1 Date Introduction of Sustainable E-Waste Management in Ghana 12:30 - 12:35 Chair and Welcome Address Oliver Boachie (Special Advisor to the Minister, MESTI) 12:35 - 12:55 The National E-Waste Strategy of Ghana Policy Level: Lydia Essuah (Director PPME, MESTI) Regulatory Level: John Pwamang (Acting Executive Director, EPA) 12:55 – 13:00 Film: Impressions of the Old Fadama Scrap Yard 13:00 - 13:40 Technical Support of GIZ General Overview and Approach (Markus Spitzbart, GIZ) Peace Building Process (Sampson Atiemo, MRI) Technical Trainings and Visioning (Veronika Johannes, GIZ) Support on Policy Level (Joseph Sikanartey, GIZ) 13:40 – 14:00 Q/A with Hon. Minister, Prof. Kwabena Frimpong-Boateng

Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

1Date

Introduction of Sustainable E-Waste Management in Ghana

12:30 - 12:35Chair and Welcome Address• Oliver Boachie (Special Advisor to the Minister, MESTI)

12:35 - 12:55The National E-Waste Strategy of Ghana• Policy Level: Lydia Essuah (Director PPME, MESTI)• Regulatory Level: John Pwamang (Acting Executive Director, EPA)

12:55 – 13:00Film: • Impressions of the Old Fadama Scrap Yard

13:00 - 13:40

Technical Support of GIZ • General Overview and Approach (Markus Spitzbart, GIZ)• Peace Building Process (Sampson Atiemo, MRI)• Technical Trainings and Visioning (Veronika Johannes, GIZ)• Support on Policy Level (Joseph Sikanartey, GIZ)

13:40 – 14:00 Q/A with Hon. Minister, Prof. Kwabena Frimpong-Boateng

Page 2: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

SUSTAINABLE E-WASTE MANAGEMENT IN GHANA

MRS. LYDIA ESSUAHDIRECTOR POLICY PLANNING, MONITORING AND

EVALUATION

PRESENTED BY:

www.mesti.gov.gh @mestighofficial

MINISTRY OF ENVIRONMENT, SCIENCE, TECHNOLOGY AND INNOVATION (MESTI)

Page 3: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

PRESENTATION OUTLINE

INTRODUCTION

SUSTAINABLE RECYCLING CHAIN

1

2

www.mesti.gov.gh @mestighofficial

2

POLICY DIALOGUE3

Page 4: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

INTRODUCTION 3

www.mesti.gov.gh @mestighofficial

• Currently, resource recovery from e-waste inGhana is almost exclusively informally organized.

• It provides a livelihood for many, but also hassevere negative consequences.

• Materials that are of no use to the scrap workersare burnt or dumped into the environment,without considering the indirect costs that arecaused not only locally but also at the global level.

• Such practice gives the informal sector acompetitive advantage vis-à-vis recyclingenterprises in the formal sector, caring forenvironmentally sound and socially responsiblerecycling, applying occupational health and safetystandards and caring for proper treatment andelimination of hazardous substances.

Page 5: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

INTRODUCTION Cont’d…. 4

www.mesti.gov.gh @mestighofficial

The government of Ghana recognized this challenge and passed the

following legislations to tackle the menace.

• Hazardous and Electronic Waste Control and Management Act (Act 917, 2016)

(Eco Levy)

• LI 2250

• Technical guidelines

Page 6: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

5

SUSTAINABLE RECYCLING IN GHANA

www.mesti.gov.gh @mestighofficial

Page 7: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

SUSTAINABLE RECYCLING IN GHANA 6

www.mesti.gov.gh @mestighofficial

• Ghana is currently working on using two (2) approaches to ensuresustainable recycling. These are;

1. National Integrated Management System, which is part of the processes ofoperationalizing Act 917.

2. Support from Development Partners (Germany, Switzerland and the EU)among others.

• Ultimately, the Ministry is seeking to enhance job creation andemployment, ensure a clean environment and transform the scrap yardinto a collection, dismantling and recycling hub that is adequatelyregulated.

