Upload
others
View
16
Download
0
Embed Size (px)
Citation preview
Pre-application Acceptance Pre-examination Examination Decision Post-decision
View our proposals
Attend our consultation events
Provide your comments by 13 February 2017
The Planning Inspectorate has 28 days to decide whether the application meets the required standards to proceed, including whether our consultation has been adequate
You can register with the Planning Inspectorate as an interested party in order to be kept informed of progress and opportunities to be involved. The Planning Inspectorate will set timescales
The Planning Inspectorate has 6 months to carry out an examination
Registered parties can send written comments to the Planning Inspectorate
They can ask to speak at a public hearing
The Planning Inspectorate will make a recommendation to the relevant Secretary of State within 3 months. The Secretary of State then has a further 3 months to issue a decision
There is the opportunity for legal challenge
The Planning Act 2008 process for the nationally significant infrastructure projects
How you can be involved
Highways England is proposing to relieve congestion and provide better access to the Port of Hull by improving the A63 between the Ropery Street and Queen Street junctions.
The A63 Castle Street scheme is approximately 0.9 miles long and is a dual carriageway which runs through the centre of Hull.
This scheme aims to:
� Reduce traffic congestion � Improve access to the port � Improve safety for road users and the
local community � Improve links between the city centre to the
north and the leisure facilities to the south of the A63
In 2013, a consultation exercise was held which presented our proposed road improvements in more detail. Since 2013, we have taken on board your comments and undertaken additional environmental and traffic assessments to ensure our plans are robust.
We are consulting again to obtain your views on the changes we have made since 2013. As four years have elapsed we are taking the opportunity to re-consult on our proposals in case your views have changed.
Introduction
Highways England – Creative N160271
A63 Improvements Scheme areas Additional scheme areas Landmarks
N
The DeepKingston Retail Park
Princes QuayShopping CentreTrain station
Area 1Area 2
Area 3
Old Town
Fruit Market
A63
A63
Mytongatejunction
HullHull
HessleHessle
CottinghamCottingham
Humber BridgeHumber Bridge
Hum
ber
Hum
ber
Humber Humber
A63
A63
A63
A1079
A165
A165
Mytongatejunction
A63 Castle Streetimprovement
N
©Bluesky International Limited
The proposed route
© Crown copyright 2016.
Highways England – Creative N160271
St James Street closed
William Street andCogan Street closed
New restricted access
Proposed Porter Streetfootbridge
Lister StreetLister Street
English Street
English Street
Walker StreetWalker Street
Wal
ker
Str
eet
Wal
ker
Str
eet
Porte
r Stre
et
Porte
r Stre
et William StreetWilliam Street
Kingston Retail Park
Demolition of MytonCentre and proposedpublic open space
Re-configure Arco car parkand create a new accessfrom St James Street.
Re-configure KingstonRetail Park car parkto reduce the lossof parking spaces.
N
A63 Improvements Proposed public open space Landmarks
Area 1 – West of Mytongate junction
© Crown copyright 2016.
Highways England – Creative N160271
Preferred pumpingstation location
Alternative pumpingstation location
Trinity Burial Ground
A63 lowered by approx. 7m
Princes Quay footbridge
Relocation ofSpurn Lightship
Junctionclosed
New bridge to carryFerensway overthe A63
N
A63 Improvements Landmarks
Myton S
treetM
yton Street
Roper Street
Roper StreetW
ater
hous
e La
ne
Wat
erho
use
Lane
Kingston Street
Kingston Street
Railw
ay Street
Railw
ay Street
Princes QuayShopping Centre
Area 2 – Mytongate junction
© Crown copyright 2016.
Highways England – Creative N160271
Area 3 – East of Mytongate junction
Myton Bridge
Scale Lane Swing Bridge
BlackfriargateBlackfriargate
Blanket RowBlanket Row
Humber Street
Humber Street
Hum
ber Dock S
treet
Hum
ber Dock S
treet
Hig
h S
tree
tH
igh
Str
eet
Mar
ket P
lace
Mar
ket P
lace
Scale LaneScale Lane
Pri
nces
Do
ck S
tree
tP
rinc
es D
ock
Str
eet
A63 Improvement Proposed public open space
Queen S
tQ
ueen St
High
Str
ee
t
High
Str
ee
t
Junctionclosed
Provide three lanes foreastbound traffic betweenPrinces Dock Street andMarket Place.
N
Junctions closedEmergency access only
Proposed publicopen space
© Crown copyright 2016.
Highways England – Creative N160271
PosterngatePosterngate
Dag
ger
Lan
eD
agg
er L
ane
Vic
ar L
ane
Vic
ar L
ane
Fis
h S
tree
tF
ish
Str
eet
Trin
ity H
ouse
Lan
e
Trin
ity H
ouse
Lan
e
Pri
nces
Do
ck S
tree
tP
rinc
es D
ock
Str
eet
Mar
ket P
lace
Mar
ket P
lace
North Church Side
North Church Side
South Church SideSouth Church Side
Prince StreetPrince StreetHoly TrinityChurch
Temporary deliveryaccess only
Junctions improvements to allowsmoother access to and from the A63
Widening required
King
Stre
et
King
Stre
et
A63 Improvements New one way system New two way system
Landmarks
7.5 Tonne weight restriction
Land acquired for turning provision
N
Junctions closedEmergency access only
Blanket RowBlanket Row
Humber Street
Humber Street
Pier S
treetP
ier Street
Queen S
treetQ
ueen Street
Hum
ber
Place
Hum
ber
Place
Hum
ber Dock S
treet
Hum
ber Dock S
treet
Wellington Street
Wellington Street
Wideningrequired
No parking zone
Approx. boundaryof Fruit Marketdevelopment
Permit holdersparking only
High
Str
ee
t
High
Str
ee
t
A63 Improvements New one way system Permit holders only 18 Tonne weight restriction
N
Junction closed
Option 1 Option 2 Discounted option
Kingston Street
Kingston Street
Wellington Street West
Wellington Street West
Manor H
ouse Street
Manor H
ouse Street
Railw
ay Street
Railw
ay Street
Preferred pumpingstation location
Alternative pumpingstation location
Old Town – Proposal
Fruit Market – Proposal
Drainage outfall – Proposal© Crown copyright 2016.
