Annex I: Tender specifications A. Introduction The European GNSS Agency (hereinafter ‘GSA’, ‘the Agency’ or ‘the Contracting Authority’) is an official European Union Agency formed to accomplish specific tasks related to the European GNSS programmes’. The Agency is located in Prague, Czech Republic (]anovského 438/2, 170 00 Prague 7 Holesovice). Further information can be found on the Agency’s web site at http://www.gsa.europa.eu The services required by GSA under the contract to be potentially awarded as a result of this procurement procedure are described in the technical specifications below (TS). This invitation to tender, and notably technical specifications, will become an integral part of the contract that may be awarded as a result of the procedure. If you are interested in this contract are hereby invited to submit a tender duly signed by authorised representative, satisfying all the conditions of submission and presentation of tender described below according to schedule hereafter: Launch of tender 3 March 2016 After publication in the 0], all documents available at: http://www.gsa.eu ropa.eu/gsa/procurement Deadline for request of 14 April 2016 Requests to be sent in writing only to: clarifications from GSA [email protected] clearly quoting the reference number of procurement procedure Last date on which 15 April 2016 All clarifications will be published at: clarifications are issued http://www.gsa.eu ropa.eu/gsa/procurement by GSA Tenderers are advised to check this webpage on a regular basis for possible updates and/or clarifications Deadline for 20 April 2016 According to conditions of submission set submission of tenders in Section 4 of these Tender Specifications Opening session and 27 April 2016 11:00 in GSA premises in ]anovskeho 438/2, Prague 7, start of evaluation Czech Republic. session An authorised representative of each tenderer may attend the opening of the tenders. Companies wishing to attend are requested to notify their intention by sending an e-mail at least 48 hours in advance to [email protected]. This notification must be 1 REGULATION (EU) No 912/2010 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 22 September 2010 setting up the European GNSS Agency, as modified by REGULATION (EU) No 512/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014

Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

Annex I: Tender specifications

A. Introduction

The European GNSS Agency (hereinafter ‘GSA’, ‘the Agency’ or ‘the Contracting Authority’) is an officialEuropean Union Agency formed to accomplish specific tasks related to the European GNSS programmes’.The Agency is located in Prague, Czech Republic (]anovského 438/2, 170 00 Prague 7 — Holesovice).

Further information can be found on the Agency’s web site at http://www.gsa.europa.eu

The services required by GSA under the contract to be potentially awarded as a result of this procurementprocedure are described in the technical specifications below (TS).

This invitation to tender, and notably technical specifications, will become an integral part of the contract

that may be awarded as a result of the procedure.

If you are interested in this contract are hereby invited to submit a tender duly signed by authorised

representative, satisfying all the conditions of submission and presentation of tender described below

according to schedule hereafter:

Launch of tender 3 March 2016 After publication in the 0], all documents available at:http://www.gsa.eu ropa.eu/gsa/procurement

Deadline for request of 14 April 2016 Requests to be sent in writing only to:clarifications from GSA

[email protected]

clearly quoting the reference number of procurementprocedure

Last date on which 15 April 2016 All clarifications will be published at:clarifications are issued http://www.gsa.eu ropa.eu/gsa/procurement

by GSATenderers are advised to check this webpage on aregular basis for possible updates and/or clarifications

Deadline for 20 April 2016 According to conditions of submission setsubmission of tenders

in Section 4 of these Tender Specifications

Opening session and 27 April 2016 11:00 in GSA premises in ]anovskeho 438/2, Prague 7,start of evaluation Czech Republic.session

An authorised representative of each tenderer may

attend the opening of the tenders. Companies wishing

to attend are requested to notify their intention by

sending an e-mail at least 48 hours in advance to

[email protected]. This notification must be

1 REGULATION (EU) No 912/2010 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 22 September 2010 setting up the European GNSS

Agency, as modified by REGULATION (EU) No 512/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014

Page 2: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

signed by an authorised officer of the tenderer and

specify the name of the person who will attend the

opening of the tenders on the tenderer’s behalf.

Completion of Beginning of May 2016 Estimatedevaluation and award

Signature of the Mid-May 2016 Estimatedcontract

B. Technical specifications

The objective of the contemplated contract is the periodic provision to GSA of lunch (food) and wellbeing

(multipurpose) vouchers for distribution to its Prague staff (approximately 140).

1. Outline of the services required

1.1. Provision of food and wellbeing (multipurpose) vouchers

GSA will request two types of vouchers according to the following specifications:

1. Lunch (food) vouchers for a standard total value of CZK 160 per working day and a staff member.Total number of vouchers to be requested for the life of the contract will be approximately equalto 140 (staff) x 244 (working days) x CZK 160 (per day) x 4 years = CZK 21.862.400 in lunch vouchersof different denominations.

2. Wellbeing (multipurpose) vouchers (sport, gyms, spa, cultural activities, and other relatedpurposes). Vouchers will be for a standard total value of CZK 1600 per month and a staff member.Total number of vouchers to be requested for the life of the contract will be approximately equalto 140 (staff) x 12 (month) x CZK 1600 (per month) x 4 years = CZK 10.752.000 in wellbeing(multipurpose) vouchers of different denominations.

3. Vouchers can be delivered for any value respecting total value of 160 CZK for food vouchers (e.g.2x 80 CZK voucher per working day per employee) and 1600 CZK for multipurpose vouchers (e.g.16 vouchers of 100 CZK value).

Minimum requirements for these vouchers are the following:

1. Lunch vouchers shall be accepted by at least 10 restaurants in Prague 7. Multipurpose vouchers

shall be accepted by at least 50 businesses in Prague.

2. Vouchers shall be in paper format. Other options can be offered by the contractor for GSA

consideration [e.g. contractors should explain the possibility of offering electronic vouchers, if

available (costs and implementation conditions)J.

3. Vouchers should be anonymous, not issued on staff member’s name.

4. Vouchers shall be issued in Czech language.

1.2. Implementation aspects

Page 3: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

The vouchers will be supplied according to the following operational steps:

1. Once a year the GSA will send to the contractor an order form specifying the maximum volume of

services for the ongoing year.

2. On the basis of this orderform, the GSAwiIl specify its needs for each month bysendinga monthly

request for services. This request will be sent by the 7th day of the ongoing month via email. The

request will include an overview of staff members which will indicate how many lunch vouchers

and wellbeing (multipurpose) vouchers shall each individual staff member receive in the given

month.

3. The vouchers shall be delivered to the GSA headquarters at latest on the 15th day of the month,

based on the notification above.

4. The vouchers shall be packaged for each individual staff member separately — one envelope per

staff member.

5. The envelopes for staff shall be assigned to each staff member’s name and also include a summary

of how many working days are counted for the respective month and how many lunch/wellbeing

vouchers in which value (plus a total value of vouchers for the respective month) were delivered.

6. In addition, common lists for signature by all staff members shall be delivered stipulating the

number of vouchers to be distributed in the respective month to each staff member for the control

of its distribution.

7. HR shall receive a monthly overview of the value of vouchers delivered and an annual overview of

vouchers received and its value.

8. The GSA shall be invoiced by the 25th day of the month (upon GSA request, the invoice might be

issued earlier) for the vouchers delivered on the 15th day of month, the invoice payment period

should be monthly.

9. The GSA shall pay the invoice within 30 days.

10. The GSA may decide to replace paper vouchers by electronic vouchers provided that the successful

tenderer proposes this option.

11. If a tenderer does not agree with one or more operational steps above (e.g. payment

conditions), the tenderer shall indicate it in the tender and propose another operation step; this

derogation would be taken into account under award criteria (ii) (“Proposed management of

services”) (see Award criteria under Section 6 below).

2. Volume and type of the contract

2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of

a maximum total potential value of vouchers of CZK 36,000,000 (thirty six million Czech Crowns) for the

full duration of the contract.

The maximum fees invoiced to the GSA for this issuance shall be CZK 200,000 (two hundred thousand

Czech crowns) for the full duration of the contract.

The framework contract will be implemented by order forms and requests for services (referred to in

point 1.2. above).

The budget amount provided for this framework contract and for each order form is merely indicative.

Only the amounts indicated in requests for services are binding, GSA reserves the right to reduce at any

time amounts referred to in framework contract and in order forms. Any condition in relation to a

Page 4: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

minimum amount for the contract made by the Contractor in its tender shall be rejected. Likewise the GSA

reserves the right to ask for modification of the value of the vouchers referred to under point 1.1 above.

