Upload
anna-atkinson
View
225
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Â
Citation preview
AN INTRODUCTION TO OD
WELCOME Od is London’s leading fit-out and refurbishment company in commercial, residential and leisure.
We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds.
We’re experts in organising people and materials within tight timescales.
Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor
Within this document you will find a selection of our recently completed commercial office projects
• OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.
• Recruitment of Commercial Director (Managing Surveyor of top fit out company)
• Recruitment of Construction Director (BCO & FX Quality Award Winner)
• AIB framework contractor.
• OD Projects currently employ 25 staff.
• Achieve British Council for offices corporate member status.
• Sign 5 year lease and fit out Moorgate HQ.
• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.
• Rolls Royce Framework contractor• Green Apple Award for Digitas
Saatchi & Saatchi
• Instutute of Chartered Accountants Framework contractor
• Awarded Vogue /Condenast HQ fitout
• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
• Savills approved contractor
• High end residential team acknowledged as leading contractor within sector
• Awarded refurbishment for Royal Albert Hall
2004 2005 2006 2007 2008 2009 2010 2011 2012
In January Jon Kearney founds OD Projects.
• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.
• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.
• Royal & Sun Alliance approved contractor status.
• OD Projects complete £4 million,107 Leadenhall, fit out.
• OD Projects achieve ISO9001 status.
• Forecast record turnover of circa £20m in with Business Plan.
• Official launch of aftercare team ‘ZEROdEFECTS’.
• Successful completion of first Irish project for Marcus Evans HQ in Dublin.
• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.
• Rebrand of Od which defines our focus and disciplined approach to achieving quality.
• Od appointed on Savills Estate Agency office fitout framework
• Repeat business levels at 70% of turnover and growing
• Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London
• Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead
• Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build
• OD Expand office space to take another floor at Sun St HQ
COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD has over 50 years collective experience as London and South East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects.
We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a project team’s expectations.
182 8 10 12 14 164 60
(Turnover £m April-April)
2011/2012
20 2422 26
2012/2013
Secured2013/2014 (Projected)
(Turnover £m April-April)
OD Solutions
Secured
Secured OD Interiors
OD Projects
2013/2014 (Projected)
2 8 10 12 144 60
OD GROUP TURNOVER
Secured
Secured2014/2015 (Projected)
TURNOVERRecently Od were delighted to announce the formation of the Od Group (Od Holdings)
This has provided a transparent platform for our service to continually improve, allowing our key staff to drive their core skills specifically within their respective specialist division
The group organisation commenced from the 2013/ 2014 financial period and is currently forecasting an overall turnover of £24million, £12 million of our forecast was secured prior to commencement of the new April to Apil financial period.
OD HOLDINGS
OD INTERIORSOD PROJECTS OD SOLUTIONS
Specialising in interior fit out and construction to the professional construction industry.
Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients.
Covering all sectors including Commercial, Retail and Leisure
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
OD INTERIORS
Jon KearneyManaging Director
Steve CherryConstruction Director
Greg PinchinCommercial Director
Andy TorlotDirector
Jon KearneyDirector
Andrew WrightDirector
** Company No: 06494819 ** Company No: 5029142 ** Company No: 8401423
** 1 Sun Street, London, EC2A 2EP
Procurement: Design & Build
Architect GenslerProject Manager GenslerQuantity Surveyor Montie
Duration 11 WeeksValue £600,000Size 3000 sq ft
SAPINDALEVEL 5, 25 PARK LANE, W1
• New Cellularized Offices,
• New Meeting and Board rooms,
• High spec stone reception,
• Stone flooring,
• Specialist joinery,
• New Lighting inclusive of feature lighting installed throughout into the existing suspended ceiling and the new plasterboard.
Strip out and new fit out of existing occupied offices in two separate phases.
The works undertaken comprised:
Procurement: Design & Build
Project Manager GenslerArchitect Gensler
Duration 10 weeksValue £535,000 Size 7000 sqft
HARRIS WILLIAMSLEVEL 2, BROOK STREET MAYFAIR
• High quality bespoke joinery,
• Mechanical & electrical modifications,
• Double glazed BENE partitions & doors,
• Handmade carpet flooring,
• Audio visual installations.
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.