Page 8: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

National Integrated E-WASTE Management System 13

www.mesti.gov.gh @mestighofficial

Page 9: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

SUSTAINABLE RECYCLING IN GHANA 6

www.mesti.gov.gh @mestighofficial

• The Environmentally Sound Management of E-Waste is one of the theProjects implemented by GIZ, with MESTI as the Project ExecutingAgency (PEA).

• The Project seeks to provide,

1. Policy Support

2. Development of Business Models

3. Support to the informal Sector

Page 10: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

SUSTAINABLE RECYCLING IN GHANA 6

www.mesti.gov.gh @mestighofficial

• As part of the quest to implement the ACT 917, optimal recycling isrequired to define the roles of various actors within the e-waste valuechain.

• Consequently, a workshop on “E-Waste Recycling Options for Ghana”provided different options for e-waste recycling in Ghana.

• This was a basis for feasibility studies on each option to facilitate decisionmaking.

• A follow-up workshop for the Ministry of Environment, Science Technologyand Innovation (MESTI) as well as its Agency the Environmental ProtectionAgency (EPA) was conducted and a proposed Optimal Recycling Optiondeveloped.

Page 11: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

SUSTAINABLE RECYCLING IN GHANA Cont’d… 7

www.mesti.gov.gh @mestighofficial

Page 12: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

8

POLICY DIALOGUE

www.mesti.gov.gh @mestighofficial

Page 13: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

POLICY DIALOGUE 9

www.mesti.gov.gh @mestighofficial

• The Ministry is developing a National EEE Management and ControlPolicy with the objective of;

✓Establishing an effective, accountable and transparent framework formanaging and controlling Environmentally Sound Disposal,

✓Collection and Recycling of WEEE in Ghana.

• The Policy Dialogue serves as input into the stakeholder engagementprocesses.

Page 14: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

POLICY DIALOGUE Cont’d…. 10

www.mesti.gov.gh @mestighofficial

Page 15: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

11

OUTLOOK

www.mesti.gov.gh @mestighofficial

Page 16: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

OUTLOOK 12

www.mesti.gov.gh @mestighofficial

• Ghana will be implementing an E-Waste Optical Recycling thatcombines manual dismantling and optimal recycling facilities setupswith approval from the EPA according to the legal instruments andtechnical guidelines.

• Proposed activities (in fig. 2 SLIDE 10) will also feed into the formationof the National EEE Management and Control Policy.

Page 17: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

14

ACKNOWLEDGEMENTS

www.mesti.gov.gh @mestighofficial

Page 18: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

ACKNOWLEDGEMENTS 15

www.mesti.gov.gh @mestighofficial

The implementation of the Hazardous and Electronic Waste Control andManagement Act 2016 (ACT 917) is supported by;

• The German Federal Ministry for Economic Cooperation and Development(BMZ) through;

✓ "Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)

GmbH" E-Waste Programme and KfW

• The EU-funded programme E-Magin and

• The Swiss (SECO) funded programme SRI – Sustainable Recycling Industries

Page 19: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Thank you

www.mesti.gov.gh @mestighofficial

Page 20: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Workshop on Introduction of Sustainable E-Waste Management in Ghana, WRF, Geneva, October 2019 Overview of the Hazardous and Electronic Waste Control and

Management Act, 2016 (Act 917)Presented by:

John A. Pwamang, Acting Executive Director, Environmental Protection Agency - Ghana

Page 21: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

OutlineObjectives of the Act

Key Provisions of the Part Two of the Act

Progress of Implementation of Part Two of Act 917

Page 22: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Objectives of Act 917 An Act to provide for the control, management and disposal of

hazardous waste, electrical and electronic waste and for related purposes

Control and management of E-waste is Part two of the Hazardous and electronic waste control & management Act

Part one covers control and management of hazardous wastes in general and seeks to domesticate the Basel Convention and aspects of the Stockholm Convention relating with PCBs in Ghana.

