30
12/18/2013 1 Resource Webinar Series: “Introduction to LEED v4!” usgbc.org

Intro to Lee Dv 4 Performance

Embed Size (px)

DESCRIPTION

Intro to Lee Dv 4 Performance

Citation preview

Page 1: Intro to Lee Dv 4 Performance

12/18/2013

1

Resource

Webinar Series: “Introduction to LEED v4!”

usgbc.org

Page 2: Intro to Lee Dv 4 Performance

12/18/2013

2

Presenters

Chris Schaffner, PE, LEED FellowFounder and PrincipalThe Green Engineer, Inc.

Page 3: Intro to Lee Dv 4 Performance

12/18/2013

3

Page 4: Intro to Lee Dv 4 Performance

12/18/2013

4

LEED System Goals

• Reduce contribution to global climate change

• Enhance individual human health

• Protect and restore water resources• Protect and restore water resources

• Protect and enhance biodiversity and ecosystem

services

• Promote sustainable and regenerative material cycles

• Build a green economy

• Enhance community quality of life

Page 5: Intro to Lee Dv 4 Performance

12/18/2013

5

LEED v4 System Goals

Sound Process Higher LEED score Better Performance

Page 6: Intro to Lee Dv 4 Performance

12/18/2013

6

LEED Projects are…

• responsible for over 80 million tons of waste diverted landfills

• in the 11th percentile in the U.S. in terms of energy usageenergy usage

• 57% lower Source Energy use intensity than the national average

LEED Projects are…

• responsible for over 80 million tons of waste diverted landfills

• in the 11th percentile in the U.S. in terms of energy usageenergy usage

• 57% lower Source Energy use intensity than the national average

Page 7: Intro to Lee Dv 4 Performance

12/18/2013

7

LEED Projects are…

• responsible for over 80 million tons of waste diverted landfills

• in the 11th percentile in the U.S. in terms of energy usageenergy usage

• 57% lower Source Energy use intensity than the national average

Project Data + Results = Performance

LEED v4 Credit: Bicycle Facilities 

Bicycle Storage Bicycle Network

Page 8: Intro to Lee Dv 4 Performance

12/18/2013

8

NEED PHOTO(S) OF COLLEGE CAMPUS

Page 9: Intro to Lee Dv 4 Performance

12/18/2013

9

Metering in LEED v4

Sound Process Higher LEED score Better Performance

Page 10: Intro to Lee Dv 4 Performance

12/18/2013

10

Integrative Process + Sustainable Sites

Ecosystem

Project Sites

PERFORMANCE + LEED v4

Buildings

Occupants

Design control vs. Occupant control

Page 11: Intro to Lee Dv 4 Performance

12/18/2013

11

Design control vs. Occupant control

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Performance in Location and Transportation

Page 12: Intro to Lee Dv 4 Performance

12/18/2013

12

LEED v4 Credit: Access to quality transitLEED for Neighborhood Development location

Alternative compliance path to all of the LT credits in LEED BD+C and I+DC

LEED v4 Credit: Access to quality transit

Page 13: Intro to Lee Dv 4 Performance

12/18/2013

13

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Performance in 

Sustainable SitesSustainable Sites

LEED v4 Credit: Site Development – Protect or Restore Habitat

Includes the building footprint

Setback requirement replaced with minimum preservation standards

Expanded soil requirements

Page 14: Intro to Lee Dv 4 Performance

12/18/2013

14

LEED v4 Credit: Site Assessment

Storm Water  Rainwater

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Page 15: Intro to Lee Dv 4 Performance

12/18/2013

15

LEED v4 Prerequisite: Building‐Level Water Metering

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Page 16: Intro to Lee Dv 4 Performance

12/18/2013

16

Defining Performance in Energy & AtmosphereEnergy & Atmosphere

LEED 2009  LEED v4Minimum Performance Requirement MPR 6 to share

Prerequisite + credit for metering and sharing dataMPR 6 to share 

datasharing data

ASHRAE 90.1 2007vs. 

ASHRAE 90.1 2010

Page 17: Intro to Lee Dv 4 Performance

12/18/2013

17

ASHRAE 90.1 2007vs. 

ASHRAE 90.1 2010

‐ Improved Lighting Controls 

LEED v4 Prerequisite: Building‐Level Energy Metering

Page 18: Intro to Lee Dv 4 Performance

12/18/2013

18

LEED v4 credit: Demand Response

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Materials & Resources

Page 19: Intro to Lee Dv 4 Performance

12/18/2013

19

Defining Performance in Materials & Resources

Do more with less

Optimize material selection

Single Attributes  Multiple Attributes

Life Cycle Assessment (LCA)ife Cycle Assessment ( CA)

Page 20: Intro to Lee Dv 4 Performance

12/18/2013

20

LCA as a Design Tool

LEED v4 Credit:Construction and demolition waste management

Page 21: Intro to Lee Dv 4 Performance

12/18/2013

21

Life Cycle Assessment (LCA)Life Cycle Assessment (LCA)

LEED v4 Credit: Building product disclosure and optimization – environmental product declarations

Building Product and Disclosure Credits Steps

Step 1: Establish overall strategy for materials

Step 2: Transparency

Step 3: Optimize product purchasing 

Step 4: Track purchases

Page 22: Intro to Lee Dv 4 Performance

12/18/2013

22

Transparency Brief

• Short version of an Environmental Product Declaration

Page 23: Intro to Lee Dv 4 Performance

12/18/2013

23

Program Operator

• the entity that registers an Environmental Product Declaration

Cradle to Gate

• Analysis of a product’s partial life‐cycle, from resource extraction (cradle) to factory gate (before it is transported for distribution and sale)sale)

Filler slide – MR credits

• Picture of materials? BPDO? Icon?

Page 24: Intro to Lee Dv 4 Performance

12/18/2013

24

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Defining Performance in Indoor Environmental Quality

Page 25: Intro to Lee Dv 4 Performance

12/18/2013

25

Lighting

Acoustics

Page 26: Intro to Lee Dv 4 Performance

12/18/2013

26

Occupant Experience

Thermal Comfort

Quality ViewsComfort 

imageViews image 

LEED v4 Credit:Low emitting materials

QUALITY VIEWS

Added requirement for quality view, defined by the LEED 2009 exemplary performance criteria.

LEED v4 Credit:Low emitting materials

Page 27: Intro to Lee Dv 4 Performance

12/18/2013

27

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Systems Thinking

Integrative Process is a gfoundation of LEED v4

Page 28: Intro to Lee Dv 4 Performance

12/18/2013

28

Performance

Location and Transportation

Sustainable Sites

Water Efficiency

Energy and AtmosphereEnergy and Atmosphere

Materials and Resources

Indoor Environmental Quality

Wrap-Up

Slide1 jpgSlide1.jpg

Page 29: Intro to Lee Dv 4 Performance

12/18/2013

29

Rating System Reviews

• Design & Construction– Covers Building Design and Construction and Interior Design and Construction

• Existing Buildings: Operations & Maintenance• Existing Buildings: Operations & Maintenance

Page 30: Intro to Lee Dv 4 Performance

12/18/2013

30