The works comprised:
PARADIGM HOUSINGHIGH WYCOMBE
Quantity Surveyor: HeasmansArchitect: Mansfield Monk
Duration: 9 weeksSize: 40,000 sq ft
• Structural modifications;
• Revision of basebuild services;
• Dedicated comms room with UPS backups;
• Formation of new glazed offices;
• General fit out of office space over all floors;
• New Reception;
• 5 New kitchens & Breakout station;
• Board room with integral AV installation;
• Third project in UK to achieve Silver SKA Rating for sustainability.
The 40,000sq ft fit out from CAT A of Building 1A, Glory Park for Paradigm Housing Association to provide them with their headquarters. Works included:
Procurement: Design & Build
Architect: Edge Quantity Surveyor: ArcadisServices Consultant: Arcadis
Duration: 12 weeks Value: £1mSize: 30,000 sq ft
DOW JONESGRAYS INN RAOD, LONDON
• Strip out• Installation of new electrical & mechanical
services• Glass partitions• Fit Out of new toilets
• Tea Points• High specification restaurant• Floor coverings
Refurbishment of office floor whilst the building remained in full occupation, works included:
Architect: Pure DesignProject Manager: Savills
Project Value: £1,100,000Duration: 14 Weeks
WINCOR NIXDORFDARTFORD
• Raised floor & ceilings;
• New partition layout including glazed walls;
• Air conditioning;
• Toilet fit out;
• External works.
The complete strip out of the existing office building and installation of a CAT B fit out comprising
Procurement: Design & Build
Architect: BLDA
Duration: 12 WeeksValue: £700,000Size 9000 sq ft
MARCUS EVANSSIMMONSCOURT HOUSE DUBLIN
• New Offices,
• New Meeting and Board rooms,
• High spec reception,
• Staff break out areas,
• New comms Room,
Cat B commercial office fit out at Simmonscourt House in Dublin,
Works included:
SUSTAINABILITYOd is taking positive steps to reduce its own carbon footprint – from the office environment to the manufacturing process. Wherever possible we control emissions, recycle, use renewable resources and conserve energy.
We and have received numerous environmental awards and accreditations including:
• SKA – Silver
• BREEAM – Excellent
• LEED™ – Silver
• Green Apple Award
Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result.Well done, great team effort and thank you once again
Philip SuttonDevelopments Project Manager - Property Royal London Asset Management
“ ”
PAGE 96 PREPARED BY OD SOLUTIONS FOR TEMASEK INTERNATIONAL (EUROPE) LIMITED
Issue Date: 16 September 2011 Site ID: 52602
Robert Biggs Chairman, Considerate Constructors Scheme Ltd.
Presented to
Patrick Mcloone
Of
OD Developments and Projects Ltd
For
Portland Building
CERTIFICATIONCERTIFICATION
CERTIFICATION
Fit‐out Sustainability AssessmentThis is to certify that
Paradigm Housing GroupBuilding A1 Glory Park
High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Accredited Assessor
Pringle Brandon LLP
On behalf of
Paradigm Housing Group
Project Manager
Savills Commercial Ltd
Architect
Mansfield Monk
Contractor
OD Projects
Building Services Engineer
Capita Symonds
Certificate Reference
Glory Park, High Wycombe
Date
29/06/2010
This certificate has been produced using Ska Rating Offices version 1.0
SUSTAINABLE CREDENTIALS
COMPANY
STAGE 1 – PLANNING FOR QUALITY•ZeroDefectsIntroductionMeeting•DetailedDesignReview•IdentifyQualityRisks•IdentifyWorkZones/Sequencing/Phasing•Sub-contractorTargetProgramme
STAGE 2 – INFORMATION RELEASE•Drawing/InformationReleaseSchedule•SampleSchedule•OffSiteInspectionSchedule
STAGE 3 – SETTING QUALITY STANDARDS•Benchmarking•SampleApproval•KeyInspections•ProtectionRegime
STAGE 4 – REVIEW & QUALITY CONTROL SIGN OFF•Review•Monitoring•Handover
STAGE 5 – SNAGGING & DEFECTS•DefectsProcess•IdentifyingDefects•SiteMarkUps•Sub-ContractorDefectManagement•DefectReporting
STAGE 6 – PROJECT CLOSE OUT•FinalisationPlan•CloseOutProgrammes•DefectReporting•RecordDocument•ClientFamiliarisation
Od operates a ‘zero defects’ plan. This is more commonly known as a quality plan. The plan is written at the commencement of theprojectandsetsouttoachieveashighaqualitydeliveryaspossible.Thisisnotjustinthefinishedproduct,itcoverseverystage of the project including management techniques as follows;
ZER efects
1 Sun StreetLondonEC2A 2EP