Page 23: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Key Provisions of the Part Two of Act 917 – Section 20

A manufacturer or importer of electrical electronic equipment is required to register with the Agency and pay a levy in respect of electrical or electronic equipment that are imported into or manufactured in the country

Page 24: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Levy and the Fund – Sections 23 and 24The levy is to cater for the costs of the collection,

treatment, recovery and environmentally sound recycling and disposal of e-waste

Provides for the establishment of an E-Waste Fund to finance the management of e-waste and reduce the adverse impacts of e-waste recycling on human health and the environment

28 October, 2019JAP-Ewaste5

Page 25: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Sources of Money for the E-waste Fund Section 25

The sources of money for the Fund include: the levies collected including the advance recycle eco

levy in respect of items listed;moneys received from other sources or that may in any

manner become lawfully payable and vested in the Fund;

Grants, donations, gifts and other voluntary contributions; and

moneys approved by Parliament

Page 26: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Disbursements from the Fund–Section 28Moneys from the Fund shall be disbursed as follows:

Offer incentives for collection of electrical and electronic wastes and for establishing and maintenance of collection Centres – 20%

Construction & maintenance of electrical and electronic waste recycling & related facilities – 40%

The Ministry responsible for the Environment – 10%

Environmental Protection Agency – 20%

Page 27: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Disbursements from the Fund continuedSupport research and development into electrical and

electronic waste management – 5%

Monitoring and evaluation – 3.5%

Capacity building of key Trade Associations and manufacturers of electrical and electronic equipment –1%

Administrative expenses of the fund – 0.5%

Page 28: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Establishment of Recycling Facilities -Section 31

The Minister on the advice of the Agency may make arrangements for the establishments of electrical and electronic waste recycling plants and related facilities in the country

Page 29: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Obligation of Taking Back–ExtendedProducer Responsibility (EPR)–Section 32

A manufacturer, distributor or wholesaler of electrical and electronic equipment is required to take back used or discarded electrical and electronic equipment manufactured or sold by it for recycling purposes (Section 32)

There is need to develop guidelines on this provision

Page 30: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Examples of Levies on Electrical and Electronic Equipment

Item Levy Amount (US$) )

Personal computers (CPU, mouse, screen and keyboard)

1.50

Laptop computer 1.50Printers 1.00Cellular telephones 1.00Cathode-ray Tube (CRT) Television set 12.00Video cameras and recorders 1.00Refrigerators, Freezers, ACs 5.00

Page 31: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Status of implementation (1/4) There is a Regulation (LI 2250) of 2016 under Act 917 The External Service Provider (Section 21) was

appointed in July 2018 by an agreement signed between SGS, MESTI and EPA.

On the same day an agreement was signed with Debsther Klean Recycle Limited for the establishment of recycling facility pursuant to Section 31.

Both agreements were subsequently ratified by Parliament in July 2018

Page 32: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Status of implementation (2/4) Action has also been initiated to establish a Hazardous

Wastes and Electronic Wastes Management Committee as provided for in Section 36, subsection (a) of Act 917

The 5th Schedule (List of items for which levy is applicable) has been incorporated into the EPA’s component of the Fees and Charges Regulations, 2018 and submitted to the Ministry of Finance for consideration and approval by Parliament

Page 33: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Status of Implementation (3/4) EPA, MESTI and Attorney General’s Department are working

to develop key regulations so they could be considered by Parliament. These include:Guidelines on Extended Producer Responsibility by Original

Equipment Manufacturers (OEMs) Regulations on environmentally sound recycling of e-wastes

(Convert existing technical guidelines into Regulations) Conducting intensive awareness creation and engagements on

provisions of the Act 917 to pave way for full operationalization. Target Groups include Scrap Dealers, Trade Associations, Importers

Page 34: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Status of Implementation (4/4) Training of scrap dealers in environmentally sound dismantling

of electrical and electronic wastes under Ghana National Cleaner Production Centre (GNCPC) and GIZ project

