1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY- 2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European Commission DG Research Gilles Lequeux Tel: +32/2/299.23.67 [email protected]

International Co-operation FP7 Energy Theme Energy EU-Russia Call

  • Upload
    kolton

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

International Co-operation FP7 Energy Theme Energy EU-Russia Call. European Commission DG Research Gilles Lequeux Tel: +32/2/299.23.67 [email protected]. Date of publication: 30 November 2007 Deadline: 26 February 2008 Indicative budget: 4 M€ (EC contribution) - PowerPoint PPT Presentation

Citation preview

Page 1: International Co-operation FP7 Energy Theme Energy EU-Russia Call

1

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

International Co-operationFP7 Energy ThemeEnergy EU-Russia Call

European CommissionDG Research

Gilles LequeuxTel: +32/2/299.23.67

[email protected]

Page 2: International Co-operation FP7 Energy Theme Energy EU-Russia Call

2

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Date of publication: 30 November 2007

Deadline: 26 February 2008

Indicative budget: 4 M€ (EC contribution)

Topic ENERGY.2008.2.2.1: Enhancing strategic international cooperation with Russia in the field of power generation from biomass

Topic ENERGY.2008.7.2.3: Innovative operational and monitoring tools for large power systems

All specific arrangements for this particular Call will be set out in the relevant Guide for Applicants

Call Information

Page 3: International Co-operation FP7 Energy Theme Energy EU-Russia Call

3

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

• Content/scope: Research and technology development in the field of power generation from biomass. The co-operation activity should be based on an assessment of ongoing research, the identification of best practices, gaps in knowledge and barriers to implementation in both, the EU and Russia, and propose direction for a collaborative research project in the area.

• Funding scheme: Collaborative Project (the project duration is normally 3 years)

• Expected impact: Effective cooperation between key researchers and industries in the field of power generation from biomass should foster the development and uptake of innovative methods and technologies to expand the use of biomass in power generation.

Enhancing strategic international cooperation with Russia in the fieldof power generation from biomass

Page 4: International Co-operation FP7 Energy Theme Energy EU-Russia Call

4

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Innovative operational and monitoring tools for large

power systems

• Content/scope: Development and validation of new of innovative operational and monitoring software tools and hardware equipment for large power systems.

• Funding scheme: Collaborative Project (the project duration is normally 3 years)

• Expected impact: The possible future interconnection between the Pan-European and Russian electricity transmission system would be greatly simplified if common/compatible software tools, hardware equipment and operational procedures are adopted by all Transmission System Operators involved. The joint development of these tools and equipments will promote their adoption.

Page 5: International Co-operation FP7 Energy Theme Energy EU-Russia Call

5

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

In addition to the European Commission funding of 4 M€, the Russian Federal Agency for Science & Innovation (FASI) agreed to dedicate a similar total budget of 4 M€ to fund the Russian participants.

Two projects will be funded (one per topic). Collaborative Projects under this call shall have a

maximum requested EC contribution of 2 M€. This is an eligibility criterion – proposals above this limit will not be evaluated.

Funding

Page 6: International Co-operation FP7 Energy Theme Energy EU-Russia Call

6

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

The Russian participants will be funded by FASI up to 2 M€ per project according to the Russian rules.

The other participants will be funded by the EC up to 2 M€ per project according to the forms of grant and maximum reimbursement rates applied under the FP7 rules.

Funding

Page 7: International Co-operation FP7 Energy Theme Energy EU-Russia Call

7

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

FP7 Funding rules Collaborative Project

• R&D Activities:

- EU grant up to 50% of the total eligible cost.

- Certain legal entities can receive up to 75% (non-profit public bodies, Small and Medium Size Enterprises / SMEs, higher education establishments).

• Demonstration Activities:

- the reimbursement rate may reach 50% of the total eligible cost.

• Other activities (consortium management, networking, training, coordination, dissemination etc. )

- the reimbursement can be up to 100% of the eligible cost.

Page 8: International Co-operation FP7 Energy Theme Energy EU-Russia Call

8

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

The EC may contribute to the funding of the total eligible costs of the Russian participants not covered by FASI that can represent a maximum of 5% (indicative amount: max. 100.000 €) of their total eligible costs. e.g. costs for coordination, management, translation, visits

Assess impact on financial reporting obligations

Financial provisions are not applicable to third countries participants with no EC contribution (no financial audit neither control, etc…)

Participants with EC contribution < 375.000 € don’t need to provide finance statement certificates

Funding

Page 9: International Co-operation FP7 Energy Theme Energy EU-Russia Call

9

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Funding

Funding distributio

n

Topic 2.2.1

Topic 7.2.1

Total

EC (FP7) Funding

Up to 2 M€ Up to 2 M€ Up to 4 M€

FASI Funding

Up to 2 M€ Up to 2 M€ Up to 4 M€

Total funding

(EC + FASI)

Up to 4 M€ Up to 4 M€ Up to 8 M€

Page 10: International Co-operation FP7 Energy Theme Energy EU-Russia Call

10

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

According to the FP7 rules, the minimum number of participants in each project proposal is 3 from different EU Member States or Associated Countries

In order to ensure a balance between participants a minimum number of two participants established in Russia is requested in each project proposal. This is an eligibility criterion.

Participants

Page 11: International Co-operation FP7 Energy Theme Energy EU-Russia Call

11

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Two calls will be announced, one by the EC (FP7) and one by FASI.

All EU-RU project consortia have to submit their proposals to the FP7 Energy EU-Russia Call according to the FP7 submission procedure.

The description of the work packages in the project proposal shall clearly link Eu and RU researchers and emphasise the integration of research activities.

