1
Inverter parallel operation instructions. It is possible to connect two Full Boar SD2200i generators to each other, using a parallel cable kit DPC-AU02, to increase available power output. DANGER! Never connect the paralleling cord to the inverters with the inverters running. The inverters must not be running and both the paralleling cord switches must be off when connecting the cords. WARNING! Do not attempt to parallel the inverter with any other manufacturers’ inverters. Do not use the paralleling cord for any application other than inverter paralleling. Do not use this cord on other manufacturers’ inverters. WARNING! Always ensure that both ends of the paralleling cord are switched off before connecting the inverters. OFF ON AC SW. OPERATION OUTLETS 1. Connect Ground Wire (GREEN) to the Ground Terminal (Earth) to two SD2200i generators (fig. 1). 2. Connect both the RED and BLACK wires to the PARALLEL OPERATION OUTLETS on both SD2200i generators. Ensure that both wires are in the same location on both generators (fig. 2). 3. Make sure the Economy throttle switch is in the OFF position on both generators (fig. 3). 4. All electronic devices should be turned “OFF” and disconnected from inverter generators prior to starting generator engines. 5. Start generator engines. Make sure the green power indicator LED comes on for each generator. 6. When engines have stabilized, plug in electronic device to AC socket and turn on first load. 7. Allow generator output to stabilize (engine and attached devices run evenly) before plugging in the next load. Maximum Power in Parallel Operation: 3.96VA Rated Power in Parallel Operation: 3.6kVA Limit operation time to 3 seconds for load requiring maximum output. For continuous operation, do not exceed the rated output. Note: It is strongly recommended to plug in devices with the largest output first and the smallest output last to help prevent overloading the generator. OFF ON AC SW. PARALLEL OPERATION OUTLETS OFF ON ECONOMY OFF PARALLEL OPERATION OUTLETS OFF ON NOMY OFF ON AC SW. PARALLEL OPERATION OUTLETS OFF ON ECONOMY Fig. 1 Fig. 2 Fig. 3 Customer Service Hotline - 1800 069 486 Aus 0508 069 486 NZ fullboartools.com.au Ozito Industries Pty Ltd Australia (Head Office) ACN 050 731 756 1-23 Letcon Drive, Bangholme Victoria Australia 3175

Inverter parallel operation instructions

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Inverter parallel operation instructions

Inverter parallel operation instructions.

It is possible to connect two Full Boar SD2200i generators to each other, using a parallel cable kit DPC-AU02, to increase available power output.

DANGER! Never connect the paralleling cord to the inverters with the inverters running. The inverters must not be running and both the paralleling cord switches must be off when connecting the cords.

WARNING! Do not attempt to parallel the inverter with any other manufacturers’ inverters. Do not use the paralleling cord for any application other than inverter paralleling. Do not use this cord on other manufacturers’ inverters.WARNING! Always ensure that both ends of the paralleling cord are switched off before connecting the inverters.

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

1. Connect Ground Wire (GREEN) to the Ground Terminal (Earth) to two SD2200i generators (fig. 1).

2. Connect both the RED and BLACK wires to the PARALLEL OPERATION OUTLETS on both SD2200i generators. Ensure that both wires are in the same location on both generators (fig. 2).

3. Make sure the Economy throttle switch is in the OFF position on both generators (fig. 3).

4. All electronic devices should be turned “OFF” and disconnected from inverter generators prior to starting generator engines.

5. Start generator engines. Make sure the green power indicator LED comes on for each generator.

6. When engines have stabilized, plug in electronic device to AC socket and turn on first load.

7. Allow generator output to stabilize (engine and attached devices run evenly) before plugging in the next load.

Maximum Power in Parallel Operation: 3.96VARated Power in Parallel Operation: 3.6kVALimit operation time to 3 seconds for load requiring maximum output. For continuous operation, do not exceed the rated output.

Note: It is strongly recommended to plug in devices with the largest output first and the smallest output last to help prevent overloading the generator.

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMY

OFFONAC SW.

PARALLELOPERATION

OUTLETS

OFF

ON

ECONOMYFig. 1 Fig. 2 Fig. 3

Customer Service Hotline -1800 069 486 Aus0508 069 486 NZfullboartools.com.au

Ozito Industries Pty LtdAustralia (Head Office)

ACN 050 731 7561-23 Letcon Drive, Bangholme

Victoria Australia 3175