Permits are being issued to private entities and NGOs to set up collection centres and buy-back centres in cooperation with informal e-waste dealers

EPA is collaborating with stakeholders to remediate the highly contaminated Agbogbloshie scrap yard and other potentially contaminated sites in Ghana

Page 35: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

The Draft Hazardous & ElectronicWaste Management Committee (1/2)

Draft Regulations to provide for an inter-sectoral Committee

1. Executive Director of EPA as Chairman and representatives not below the rank of Director or equivalent of the following:

2. Ministry responsible for Environment3. Ministry responsible for Local Government and Rural

Development4. Ministry responsible for Trade and Industry5. Ministry responsible for Sanitation & Water Resources6. Customs Division of the Ghana Revenue Authority

Page 36: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Draft Hazardous & Electronic WasteManagement Committee (2/2)

7 Ghana Ports & Harbours Authority8 Ghana Health Service9 External Service Provider specified in section 21 of Act 91710 Administrator of the Fund specified in section 27 of Act 91711 Private Enterprises Federation (PEF)12 One person from the private sector involved in the management

of hazardous & electronic wastes13 The head of Department/Unit responsible for hazardous and

electronic waste management at the EPA as Secretary

Page 37: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

www.epa.gov.gh Contact :info.epa.gov.gh Tel:+233-0302-664697/8

Thank you for your Attention

[email protected]@yahoo.com

Page 38: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

GIZ E-Waste Programme Ghana Supporting Ghana in Introducing Sustainable E-Waste Management

Markus Spitzbart, Joseph Sikanartey, Veronika Johannes, Sampson Atiemo

WRF

Geneva, Switzerland, October 24

Page 39: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

2Date

E-Waste Programme

Environmentally Sound Disposal & Recycling of E-Waste

Main Objective: Improving the conditions for sustainable e-waste management in Ghana

Commissioned by: German Federal Ministry for Economic Cooperation and Development (BMZ)

Duration: 1st Phase 08/2016 – 01/20202nd Phase 02/2020 – 01/2023

Budget TC: 1st Phase EUR 5,000,0002nd Phase EUR 5,000,000

Lead Executing Agency: Ministry of Environment, Science, Technology and Innovation (MESTI)

Page 40: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

3Date

E-Waste Programme

Greater Accra Scrap Dealer‘s

Association

Partners

Page 41: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

4Date

E-Waste ProgrammeE-Waste Collection in Ghana

Page 42: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

5Date

E-Waste ProgrammeOld Fadama Scrap Yard

?

✓ ?

Page 43: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

6Date

E-Waste ProgrammeStructure of 1st Phase

InformalSector

Business Models

PolicyAdvice

CapacityDevelopment

Pilot

Implementations

Development of

Strategies

Stakeholder-Dialog

Multi-national longterm expert-team

National and international short term experts

Trainings & workshops

Technical assistence

Development partnerships with private sector

Cooperation with other initiatives and actors

Page 44: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

7Date

E-Waste Programme

Transformation of the Old Fadama Scrap Yard

(“Agbogbloshie”)into ....

maintaining its individual character

Page 45: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

8Date

E-Waste ProgrammeOld Fadama Scrap Yard

National E-Waste Strategy

Community Scrap YardCapacity Building Measures

Assessment of ProcessesTechnical Solutions

Permitting System

Page 46: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

9

Desktop Computer Dismantling

Nigerians

Dagombas

University of Stuttgart Karoline Owusu-Sekyere Improving the e-waste management conditions in Agbogbloshie through a MFA 10/24/2019

Page 47: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

10Date

E-Waste Programme

Re-designingthe interfaces between

informal scrap sector andformal e-waste recycling

Page 48: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

11Date

E-Waste Programme

destining “critical” e-waste fractions to proper recycling/ disposal

fostering young entrepreneurs and innovative start-up ideas

Page 49: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

12Date

E-Waste ProgrammeDeveloping Innovative Business Models

TS Caritas GhanaSocial Recycling Business

ODS Bank Management

Street Signsof WEEE plastics

Strategic Technology Center

Piloting Payment System

Business Innovation Platform

Page 50: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

13Date

E-Waste Programme

Extracting & proposing potential general solutions based on the pilot

experiences

Linking different stakeholder groups

Page 51: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

14Date

E-Waste Programme

➢ NEEDS OF THE WORKERS AND PEOPLE- health and safety measures- capacity building and trainings- community building

