Upload
robyn-golden
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Investor Presentation
2013
KAZPETRODRILLING
Table of Contents
1. Introduction to KazPetroDrilling 3
2. Investment Highlights 6
3. Growth Opportunity 12
4. Operational Highlights 17
5. Financial Highlights 23
1. INTRODUCTION TO KAZPETRODRILLING
Key Operational and Financial Characteristics
Operational 2011 2012 2013F
Total Drilling Volume 347 thous.m 418 thous.m 538 thous.m
Drilling Efficiency 1310 m/ drill crew/ day
1721 m/ drill crew/ day
1737 m/ drill crew/ day
Employees 3 585 4 940 5 253
Drill Rigs 34 38 42
Workover Rigs 40 52 51
Cementing(Currently Dormant)
3
Implemented and perspective projects
Market Leader With 18% market share by drilling volume KPD is the unrivalled leader
in Kazakhstan, with the closest competitor occupying the mere 8% of the market
KPD demonstrated resilient performance in face of the turbulent business climate
The Group’s modernised drilling fleet (42 rigs) and workover fleet (51 items), along with the planned increased capacity will allow to further diversify client portfolio
The Group enjoys modern drilling technology collaborating with many companies such as Schlumberger, Backer Hughes, NOV, Suay Energy, etc.
…Becoming the Largest Driller in KazakhstanKazakhstan Drilling Market by Volume Drilled
2012 Total Volume Drilled: 2,208,213 meters
10
20%
8%
9%
6%
7%3%5%3%
31%
KPD
VelikayaStena
SibuKyzylorda
Vostokoneft
OntustykMunayGas
NeftTechService
Sinopec
SmartOil
Other
Imcreased Drilling SpeedMeters Drilled per Rig per Month
Source: Company.
11
777646
8181046
8781084998 1107
1278
1573 1492 1532
2793 2850
0
500
1000
1500
2000
2500
3000
2008 2009 2010 2011 2012 2013F
KMG Drilling Burgylau Astra Star
KPD Overview
Abandonment Volume
Drilling Volume Workover Volume
17
138
320302
225 235
297
2008 2009 2010 2011 2012 2013F
Number of Wells
1 201
363428 457
359 328
2008 2009 2010 2011 2012 2013F
Number of Wells
250
148
302347
418
538
224
99
223259
343396
2008 2009 2010 2011 2012 2013F
Total Thous.m. Drilled Number of Wells Drilled
Health & Safety and Environment
22
• The Health & Safety and Environmental policy of the Company comprises the following main tasks: to provide environmental protection through the application of the best technologies and practices; to observe environmental legislation; to maintain implementation of the quality control system (according to ISO 9001) and environmental management system (according to ISO 14001); to utilize production wastes and eliminate land contamination.
• The Company operates in compliance with all applicable requirements in the area of health, safety and environment, methods and best international petroleum industry practices for the development of oilfields.
• Annually the Company invests progressively (as demonstrated at table) in HSE actions. In 2010, the Company invested KZT 739.8 mln in HSE, in 2011 – KZT 1140 mln, in 2012 – KZT 1 207 mln. In 2013, the Company invested KZT 1 542.7 mln (USD$ 10.2 mln) for the implementation of environmental and safety measures.
• Subsidiary companies include HSE departments. HSE Departments consist of teams of 30 employees.
• For the current year the Company obtained the ecological permits and approval of its environmental protection plans from the Ministry for Environmental Protection, which must be fulfilled.
• In addition, the Company has developed and coordinated with the Ministry for Environmental Protection and Ecological Control Program through which the ecosystems of the fields are being permanently monitored.
• The Company monitors the environmental situation of its production facilities annually. For this purpose the Company engages independent specialized organizations which have necessary permits, licenses and accredited laboratories to carry out tests.
• The Company has been carrying out measures to clean up contaminated lands using the latest biotechnologies for the reclamation of oil-contaminated land. For this purpose the Company has supplied specialized companies with the necessary permits, licenses, equipment and qualified personnel.
2010 2011 2012 2013400,000,000Т600,000,000Т800,000,000Т
1,000,000,000Т1,200,000,000Т1,400,000,000Т1,600,000,000Т1,800,000,000Т2,000,000,000Т
Investments to HSE