3. Duration of the contract

All activities under the framework contract shall be completed for a maximum period of four years.

4. Place of delivery/execution

The vouchers will be delivered to GSA premises in Prague. Correspondence and clarifications may take

place via email, over the phone or by mail.

5. Project meetings

At request of the GSA, contract status meetings may be held between GSA and the Contactor to monitorthe progress of the contract and any identified issues (notably kick-off meeting and annual reviewmeeting). Meeting shall be held at GSA premises in Prague. A meeting may be also held by telephone orvideo conference. Travelling to these meetings, accommodation and any other costs related thereto shallbe at the sole expense of the Contractor and shall be fully included in the price presented in the financialevaluation.

C. Contract provisions

In drawing up your tender, you should bear in mind the provisions of the model contract (see Annex II).Submission of a tender implies acceptance of all the terms and conditions set out in the invitation to tenderand model contract and, where appropriate, waiver of the tenderer’s own general or specific terms andconditions. This submission binds the contractor to whom the contract is awarded during performance ofthe contract.

Protocol on the Privileges and Immunities of the European Union applies to the present tender andcontract.

D. Evaluation of the tenders

5. Exclusion and selection criteria

Exclusion criterion E.1 Participation in this procedure is only open to tenderers who are not in any of theexclusion situations listed under Art. 106 and 107 of Financial Regulation (FR) (see the annexeddeclaration)2- Respect of this condition shall be proven by signature of declaration enclosed in Annex Ill,duly signed and dated. Failure to provide such declaration shall exclude from further evaluation process.After award of the contract, the Agency will require from successful tenderer supporting documentsproving more in detail the respect of criteria above.

Selection criterion S.2 The candidate shall also have the capacity to pursue the professional activityneeded for performing this contract which means that the canditate shall be enrolled in a relevant

2Regulation (EU, Euratom) n 966/2012 of 25 October 2012 on the financial rules applicable to the general budget of

the Union (OiL 298, 26.10.2012, p.1))

Page 5: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

professional or trade register of the country of its establishment. The sucessful tenderer will be invited toprove this capacity by extract from this register.

Selection criterion S.3 The tenderer must be in a stable financial position and have the economic andfinancial capacity to perform the contract. To that end, the tenderer must have a minimum yearly turnoverof annual estimated value of issued vouchers + fees. The successful tenderer will be invited to prove thiscondition by a financial statement or a statement of the economic operator’s overall turnover for the lastfinancial year. In duly justified cases, other proof may be accepted.

Selection criterion S.4 The tenderer shall have the technical and professional capacity needed for

performing the contract. To that end, the tenderer must have an experience of at least 3 years of issuing

lunch and wellbeing vouchers. The successful tenderer will be invited to prove this condition by providing

a listing of five clients for each type of vouchers to whom the tenderer provided vouchers for an annual

amount equal or higher than the amount requested by GSA and under similar conditions. The listing shall

specify the dates when the services were provided to these clients, bearing in mind that these dates shall

cover the whole period of the last 3 years.

The tenderer shall prove the respect of the criteria above by providing the declaration enclosed in AnnexIll, duly signed and dated and other relevant documentation requested above- failure to do so shallexclude tenderer from further evaluation process. After award of the contract, the Agency will requirefrom successful tenderer supporting documents specified above.

6. Award criteria

Only the tenderers meeting the requirements of the exclusion and selection criteria will have their tenderevaluated in terms of quality and price.

The contract shall be awarded to the tenderer submitting the admissible tender offering the best-value-

for-money (best quality-price ratio).

The quality of technical offers reaching this stage will be evaluated in accordance with the award criteria

and the associated weightings as detailed in the evaluation grid below.

MAXNO CRITERIA

POINTS

Technical Evaluation

Q.5 The content of the tenderer’s technical proposal should be drafted with reference to

and shall be evaluated in line with the following criteria:

(i) Quality of service related to acceptance of vouchers::. Numberandvarietyofrestaurants in Prague 7(abovethe number

indicated in the minimum requirements) where the lunch vouchers canbe used so

. Number and variety of shops/businesses in Prague where lunchvouchers can be used

. Number and variety of businesses in Prague and its surrounding (abovethe number indicated in the minimum requirements) where wellbeing(multipurpose) vouchers can be used (preferably, businesses should belisted separately in following categories: sport, culture, health, others)

Page 6: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

M AXNO CRITERIA

POINTS

[max 50 points; compliance with Minimum Requirements will grant 20%of maximum points (10 points)]

(ii) Quality of proposed management of services:

• Respect of (or derogations from) implementation steps referred tounder point 1.2 above (e.g. payment conditions);

. Description of administrative processing of vouchers and its delivery tothe Agency (such as delivery time from the time of order),

. Description of technical/li parameters of data processing,• Measures taken to ensure flexibility and continuity of the services

provided (e.g. replacements, number and quality of employeesallocated to service the contract).

[max 20 points]

(iii) Environmental and social responsibility:. Promotion of environmentally and socially responsible businesses and

services and other operational aspects promoting environmental andsocial responsibility.

[max 5 points]

(iv) Quality of digital administration:

. Quality of the contractor’s approach to provide vouchers throughacceptable electronic means: credit card, cards with chip or similar.

[max 5 points]

Financial Evaluation

The financial evaluation will be made on the basis of fees and other costs charged to

the GSA. This percentage should be calculated as the total amount of fees and costs

charged directly to the GSA by the tenderer in any given year (numerator) divided by

the estimated value of all vouchers bought from the tenderer in any given year

( denominator).

P.6 Points to be allocated according to the following range: 20

• 0 % fees and costs = 20 points

. Up to 0,2 % fees and costs = 10 points

. Above 0,2 and up to 0,4 % fees and costs = 5 points

. above 0,4% fees and costs = 0 points

E. Submission of tenders

Tenderers are requested to submit their tender as specified below:

Page 7: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

Content of tender Checklist

1. Technical Proposal: U

The proposal shall contain all information to allow evaluation of the tenderaccording to the technical award criteria mentioned in section 6 above (technicaland financial evaluation).

2. Supporting Documents:

The tenderer shall submit the following supporting documents (originals) as part of the

tender:

• Declaration and evidence of absence of situation of exclusion using the attached a

form (Annex Ill) — duly signed and dated.

• Legal Entity Form3 - duly filled in, signed and dated Legal Entity Form accompanied

by the supporting documents requested therein to be download from:

http://ec.europa.eu/budget/contracts grants/info contracts/legal entities/le

gal entities en.cfm#en

Financial Identification Form34— duly filled in, signed and dated Financial

Identification Form using the template5 which is to be downloaded from:

http://ec.europa.eu/budget/contracts grants/info contracts/financial id/financial Id en.cfm

a

Tenders must be submitted in an envelope or parcel and carry the following information:

the reference number of the invitation to tender GSA/OP/O1/16 and project title “Procurement

of vouchers for GSA staff in Prague”

Please note: where a tenderer has already signed another contract with GSA these documents do not need to be submitted once

again so long as the information is still valid and accurate. In such cases please indicate this accordingly with reference to the

contract which has already been signed.

In case of consortia, only one Financial Identification Form for the whole consortium shall be submitted, nominating the bank

account into which payments are to be made under n the event of successful contract award.

Page 8: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

• the indication “Tender - Not to be opened by the internal mail service”

• the address for submission of tenders (as indicated in below)

• the date of posting (if applicable) should be legible on the envelope

Tenders sent by post mail are to be sent not later than on date specified in the invitation letter above to

the following address:

European GNSS AgencyLegal and Procurement Department

Janovského 438/2170 00 Prague 7 — Holesovice

Tenders may be also submitted by hand-delivery to the premises of the GSA (]anovskeho 438/2, 170 00

Prague 7— Holesovice) and during working hours (8:30-17:30).