E-Waste Programme

CONSTRUCTIONS

FOOTBALL PITCH WAREHOUSE MAIN ROAD

Page 52: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

15Date

E-Waste ProgrammeConstruction

2017

2017 2019

2019

Page 53: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

16Date

E-Waste ProgrammeE-Waste Programme

Page 54: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

17Date

E-Waste Programme

TECHNICAL TRAINING CONCEPT:

• Focus on Environmentally Sound Manual Dismantling of E-Waste

• TOT course Febuary 2019 / Roll-out June 2019

Capacity Building at the Training Center

120 TRAINED SO FAR

2 Workshops/ week 300 PEOPLE TRAINED BY THE END OF THE YEAR 670+ MINORITIES TRAINED

Page 55: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

18Date

E-Waste Programme

0

10

20

30

40

50

60

TRIBES

The Dynamics of the Old Fadama Scrap Yard

New PatrioticParty (NPP)

National Democratic Party (NDC)

POLITICAL FORMATIONS

Abudus Andanis

➢ INTERNAL INFLUENCES

➢ EXTERNAL INFLUENCES

MUSHROOM SCRAP YARDS

ETHNIC GROUPS & TRIBES

DagombaFrafraGoniaKonkomba

ACTOR D

ACTOR C

ACTOR FACTOR O

ACTOR Z

Page 56: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

19Date

E-Waste Programme

HOW DO WE CREATE A COMMON VISION THAT IS COHERENT BETWEEN ALL RELEVANT

ACTORS?

HOW DO WE ENSURE A PARTICIPATORY APPROACH THAT PROMOTES OWNERSHIP

AND SUSTAINABLE CHANGE?

Page 57: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

20Date

E-Waste ProgrammeVisioning Process/ Generic Actors‘ Map

1

2

3

4

56

7

8 9

10

11

12

13

1415

16

17

18

19

20

21

22

23

24

25

26

27

28

293…

31

32

33

34

35

36

37

38

39

40

41

42 4344

45

46

47

48

495051

52

53

54

55

56

57

58

59

60

61

62

63

INFL

UEN

CE/

PO

WER

STAKE/INTEREST

STAKEHOLDER MAPPING

Page 58: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

21Date

E-Waste Programme

➢ VISIONING SESSIONS- 30 identified stakeholders- Workshops, Interviews & Working Groups- Categorized into ISWM Sustainability Aspects

Visioning Process WRFWorld Resources Forum

HOW DO YOU ENVISION THE FUTURE OF THE OLD FADAMA SCRAP YARD?

COMMON VISION

ACTOR A

ACTOR B ACTOR D

ACTOR C

ACTOR F

ACTOR Z

Technical & PerformanceFinancial & EconomicEnvironment & HealthPolicy, Legal & Governance

Socio- Cultural

Institutional & Organizational

Page 59: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

22Date

E-Waste ProgrammeMulti Stakeholder Dialog

Page 60: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

23Date

E-Waste ProgrammeSD Informal Sector

Activities Carried Out

Ongoing Activities

➢ Development theatre has been used asdialogue tool within the scrap yard and amongother stakeholders

➢ GIZ and GASDA piloted two plays by December2018 on themes agreed by both parties

➢ Five production themes were agreed byGASDA, EPA and GIZ and staged at the scrapyard

➢ Some production themes included; Heath andsafety at the scrapyard, GASDA unionizationand conflict resolution.

➢ Working with partners to identify relevantproduction themes for further cooperation

Page 61: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

24Date

E-Waste ProgrammeSD Recycling Companies

Activities Carried Out➢ Several Workshops with Recycling

Partners and Stakeholders carried out

▪ The workshop provided a platform for dialogue between the recycling industry and government.