Highways England – Creative N160271
HullHull
HessleHessle
CottinghamCottingham
Hum
ber
Hum
ber
Humber Humber
A63
A63
A63
A1079
A165
A165
Blackfriargate Bonus Site
Tower Street Wharf (north)temporary compound andcreation of public open space
Tower Street Wharf (south)
Wellington StreetIsland Wharf
Demolition of Myton Centreand creation of publicopen space Waterhouse Lane
Coach Park
Land south east ofMytongate junction
A63 eastbound laybynorth of St Andrews Quay
Neptune Street SouthAMI Cold Stores
Saxon Way
Livingstone RoadSouth HumberProperties Ltd. A63
A63A63
A63
N
N
N N
N N
Site compounds – Proposal
We are considering using a number of vacant development plots as offices and equipment stores for the work and will be including the sites listed below in the Development Consent Order
Vacant land east of River Hull Land south-east of Mytongate junction
Car park east of River Hull Land south of Neptune Street
Bonus site south of Blackfriargate Layby on A63
Site south of Wellington Street West Commercial site south of A63 and east of Hessle Haven
© Crown copyright 2016.
Highways England – Creative N160271
We are currently designing a scheme of works that will provide a very good understanding of the different types of archaeological remains that lie within and around the burial ground. We are continuing to work with stakeholders, such as Holy Trinity Church, The Diocese of York, Historic England and Humber Archaeology Partnership to ensure that the works meet ethical, legal and academic standards, and that they provide benefits to the wider community.
Our research to date has identified four main types of archaeological remains within the development area, each of which can tell us something different about the history of Hull. More details can be found in our separate newsletter, Trinity Burial Ground Archaeology Update.
We are keen to involve interested members of the public wherever we can. We also aim to engage a broad range of people in using Hull’s extensive historical resources to research about the individuals and families in the burial ground and the gaol, where they lived, and where they worked, as we try and foster a greater understanding of the human story and social history of Hull.
Please speak to a member of the team here today about how you can be involved.
What happens next?
Trinity Burial Ground lies partially within our proposed A63 improvement scheme. It is associated with Holy Trinity Church, Hull’s medieval parish church, which stands in Market Place, the heart of Hull old town.
Trinity Burial Ground is extremely significant because it was in use for a relatively short period of time (1783 – 1860). This period of use coincides with a dramatic change in the fortunes of Hull and its people, as it expanded beyond its medieval boundaries to become one of the most influential and industrialised centres on the east coast. The excavation of such a site outside of the south east of England is extremely rare, and offers a unique opportunity to understand how Hull and its people lived, their beliefs, and what changed at this key moment in its history.
In summer 2015, we worked closely with the church and Historic England to carry out investigations under
a Faculty from the Diocese of York taken by Oxford Archaeology-Humber Field Archaeology on our behalf (see Trinity Burial Ground Archaeology Update for more information). A specialist from the British Register of Accredited Monumental Masons was able to safely remove and replace headstones where required.
We made every effort to minimise disruption to the burial ground during our investigations. We were also very sensitive to the privacy of burial sites. We used special privacy tents to cover some of the larger excavations where we expected to find burials.
Whilst we were working within the burial ground, we took the opportunity to tidy the whole site of rubbish and overgrown vegetation. We also re-laid footpaths and reseeded the grassed areas.
Investigating archaeology – Trinity Burial Ground
Details of the finds can be found in our separate newsletter, Trinity Burial Ground Archaeology Update.
Highways England – Creative N160271
We have undertaken extensive work and consultation on the bridge crossing at Princes Quay. The proposed bridge follows a similar alignment to the previous preferred option but seeks to:
� Make people’s experience of the route more attractive
� Integrate the public spaces into the setting and urban fabric
� Avoid building and maintenance over water � Clarify the extent of Highways England
and Hull City Council responsibilities
The A63 bridge needs to respond to its sensitive location, partly within the Old Town Conservation Area, and partly above the existing Grade II Listed Princes and Humber Docks. It will play a critical role in reconnecting the Old Town and waterfront area. The revised proposal is a bespoke design that is sensitive to the historic place and is of such quality that it may be valued both now and in the future.
The Scale Lane bridge has set the bar in terms of design quality and distinctiveness.
Princes Quay Bridge
Highways England – Creative N160271
The construction period will last between 3 and 5 years. During this period we will seek to minimise disruption to both local communities and road users. The restrictions and constraints that will be considered as part of the construction work are:
Construction constraints
� We will not close lanes of traffic on the A63 between 6am and 8pm Monday to Saturday
� Two lanes will kept open to traffic on the A63 in both directions where practicable with a minimum of one traffic lane kept open in each direction at all times
� Full or partial road closures on the A63 will only be allowed overnight or at weekends for certain work
� Access to business and properties will be maintained wherever possible. Noise, vibration and disruption to adjacent properties will be kept to a minimum
� Alternative pedestrian footway and crossing facilities will be maintained at all times
� Where we need to close the road, either fully or partially, we will keep you up to date via a dedicated Public Liaison Officer
Highways England – Creative N160271