Page 9: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

Annex II to the Invitation to tenderDraft Service contract

FRAMEWORK SERVICE CONTRACT

NUMBER — GSA/OP/O1/16

1. The European GNSS Agency (hereinafter referred to as the “GSA or the “contracting authority”), which

is represented for the purposes of the signature of this contract by Mr Carlo des Dorides, Executive

Director,,

on the one part, and

2. [Full official name]

[Official legalform]

[Statutory registration number or ID or passport number]

[Full official address]

[VAT registration number]

([collectively] ‘the contractor’), represented for the purposes of the signature of this contract by

[forename, surname, function of legal representative and name of company in the case of a joint tender],

on the other part,

HAVE AGREED

to the special conditions, the general conditions for service contracts and the following annexes:

Annex I — Invitation to tender (reference No GSA/OP/O1/16 of [insert date])

Annex II — Contractor’s tender (reference No [complete] of [insert date])

Annex Ill — Declaration on confidentiality and absence of conflict of interests;

which form an integral part of this contract (‘the contract’).

This contract sets out the obligations of the parties during and after the duration of this contract.

All documents issued by the contractor (end-user agreements, general terms and conditions, etc.) except

its tender are held inapplicable, unless explicitly mentioned in the special conditions of this contract. In all

circumstances, in the event of contradiction between this contract and documents issued by the

contractor, this contract prevails, regardless of any provision to the contrary in the contractor’s

documents.

Page 10: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

I. Special Conditions

1.1. ORDER OF PRIORITY OF PROVISIONS

If there is any conflict between different provisions in this contract, the following rules must be applied:

(a) The provisions set out in the special conditions take precedence over those in the other parts ofthe contract.

(b) The provisions set out in the general conditions take precedence over those in the otherannexes.

(c) The provisions set out in the tender specifications (Annex I) take precedence over those in thetender (Annex II).

.2. SuBJEaMAUER

The subject matter of the framework contract (“FWC”) is provision of services related to issue and

management of lunch and wellbeing vouchers (hereinafter collectively referred to as “vouchers”).

Signature of the FWC imposes no obligation on the contracting authority to purchase. Only

performance of the FWC through annual order forms and monthly requests for services is binding

on the contracting authority.

1.3. ENTRY INTO FORCE AND DURATION

1.3.1 The contract enters into force on the date on which the last party signs it.

1.3.2 The performance of the contract cannot start before its entry into force. Execution of the service

may under no circumstances begin before the date on which the order form is signed by both

parties and subsequent requests for services are sent to the contractor.

1.3.3 The duration of the performance of the FWC must not exceed 48 months. Performance of the FWC

starts from the date of entry into force of the contract.

The period of performance of the contract may be extended only with the express written

agreement of the parties before the expiration of such period.

1.4. PRICE

1.4.1. Maximum price of the contract

The contracting authority shall pay to the contractor the value of vouchers which were issued and

delivered to the contracting authority. The maximum total amount to be paid by the contracting

authority for the value of the vouchers under the contract shall be 36,000,000 CZK (thirty-six million

Czech crowns).

The maximum total amount of fees to be paid by the contracting authority under the contract shall

be [to be completed].

The above total amount is fixed and firm and shall include all costs and expenses.

Page 11: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

1.5. PERFORMANCE OF THE FWC AND PAYMENT ARRANGEMENTS

1. Once a year the contracting authority will send to the contractor an order form specifying the maximum

volume of services for the ongoing year. The amount indicated in such an order form is merely indicative.

GSA reserves the right to reduce such amount at any time.

Within 5 working days of an order form being sent by the contacting authority to the contractor, the

contracting authority shall receive the completed order form back, duly signed and dated.

Every month, the GSA will send by the 7th day of the ongoing month via email a request for services

including an overview of staff members which will indicate how many lunch vouchers and wellbeing

(multipurpose) vouchers shall each individual staff member receive in the given month.

The contractor shall submit an invoice for payment of value of the vouchers and of fees [after sending the

requested amount of vouchers to the Agency] [or: to be filled in accordance with the tender if the payment

conditions differ from the ones under 1.2 of the tender specifications]. The invoice shall indicate the

reference number of the contract to which it refers.

The invoices shall be denominated in Czech crowns (CZK).

The invoice shall be submitted by email to GSA financial department:

[email protected]

2. The contracting authority must approve the submitted documents or deliverables and pay [within 30

days from receipt of the invoice] [or: to be filled in accordance with the tender if the payment conditions

differfrom the ones under 1.2 of the tender specifications].

3. If the contracting authority has observations to make, it must send them to the contractor (or leader in

the case of a joint tender) and suspend the time limit for payment. The contractor (or leader in the case of

a joint tender) has 5 days to submit additional information or corrections or a new version of the

documents if the contracting authority requires it.

1.6. BANK ACCOUNT

Payments must be made to the contractor’s bank account denominated in Czech crowns (CZK), identified

as follows:

Name of bank:

Full address of branch:

Exact denomination of account holder:

Full account number including bank codes:

[IBAN6 code:]

1.7. COMMUNICATION DETAILS

For the purpose of this contract, communications must be sent to the following addresses:

Page 12: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

Contracting authority:

Project officer:

Name:

Surname:

Email: [[email protected]

Telephone number:

European GNSS Agency

Attention:

Janovskeho 438/2

CZ-170 00 Prague

Contractor:

[Full name]

[Function]

[Company name]

[Full official address]

E-mail: [complete]

1.8. DATA CONTROLLER

The data controller is Executive Director of the GSA.

1.9. TERMINATION BY EITHER CONTRACTOR

Contractor may, terminate the contract by sending formal notification to the GSA with six (6) months

written notice.

If the contract is terminated:

(a) neither party is entitled to compensation;

(b) the contractor is entitled to payment only for the services provided before termination takes

effect.

1.10. TERMINATION BY THE GSA

GSA may, terminate the contract by sending formal notification to the Contractor with one month written

notice.

If the contract is terminated:

(a) neither party is entitled to compensation;

(b) the contractor is entitled to payment only for the services provided before termination takes

effect.

Page 13: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

1.11. APPLicABLE LAW AND SETTLEMENT OF DISPUTES

1.12.1. The contract is governed by European Union law, complemented, where necessary, by the law of

Belgium.

1.12.2. The courts of Brussels (Belgium) have exclusive jurisdiction over any dispute regarding the

interpretation, application or validity of the contract.

Page 14: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

II.

General Conditions for the service contract

ARTICLE 11.1— PERFORMANCE OF THE CONTRACT

11.1.1

11.1.2 The contractor shall be solely responsible for taking the

necessary steps to obtain any permit or licence required

for performance of the contract under the laws and

regulations in force at the place where the tasks

assigned to it are to be executed.

11.1.3 Without prejudice to Article 11.4 any reference made to

the contractor’s personnel in the contract shall relate

exclusively to individuals involved in the performance of

the contract.

11.1.4 The contractor must ensure that the personnel

performing the contract possesses the professional

qualifications and experience required for the execution

of the tasks assigned to it.

11.1.5 The contractor shall neither represent the contracting

authority nor behave in any way that would give such an

impression. The contractor shall inform third parties that

it does not belong to the European public service.

11.1.6 The contractor shall be solely responsible for the

personnel who executes the tasks assigned to the

contractor.

The contractor shall stipulate the following employment

or service relationships with its personnel:

(a) personnel executing the tasks assigned to the

contractor may not be given orders directly

by the contracting authority;

)b) the contracting authority may not under any

circumstances be considered to be the

employer of the pemonnel referred to in

point (a) and the personnel shall undertake

not to invoke against the contracting

authority any right arising from the

contractual relationship between the

contracting authority and the contractor.

11.1.7 In the avant of disruption resulting from the action of

one of the contractor’s personnel working on the

contracting authority’s premises or in the event that the

expertise of a member of the contractor’s personnel fails

to correspond to the profile required by the contract,

the contractor shall replace him without delay. The

contracting authority shall have the right to make a

reasoned request for the replacement of any such

personnel. The replacement personnel must have the

necessary qualifications and be capable of performing

the contract under the same contractual conditions. The

contractor shall be responsible for any delay in the

execution of the tasks assigned to it resulting from the

replacement of personnel.

event, action or omission, the contractor shall

immediately and on its own initiative record it and

report it to the contracting authority. The report shall

include a description of the problem and an indication of

the date on which it started and of the remedial action

taken by the contractor to ensure full compliance with

its obligations under this contract. In such an event the

contractor shall give priority to solving the problem

rather than determining liability.

11.1.9 Should the contractor fail to perform its obligations

under the contract, the contracting authority

may - without prejudice to its right to terminate the

contract - reduce or recover payments in proportion to

the scale of the unperformed obligations. In addition,

the contracting authority may claim compensation or

impose liquidated damages in accordance with Article

11.12.