▪ E-waste Roundtable Association recognized as a sector association and officially incorporated

▪ Attendance: MESTI, EPA, GIZ, Recyclers, Appraisal Mission

➢ Stakeholder Dialog between policy maker, regulator and private

➢ Support for the sector association (E-waste Round Table Association)

➢ Technical Support to individual recycling companies (upon request from recycler after agreement with political partner)

Ongoing Activities

Page 62: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

25Date

E-Waste Programme

Development of an optimal e-wasterecycling chain/ Starting Point

Page 63: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

26Date

E-Waste ProgrammeRecycling Fund Governance Options

➢ MESTI/EPA Workshop at PeduaseWorkshop to proposepossible Recycling Fund Governance structurefor Ghana (On Operational Level)

ACTIVITIES CARRIED OUT

➢ Follow-up Workshop at MESTIWorkshop for wider stakeholderconsultation (Stakeholders – GIZ, KfW, MESTI-PIU)

➢ Feasibility ReportProvided a Feasibility Study on theFund Governance Structure

Page 64: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

27Date

E-Waste ProgrammeOutlook of Optimal Recycling Chain

Page 65: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

28Date

E-Waste Programme

Page 66: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

29Date

E-Waste ProgrammeGIZ- E-Waste Programme Ghana

Disposal costs have to be considered as essential operational costs

when doing recycling of e-waste!

Sustainable Management and Disposalof E-Waste in Ghana

Deutsche Gesellschaft für

Internationale Zusammenarbeit (GIZ) GmbH

www.giz.de

Thank you for your attention!

Implemented by

Page 67: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

E-waste Ghana Lot 3Enhancing capacities of informal sector

stakeholders & payment system for e-waste

GIZ/MESTI E-Waste Programme

Team and Implementing PartnersMRI

CoordinationCoordinator: Öko-InstitutFocal Person GIZ: Richard Afoblikame

Page 68: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Violent Clashes at Agbogbloshie

Page 69: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Political and ethnic Violent Clashes at Agbogbloshie

Page 70: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Strategic Objectives

❖Support GASDA in strengthening their organizational capacities

❖Provide Peace building Processes at the scrap yard

Page 71: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal
Page 72: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Joint Working Group Meeting at GIZ

The meeting resulted in the formation of committee to look into the draft constitution of GASDA

Tension among leaders was significantly reduced

Leaders affirmed the GIZ process

Page 73: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Meeting of Peace Champions at the Bukom Boxing Arena

The meeting highlighted the need for Peace at the Scrap Yard

Page 74: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

▪ Meeting with Accra Dagomba Naa

▪ Find Traditional solutions to some of the problems

▪ The ultimate goal is to get the overlord of Dagbon, Yaa Naa informed about the process

▪ Meetings has been held with the political leadership to secure their commitment

Page 75: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal
Page 76: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

General Challenges

❖A seeming political tensions in Accra and the area.

❖Though early days, a fragile peace in the north (the hometown of

scrap dealers)

❖Constant threat of ejection of scrap dealers of those at the

Mortuary Road by AMA

❖Fear of constituents accepting the vision of leadership

Page 77: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

Andreas Manhart, Bennett Akuffo, Sampson Atiemo, KwekuAttafuah-Wadee, Johanna Jacobs, Alexander Batteiger

Incentive based collection of e-waste – Results from pilot implementation in Ghana

World Resources ForumGeneva

23-24 October 2019

Page 78: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

2World Resources Forum23.-24.10.2019

Greater Accra Scrap Dealer‘s

Association

PartnersIncentive based collection of e-waste:

Results from pilot implementation in Ghana

CITY WASTE RECYCLING

Page 79: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

3World Resources Forum23.-24.10.2019

Background & introduction

• One of the most pressing pollution issues in informal e-waste recycling.

• Aim: Earn money from the sale of copper & aluminium.

