Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

Embed Size (px)

Citation preview

Page 1: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

Interoperable Railways Interoperable Railways from vision to reality: the from vision to reality: the

Italian experienceItalian experience

RAILWAY DAYS – BUCAREST RAILWAY DAYS – BUCAREST

Page 2: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

2

Summary

1. A Vision made Reality: the new Italian High Speed Railways in commercial operation

2. Key to Interoperabilty: the European Traffic Management System ERTMS

3. The basis: European Directives and Technical Specifications

4. Proving that it works: the integration and verification of Interoperability

Page 3: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

3

A Vision in Context

• All main TEN (Trans European Network) Corridors run through Italy

• New Interoperable Infrastructure to be built

• Existing infrasctructure to be made interoperable

• The Signalling problem

Page 4: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

4

A Vision in Context

Page 5: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

5

European Signalling: a non-interoperable Legacy

Page 6: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

6

The Interoperable solution: ERTMS Signalling

Madrid-Sevilla line

Tournan-Marles -en-Brie line

Site Tests Ongoing Projects

Madrid-Barcelona-French border HS line

TGV East

Lev. 1overall network

STM for migrationstrategy

Vienna Budapest line

Plovdiv junction andStara Zagora-Burgas

line

Italian H. S. network

Poříčany - Kolín line

Madrid-Sevilla line

Tournan-Marles -en-Brie line

Site Tests Ongoing Projects

Madrid-Barcelona-French border HS line

TGV East

Lev. 1overall network

STM for migrationstrategy

Vienna Budapest line

Plovdiv junction andStara Zagora-Burgas

line

Italian H. S. network

Poříčany - Kolín line

Page 7: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

7

ERTMS is the Solution for Signalling

Page 8: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

8

ERTMS: Why is it good?

• ERTMS allows the uninterrupted travel of passengers and goods through national boundaries

• ERTMS is standard for Europe so it opens the European market for railway products

• ERTMS increases the capacity of existing railways• ERTMS improves the Safety of existing railways

Page 9: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

9

ERTMS: Where shall it be used?

• Fitting of new high speed lines and trains

• Retrofitting of conventional trains for interoperable service

• Retrofitting of conventional lines as overlay on the existing signalling system

Page 10: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

10

Equipment for ERTMSE

nco

trak

-LE

U

Unicab –On board Equip.

Bal

ise

Tra

nsm

issi

on M

odu

le

Equipment for ERTMSE

nco

trak

-LE

UE

nco

trak

-LE

U

Unicab –On board Equip.

Bal

ise

Tra

nsm

issi

on M

odu

le

Bal

ise

Tra

nsm

issi

on M

odu

le

Page 11: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

11

Equipment for ERTMS: the Ansaldo Numbers

2

30000

3000

40

1430

600

In opera

Yes

Yes

Yes

Yes

Yes

YesIn progress

Certified

18--5----175Radio Block Center

452181040350018001078600220035000Eurobalise

5759398347------145000LEU

2400------------2400Cab Radio GSM-R

558511924201848305200BTM+Anten.

2785PILOT

L1

11932----4302600On-Board

TOTSNCB

INDIAGIFMAVBDŽSŽDCLGV EstRFI Network(SCMT+HSL)

ProductsVsApplications

2

30000

3000

40

1430

600

In opera

Yes

Yes

Yes

Yes

Yes

YesIn progress

Certified

18--5----175Radio Block Center

452181040350018001078600220035000Eurobalise

5759398347------145000LEU

2400------------2400Cab Radio GSM-R

558511924201848305200BTM+Anten.

2785PILOT

L1

11932----4302600On-Board

TOTSNCB

INDIAGIFMAVBDŽSŽDCLGV EstRFI Network(SCMT+HSL)

ProductsVsApplications

Page 12: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

12

ERTMS Systems: the Ansaldo References

• Torino-Novara-Milano Line – extension 120 km – IN OPERATION since February 2006– 2 RBC - 10 Interlockings (Torino-Novara) – 4 Interlockings (Novara-Milano)– 900 Eurobalises (fixed and switchable)– about 40 LEU (HSL entrance handling / Hot Box Detection)– about 180 Audio frequency track circuits

• Roma-Napoli Line – extension 200 km - IN OPERATION since December 2005– 3 RBC - 18 Interlockings – about 1500 Eurobalises (fixed and switchable)– about 60 LEU (HSL entrance handling / Hot Box Detection)