11.1.10 The contractor shall comply with applicable obligations

in the fields of environmental, social and labour law

established by Union law, national law, collective

agreements or by the international environmental,

social and labour law provisions listed in Annex X of

Directive 2D14/24/EU.

ARTIcLE 11.2— MEANs OF COMMUNICATION

11.2.1 Any communication relating to the contract or to its

performance shall be made in writing and shall bear the

contract number. Any communication is deemed to

have been made when it is received by the receiving

party unless otherwise provided for in this contract.

11.2.2 Electronic communication shall be deemed to have been

received by the parties on the day of dispatch of that

communication provided it is sent to the addressees

listed in Article 1.6. Without prejudice to the preceding,

if the sending party receives a message of non-delivery

to or of absence of the addressee, it shall make every

effort to ensure the actual receipt of such

communication by the other party.

Electronic communication shall be confirmed by an

original signed paper version of that communication if

requested by any of the parties provided that this

request is submitted without unjustified delay. The

sender shall send the original signed paper version

without unjustified delay.

11.2.3 Mail sent using the postal services is deemed to have

been received by the contracting authority on the date

on which it is registered by the department responsible

referred to in Article 1.6.

Any formal notification shall be made by registered mail

with return receipt or equivalent, or by equivalent

electronic means.

ARTICLE 11.3— LIABILITY

The contractor shall perform the contract to the highest

professional standards.

11.1.8 Should the execution of the tasks be directly or indirectly

hampered, either partially or totally, by any unforeseen

Page 15: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

11.3.1 The contractor shall be solely responsible for complying

with any legal obligations incumbent on it.

11.3.2 The contracting authority shall not be held liable for any

damage caused or sustained by the contractor, including

any damage caused by the contractor to third parties

during or as a consequence of performance of the

contract, except in the event of wilful misconduct or

gross negligence on the part of the contracting

authority.

11.3.3 The contractor shall be held liable for any loss or damage

sustained by the contracting authority in performance of

the contract, including in the event of subcontracting,

and for any claim by a third party, but only to an amount

not exceeding three times the total amount of the

contract. Nevertheless, if the damage or loss is caused

by the gross negligence or wilful misconduct of the

contractor or of its personnel or subcontractors, the

contractor shall have unlimited liability for the amount

of the damage or loss.

11.3.4 The contractor shall indemnify and hold the GSA

harmless for all damages and costs incurred due to any

claim. The contractor shall provide compensation in the

event of any action, claim or proceeding brought against

the contracting authority by a third party as a result of

damage caused by the contractor during the

performance of the contract. In the event of any action

brought by a third party against the contracting

authority in connection with the performance of the

contract, including any alleged breach of intellectual

property rights, the contractor shall assist the

contracting authority. Such expenditure incurred by the

contractor may be borne by the contracting authority.

11.3.5 The contractor shall take out an insurance policy against

risks and damage relating to the performance of the

contract, if required by the relevant applicable

legislation. It shall take out supplementary insurance as

reasonably required by standard practice in the industry.

A copy of all the relevant insurance contracts shall be

sent to the contracting authority should it so request.

ARTICLE 11.4- CONFLICT OF INTEREST

11.4.1 The contractor shall take all the necessary measures to

prevent any situation of conflict of interest. Such

situation arises where the impartial and objective

performance of the contract is compromised for reasons

involving economic interest, political or national affinity,

family or emotional ties, or any other shared interest.

11.4.2 Any situation constituting or likely to lead to a conflict of

interest during the performance of the contract shall be

notified to the contracting authority in writing without

delay. The contractor shall immediately take all the

necessary steps to rectify the situation. The contracting

authority reserves the right to verify that the steps taken

are appropriate and may require that additional steps be

taken within a specified deadline.

11.4.3 The contractor declares that it has not granted and will

not grant, has not sought and will not seek, has not

attempted and will not attempt to obtain and has not

accepted and will not accept, any advantage, financial or

in kind, to or from any party whatsoever, when such

advantage constitutes an illegal practice or involves

corruption, either directly or indirectly, in so far as it

serves as an incentive or reward relating to the

performance of the contract.

11.4.4 The contractor shall pass on all the relevant obligations

in writing to its personnel and to any natural person with

the power to represent it or take decisions on its behalf

and ensure that it is not placed in a situation which could

give rise to conflicts of interest. The contractor shall also

pass on all the relevant obligations in writing to third

parties involved in the performance of the contract

including subcontractors.

Article 11.5— Confidentiality

11.5.1 The contracting authority and the contractor shall treat

with confidentiality any information and documents, in

any form, disclosed in writing or orally in relation to the

performance of the contract and identified in writing as

confidential.

The contractor shall:

(a) not use confidential information and documents for any

purpose other than fulfilling its obligations under the

contract without prior written agreement of the contracting

authority;

)b) ensure the protection of such confidential information and

documents with the same level of protection it uses to

protect its own confidential information, but in no case any

less than reasonable care;

)c) not disclose directly or indirectly confidential information

and documents to third parties without prior written

agreement of the contracting authority.

11.5.2 The confidentiality obligation set out in Article 11.5.1 shall

be binding on the contracting authority end the

contractor during the performance of the contract and

for five years starting from the date of the payment of

the balance unless:

(a) the concerned party agrees to release the other party from

the confidentiality obligation earlier;

)b) the confidential information becomes public through other

means then in breach of the confidentiality obligation

through disclosure by the party bound by that obligation;

(c) the disclosure of the confidential information is required by

law.

11.5.3 The contractor shall obtain from any natural person with

the power to represent it or take decisions on its behalf,

as well as from third parties involved in the performance

of the contract, an undertaking that they will comply

with the confidentiality obligation set out in Article 11.5.1.

ARTICLE 11.6— PROCESSING OF PERSONAL DATA

11.6.1 Any personal data included in the contract shall be

processed pursuant to Regulation (EC) 45/2001 of the

European Parliament and of the Council of ig December

2000 on the protection of individuals with regard to the

processing of personal data by the Community

institutions and bodies and on the free movement of

such data. Such data shall be processed by the data

Page 16: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

controller solely for the purposes of the performance,

management and monitoring of the contract without

prejudice to its possible transmission to the bodies

tharged with monitoring or inspection tasks in

application of Union law.

11.6.2 The contractor shall have the right to access its personal

data and the right to rectify any such data. The

contractor should address any queries concerning the

processing of its personal data to the data controller.

11.6.3 The contractor shall have right of recourse at any time

to the European Data Protection Supervisor.

11.6.4 Where the contract requires the processing of personal

data by the contractor, the contractor may act only

under the supervision of the data controller, in particular

with regard to the purposes of the processing, the

categories of data which may be processed, the

recipients of the data and the means by which the data

subject may esercise his rights.

11.6.5 The contractor shall grant its personnel access to the

data to the estent strictly necessary for the

performance, management and monitoring of the

contract.

11.6.6 The contractor undertakes to adopt appropriate

technical and organisational security measures having

regard to the risks inherent in the processing and to the

nature of the personal data concerned in order to:

(a) prevent any unauthorised person from gaining access to

computer systems processing personal data, and

especially:

unauthorised reading, copying, alteration or

removal of storage media;

(ii) unauthorised data input, as well as any

unauthorised disclosure, alteration or erasure of stored

personal data;

(iii) unauthorised use of data-processing systems

by means of data transmission facilities;

)b) ensure that authorised users of a data-processing

system can access only the personal data to which their

access right refers;

)c) record which personal data have been communicated,

when and to whom;

)d) ensure that personal data being processed on behalf of

third parties can be processed only in the manner

prescribed by the contracting authority;

e) ensure that, during communication of personal data and

transport of storage media, the data cannot be read,

copied or erased without authorisation;

)f) design its organisational structure in such a way that it

meets data protection requirements.

ARTIcLE 11.7 —SuBcoNTRActiNG

11.7.1 The contractor shall not subcontract without prior

written authorisation from the contracting authority nor

cause the contract to be de facto performed by third

parties.

11.7.2 Even where the contracting authority authorises the

contractor to subcontract to third parties, it shall

nevertheless remain bound by its contractual

obligations and shall be solely responsible for the proper

performance of this contract.

11.7.3 The contractor shall make sure that the subcontract

does not affect rights and guarantees granted to the

contracting authority by virtue of this contract, notably

by Article 11.18.

