investment in demand: clean energy GEOTHERMAL POWER PLANTS B
GEOTHERMAL PLANTS
Imagine more than 5000 Mw Clean Energy
Indonesia’s geothermal reserve + 20.000 MW
Out of it 27% of the potency is in West Java with total of
6101 Mwe
Inventoried in 43 areas, divided into
• 2,184 Mwe proven resource and
• 3,237 Mwe of reserve.
2
… envisions by 2025, about 3-4 percent of Indonesia energy needs, will be met mostly through the use of West Java’s geothermal resources.
GEOTHERMAL PLANTS
The Road Map: Government Objectives
The Road Map: Government targets
• In 2012, national electricity by geothermal is 3400 Mwe
• In 2020, national electricity by geothermal is 6000 Mwe
Legal basis in Development of Mine and Energy enterprising involves:
• All issues on environment and sustainable development are the main provisions in legislation on energy, particularly geothermal, in Law 27/2003 and national energy policy 2003-2020.
• Law No. 32 Year 2004 on Local Government
• Governmental Regulation No. 25 Year 2000 on Authorities of Provincial Government
• Provincial Regulation (By-Law) No. 15 Year 2001 on Establishment of Local Agency of Province of West Java
• Provincial Regulation No. 1 Year 2001 on RENSTRA (strategic plan) of Province of West Java.
3
Tangkuban Parahu G. Tampomas
Ciremai-Sangkanhurip
PLTP Kamojang
PLTP Darajat
PLTP Wyg. Windu G. Masigit-Guntur
PLTP Karaha-Bodas
G. Galunggung G. Papandayan
G. Sawal
Cilayu
PLTP Ciwidey
PLTP Patuha Tanggeung
G. Gede-Pangrango
PLTP Awibengkok
Kawah Ratu
Cisolok-Sukarame
G. Pancar
POTENSI PANAS BUMI
PLTP EKSISTING
WEST JAVA GEOTHERMAL
LOCATIONS OFFERED
CIBALONG
PRELIMINARY SURVEY ASSIGNMENT
CILAYU
JAMPANG
CIREBON-KROMONG
TANGGEUNG
KUNINGAN CIBINGBIN
4
FOR BIDDING PROCESS IN 2010
5
WEST JAVA GEOTHERMAL
LOCATIONS OFFERED (1)
SUKABUMI REGENCY: JAMPANG 225 MWe Coordinate: 07°01’34.7” LS dan 106°43’47.6” BT pH: 6,61 Chlorida: 239.81 Hot Water Temperaturr 38,6oC Water Debit: 2,0lt/sec ResourcesL Speculative 225 MW, Hipothetical 119 MW Resources Temperature: ........oC (geothermometer Na/K – Giggenbach)
TASIKMALAYA REGENCY: CIBALONG 25 MWe Coordinate: 07°32’10.2” LS dan 108°11’20.8” BT pH: 5,73 Chlorida: 1.281,73Hot water temperature: 49,7oC Water debit: lt/sec Resources: Speculative 25 MW, Hipothetical 13 MW Resources Temperature:164,85oC (geothermometer Na/K – Giggenbach)
CIREBON REGENCY: Mt. KROMONG 25 MWe Coordinate: 06°42’45.9” LS dan 108°23’57.2”BT pH: 6,6 Chlorida: 3.497,85 Water Temperature: 57,9oC Water Debit : 4,0lt/detik Resources Speculative 25 MW, Hipothetical 13 MW
6
WEST JAVA GEOTHERMAL LOCATIONS OFFERED (2)
GARUT REGENCY: CILAYU 100 MWe Coordinate: 07°25’22.2”LS dan 108°31’12.9” BT pH: 7,0 Chlorida: 1421.44 Water Temperatures: 61,3oC Water Debit : 1 lt/second Resources: Speculative 100 MW, Hipothetical 53 MW Resources Temperature: 198,51oC (geothermometer Na/K – Giggenbach)
CIANJUR REGENCY: TANGGEUNG-CIBUNGUR 100 MWe Coordinate: 07°15’29.8” LS dan 107°06’37.8”BT pH: 6.8 Chlorida: 774.91 Water Temperaturs: 69,1 – 70,5oC WaterDebit: 2,0lt/sec Resources: Speculative 100 MW, Hipothetical 53 MW Resources Temperatur: 122,98oC (geothermometer Na/K – Giggenbach)
KUNINGAN REGENCY: CIBINGBIN 25 MWe Coordinate: 07°04’30.5” LS dan 108°44’52.0” BT pH: 7,7 Chlorida: 9.040,60 Hot water temperature: 54,2oC Water debit: 3,0 lt/sec Resources: Speculative 25 MW, Hipothetical 13 MW Resources Temperature: 132,53oC (geothermometer Na/K – Giggenbach)
EXPLOITATION
GEOTHERMAL PLANTS
Map of Investment Process
2 YRS 30 YRS 3 YRS
GEOTHERMAL
POTENCY FEASIBILITY
STUDY
RESOURCES
UTILIZATION EXPLORATION
(Based on Law No. 27/2003 and Government Regulation No. 59/2007)
BUMN, BUMD, PRIVATE, COOPERATION CENTRAL/ LOCAL
GOVERNMENT OR PRIVATE
CENTRAL/LOCAL GOVERNMENT
DATA AND INFORMATION
R E G U L A T I O N H U M A N R E S O U R C E S T E C H N O L O G Y
GEOTHERMAL WORKING LICENSE - 35 years ASSIGNMENT
BIDDING PROCESS
7
PRELIMINARY
SURVEY
GEOTHERMAL PLANTS
Beneficial Supporting Components
• National Policy support (Geothermal Road Map 2025)
• Carbon credit (Clean Development Mechanism)
• Fiscal Incentives (free imported tax for exploration equipment. Etc)
• Support for processing permit and other incentives from Local Government.
1. Bidding process for Geothermal Working Area (GWA):
- Open bidding in two phases
- Winner gets Geothermal License for 35 years
2. Preliminary Survey Assignment for Open Areas :
- Direct Investment to finance exploration
- First right refusal for the Assignee
- Awarded compensation if Assignee not win the bidding.
3. Business Cooperation with Existing License Holder :
drilling, infrastructure, power plant EPC, finance, carbon credit/CDM, etc.
8
CONTACTING INSTITUTION
Energy and Mineral Resources Office, West Java Province.
website: http://esdm.jabarprov.go.id or