INTERNATIONAL PIPE LINE & OFFSHORE INTERNATIONAL PIPE LINE & OFFSHORE CONTRACTORS ASSOCIATION CONTRACTORS ASSOCIATION TECHINT TECHINT JUNE 2004 TECHINT TECHINT ´ ´ S S ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT SYSTEM SYSTEM The The 2004 IPLOCA ENVIRONMENTAL AWARD 2004 IPLOCA ENVIRONMENTAL AWARD

INTERNATIONAL PIPE LINE & OFFSHORE CONTRACTORS … · PROYECTO CAMISEA. MANUAL DE GESTION AMBIENTAL. General. Specific Manuals. TRAINING MATERIAL – – ENVIRONMENTAL MANUALS. TECHINT

Embed Size (px)

Citation preview

INTERNATIONAL PIPE LINE & OFFSHORE INTERNATIONAL PIPE LINE & OFFSHORE CONTRACTORS ASSOCIATIONCONTRACTORS ASSOCIATION

TECHINT TECHINT JUNE 2004

TECHINTTECHINT´́SS ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT SYSTEMSYSTEM

TheThe 2004 IPLOCA ENVIRONMENTAL AWARD2004 IPLOCA ENVIRONMENTAL AWARD

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard - ISO 14001

• Training Program

• Conclussion

DESCRIPTION OF THE CAMISEA PROJECT

• 740 km of NGL and NG lines.

• Crossing 200 km of Rain Forest area (more than 7.000 mm per year).

• 380 km crossing the Andes Mountain (5.000m.o.s.l.) and 160 km on desert area.

• Evaluation of Seismic Risk and Geomorphologic dynamics.

• Archaeologic findings in all over the Right of Way.

• Biodiversity areas with the most valuable species in the world.

• Communities ever contacted by occidental culture.

• Hydrologic, Hydraulic, Geologic and Geotechnical survey.

TECHINTTECHINT

CAMISEACAMISEA

Index

• Description of the project

• Principal Challenges• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

ROADS IMPROVEMENT WITH GEOTECHNICAL WORKSROADS IMPROVEMENT WITH GEOTECHNICAL WORKS

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL WORKS ON ROADSGEOTECHNICAL & ENVIRONMENTAL WORKS ON ROADS

TECHINTTECHINT

CAMISEACAMISEA

ARCHAEOLOGICAL FINDINGS AND CAREARCHAEOLOGICAL FINDINGS AND CARE

TECHINTTECHINT

CAMISEACAMISEA

WASTE SEGREGATION IN ISOLATED CAMPS

TECHINTTECHINT

CAMISEACAMISEA

WASTE MANAGEMENTWASTE MANAGEMENT

Medical Waste Scrap Waste

Hazardous WasteDomestic Waste

ENVIRONMENTAL CHAIN OF CUSTODY WITH HELICOPTER & RIVER TRANSPORT

TECHINTTECHINT

CAMISEACAMISEA

WASTE MANAGEMENTWASTE MANAGEMENT

Disposal Area (Compostera)

Organic Waste

SPECIAL CROSSING FOR ANIMALSSPECIAL CROSSING FOR ANIMALS

TECHINTTECHINT

CAMISEACAMISEA

SUBSUPERFICIAL HYDRAULIC SOIL PROTECTION SUBSUPERFICIAL HYDRAULIC SOIL PROTECTION (BOFEDALES)(BOFEDALES)

TECHINTTECHINT

CAMISEACAMISEA

SPECIAL CARE FOR CAMELSSPECIAL CARE FOR CAMELS

TECHINTTECHINT

CAMISEACAMISEA

Capacity 25 m3/d (Average)

TECHINTTECHINT

CAMISEACAMISEA

WASTEWATER MANAGEMENT IN ISOLATED AREASWASTEWATER MANAGEMENT IN ISOLATED AREAS

Capacity 25 m3/d (Average)Coast Spread Jungle & Mountain Spread

Capacity 3,000 liters per hour

(Average)

TECHINTTECHINT

CAMISEACAMISEA

Capacity 3,500 liters per hour

(Average)