ARTIcLE 11.8 —AMENDMENTS

11.8.1 Any amendment to the contract shall be made in writing

before fulfilment of any new contractual obligations and

in any case before the date of payment of the balance.

11.8.2 The amendment may not have the purpose or the effect

of making changes to the contract which might call into

question the decision awarding the contract or result in

unequal treatment candidates.

ARTicLE 11.9—ASSIGNMENT

11.9.1 The contractor shall not assign the rights, including

claims for payments, and obligations arising from the

contract, in whole or in part, without prior written

authorisation from the contracting authority.

11.9.2 In the absence of such authorisation, or in the event of

failure to observe the terms thereof, the assignment of

rights or obligations by the contractor shall not be

enforceable against the contracting authority and shall

have no effect on it.

ARTIcLE 11.10—OWNERSHIP OF THE RESULTS - INTELLEctUAL AND INDUSTRIAL

PROPERTY RIGHTS

11.10.1 DefinitionsIn this contract the following definitions apply:

(1) ‘results’ means any intended outcome of the performance of the

contract which is delivered end finally accepted by the contracting

authority;

(2) ‘creator’ means any natural person who contributed to the

production of the result and includes personnel of the contracting

authority or a third party;

(3) ‘pre-existing rights’ means any industrial and intellectual

property rights, including background technology, which exist prior

to the contracting authority or the contractor ordering them for the

purpose of the contract execution and include rights of ownership

and use by the contractor, the creator, the contracting authority

and any third parties.

11.10.2 Ownership of the results

The ownership of the results shall be fully and irrevocably acquired

by the GSA under this contract including any rights in any of the

Page 17: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

results listed in this contrsct. Those rights in the results may include

copyright and other intellectual or industrial property rights, as well

as all technological solutions and information contained within

these technological solutions, produced in performance of the

contract. The contracting authority may exploit them as stipulated

in this contract. All the rights shall be acquired by the GSA from the

moment the results are delivered by the contractor and accepted

by the contracting authority. Such delivery and acceptance are

deemed to constitute an effective assignment of rights from the

contractor to the GSA.

The payment of the price as set out in the contract is deemed to

include any fees payable to the contractor in relation to the

acquisition of rights by the GSA including all forms of use of the

results.

The acquisition of rights by the GSA under this contract covers all

territories worldwide.

Any intermediary sub-result, raw data, intermediary analysis made

available by the contractor cannot be used by the contracting

authority without the written consent of the contractor, unless the

contract explicitly provides for it to be treated as a self-contained

result.

11.10.3 Licensing of pre-existing rights

The GSA shall not acquire ownership of the pre-esisting rights.

The contractor shall license the pre-existing rights on a royalty-free,

non-exclusive and irrevocable basis to the GSA which may use the

pre-existing right as foreseen in Article i.g.i. All the pre-existing

rights shall be licensed to the GSA from the moment the results

were delivered and accepted by the contracting authority.

The licensing of pre-esisting rights to the GSA under this contract

covers all territories worldwide and is valid for the whole duration

of intellectual property rights protection.

11.10.4 Modes of exploitation

The GSA shall acquire ownership of each of the results produced as

an outcome of this contract which may be used for any of the

following purposes:

(a) giving access upon individual requests without the right toreproduce or exploit, as provided for by Regulation1049/2001 of the European Parliament and of the Council of30 May 2001 regarding public access to EuropeanParliament, Council and Commission documents;

)b) storage of the original and copies made in accordance withthis contract;

)c) archiving in line with the document management rulesapplicable to the contracting authority.

11.10.5 Identification and evidence of granting of pre

existing rights and rights of third parties

When delivering the results, the contractor shall warrant that they

are free of rights or claims from creators and third parties including

in relation to pre-existing rights, for any use envisaged by the

contracting authority. This does not concern the moral rights of

natural persons.

contract or parts thereof. This list shall be provided no later than

the date of delivery of the final results.

In the result the contractor shall clearly point out all quotations of

existing textual works. The complete reference should include ax

appropriate: name of the author, title of the work, date and place

of publication, date of creation, address of publication on internet,

number, volume and other information which allows the origin to

be easily identified.

Upon request by the contracting authority, the contractor shall

provide evidence of ownership of or rights to use all the listed pre

existing rights and rights of third parties except forthe rights owned

by the GSA.

This evidence may refer, inter alia, to rights to: parts of other

documents, images, graphs, tables, data, software, technical

inventions, know-how etc. (delivered in paper, electronic or other

form), IT development tools, routines, subroutines and/or other

programs (“background technology”), concepts, designs,

installations or pieces of art, data, source or background materials

or any other parts of external origin.

The evidence shall include, as appropriate:

(a) the name and version number of a software product;)b) the full identification of the work and its author, developer,

creator, translator, data entry person, graphic designer,publisher, editor, photographer, producer;

)c) a copy of the licence to use the product or of the agreementgranting the relevant rights to the contractor or a referenceto this licence;

)d) a copy of the agreement or extract from the employmentcontract granting the relevant rights to the contractor whereparts of the results were created by its personnel;

)e) the text of the disclaimer notice if any.

Provision of evidence does not release the contractor from its

responsibilities in case it is found that it does not hold the necessary

rights, regardless of when and by whom this fact was revealed.

The contractor also warrants that it possesses the relevant rights or

powers to execute the transfer and that it has paid or has verified

payment of all due fees including fees due to collecting societies,

related to the final results.

11.10.6 Creators

gy delivering the results the contractor warrants that the creators

undertake not to oppose that their names be recalled when the

results are presented to the public and confirms that the results can

be divulged. Names of authors shall be recalled on request in the

manner communicated by the contractor to the contracting

authority.

The contractor shall obtain the consent of creators regarding the

granting of the relevant rights and be ready to provide

documentary evidence upon request.

11.10.7 Persons appearing in photographs or filmsIf natural, recognisable persons appear in a result or their voice is

recorded the contractor shall submit a statement of these persons

(or of the persons exercising parental authority in case of minors)

where they give their permission for the described use of their

image or voice on request by the contracting authority. This does

not apply to persons whose permission is not required in line withThe contractor shall establish to that effect a list of all pre-existing

rights and rights of creators and third parties on the results of this

Page 18: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

the law of the country where photographs were taken, films shot

or audio records made.

11.10.8 Contractor’s copyright for pre-existing rightsWhen the contractor retains pre-esisting rights on parts of the

results, reference shall be inserted to that effect when the result is

used as set out in Article 1.8.1 with the following disclaimer: © - year

— European Union. All rights reserved. Certain parts are licensed

under conditions to the EU.

11.10.9 Visibility of GSA funding and disclaimerWhen making use of the results, the contractor shall declare that

they have been produced within a contract with the GSA and that

the opinions expressed are those of the contractor only and do not

represent the contracting authority’s official position. The

contracting authority may waive this obligation in writing.

ARTIcLE 11.11— FORcE MAJEURE

11.11.1 ‘Force majeure’ means any unforeseeable and

exceptional situation or event beyond the parties’

control which prevents either of them from fulfilling any

of their obligations under the contract, which was not

attributable to error or negligence on their part or on the

part of subcontractors and which proves to be inevitable

in spite of exercising due diligence. Any default of a

service, defect in equipment or material or delays in

making them available, unless they stem directly from a

relevant case of force majeure, as well as labour

disputes, strikes or financial difficulties, cannot be

invoked as force majeure.

11.11.2 A party faced with force majeure shall formally notify the

other party without delay, stating the nature, likely

duration and foreseeable effects.

11.11.3 The party faced with force majeure shall not be held in

breach of its contractual obligations if it has been

prevented from fulfilling them by force majeure. Where

the contractor is unable to fulfil its contractual

obligations owing to force majeure, it shall have the right

to remuneration only for the tasks actually executed.

11.11.4 The parties shall take all the necessary measures to limit

any damage due to force majeure.

The contractor may submit arguments against this decision within

30 days of receipt of the formal notification. In the absence of a

reaction on its part or of written withdrawal by the contracting

authority within 30 days of the receipt of such arguments, the

decision imposing the liquidated damages shall become

enforceable.

The parties expressly acknowledge and agree that any sums

payable under this article are in the nature of liquidated damages

and not penalties, and represent a reasonable estimate of fair

compensation for the losses incurred due to failure to fulfil

obligations which may be reasonably anticipated.

