[In.ter.vén.si] |نسي اينترۏي2016 & 2017 Laporan Hasil Intervensi UPPP Oleh Sarimah bt Ahmad Unit Pengurusan Prestasi Projek (UPPP) Bahagian Pengurusan Projek Kompleks(PROKOM) Cawangan Perancangan Aset Bersepadu 25 Julai 2017

[In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

[In.ter.vén.si] |اينترۏينسي 2016 & 2017

Laporan Hasil Intervensi UPPP

OlehSarimah bt AhmadUnit Pengurusan Prestasi Projek (UPPP)Bahagian Pengurusan Projek Kompleks(PROKOM)Cawangan Perancangan Aset Bersepadu 25 Julai 2017

Page 2: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

Project Management

Project management is the planning , organization, monitoring and control all the aspects of a project and the motivation of all involved to achieve the project objectives safely and within agreed time, cost and performance criteria(quality).

Page 3: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

• Systems, processes,

and procedures are

important in order to

standardize the way

things are done.

• These will cover

management of work and

approval, monitoring,

controls and technical

requirements.

• Systems will also cover

methods of handling

information transfer,

storage and retrieval.

PeopleExperienced staffing professionalsAvailable to operate onsite

Process and procedureOptimized process and procedure to reduce time and cost and enforces consistent delivery

