Upload
lytruc
View
217
Download
0
Embed Size (px)
Citation preview
MANAGEMENT SYSTEM
KUD MAS INTAN JAYA
KUD BERKAT SUBUR
KUD BINA BENUA BERSAMA
KUD BAUNTUNG BATUAH
KUD CINTAPURI DARUSALAM
The company is partnering with 5 different village unions
(KUD) in order to develop plasma plantation of palm trees
and to promote the villages where the plantations are
located.
Those village unions (KUD) are Entity Under Common
Control with the company
35% of shared-profit to all farmers.
Planted palm : 5923Ha Plasma area : 2423Ha Mature Hectares (TM) : 1150Ha Immature Hectares (TBM) : 4850Ha
New plantings are going forward at approximately 2100ha per year.
Performance
The geographical location of this plantation is well situated, near with jetty and this keeps transport costs low.
Ground level of plantation area is flat, Average total rainfall per year is 2,500 mm well distributed throughout the year with a short two month dry season.
Terracing has been implemented as a standard policy, leguminous cover crops have been planted and the land is well drained with no significant drainage problems.
The first company in South Kalimantan to gather plasma plantation with nucleus plantation in one concession.
There is a jetty. There are main roads, collection roads, having bridges where required.
The plantation is divided into blocks for efficient management.
AREA CONDITION
HEAVY EQUIPMENT Excavator standard 5 unit Truck 6 unit Motorcycle 20 unit Excavator long arm 2 unit Double cabin car 4 unit Tractor 1 unit Pick Up car 5 unit
PRODUCTION COST
Name
Cost
Actual to Date
2015 2016
Rupiah Rp/Kg Rp/Ha Rupiah Rp/kg Rp/Ha
Estate
Cintapuri Darusalam 1
Crops 528.370 .905 138 673.184.256 169
Hauling 134.227.800 35 139.101.401 35
Fertilization 5.332.447.552 5.248.472 2.079.654.545 2.046.904
Maintenance 9.072.880 8.930 3.538.423 3.483
Others 651.310.864 641.054 254.011.237 250.011
Overhead 665.543.000 655.062 314.948.986 309.989
Total 7.320.973.002 173 3.464.438.849 204
Estate Cintapuri
Darusalam 2
Crops - - - -
Hauling - - - -
Crops and others - - - -
Fertilization - - - -
Maintenance - - - -
Others - - - -
Overhead - - - -
Total - - - -
Nucleus
PRODUCTION COST
Name
Cost
Actual to Date
2015 2016
Rupiah Rp/Kg Rp/Ha Rupiah Rp/kg Rp/Ha
Estate
Cintapuri Darusalam 1
Crops 283.591.085 138 341.783.472 169
Hauling 72.043.724 35 70.623.398 35
Fertilization 2.713.460.024 5.248.472 1.058.249.409 2.046.904
Maintenance 4.616.810 8.930 1.800.556 3.483
Others 331.424.918 641.054 129.255.718 250.011
Overhead 340.513.656 658.634 160.171.255 309.809
Total 3.745.650.216.37 173 1.761.883.809 204
Estate
Cintapuri Darusalam 2
Crops - - - -
Hauling - - - -
Crops and others
- - - -
Fertilization - - - -
Maintenance - - - -
Others - - - -
Overhead - - - -
Total - - - -
Plasma