ARTIcLE 11.13— SuSPENsIoN OF THE PERFORMANCE OF THE coNTRACT

11.13.1 Suspension by the contractorThe contractor may suspend the performance of the contract or any

part thereof if a case of force majeure makes such performance

impossible or excessively difficult. The contractor shall inform the

contracting authority about the suspension without delay, giving all

the necessary reasons and details and the envisaged date for

resuming the performance of the contract.

Once the circumstances allow resuming performance, the

contractor shall inform the contracting authority immediately,

unless the contracting authority has already terminated the

contract.

11.13.2 Suspension by the contracting authorityThe contracting authority may suspend the performance of the

contract or any part thereof:

(a) if the contract award procedure or the performance of

the contract prove to have been subject to substantial errors,

irregularities or fraud;

)b) in order to verify whether presumed substantial errors,

irregularities or fraud have actually occurred.

Suspension shall take effect on the day the contractor receives

formal notification, or at a later date provided in the notification.

The contracting authority shall give notice ax soon as possible to the

contractor to resume the service suspended or inform the

contractor that it is proceeding with the termination of the

contract. The contractor shall not be entitled to claim

compensation on account of suspension of the contract or of part

thereof.

ARTIcLE 11.12— LI0uI0ATED DAMAGES

The contracting authority may impose liquidated damages should

the contractor fail to complete its contractual obligations, also with

regard to the required quality level, according to the invitation to

negotiate.

Should the contractor fail to perform its contractual obligations

within the time-limits set by the contract, then, without prejudice

to the contractor’s actual or potential liability or to the contracting

authority’s right to terminate the contract, the contracting

authority may impose liquidated damages for each and every

calendar day of delay according to the following formula:

0.3 x (V/b)

Vis the amount specified in Article 1.3.1;

d is the duration specified in Article 1.2.3 expressed in

calendar days.

ARTIcLE 11.14—TERMINATION OF THE CONTRACT

11.14.1 Grounds for terminationThe contracting authority may terminate the contract in the

following circumstances:

)a( ifs change to the contractor’s legal, financial, technical ororganisational or ownership situation is likely to affect theperformance of the contract substantially or calls intoquestion the decision to award the contract;

)b) if execution of the tasks has not actually commencedwithin three months of the date foreseen, end the newdate proposed, if any, is considered unacceptable by thecontracting authority, taking into account Article 11.8.2;

)c( if the contractor does not perform the contract asestablished in the invitation to negotiate or fails to fulfilanother substantial contractual obligation;

)d) in the event of force mejeure notified in accordance withArticle 11.11 or if the performance of the contract has beensuspended by the contractor as a result of force majeure,notified in accordance with Article 11.13, where either

Page 19: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

resuming performance is impossible or the modificationsto the contract might call into question the decisionawarding the contract or result in unequal treatment ofcandidates;

(e) if the contractor is declared bankrupt, is being wound up,is having its affairs administered by the courts, has enteredinto an arrangement with creditors, has suspendedbusiness activities, is the subject of proceedingsconcerning those matters, or is in any analogous situationarising from a similar procedure provided for in nationallegislation or regulations;

jf) if the contractor or any natural person with the power torepresent it or take decisions on its behalf has been foundguilty of professional misconduct proven by any means;

(g) if the contractor is not in compliance with its obligationsrelating to the payment of social security contributions orthe payment of tases in accordance with the legalprovisions of the country in which it is established or withthose of the country of the applicable law of this contractor those of the country where the contract is to beperformed;

(h) if the contracting authority has evidence that thecontractor or natural persons with the power to representit or take decisions on its behalf have committed fraud,corruption, or are involved in a criminal organisation,money laundering or any other illegal activity detrimentalto the Union’s financial interests;

(i) if the contracting authority has evidence that thecontractor or natural persons with the power to representit or take decisions on its behalf have committedsubstantial errors, irregularities or fraud in the awardprocedure or the performance of the contract, including inthe event of submission of false information;

(j) if the contractor is unable, through its own fault, to obtainany permit or licence required for performance of thecontract.

11.14.2 Procedure for terminationWhen the contracting authority intends to terminate the contract

it shall formally notify the contractor of its intention specifying the

grounds thereof. The contracting authority shall invite the

contractor to make any observations and, in the case of point (c) of

Article 11.14.1, to inform the contracting authority about the

measures taken to continue the fulfilment of its contractual

obligations, within 30 days from receipt of the notification.

If the contracting authority does not confirm acceptance of these

observations by giving written approval within 30 days of receipt,

the termination procedure shall proceed. In any case of termination

the contracting authority shall formally notify the contractor about

its decision to terminate the contract. In the cases referred to in

points (a), )b), )c), )e), )g) and )j) of Article 11.14.1 the formal

notification shall specify the date on which the termination takes

effect. In the cases referred to in points )d), )f), )h), and )i) of Article

11.14.1 the termination shall take effect on the day following the

date on which notification of terminatios is received by the

contractor.

11.14.3 Effects of terminationIn the event of termination, the contractor shall waive any claim for

consequential damages, including any loss of anticipated profits for

uncompleted work. On receipt of the notification of termination,

the contractor shall take all the appropriate measures to minimise

costs, prevent damages, and cancel or reduce its commitments. The

contractor shall have 60 days from the date on which termination

takes effect to draw up the documents required by the special

conditions for the tasks already esecuted on the date of

termination and produce an invoice if necessary. The contracting

authority may recover any amounts paid under the contract.

The contracting authority may claim compensation for any damage

suffered in the event of termination.

On termination the contracting authority may engage any other

contractor to esecute or complete the services. The contracting

authority shall be entitled to claim from the contractor all extra

costs incurred in this regard, without prejudice to any other rights

or guarantees it may have under the contract.

ARTIcLE 11.15— REPORTiNG AND PAYMENTS

11.15.1 Date of paymentPayments shall be deemed to be effected on the date when they

are debited to the contracting authority’s account.

11.15.2 CurrencyThe contract shall be in CZK.

Payments shall be esecuted in CZK as provided for in Article 1.5.

Conversion between the euro and another currency shall be made

according to the daily euro exchange rate published in the Officiol

iournol of the Furopeon Union or, failing that, at the monthly

accounting exchange rate established by the European Commission

and published on its website, applicable on the day on which the

payment order is issued by the contracting authority.

11.15.3 Costs of transferThe costs of the transfer shall be borne in the following way:

(a) costs of dispatch charged by the bank of the contractingauthority shall be borne by the contracting authority,

)b) cost of receipt charged by the bank of the contractor shall beborne by the contractor,

)c) costs for repeated transfer caused by one of the parties shallbe borne by the party causing repetition of the transfer.

11.15.4 Invoices and Value Added TaxInvoices shall contain the contractor’s identification, the amount,

the currency and the date, as well as the contract reference.

Invoices shall indicate the place of tasation of the contractor for

value added tax (VAT) purposes and shall specify separately the

amounts not including VAT and the amounts including VAT.

The contracting authority is, as a rule, exempt from all taxes and

duties, including VAT, pursuant to the provisions of Articles 3 and 4

of the Protocol on the Privileges and Immunities of the European

Union.

The contractor shall accordingly complete the necessary formalities

with the relevant authorities to ensure that the supplies and

services required for performance of the contract are exempt from

taxes and duties, including VAT exemption.

11.15.5 Pre-financing and performance guaranteesPre-financing guarantees shall remain in force until the pre

financing ix cleared against interim payments or payment of the

balance and, in case the latter takes the form of a debit note, three

months after the debit note is notified to the contractor. The

contracting authority shall release the guarantee within the

following month.

Performance guarantees shall cover performance of the Service in

accordance with the terms set out in the invitation to negotiateuntil itt final acceptance by the contracting authority. The amount

of a performance guarantee shall not exceed the total price of the

contract. The guarantee shall provide that it remains in force until

Page 20: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

final acceptance. The contracting authority shall release the

guarantee within a month following the date of final acceptance.

Where, in accordance with Article 1.4, a financial guarantee is

required for the payment of pre-financing, or as performance

guarantee, it shall fulfill the following conditions:

(a) the financial guarantee is provided by a bank or an approvedfinancial institution or, at the request of the contractor andagreement by the contracting authority, by a third party;

)b) the guarantor stands as first-call guarantor and does notrequire the contracting authority to have recourse againstthe principal debtor (the contractor).