• Milano-Bologna Line – extension 185 km – IN PROGRESS– 3 RBC - 17 Interlockings– about 1500 Eurobalises (fixed and switchable)– about 60 LEU (HSL entrance handling / Hot Box Detection)

Page 13: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

13

ERTMS Systems: other Ansaldo Applications

• Poříčany–Kolín Line (Czech Republic) – L2 pilot section, extension 22 km – 1 RBC - 3 already existing IXL (supplied by AŽD)

• The RBC/IXL protocol developed for the IHSL has been reused; it has been implemented by AŽD following the IHSL Specifications

– 300 Eurobalises (fixed)

• Schaerbeek Site (Belgium) – test site– ERTMS L1 superimposed on National System TBL1+

Page 14: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

14

The Basis: European Directives

• Directive 96/48/EC – Interoperability of TransEuropean High Speed Rail System

• Directive 2001/16/EC – Interoperability of TransEuropean Conventional Rail System

• Unified by 2004/50/EC: identical requirements both Conventional and High Speed

Page 15: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

15

The Basis: Technical Specifications for Interoperability (TSIs)

• TSI CCS for High Speed Rail Systems• TSI CCS for Conventional Rail Systems

ERTMS characteristics set in Annex A to the TSIsAnnex A reference all mandatory specifications

and their valid versionsAnnex A may be updated without updating TSI text

Page 16: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

16

Which Version of ERTMS?

• ERTMS system version (trackside and onboard) is defined by its Baseline

• ERTMS Baseline is the set of versions of the mandatory documents referred by the TSI in its Annex A

Page 17: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

17

Example: ERMTS Baseline Version 2.2.2

• System Requirement Specifications v.2.2.2• Engineering Rules v2.2.2• Eurobalise Specifications v2.0.0• …

Page 18: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

18

ERTMS System Version in Italy

• Our project development started on the basis of ERTMS Baseline Version 2.2.2 to which we applied some changes chosen among those already agreed at European level in the framework of the ongoing consolidation process

• The changes applied fulfilled the needs of our contractor (RFI Italian Railway Network)

• As the the European ERTMS Version consolidation process is now concluded we will apply also the remaining agreed changes so to complete the migration to the new armonised ERTMS Baseline Version 2.3.0

• This migration is being coordinated with the Italian Railways so to assure the smoothest transition with an uninterrupted commercial operation service

Page 19: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

19

Making sure it works: Ansaldo ERTMS Integration Process for Torino-Novara HSL

Page 20: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

20

Making sure it works: Ansaldo ERTMS Integration Process

• Increased approach, from laboratory environment to real plant, using the real interfaces • Equipment

• Interlockings• Radio Block Centers• Interlocking Simulator (software running on commercial hardware)• Balise Groups (2 balises)• Onboard Unit (EVC European Vital Computer)

• Simulation tools• Track Circuit and Station Simulator• Running Train Simulator / Line Status Simulator

Page 21: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

21

LAN

Track Circuit & Station Simulator

IXL Simul.PT Settimo Track Circuit &

Station Simulator

IXL Simul.PJ NovaraO.

GSM/R GSM/R

ETCS EVCRunning Train SimulatorTrack Line Simulator

RBC 1 RBC

2EVC

… … …

Page 22: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

22

GSM/R GSM/R

PT Settimo

WAN

RBC 1 RBC

2ETCS EVCRunning Train SimulatorTrack Line Simulator

PJ NovaraO.

EVC

… … …

Page 23: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

23

GSM/R GSM/R

EVC

RBC 1 RBC

2

PT Settimo

WAN

PJ NovaraO.

… … …

Page 24: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

24

Interoperability from paper to practice: the Turin-Milan railway line

Page 25: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

25

ERTMS Testing for interoperability

• Increased approach, from laboratory environment to real plant, using the real interface • Equipment

•ANSALDO Radio Block Center•ALSTOM Onboar Unit•Interlockings• Interlocking Simulator (NVP sw running on commercial hardware)• 220 Balise Groups (2 balises)

• Simulation tools• Track Circuit and Station Simulator• Running Train Simulator / Line Status Simulator

Page 26: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

26

GSM/R GSM/R

ASF RBC 1 ASF RBC

2

PT Settimo

WAN

PJ NovaraO.

AF OBU

… … …

Page 27: Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST

27

The ConclusionThe Conclusion