FRESH WATER MANAGEMENT IN CAMPSFRESH WATER MANAGEMENT IN CAMPS

Crossing jungle areas

without access

TECHINTTECHINT

CAMISEACAMISEA

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

LOGISTIC CHALLENGESLOGISTIC CHALLENGES

TECHINTTECHINT

CAMISEACAMISEA

Pacobamba Camp (Mountain Spread)

TECHINTTECHINT

CAMISEACAMISEA

TEMPORARY CAMPS LOCATED IN ISOLATED AREASTEMPORARY CAMPS LOCATED IN ISOLATED AREAS

Chocoriari Camp (Jungle Spread)

COMPLETE CYCLE OF CONTROL AND CARE OF WASTES

TECHINTTECHINT

CAMISEACAMISEA

Hazardous Waste

Temporary Storage

Colection

Haz Waste

TransportationTreatment & Final

Disposal

WASTE MANAGEMENTWASTE MANAGEMENT

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON HILLSIDE

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON RIDGES

TECHINTTECHINT

CAMISEACAMISEA

CONSTRUCTION METHODOLOGY ON NARROW RIDGES

TECHINTTECHINT

CAMISEACAMISEA

Shoo Flys

SAFETY CONSTRUCTION MEASURES

TECHINTTECHINT

CAMISEACAMISEA

SAFETY CONSTRUCTION MEASURESSAFETY CONSTRUCTION MEASURES

PK 120PK 120

TECHINTTECHINT

CAMISEACAMISEA

RightRight ofof WayWay andand ShooShoo Fly Fly overover

ComerciatoComerciato riverriver

SAFETY CONSTRUCTION MEASURESSAFETY CONSTRUCTION MEASURES

TECHINTTECHINT

CAMISEACAMISEA

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

TEMPORARY WORKS DEFINITIVE WORKS

OBJECTIVESOBJECTIVESPROTECTION OF THE ENVIRONMENT & COMUNITIESPROTECTION OF AFFECTED AREASPROTECTION OF THE PIPES

EROSION CONTROL WORKSEROSION CONTROL WORKS

• Slope breakers• Channels and culverts• Energy dispersors

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

SLOPE BREAKERSSLOPE BREAKERS

THEY CAN BE BUILT WITH SACKS/BIOMATS OR WITHOUT THEM

COMPACTED SOILCOMPACTED SOIL

BOTTON OF BOTTON OF TRENCHTRENCH

0.50 MTS.0.50 MTS.

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

SLOPE BREAKER ON THE SLOPE BREAKER ON THE RofWRofW

PK 125PK 125

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

SLOPE BREAKERS SLOPE BREAKERS WITH SOILWITH SOIL--CEMENT CEMENT

SACKSSACKS

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

SLOPE BREAKER PLANT VIEWSLOPE BREAKER PLANT VIEW

IN DIAGONAL DOUBLE DRAINAGE

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

LOCATION OF SLOPE BREAKERSLOCATION OF SLOPE BREAKERS

SEPARATION

DEFINITIVE SLOPE BREAKERS - NO TRAFFIC OR FUTURE WORKS

TEMPORARY SLOPE BREAKERS - FOR RAINY SEASON

OBJECTIVE : MINIMIZATION OF WATER CONCENTRATION AND EFFICIENT DISCHARGE OUT OF RIGHT OF WAY

SLOPE BREAKER

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

SLOPE BREAKERS SLOPE BREAKERS AND CHANNELS OF AND CHANNELS OF

WATER COLLECTIONWATER COLLECTIONSLOPE BREAKERSSLOPE BREAKERS

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

DITCH BREAKERSDITCH BREAKERS

OBJECTIVES :OBJECTIVES :