The cost of providing such guarantee shall be borne by the

contractor.

11.15.6 Interim payments and payment of the balanceThe contractor shall submit an invoice for interim payment upon

delivery of intermediary results, accompanied by a progress report

or any other documents, as provided for in Article 1.4 or in the

invitation to negotiate.

The contractor shall submit an invoice for payment of the balance

within 60 days following the end of the period referred to in

Article 1.2.3, accompanied by a final progress report or any other

documents provided for in Article 1.4 or in the invitation to

negotiate.

Upon receipt, the contracting authority shall pay the amount due

as interim or final payment within the periods specified in Article

1.4, provided the invoice and documents have been approved and

without prejudice to Article 11.15.7. Approval of the invoice and

documents shall not imply recognition of the regularity or of the

authenticity, completeness and correctness of the declarations and

information they contain.

Payment of the balance may take the form of recovery.

11.15.7 Suspension of the time allowed for paymentThe contracting authority may suspend the payment periods

specified in Article 1.4 at any time by notifying the contractor that

its invoice cannot be processed, either because it does not comply

with the provisions of the contract, or because the appropriate

documents have not bean produced.

The contracting authority shall inform the contractor in writing as

soon as possible of any such suspension, giving the reasons for it.

Suspension shall take effect on the date the notification is sent by

the contracting authority. The remaining payment period shall start

to run again from the date on which the requested information or

revised documents are received or the necessary further

verification, including on-the-spot checks, is carried out. Where the

suspension period exceeds two months, the contractor may

request the contracting authority to justify the continued

suspension.

Where the payment periods have been suspended following

rejection of a document referred to in the first paragraph end the

new document produced is also rejected, the contracting authority

reserves the right to terminate the contract in accordance with

Article 11.14.1(c).

11.15.8. Interest on late paymentOn expiry of the payment periods specified in Article 1.4, and

without prejudice to Article 11.15.7, the contractor is entitled to

interest on late payment at the rate applied by the European

Central Bank for its main refinancing operations in Euros (the

reference rate), plus eight points. The reference rate shall be the

rate in force on the first day of the month in which the payment

period ends, as published in the C series of the Officio! iourno! of

the Europeon Union.

The suspension of the payment periods in accordance with Article

11.15.7 may not be considered as a late payment.

Interest on late payment shall cover the period running from the

day following the due date for payment up to and including the date

of actual payment as defined in Article 11.15.1.

However, when the calculated interest is lower than or equal to

EUR 200, it shall be paid to the contractor only upon request

submitted within two months of receiving late payment.

ARTIcLE 11.16- REIMeuR5EMENT5

11.16.1 Where provided by the special conditions or by the

invitation to negotiate, the contracting authority shall

reimburse the expenses which are directly connected

with execution of the tasks on production of original

supporting documents, including receipts and used

tickets, or failing that, on production of copies or

scanned originals, or on the basis of flat rates.

11.16.2 Travel and subsistence expenses shall be reimbursed,

where appropriate, on the basis of the shortest itinerary

and the minimum number of nights necessary for

overnight stay at the destination.

11.16.3 Travel expenses shall be reimbursed as follows:

(a) travel by air shall be reimbursed up to the maximum cost

of an economy class ticket at the time of the reservation;

)b) travel by boat or rail shall be reimbursed up to the

maximum cost of a first class ticket;

)c) travel by car shall be reimbursed at the rate of one first

class rail ticket for the same journey and on the same

day;

In addition, travel outside Union territory shall be reimbursed

provided the contracting authority has given its prior written

consent.

11.16.4 Subsistence expenses shall be reimbursed on the basis

of a daily subsistence allowance as follows:

(a) for journeys of less than 200 km for a return trip, no

subsistence allowance shall be payable;

)b) daily subsistence allowance shall be payable only on

receipt of supporting documents proving that the

person concerned was present at the destination;

)c) daily subsistence allowance shall take the form of a

flat-rate payment to cover all subsistence expenses,

including meals, local transport which includes transport

to and from the airport or station, insurance end

sundries;

)d) daily subsistence allowance shall be reimbursed at the

flat rates specified in Article 1.3;

e) accommodation shall be reimbursed on receipt of

supporting documents proving the necessary overnight

stay at the destination, up to the flat-rate ceilings

specified in Article 1.3.

Page 21: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

11.16.5 The cost of shipment of equipment or unaccompsnied

luggage shall be reimbursed provided the contracting

suthority has given prior written authorisation.

11.16.6 Conversion between the euro and another currency

shall be made as specified in Article 11.15.2.

Article 11.17— Recovery

11.17.1 If an amount is to be recovered under the terms of the

contract, the contractor shall repay the contracting

authority the amount in question according to the terms

and by the date specified in the debit note.

11.17.2 If the obligation to pay the amount due is not honoured

by the date set by the contracting authority in the debit

note, the amount due shall bear interest at the rate

indicated in Article 11.15.8. Interest on late payments

shall cover the period from the day following the due

date for payment, up to and including the date when the

contracting authority receives the full payment of the

amount owed.

Any partial payment shall first be entered against

charges and interest on late payment and then against

the principal amount.

11.17.3 If payment has not been made by the due date, the

contracting authority may, after informing the

contractor in writing, recover the amounts due by

offsetting them against any amounts owed to the

contractor by the Union or by the European Atomic

Energy Community or by calling in the financial

guarantee, where provided for in Article 1.4.

ARTIcLE 11.18 —CHEcKs AND AUDITS

11.18.1 The contracting authority and the European Anti-Fraud

Office may check or have an audit on the performance

of the contract. It may be carried out either directly by

their own staff or by any other outside body authorised

to do so on their behalf.

Such checks and audits may be initiated during the

performance of the contract and during a period of five

years which starts running from the date of the payment

of the balance.

The audit procedure shall be deemed to be initiated on

the date of receipt of the relevant letter sent by the

contracting authority. Audits shall be carried out on a

confidential basis.

SIG NATU RES

For the contractor,

[Company name/forename/surname/position)

Signature:

__________________________

11.18.2 The contractor shall keep all original documents stored

on any appropriate medium, including digitised originals

when they are authorised by national law and under the

conditions laid down therein, for a period of five years

which starts running from the date of payment of the

balance.

11.18.3 The contractor shall allow the contracting authority’s

staff and outside personnel authorised by the

contracting authority the appropriate right of access to

sites and premises where the contract is performed and

to all the information, including information in

electronic format, needed in order to conduct such

checks and audits. The contractor shall ensure that the

information is readily available at the moment of the

check or audit and, if so requested, that information be

handed over in an appropriate form.

11.18.4 On the basis of the findings made during the audit, a

provisional report shall be drawn up. It shall be sent to

the contractor, which shall have 30 days following the

date of receipt to submit observations. The final report

shall be sent to the contractor within 60 days following

the espiry of that deadline.

On the basis of the final audit findings, the contracting

authority may recover all or part of the payments made

and may take any other measure which it considers

necessary.

11.18.5 gy virtue of Council Regulation (Euratom, EC) No

2lgs/96 of 11 November 1996 concerning on-the-spot

checks and inspection carried out by the Commission in

order to protect the European Communities’ financial

interests against fraud and other irregularities and

Regulation (EC) No 1073/1999 of the European

Parliament and the Council of 25 May 1999 concerning

investigation conducted by the European Anti-Fraud

Office (OtAF), the OtAF may also carry out on-the-spot

checks and inspections in accordance with the

procedures laid down by Union law forthe protection of

the financial interests of the Union against fraud and

other irregularities. Where appropriate, the findings

may lead to recovery by the contracting authority.

11.18.6 The Court of Auditors shall have the same rights as the

contracting authority, notably right of access, for the purpose of

checks and audits.

For the contracting authority,

[forename/surname/position]

Signature:________________________

Done at [place], [date] Done at [place], [date]

In duplicate in English.

