitoring Soft
Ware SSM )
BOX 3
UTP CABLE CAT 6 EA 2
CD PIPE ROLL 22C EA 2
CD PIPE ROLL 28C EA 1
Flexible 22C SET 1
Accessories PVC Mold
3 - Sub Total
4. Data Cabling / Facility
Management System
Page 14 of 15
MODEL SPECIFICATION Unit Q'ty
4.1 Main Patch Zone EA 4
FDF FDF(4 MPO CASSETTE)
1U EA 16
CASSETTE MPO CASSETTE(OM3
MPO-12core LC) EA 16
MPO Cable MPO Trunk Cable 80m EA 200
F/O Patch Cord OM3 LC-LC F/O Patch
Cord 10m EA 40
Patch Panel Cat.6A UTP 24port Patch
Panel 1U Box 30
UTP Cable Cat.6A UTP Cable EA 960
UTP Patch Cord Cat.6A UTP Patch Cord
3m PORT 960
LABEL LABEL_Cable Tag
4.2 Sub Patch ZONE EA 40
Patch Panel Cat.6A UTP 24port Patch
Panel 1U EA 960
UTP Patch Cord Cat.6A UTP Patch Cord
3m PORT 960
TEST LINK TEST Report PORT 960
LABEL LABEL_Cable Tag
4.3 Facility Management EA 1
Appliance system 2LAN, 1RS232, 1RS485,
5DI, 2RO, Dashboard EA 3
Sensor Port
Ethernet, IP WatchDog,
DI 2Port, Relay 2Port, AI
2Port
EA 1
Development
Power/ Crac/ Fire/ Temp/
Humi/ Water/Door
Customizing
Development
EA 2
Water Detector Sensor Cable Type 30M EA 4
Temp/Humidity Sensor Cable size 10m Type EA 1
Installation Hardware & Software SET 1
3D Layout 3D Design
Page 15 of 15
Annex 2: Floor Plan design
Colocation