INTRODUCTION TO RADIUSTitle V
Air Permit Application
New Jersey Department of Environmental Protection
(December 6, 2011)
AQP-WF 2
Air Permit Application
�RADIUS software available at:�http://www.state.nj.us/dep/aqpp/radius.html�Use for non-confidential information
�Save RADIUS application on CD and send to DEP
�Helplines at:�http://www.state.nj.us/dep/aqpp/contact.html
AQP-WF 3
RADIUS Forms
�Used for all applications�Major and Non-major facilities�New and modified sources�Use latest version of RADIUS
�For Operating Permit Renewals with attachment at:�http://www.state.nj.us/dep/aqpp/applying.html
�Except Non-Technical Amendments�http://www.state.nj.us/dep/aqpp/applying.html
AQP-WF 4
Confidential Information
�Need two applications�RADIUS to include non-confidential info only�Complete Paper Application�Consistent with N.J.A.C. 7:27-1
�http://www.state.nj.us/dep/aqm/Sub1.pdf
�Emission Info may not be confidential�All info considered confidential until
decision of confidentiality is made
AQP-WF 5
Application InformationN.J.A.C. 7:27-1
�See N.J.A.C. 7:27-1 (Definitions)� Includes, but not limited to,
�Facility Name and location�Emission type and rate�Frequency and duration of release�Maximum production rate�Emission estimation methods
AQP-WF 6
Pre-Application Information
�Need ID# (or PI#)�Use form AIMS-099A
�Need PIN code�Use form AIMS-099B
�Forms available at:�http://www.state.nj.us/dep/aqpp/applying.html
AQP-WF 7
Certification
�Either electronic or paper�Electronic preferred
�Need PIN code�Use form AIMS-099BPaper certification at:�http://www.state.nj.us/dep/aqpp/applying.html
AQP-WF 8
Application Completeness
�Administrative Check�Errors�Warnings
� Instructions�To be updated soon�http://www.state.nj.us/dep/aqpp/applying.html
AQP-WF 9
Additional Information
�Compliance Demonstration�Submit information electronically
whenever possible�Attach files directly to RADIUS forms, or�Include separately on the CD
AQP-WF 10
APPLICATION EXAMPLE
�INTRODUCTION TO RADIUSTitle V
� EXAMPLE OF AN EMISSION UNIT
AQP-WF 11
Example…Adding Equipment
�Boiler�280 MMBTU/hr heat input�Fuel Burned
�Natural gas�#2 fuel oil (backup)
�Hours of Operation: 4000 hrs/yr�One 10,000 Fuel Oil Storage Tank
AQP-WF 12
Select “file” to activate the drop down menu.To create a new application select “New”from the drop down menu.
AQP-WF 13
Adding a new source select“Title V Operating permit” from the drop down menu.
Select permitapplication
AQP-WF 14
Select “OK” to go to main menu
AQP-WF 15
Double click on “Reason for Application”
AQP-WF 16
Enter reasons + any other relevant information.
AQP-WF 17
Double click on “Facility Profile (General)
AQP-WF 18
Select “contact information” from the drop down menu
Select “Owner” from the drop down menu
AQP-WF 19
Select “Responsible Official” - mandatory
AQP-WF 20
Select “Responsible Official” - mandatory
AQP-WF 21
Double click on “Equipment Inventory”
AQP-WF 22
The application adds two pieces of equipment.Enter all required information.
AQP-WF 23
Highlight equip row and select “edit details” to open the equip detail sheet. Enter all details.
AQP-WF 24
Highlight next equip row andHighlight next equip row andselect select ““ edit detailsedit details”” totoopen the equip detail sheet.open the equip detail sheet.Enter all equip details.Enter all equip details.
AQP-WF 25
Double click on “Control Device Inventory”
AQP-WF 26
Control device is one RTOCanister Regenerative Thermal Oxidizer.
AQP-WF 27
Highlight control device row andselect “edit details” to open the CD detail sheet. Enter all details.
Once the CD details are completeClick “OK”
AQP-WF 28
Double click on “Emission Point Inventory”
AQP-WF 29
Enter emission point details.
AQP-WF 30
Double click “Emission Unit/Batch Process Inventory”
AQP-WF 31
Two Emission Units.
Select “Emission Unit Operating Scenarios” tab.
Select “each raw and enter the respective information”
AQP-WF 32
AQP-WF 33
Select U2 “Edit Detail”
AQP-WF 34
Emission unit 1 (U1) has two operating scenarios.Enter all information.
Double click to open CD and PT fields.
AQP-WF 35
Highlight row OS2, select “edit details” and enter data.
AQP-WF 36
Highlight row U2-OS1, select “edit details” and enter data.
AQP-WF 37
Double click “Potential to Emit”
AQP-WF 38
Select “Emission Unit” from drop down menu.
AQP-WF 39
Select “U1 Boiler” from drop down menu.
AQP-WF 40
Select “U1-OS1 & OS2 Boiler” from drop down menu.And enter the lb/hr emissions
AQP-WF 41
Select “Emission Unit 1- OS1” from drop down menu.And follow the same procedure as with U1 – OS0 before
AQP-WF 42
Select “Emission Unit 2” from drop down menu.And follow the same procedure as with U1 before
AQP-WF 43
Select “Compliance Plan”
AQP-WF 44
Select “Emission Unit” from drop down menu.
AQP-WF 45
Select “OS0” and add tons/year.
AQP-WF 46
Select “OS0” and add emissions tons/year, and rules that apply to all OSs.
AQP-WF 47
Select “OS1” and add emissions Lb/hr, and rules that apply to each OS individually.
AQP-WF 48
Select “Submit” from the drop down menu.
AQP-WF 49
Select “OK”
AQP-WF 50
The system performs an administrative check.If no “errors” are found, select “certify”.If errors are found return to fix them.
AQP-WF 51
Certification may be done electronically or manually. For this case select “Skip Electronic Certification”.
AQP-WF 52
The “Select File” dialogue box appears.
AQP-WF 53
Install CD disc in A-drive.Select “CD Disc” option from drop down menu and select “save”.Beginning “May 1, 2010” The Radius application will be the only form accepted by the Department as official one.
AQP-WF 54
Announcement confirms that the export is successful.Select “OK”. The application is complete!
AQP-WF 55
Tips
� In an Emission Unit, an operating scenario can consist of multiple emission points and control devices, but only 1 piece of equipment
� Insignificant sources and non-source fugitive sources are only specified for Title V operating permits
� In the Emission Unit Operating Scenario screen, double-click the Control Device, Emission Point, and SCC fields to enter data
AQP-WF 56
More Tips
�The File\Submit command does not electronically transfer the file to DEP �Copy the file to CD-ROM and mail it to DEP�Permit modifications must only include the data
that is being added or changed�Don’t submit an edited version of the full permit
application�Electronic code of Federal regulations -
http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=%2Findex.tpl
AQP-WF 57
QUESTIONS…?