Page 22: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

Annex III to the Invitation to tender

Declaration on honour on

exclusion criteria and selection criteria

The undersigned [insert name of the signatory of this form], representing:

(only for natural persons) himself or (only for legal persons) the following legal person:

herself

ID or passport number: Full official name:

Official legal form:

Statutory registration number:

Full official address:

VAT registration number:

declares whether the above-mentioned person is in one of the following situations or not:

SITUATION OF EXCLUSION CONCERNING THE PERSON YES NO

a) it is bankrupt, subject to insolvency or winding up procedures, its assets are beingadministered by a liquidator or by a court, it is in an arrangement with creditors, its El Elbusiness activities are suspended or it is in any analogous situation arising from a similarprocedure provided for under national legislation or regulations;

b) it has been established by a final judgement or a final administrative decision that theperson is in breach of its obligations relating to the payment of taxes or social security El Elcontributions in accordance with the law of the country in which it is established, withthose of the country in which the contracting authority is located or those of the countryof the performance of the contract;

c) it has been established by a final judgement or a final administrative decision that theperson is guilty of grave professional misconduct by having violated applicable laws orregulations or ethical standards of the profession to which the person belongs, or byhaving engaged in any wrongful conduct which has an impact on its professional credibitywhere such conduct denotes wrongful intent or gross negligence, including, in particular,any of the following:

(i) fraudulently or negligently misrepresenting information required for theverification of the absence of grounds for exclusion or the fulfilment of selection El Elcriteria or in the performance of a contract;

(ii) entering into agreement with other persons with the aim of distortingcompetition; El El(iii) violating intellectual property rights;

Page 23: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

(iv) attempting to influence the decision-making process of the contracting authorityduring the award procedure; LI LI(v) attempting to obtain confidential information that may confer upon it undueadvantages in the award procedure; LI LI

U) it has been established by a final judgement that the person is guilty of any of thefollowing:

(i) fraud, within the meaning of Article 1 of the Convention on the protection of theEuropean Communities’ financial interests, drawn up by the Council Act of 26 July LI LI1995;

(ii) corruption, as defined in Article 3 of the Convention on the fight against corruptioninvolving officials of the European Communities or officials of EU Member States, LI LIdrawn up by the Council Act of 26 May 1997, and in Article 2(1) of Council FrameworkDecision 2003/568/JHA, as well as corruption as defined in the legal provisions of thecountry where the contracting authority is located, the country in which the personis established or the country of the performance of the contract;

(iii) participation in a criminal organisation, as defined in Article 2 of CouncilFramework Decision 2008/841/JHA; LI LIiv) money laundering or terrorist financing, as defined in Article 1 of Directive2005/60/EC of the European Parliament and of the Council; LI LI(v) terrorist-related offences or offences linked to terrorist activities, as defined inArticles 1 and 3 of Council Framework Decision 2002/475/JHA, respectively, or LI LIinciting, aiding, abetting or attempting to commit such offences, as referred to inArticle 4 of that Decision;

(vi) child labour or other forms of trafficking in human beings as defined in Article 2of Directive 2011/36/EU of the European Parliament and of the Council; LI LI

e) the person has shown significant deficiencies in complying with the main obligations inthe performance of a contract financed by the Union’s budget, which has led to its early LI LItermination or to the application of liquidated damages or other contractual penalties,or which has been discovered following checks, audits or investigations by an AuthorisingOfficer, OLAF or the Court of Auditors;

f) it has been established by a final judgment or final administrative decision that the personhas committed an irregularity within the meaning of Article 1(2) of Council Regulation LI LI(EC, Euratom) No 2988/95;

g) for the situations of grave professional misconduct, fraud, corruption, other criminaloffences, significant deficiencies in the performance of the contract or irregularity, the LI LIapplicant is subject to:

i.facts established in the context of audits or investigations carried out by the Court ofAuditors, OLAF or internal audit, or any other check, audit or control performed underthe responsibility of an authorising officer of an EU institution, of a European officeor of an EU agency or body;

ii.non-final administrative decisions which may include disciplinary measures taken bythe competent supervisory body responsible for the verification of the application ofstandards of professional ethics;

iii.decisions of the ECB, the ElB, the European Investment Fund or internationalorganisations;

iv.decisions of the Commission relating to the infringement of the Union’s competitionrules or of a national competent authority relating to the infringement of Union ornational competition law; or

Page 24: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

v.decisions of exclusion by an authorising officer of an EU institution, of a Europeanoffice or of an EU agency or body.

(Only for legal persons other than Member States and local authorities, otherwise delete this tableJ

declares whether a natural person who is a member of the administrative, management orsupervisory body of the above-mentioned legal person, or who haspowers of representation, decisionor control with regard to the above-mentioned legal person (this covers the company directors,members of the management or supervisory bodies, and cases where one natural person holds amajority of shares) is in one of the following situations or not:

SITUATIONS OF EXCLUSION CONCERNING NATURAL PERSONS WITH POWER OF REPRESENTATION, DECISION-

MAKING OR CONTROL OVER THE LEGAL PERSONYES NO

Situation (c) above (grave professional misconduct)

Situation (U) above (fraud, corruption or other criminal offence) LI LI

Situation fe) above (significant deficiencies in performance of a contract ) LI LI

Situation (1) above (irregularity) LI

declares whether a natural or legal person that assumes unlimited liability forthe debts of the above-mentioned legal person is in one of the following situations or not:

SITUATIONS OF EXCLUSION CONCERNING NATURAL OR LEGAL PERSONS ASSUMING UNLIMITED

LIABILITY FOR THE DEBTS OF THE LEGAL PERSONYES NO N/A

Situation (a) above (bankruptcy)

Situation (b) above (breach in payment of taxes or social security contributions)

> declares whether the above-mentioned person is in one of the following situations or not:

GROUNDS FOR REJECTION FROM THIS PROCEDURE YES NO

h) has not distorted competition by being previously involved in the preparation ofprocurement documents for this procurement procedure; LI LI

i) has provided accurate, sincere and complete information to the contracting authoritywithin the context of this procurement procedure; LI LI

> acknowledges that the above-mentioned person may be subject to rejection from thisprocedure and to administrative sanctions (exclusion or financial penalty) if any of thedeclarations or information provided as a condition for participating in this procedureprove to be false.

REMEDIAL MEASURES

Page 25: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

If the person declares one of the situations of exclusion listed above, it should indicate the measures it has

taken to remedy the exclusion situation, thus demonstrating its reliability. They may include e.g. technical,

organisational and personnel measures to prevent further occurrence, compensation of damage or

payment of fines. The relevant documentary evidence which appropriately illustrates the remedial

measures taken should be provided in annex to this declaration. This does not apply for the situations

referred in point (d) of this declaration.

EVIDENCE UPON REQUEST

Upon request and within the time limit set by the contracting authority the person shall provide

information on the persons that are members of the administrative, management or supervisory body, as

well as the following evidence concerning the person or the natural or legal persons which assume

unlimited liability for the debt of the person:

For situations described in (a), (c), (d) or (f), production of a recent extract from the judicial record isrequired or, failing that, an equivalent document recently issued by a judicial or administrativeauthority in the country of establishment of the person showing that those requirements are satisfied.

For the situation described in point (a) or (b), production of recent certificates issued by the competent

authorities of the State concerned are required. These documents must provide evidence covering all

taxes and social security contributions for which the person is liable, including for example, VAT, income

tax (natural persons only), company tax (legal persons only) and social security contributions. Where

any document described above is not issued in the country concerned, it may be replaced by a sworn

statement made before a judicial authority or notary or, failing that, a solemn statement made before

an administrative authority or a qualified professional body in its country of establishment.

If the person already submitted such evidence for the purpose of another procedure, its issuing date

does not exceed one year and it is still valid, the person shall declare on its honour that the

documentary evidence has already been provided and confirm that no changes have occurred in its

situation.

Page 26: Introduction Annex I: Tender specifications · type of the contract 2.1. The Agency intends to sign a framework service contract with the successful tenderer for issuance of a maximum

Eu top ea nGloha NavigationStNte SystenisAncy

declares whether the above-mentioned person complies with the selection criteria asprovided in the tender specifications:

Full name Date Signature

SELECTION CRITERIA YES NO

(a) It has the legal and regulatory capacity to pursue the professional activity neededfor performing the contract as required in section D.5 of the tender specifications;

(b) It fulfills the applicable economic and financial criteria indicated in section D.5 ofthe tender specifications; El LI

(c) It fulfills the applicable technical and professional criteria indicated in section D.5of the tender specifications. El El

declares that the above-mentioned person will be able to provide the necessarysupporting documents listed in the relevant sections of the tender specificationsand which are not available electronically upon request and without delay.