• Alternative treatment options more costly

Cable fires

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 80: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

4World Resources Forum23.-24.10.2019

Background & introduction

• Establishment of a National E-waste Fund

• Filled by e-waste levies on imported equipment

• To be used for sound management of e-waste and to reduce negative impacts.

• Amongst others, also for “incentives for collection, transportation and disposal”

Main objectives of this project module:• To pilot incentive based collection of worst polluting e-waste types

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 81: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

5World Resources Forum23.-24.10.2019

Starting point

• First in-field test of Piloting Payment System with a handover centre

Sub-objectives

• Gain practical experiences how the informal scrap market will react on such an incentive system.

• Test and evaluate various practical issues (stakeholder interaction, incentive levels, transaction modalities….).

• Document & share lessons-learned with policy-makers (MESTI, EPA, KfW…)

Background & introductionIncentive based collection of e-waste:

Results from pilot implementation in Ghana

Page 82: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

6World Resources Forum23.-24.10.2019

collectors

Delivercables

Develop & adjustmethodology

cables

Receivecompens.

Concept overviewIncentive based collection of e-waste:

Results from pilot implementation in Ghana

Page 83: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

7World Resources Forum23.-24.10.2019

Transaction process

1) Delivery

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 84: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

8World Resources Forum23.-24.10.2019

Transaction process

2) Quality control & grading

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 85: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

9World Resources Forum23.-24.10.2019

Transaction process

3) Weighing & photo documentation

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 86: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

10World Resources Forum23.-24.10.2019

Transaction process

4) Data recording & mobile money payment

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 87: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

11World Resources Forum23.-24.10.2019

Transaction process

5) Storage & transport to recycler

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 88: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

12World Resources Forum23.-24.10.2019

Incentive level

system down due to liquidity issues system down for restructuring cable grading & processes

Incentive based collection of e-waste: Results from pilot implementation in

Ghana

Page 89: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

13World Resources Forum23.-24.10.2019

Market responseIncentive based collection of e-waste:

Results from pilot implementation in Ghana

Low incentive

levels

Liquidity issues

Liquidity issuesLiquidity

issues

Rainy season

Ramadan

Page 90: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

14World Resources Forum23.-24.10.2019

➢ 10 months of operation (22.10.18 – 20.08.19)

➢ 27.3 t of cables collected & channeled to sound recycling

➢ 1389 individual transactions

➢ Significant emission reduction

➢ Established alternative to burning that does not discriminate small scale collectors and recyclers

ResultsIncentive based collection of e-waste:

Results from pilot implementation in Ghana

Page 91: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

15World Resources Forum23.-24.10.2019

➢ Incentive based collection is a meaningful way to link informal collectors to sound recycling and to avoid polluting practices carried-out under informal conditions.

➢ Beneficiaries are:

➢ Collectors → higher prices for some e-waste types

➢ Formal recyclers → stable access to e-waste

➢ Society → Reduced pollution

ResultsIncentive based collection of e-waste:

Results from pilot implementation in Ghana

Page 92: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

16World Resources Forum23.-24.10.2019

➢ Suitable for waste types that:

➢ are associated with high environmental impacts if not managed properly

➢ can easily distinguished from other waste types

➢ where standards, auditing & sanctions are prone to failure (informal sector settings)

➢ Ongoing financing needed → e.g. EPR-based financing

➢ Very good monitoring of costs and results possible (collected volumes & emission reductions)

ResultsIncentive based collection of e-waste:

Results from pilot implementation in Ghana

Page 93: Introduction of Sustainable E-Waste Management in …...2019/11/01  · SUSTAINABLE RECYCLING IN GHANA 6 @mestighofficial •As part of the quest to implement the ACT 917, optimal

GIZ / MESTIE-Waste Programme

Thank youfor your attention!

Bennett AkuffoM: +233 244203401E: [email protected]

Andreas ManhartM: +491605881625E: [email protected]

Alexander BatteigerM: +233 556640368E: [email protected]

Dr. Sampson AtiemoM: +233 246184766E: [email protected]

CITY WASTE RECYCLING