Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Embed Size (px)

Citation preview

Page 1: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Page 2: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Page 3: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Makers (09) Packers (09)

Case Packer (3), Transit (4), Filtromat (2), FLT (1) and Checker (1)

ODMS and Filter Feeding (3)

KDFs

KDFs (4)

Cleaning and waste collection (3)

Crew Positions in SMDODM

S

Filtromat

CIGRATTE STOCK

FILT

ROM

ATFI

LTER

ST

OCK

Line

01

Line

02

Line

03

Line

04

Line

05

Line

08

Line

10

Line

07

Line

06

CASE

PA

CKER

TRAN

SIT

CONFERENCE ROOM

TLOFFICE

WASHING BAY

TEAM

ROOM

QUALITY LAB

Office TOILETS

EXIT EXIT

Filtromat

Master technicians (3)

ClosedOFFICE

Page 4: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Study the Brand change Overs & Format change overs.

• Change Overs Downtime Analysis.

• RCO Deployment for reducing changeover downtime.

Page 5: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Analysis of Data Starting from 1st January, 2016 till July end.

• Analyse the downtime of different changeovers shift wise and brand wise.

• Driving the conclusions to select target areas for RCO.

Page 6: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Late shift has mostly less downtime than early & night shifts.

• Change Over from CBPM to PG.

Page 7: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Change Over from CBPM to B&H.

Page 8: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Change Overs from PG-CBPM

• Total Number of Change Overs = 14

• Minimum Downtime = 0:15

• Maximum Downtime = 6 :00???

• Average Downtime = 1:55

Page 9: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• RCO stands for Rapid change over.

• Each element of the changeover is analyzed

to see if it can be eliminated, simplified,

moved or streamlined.

• NASCAR Pit Crew a simple demonstration

of RCO.

Page 10: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Reduced downtime. (Increased OEE).

• Increased capacity.

• Greater flexibility.

• Reduced stock.

• Improved responsiveness to customer demand.

Page 11: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

ProcessMapping

SeparateExternalElements

OrganizingExternalElements

ConvertInternal toExternal

Streamline

Remaining

Elements

ContinuousImprovement

Page 12: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• The target area for the pilot SMED program is selected. Ideal line have the following characteristics.• Duration

• Variation

• Opportunities

• Familiarity

Page 13: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Analyzing all the steps of changeover. (Process Mapping)

• Change Overs time can be nearly cut to half with this step only.

• Examples: Retrieval, Inspection, Cleaning, Quality.

Page 14: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Advance preparation.

• Modularize.

• The remaining elements are tried to simplify.

• Following techniques could be used: release, Motion, Parallel operations.

Page 15: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Always keep looking for further improvements• New Technologies.

• New people-New Ideas.

• New premises or changes to layout.

Page 16: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Step 1: Process Mapping

Page 17: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Step 2: Separate External Elements

Page 18: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Step 3: Organizing External Elements• The blanks could reach before the process stop.

• The cleaning of surrounding could be done before stopping.

• The quality check could be done either after running the machine. To stop the machine was not a good idea.

• There was a jam and operators were not technical so it took time to clear the jam.

Page 19: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Step 4: Convert Internal Elements to External• Removing wastes from the surroundings of machine.

Step 5: Streamline remaining elements• Use two code & date printers.

Step 6: Continuous Improvement• Keep analyzing to make improvements.

Page 20: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

Process Mapping

Page 21: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• After process mapping separation of activities was done.

• Separating activities in the categories like Value Added, Not Value added nut required, delay etc.

• Time optimization of different activities.

• Separating external & Internal activities.

• Streamlining internal activities.

Page 22: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Page 23: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Proper Preparation.

• Eliminating delay like discussions during work, remaining Idle, Long lunch and tea breaks.

• Training Operators specifically for changeovers.

• Standardize all necessary nuts, bolts etc.

• Give timelines to workers.

• Moving Internal activities to external.

Page 24: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Changes in methods. Like segregating external and internal,Eliminating delays etc.

• Changes in methods are not expensive and can generate significantreductions in setup time.

• Once the benefits have been realized from the methodsimprovements mechanical modifications can be explored.

Page 25: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Area sorted and cleaned.

• Use of shadow boards for hand tools.

• All necessary tools nearby.

• Incoming and outgoing areas are clearly defined.

• Dedicated tool or tie carts for each machine station and worker.

• Visual flow of work through the area.

Page 26: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• Machine Operators.

• Setup Crew.

• Mechanic/Maintenance.

• Quality.

• Planning.

• Others as needed.

Anyone touched or affected by setup times should be involved!!!

Page 27: Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST

• The Changeovers downtime can be significantly reduced by deploying RCO.

• More than 40% setup time can be reduced by eliminating delays, proper planning, Segregating external and internal activities.