CONTROL OF WATER MOVEMENT IN THE DITCH

AVOID EROSION OF THE COVER IN STEEP SLOPES

SLOPE BREAKERSLOPE BREAKER

BOTTON OF DITCHBOTTON OF DITCH

WATER WATER DISCHARGEDISCHARGE

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

PROPER MANAGEMENT OF SOILS

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

LOCATION OF SOILS AND ITS RECOMPOSITION

Final StatusFinal Status

InitialInitial StatusStatus

EDGE WITH OUTFLOW OF WATERS

NO WAY OUT FOR WATER

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

GEOTECHNICAL & ENVIRONMENTAL PROTECTIONGEOTECHNICAL & ENVIRONMENTAL PROTECTION

TECHINTTECHINT

CAMISEACAMISEA

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

ENVIRONMENTAL ECOEFFICIENCY INDICATORSENVIRONMENTAL ECOEFFICIENCY INDICATORS

TECHINTTECHINT

CAMISEACAMISEA

ENVIRONMENTAL ECOEFFICIENCY INDICATORSENVIRONMENTAL ECOEFFICIENCY INDICATORS

TECHINTTECHINT

CAMISEACAMISEA

ENVIRONMENTAL ECOEFFICIENCY INDICATORSENVIRONMENTAL ECOEFFICIENCY INDICATORS

TECHINTTECHINT

CAMISEACAMISEA

ENVIRONMENTAL ECOEFFICIENCY INDICATORSENVIRONMENTAL ECOEFFICIENCY INDICATORS

TECHINTTECHINT

CAMISEACAMISEA

ENVIRONMENTAL ECOEFFICIENCY INDICATORSENVIRONMENTAL ECOEFFICIENCY INDICATORS

TECHINTTECHINT

CAMISEACAMISEA

ENVIRONMENTAL ECOEFFICIENCY INDICATORSENVIRONMENTAL ECOEFFICIENCY INDICATORS

TECHINTTECHINT

CAMISEACAMISEA

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

ISO 14001

TECHINTTECHINT

CAMISEACAMISEA

ISO 14001

TECHINTTECHINT

CAMISEACAMISEA

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclusion

Environmental Concientization

Learning Environmental Concerns

Training activities

TECHINTTECHINT

CAMISEACAMISEA

INTERNALIZATION OF THE ENVIRONMENTAL ASPECTSINTERNALIZATION OF THE ENVIRONMENTAL ASPECTS

PROYECTO CAMISEAMANUAL DE GESTION AMBIENTAL

General

Specific Manuals

TRAINING MATERIAL TRAINING MATERIAL –– ENVIRONMENTAL MANUALSENVIRONMENTAL MANUALS

TECHINTTECHINT

CAMISEACAMISEA

TECHINTTECHINT

CAMISEACAMISEA

CULTURAL INTEGRATION ON ENVIRONMENTAL POLICYCULTURAL INTEGRATION ON ENVIRONMENTAL POLICY

Indian-Machiguenga

Environmental Bolletin in different languages

CAMISEA PROYECTO

AMBIENTINCHIKMANTA RIMAQ FOLLETO

PAIRORIRA OKAMETITAKE

ONTSATAGAGE TAKENKANIRA

Spanish

Inka - Quechua

Environmental Tool Box

TECHINTTECHINT

CAMISEACAMISEA

TRAINING MATERIAL FOR ENVIRONMENTAL LEARNINGTRAINING MATERIAL FOR ENVIRONMENTAL LEARNING

TECHINTTECHINT

CAMISEACAMISEA

ENVIRONMENTAL CARE WITH SPECIFIC SIGNALSENVIRONMENTAL CARE WITH SPECIFIC SIGNALS

Index

• Description of the project

• Principal Challenges

• Logistic matters: Airports, Camps, River transport

• Construction Methodology

• Geotechnical and Environmental Protection Measures

• Ecoefficiency Environmental Indicators

• Certification of International Standard on Environmental Management System: ISO 14001

• Training Program

• Conclussion

• Seismic Risk & Mountain area at 5.000 meters above sea level.

• “El Niño Effect” with climatological conditioning (more 7.000 mm per year of rain).

• Archaeological Protection.

• Biodiversity Management in the Jungle area.

• No roads to access the Right of Way: Only by air (helicopter) and river (boat) in Jungle area.

• Special Social Aspects (cultural heritage).

• Terrorism attacks conditioning for construction activities.

TECHINTTECHINT

CAMISEACAMISEA

CONCLUSIONCONCLUSION

TECHINTTECHINTCAMISEA PROJECTCAMISEA PROJECT

JuneJune 20042004