ELLIOTTGROUP © FITOUT Internaonal Broadcasng Centre Olympic Games, London 2012 The Elliott Group was part of the joint Venture via a company called FCC Elliott Ltd for the design and build of this project for the Olympic Broadcasting Services London (OBSL). OBSL provide all of the broad- casting services for the Olympic Games and they provided the services for the London 2012 games. The IBC was 50,000m2 over two floor and was home to all of the worlds broadcasters throughout the 2012 Olympic Games. In January 2010 the Design & Build of the fit-out to the International Broadcast Centre for the 2012 Olympic Games commenced. The works comprise the fit out of 50,000 m² of space including television studios for up to 125 National Television Broadcasters. The design stage consisted of us obtaining the space requirements and room specifications from all of the broadcasters. This was then designed into an overall master plan and agreed with Building Control to ensure compliance with all of the statutory regula- tions. Each design was then sent back to the Broadcasters via the OBSL for cost and design approval. Once a zone was signed off the design was then issued to the construction team. Included in the project was 10km of walls, temporary structural support ceiling grid for services and ceiling installation, M&E ser- vices which included 5km of ducting and 50 AHUs. There were 10,000 doors on the project and approxi- mately 15km of skirting. The sound booths and studio areas were very bespoke to each broadcaster and in many cases the level of finishes in front of camera were extremely high. Sound attenuation was extremely important and special design sound booths were construction for each broadcaster. During the course of the works there were over 1000 personnel on site. This project was a great success and delivered on time. The most significant challenge we had to overcome on this project was getting the design and costs agreed with the various world wide broadcasters in time to ensure that it was constructed in accordance with the programme on site. Key Data: Value: €30,000,000 Building Type: Fit out Programme Duraon: 12 months Site Location: Olympic Village London Proportion of Project Undertaken: Project Management of all Main Contactor Works, PSCS & PSDS Scale: 50,000 m² Procurement: Design & Build Status: Completed Tender entity: Elliott Group Start Date: June 2011 Date of issue of Defects Certs: June 2013 End Date: June 2012 Handover Date: June 2012 Role of Company in delivery of Project: Project Management & Main Building Contractor Architect: Househam Henderson Quantity Surveyor: In House M&E Engineer: www.cundall.com Services Engineer: www.cundall.com Contracting Authority: Olympic Broadcasting Services Ltd

International Broadcasting Centre - Elliott Group · IBC was 50,000m2 over two floor and was home to all of the worlds broadcasters throughout the 2012 Olympic Games. In January 2010

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: International Broadcasting Centre - Elliott Group · IBC was 50,000m2 over two floor and was home to all of the worlds broadcasters throughout the 2012 Olympic Games. In January 2010

ELLIOTTGROUP ©

FIT

OU

T

International Broadcasting Centre

Olympic Games, London 2012

The Elliott Group was part of the joint Venture via a company called FCC Elliott Ltd for the design and

build of this project for the Olympic Broadcasting Services London (OBSL). OBSL provide all of the broad-

casting services for the Olympic Games and they provided the services for the London 2012 games. The

IBC was 50,000m2 over two floor and was home to all of the worlds broadcasters throughout the 2012

Olympic Games.

In January 2010 the Design & Build of the fit-out to the International Broadcast Centre for the 2012

Olympic Games commenced. The works comprise the fit out of 50,000 m² of space including television

studios for up to 125 National Television Broadcasters. The design stage consisted of us obtaining the

space requirements and room specifications from all of the broadcasters. This was then designed into an

overall master plan and agreed with Building Control to ensure compliance with all of the statutory regula-

tions. Each design was then sent back to the Broadcasters via the OBSL for cost and design approval.

Once a zone was signed off the design was then issued to the construction team. Included in the project

was 10km of walls, temporary structural support ceiling grid for services and ceiling installation, M&E ser-

vices which included 5km of ducting and 50 AHU’s. There were 10,000 doors on the project and approxi-

mately 15km of skirting. The sound booths and studio areas were very bespoke to each broadcaster and

in many cases the level of finishes in front of camera were extremely high. Sound attenuation was

extremely important and special design sound booths were construction for each broadcaster.

During the course of the works there were over 1000 personnel on site. This project was a great success

and delivered on time. The most significant challenge we had to overcome on this project was getting the

design and costs agreed with the various world wide broadcasters in time to ensure that it was

constructed in accordance with the programme on site.

Key Data:

Value: €30,000,000

Building Type: Fit out

Programme Duration: 12 months

Site Location: Olympic Village London Proportion of Project Undertaken: Project Management

of all Main Contactor Works, PSCS & PSDS

Scale: 50,000 m²

Procurement: Design & Build Status: Completed Tender entity: Elliott Group

Start Date: June 2011

Date of issue of Defects Certs: June 2013

End Date: June 2012 Handover Date: June 2012

Role of Company in delivery of Project:

Project Management & Main Building Contractor

Architect: Househam Henderson

Quantity Surveyor: In House

M&E Engineer: www.cundall.com

Services Engineer: www.cundall.com

Contracting Authority: Olympic Broadcasting