8
1 investment in demand: clean energy GEOTHERMAL POWER PLANTS B

investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

1

investment in demand: clean energy GEOTHERMAL POWER PLANTS B

Page 2: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

GEOTHERMAL PLANTS

Imagine more than 5000 Mw Clean Energy

Indonesia’s geothermal reserve + 20.000 MW

Out of it 27% of the potency is in West Java with total of

6101 Mwe

Inventoried in 43 areas, divided into

• 2,184 Mwe proven resource and

• 3,237 Mwe of reserve.

2

… envisions by 2025, about 3-4 percent of Indonesia energy needs, will be met mostly through the use of West Java’s geothermal resources.

Page 3: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

GEOTHERMAL PLANTS

The Road Map: Government Objectives

The Road Map: Government targets

• In 2012, national electricity by geothermal is 3400 Mwe

• In 2020, national electricity by geothermal is 6000 Mwe

Legal basis in Development of Mine and Energy enterprising involves:

• All issues on environment and sustainable development are the main provisions in legislation on energy, particularly geothermal, in Law 27/2003 and national energy policy 2003-2020.

• Law No. 32 Year 2004 on Local Government

• Governmental Regulation No. 25 Year 2000 on Authorities of Provincial Government

• Provincial Regulation (By-Law) No. 15 Year 2001 on Establishment of Local Agency of Province of West Java

• Provincial Regulation No. 1 Year 2001 on RENSTRA (strategic plan) of Province of West Java.

3

Page 4: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

Tangkuban Parahu G. Tampomas

Ciremai-Sangkanhurip

PLTP Kamojang

PLTP Darajat

PLTP Wyg. Windu G. Masigit-Guntur

PLTP Karaha-Bodas

G. Galunggung G. Papandayan

G. Sawal

Cilayu

PLTP Ciwidey

PLTP Patuha Tanggeung

G. Gede-Pangrango

PLTP Awibengkok

Kawah Ratu

Cisolok-Sukarame

G. Pancar

POTENSI PANAS BUMI

PLTP EKSISTING

WEST JAVA GEOTHERMAL

LOCATIONS OFFERED

CIBALONG

PRELIMINARY SURVEY ASSIGNMENT

CILAYU

JAMPANG

CIREBON-KROMONG

TANGGEUNG

KUNINGAN CIBINGBIN

4

FOR BIDDING PROCESS IN 2010

Page 5: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

5

WEST JAVA GEOTHERMAL

LOCATIONS OFFERED (1)

SUKABUMI REGENCY: JAMPANG 225 MWe Coordinate: 07°01’34.7” LS dan 106°43’47.6” BT pH: 6,61 Chlorida: 239.81 Hot Water Temperaturr 38,6oC Water Debit: 2,0lt/sec ResourcesL Speculative 225 MW, Hipothetical 119 MW Resources Temperature: ........oC (geothermometer Na/K – Giggenbach)

TASIKMALAYA REGENCY: CIBALONG 25 MWe Coordinate: 07°32’10.2” LS dan 108°11’20.8” BT pH: 5,73 Chlorida: 1.281,73Hot water temperature: 49,7oC Water debit: lt/sec Resources: Speculative 25 MW, Hipothetical 13 MW Resources Temperature:164,85oC (geothermometer Na/K – Giggenbach)

CIREBON REGENCY: Mt. KROMONG 25 MWe Coordinate: 06°42’45.9” LS dan 108°23’57.2”BT pH: 6,6 Chlorida: 3.497,85 Water Temperature: 57,9oC Water Debit : 4,0lt/detik Resources Speculative 25 MW, Hipothetical 13 MW

Page 6: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

6

WEST JAVA GEOTHERMAL LOCATIONS OFFERED (2)

GARUT REGENCY: CILAYU 100 MWe Coordinate: 07°25’22.2”LS dan 108°31’12.9” BT pH: 7,0 Chlorida: 1421.44 Water Temperatures: 61,3oC Water Debit : 1 lt/second Resources: Speculative 100 MW, Hipothetical 53 MW Resources Temperature: 198,51oC (geothermometer Na/K – Giggenbach)

CIANJUR REGENCY: TANGGEUNG-CIBUNGUR 100 MWe Coordinate: 07°15’29.8” LS dan 107°06’37.8”BT pH: 6.8 Chlorida: 774.91 Water Temperaturs: 69,1 – 70,5oC WaterDebit: 2,0lt/sec Resources: Speculative 100 MW, Hipothetical 53 MW Resources Temperatur: 122,98oC (geothermometer Na/K – Giggenbach)

KUNINGAN REGENCY: CIBINGBIN 25 MWe Coordinate: 07°04’30.5” LS dan 108°44’52.0” BT pH: 7,7 Chlorida: 9.040,60 Hot water temperature: 54,2oC Water debit: 3,0 lt/sec Resources: Speculative 25 MW, Hipothetical 13 MW Resources Temperature: 132,53oC (geothermometer Na/K – Giggenbach)

Page 7: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

EXPLOITATION

GEOTHERMAL PLANTS

Map of Investment Process

2 YRS 30 YRS 3 YRS

GEOTHERMAL

POTENCY FEASIBILITY

STUDY

RESOURCES

UTILIZATION EXPLORATION

(Based on Law No. 27/2003 and Government Regulation No. 59/2007)

BUMN, BUMD, PRIVATE, COOPERATION CENTRAL/ LOCAL

GOVERNMENT OR PRIVATE

CENTRAL/LOCAL GOVERNMENT

DATA AND INFORMATION

R E G U L A T I O N H U M A N R E S O U R C E S T E C H N O L O G Y

GEOTHERMAL WORKING LICENSE - 35 years ASSIGNMENT

BIDDING PROCESS

7

PRELIMINARY

SURVEY

Page 8: investment in demand: clean energy GEOTHERMAL POWER PLANTS · cisolok-sukarame g. pancar potensi panas bumi pltp eksisting west java geothermal locations offered cibalong preliminary

GEOTHERMAL PLANTS

Beneficial Supporting Components

• National Policy support (Geothermal Road Map 2025)

• Carbon credit (Clean Development Mechanism)

• Fiscal Incentives (free imported tax for exploration equipment. Etc)

• Support for processing permit and other incentives from Local Government.

1. Bidding process for Geothermal Working Area (GWA):

- Open bidding in two phases

- Winner gets Geothermal License for 35 years

2. Preliminary Survey Assignment for Open Areas :

- Direct Investment to finance exploration

- First right refusal for the Assignee

- Awarded compensation if Assignee not win the bidding.

3. Business Cooperation with Existing License Holder :

drilling, infrastructure, power plant EPC, finance, carbon credit/CDM, etc.

8

CONTACTING INSTITUTION

Energy and Mineral Resources Office, West Java Province.

website: http://esdm.jabarprov.go.id or