SystemAny system/methods to manage the project

Project Management: System, Process, Procedure

Page 4: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

ANALISA MARKAH PROGRAM INTERVENSI 2016 DAN 2017

Page 5: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

1.0 KOMPETENSI DAN KOMITMEN PASUKAN PROJEK

2.0 PERANCANGAN PROJEK

3.0 PEMANTAUAN DAN PELAPORAN KEMAJUAN PROJEK

4.0 KAWALAN KEMAJUAN PROJEK

5.0 KAWALAN KUALITI PROJEK

6.0 PENGURUSAN SUMBER MANUSIA

10 KRITERIA PENILAIAN

7.0 PENTADBIRAN KONTRAK

8.0 PENGURUSAN FAIL, DOKUMEN & REKOD

9.0 FOKUS PELANGGAN

10.0 KETUA PASUKAN PROJEK

Page 6: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

KR

ITER

IA

PEN

ILA

IAN

B

AG

I SET

IAP

K

ATE

GO

RI

KO

MIT

MEN

P

ASU

KA

N

PR

OJE

K

PER

AN

CA

NG

AN

P

RO

JEK

PEM

AN

TAU

AN

DA

N

PEL

AP

OR

AN

K

EMA

JUA

N P

RO

JEK

KA

WA

LAN

K

EMA

JUA

N D

AN

P

RES

TASI

PR

OJE

K

KA

WA

LAN

KU

ALI

TI

PR

OJE

K

PEN

GU

RU

SAN

SU

MB

ER

MA

NU

SIA

PEN

TA

DB

IRA

N

KO

NTR

AK

PEM

ATU

HA

N K

PD

SP

B, P

ENG

UR

USA

N

FAIL

DA

N

DO

KU

MEN

TA

SIK

OM

UN

IKA

SI D

AN

FO

KU

S K

EPA

DA

P

ELA

NG

GA

NP

ENG

UA

SAA

N

KET

UA

PA

SUK

AN

P

RO

JEK

KEP

AD

A

SIST

EM D

AN

P

RO

SID

UR

PR

OJE

K

MA

RK

AH

K

ESEL

UR

UH

AN

B

AG

I SET

IAP

PR

OJE

K

NAMA PROJEK JUMLAH MARKAH BAGI SETIAP KATEGORI

20

16 MEDAN SELERA,

W.P LABUAN52% 64% 76% 66% 60% 63% 70% 76% 64% 60% 65.1%

20

16 GSTB SK BUKIT KALAM,

W.P LABUAN52% 64% 76% 66% 60% 63% 70% 76% 64% 60% 65.1%

20

16

BAIKI JALAN KB-KT, KM 10 - KM 21,KELANTAN

62% 35% 48% 36% 47% 37% 64% 32% 24% 44% 43%

20

16 KEM BATU MELINTANG

(R&B)42% 41% 40% 34% 40% 43% 66% 30% 64% 64% 46%

20

16 LGM KOTA TINGGI,

JOHOR66% 58% 68% 52% 66% 47% 50% 50% 62% 54% 57%

20

16 IPK JOHOR BAHRU,

JOHOR78% 78% 78% 68% 82% 90% 70% 78% 66% 76% 76%

20

16 CCRC KUCHING,

SARAWAK56% 37% 40% 52% 65% 46% 74% 66% 70% 56% 56%

20

17

IPD JOHOR BAHRU SELATAN,JOHOR

74% 65% 66% 76% 72% 50% 90% 70% 78% 54% 69.5%

20

17 KUARTERS JKM TAMPOI,

JOHOR66% 52% 60% 64% 65% 60% 86% 68% 76% 70% 66.7%

20

17 UTeM - FAKULTI TEK. KEJ.,

MELAKA (R&B)32% 24% 32% 30% 39% 41% 70% 32% 46% 62% 40.8%

MARKAH PURATA 58% 52% 58% 54% 60% 54% 71% 58% 61% 60% 59%

ANALISA MARKAH

Page 7: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

58%

52%

58%54%

60%54%

71%

58%61% 60%

KOMITMENPASUKANPROJEK

PERANCANGANPROJEK

PEMANTAUANDAN

PELAPORANKEMAJUAN

PROJEK

KAWALANKEMAJUAN

DAN PRESTASIPROJEK

KAWALANKUALITIPROJEK

PENGURUSANSUMBER

MANUSIA

PENTADBIRANKONTRAK

PEMATUHANKPD SPB,

PENGURUSANFAIL DAN

DOKUMENTASI

KOMUNIKASIDAN FOKUS

KEPADAPELANGGAN

PENGUASAANKETUA

PASUKANPROJEKKEPADA

SISTEM DANPROSIDUR

PROJEK

Purata Markah 59%

ANALISA INTERVENSI 2016/2017

Page 8: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

PERAN-CANGAN

KAWALAN

SUMBER MANUSIA

TIGA KRITERIA PENILAIAN MARKAH TERENDAH

Penilaian

kepada

penyediaan

perancangan

dan

dokumentasi

didalam

melaksanakan

projek

Penilaian bagi

perancangan

penggunaan

sumber

manusia yang

optimum dan

efisien.

Pematuhan

kepada prosedur

SPB , SA KPKR,

Pemeriksaan pra-

penyerahan,

keperluan

berkaitan kualiti

& kebolehfungsian

bangunan

Page 9: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

PERANCANGAN PROJEK-Pengesyoran-

Mendapatkan dokumen yang dinyatakandidalam dokumen kontrak/COC

Menyemak dan mendapatkanpandangan pakar (Cth: Program Kerja)

Kawalan kepada kontraktor semasaproses perancangan

Page 10: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

KAWALAN KEMAJUAN DAN PRESTASI PROJEK

- Pengesyoran-

Merekodkan laporan kemajuan yang betul

Mengambil tindakan bagi kelewatan aktivitipembinaan

Kawalan dan tindakan kepada risiko

Page 11: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

PENGURUSAN SUMBER MANUSIA-Pengesyoran-

Memahami keperluan ahli pasukan

Menguruskan kompetensi pasukan

Menyediakan R&R pasukan

Page 12: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

Contoh Kes:

PROJEK : CADANGAN MEMBINA 50 UNIT MEDAN SELERA DI ATAS SEBAHAGIAN LOT LT 207537068, JALAN TANJUNG PURUN, WILAYAH PERSEKUTUAN LABUAN

PROJEK: PEMBINAAN GELANGGANG SERBAGUNA TERBUKA BERBUMBUNG DI SK BUKIT KALAM, W.P LABUAN

Page 13: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

KESIMPULAN

JKR telah mempunyai sistem, dokumen-dokumen Amalan Terbaik danlainnya bagi melaksanakan proses dan prosidur kerja di tapak bina. Bagi

menjayakan nya, ianya memerlukan penglibatan semua pihak.

Sekiranya semua elemen Plan-Do-Check-Act dilaksanakan merujuk kepadaSisem-Proses-Prosidur, perlaksanaan projek akan lebih terancang dan projek

akan dapat disiap mengikut Jadual-Skop dan Kos. Waima, jika projekbermasalah; tindakan penamatan kepada kontraktor dapat disegerakan.

Page 14: [In.ter.vén.si] |يسنيۏرتنيا 2016 & 2017epsmg.jkr.gov.my/images/7/7b/Laporan_Hasil_Intervensi_UPPP.pdf · Cawangan Perancangan Aset Bersepadu 25 Julai 2017. Project Management

TERIMA KASIH