The Russian participants in each project have to submit their corresponding Russian proposal (in Russian) to the Russian Call to be launched by FASI according to the Russian rules.

Implementation

Page 12: International Co-operation FP7 Energy Theme Energy EU-Russia Call

12

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

The Russian Call will have a submission deadline later than the EU-Russia Call*.

The Russian participants are advised to submit the corresponding Russian proposals at the same time or as soon as possible after the overall proposal has been submitted by the EU coordinator to the EC.

Only projects submitted to both the FP7 Energy EU-Russia Call and to the Russian Call will be considered for funding.

(*): The Russian call will be launched at the end of Januray 2008 (www.fasi.gov.ru)

Implementation

Page 13: International Co-operation FP7 Energy Theme Energy EU-Russia Call

13

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

• The proposals submitted to the FP7 Energy EU-Russia Call will be evaluated within the peer-review evaluation system of the EC and following the rules and criteria of FP7 (see Annex 2 of the WP 2008)

• Russian evaluators will participate in the EC evaluation.

• A single stage procedure will be followed

Evaluation

Page 14: International Co-operation FP7 Energy Theme Energy EU-Russia Call

14

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

• S&T quality (concept, objectives, methodology) – min. 3/5

• Implementation (consortium, management, resources) – min. 3/5

• Impact (in relation to ‘expected impact’ statements) – min. 3/5

• Overall THRESHOLD: 10/15

Evaluation Criteria and Thresholds

Page 15: International Co-operation FP7 Energy Theme Energy EU-Russia Call

15

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

• The corresponding Russian proposals will be evaluated by the Russian Federal Agency for Science & Innovations according to its procedures.

• EU evaluators will participate in the RU evaluation.

• Only proposals which have passed both the EC evaluation and the Russian evaluation may be funded. This an additional selection criteria.

Evaluation

Page 16: International Co-operation FP7 Energy Theme Energy EU-Russia Call

16

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

• On the EU side, the European coordinator of each selected project will negotiate the GA with the EC on behalf of all project participants

All project participants of each selected project shall sign the EU Grant Agreement

Participants in selected project are required to conclude a consortium agreement (IPR, use and disseminate knowledge)

ContractsMonitoring and reporting

Page 17: International Co-operation FP7 Energy Theme Energy EU-Russia Call

17

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

The corresponding Russian participants in each selected projects shall sign a contract with FASI

Ideally, the project starting date in both the EU GA and the RU contract should be identical.

The EC reporting requirements should cover the whole joint research activities according to the FP7 rules.

ContractsMonitoring and reporting

Page 18: International Co-operation FP7 Energy Theme Energy EU-Russia Call

18

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

The corresponding Russian participants in each selected projects shall sign a contract with FASI

Ideally, the project starting date in both the EU GA and the RU contract should be identical.

The EC reporting requirements should cover the whole joint research activities according to the FP7 rules.

ContractsMonitoring and reporting

Page 19: International Co-operation FP7 Energy Theme Energy EU-Russia Call

19

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Submission of a Joint

proposal to FP7 Energy EU-

Russia Call according to

FP7 rules

Integrated activitiesMin. 2 RU

participants

Min. 3 MS or AS

participants

Corresponding Russian part in the joint project

Joint technical Annex

FASIBudget: Max.2M€

Submission of tender to the Russian

Call according to FASI rules

JOINT RESEARCH PROJECT

Evaluation according RU

rules

ECEvaluation according FP7 rules

ECBudget: Max. 2M€

RU participants

sign a contract

with FASI

All participants sign the EU

FP7 GA

< 5% of TEC

EU-RU concerted dialogue

Call principles

Page 20: International Co-operation FP7 Energy Theme Energy EU-Russia Call

20

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Indicative Time Table

  EU Russia

Launch of the EC Call  30 November 2007  

Launch of the RU Call   End January 2008 

Submission deadline EU Call 26 February 2008   

Submission Deadline RU Call   End of April 2008 

Completion of EU evaluation  Beginning April 2008  

Completion of RU evaluation   Mid May 2008 

End of EU negotiations Mid July 2008   

Signature of EC GA By September 2008   

Signature of RU contracts   By Mid June 2008 

Start of projectsIdeally starting at the same time around Mid June

20008 – beginning July 2008 

Page 21: International Co-operation FP7 Energy Theme Energy EU-Russia Call

21

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

– Gilles Lequeux International Cooperation Officer European Commission – DG ResearchTel.(+32 2) 299 23 67Email:[email protected]

– Richard BurgerScience & Technology CouncellorDelegation of the European Commission to Russia Tel.(+7 495) 721 000, 721 2001, 721 2038Email:[email protected]

Contact points for information on the Russian Call:– Liudmila Orletskaya

International Programs and Projects DirectorFederal Agency for Science and Innovations of the Russian Federation Tel:(+7 495) 629 4545E-mail:[email protected]

Contact Points

Page 22: International Co-operation FP7 Energy Theme Energy EU-Russia Call

22

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Some advices A pre-proposal check is offered (deadline 26 January 2008) Get in touch with the contact points and/or your NCP Look at the EU “List of Projects” Be aware that drafting a proposal and establishing the right

consortium including appropriate Russian partners takes time, particularly as coordinator

Read carefully the Call, the WP and the Guide for applicants (topic, funding scheme, number of participants, size of project, etc.)

Cordis Web Site Addresshttp://cordis.europa.eu/fp7/dc/index.cfm?fuseaction=UserSite.DemoCooperationDetailsCallPage&call_id=82

Page 23: International Co-operation FP7 Energy Theme Energy EU-Russia Call

23

NOT LEGALLY BINDINGEnergy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007

Directorate-General for Research

Directorate K - Energy