Upload
charleen-miles
View
215
Download
1
Tags:
Embed Size (px)
Citation preview
INVESTING IN THE FUTURE
Information Sessi
on
April 6, 2
014
St. Paul’s United ChurchAccessibility Committee
1
Feasibility Committee
*our members are Dave Pearen & Isabel Thompson (co-chairs), Rev. Carla (Recording Secretary), Sandy Smith, Bryan Giffin, & Bonnie Warnock *our mandate*our proposal
Taking Action Today for
the Future2
Why we are proposing an extension?
*Provincial Legislation requires all public buildings to be accessible by 2025.
*More space is required for an accessible washroom, Food Bank and storage.
Taking Action Today for the Future
3
How was this determined?
Taking Action Today for the Future 4
1)Based on Accessibility Survey: two washrooms
(one would be accessible)
2) An expanded Food Bank area and church storage, a large & comfortable community meeting area, a choir storage area and a minister’s study that would be used for church meetings.
Taking Action Today for the
Future5
How will we make this expansion a reality?
• Trillium Foundation Capital Grant
• Ontario Association of Food Banks
• City of Ottawa Rural Grants
• United Church Grants
• Your contributionsTaking Action Today for the
Future7
• Pledges have already been made by the Sunday School Committee for $3,200
• The Pie People have pledged $30,000.
• We have already had offers of “in-kind” donations ie. dry walling & framing, painting.
Taking Action Today for the Future 8
When is the right time to build with consideration to need and
financial ability?• Costs keep going up • Our congregation is stable• We have gifted leaders who are
committed to undertaking a renovation project
• Building now to meet the current and future needs of our congregation & the community Taking Action Today for
the Future 9
Where do we need to build?
*Extension would be in the back left corner Why is that the right decision?*Plumbing is already in place*Will not interfere with our stain glass
windows*Will not interfere with our well or sanitary
sewers*Least amount of disturbance to the current
building Taking Action Today for the Future
10
Taking Action Today for the Future 11
Proposed Lower Floor Plan
Church Storage Area
Food Bank AreaHALLWAY
New Doorway to outside
Accessible Washroom
Washroom
Furnace Rm
ChurchHall
Outside Door
West
Exit to___________
Taking Action Today for the Future 12
Proposed Upper Floor Plan
Minister’s Study
Choir Storage Area
Community/Choir
Meeting Room
Sanctuary
Door to SanctuaryW ______________________________________
New Section 16’ W x 25’ L
(4
00 sq. Ft)
______________
West
Why is this floor plan the right plan for this church?
Taking Action Today for the Future 13
*This floor plan meets the legislated accessibility requirements *two washrooms (one accessible)*dedicated space for storage*a confidential space for Food Bank, discreet access entrance*expanded and heated minister’s study*community space that can be rented
What’s next?*Obtain congregational support*Obtain front end money for the architectural drawings*Once drawings are done go to tender thus getting more accurate cost*Permits from City*Apply for grants
Taking Action Today for the
Future14
Motion: We the Congregation support an expansion to the church building that would involve fundraising to supplement the funds obtained through grants and other revenues streams.
(Mover: …………Seconder:…………..)Taking Action Today for the Future 16