INTERNAL AUDIT OUTSTANDING RECOMMENDATIONS
Service Prty Audit Area Year Assurance
level
Audit Recommendation Management Response Original
Deadline
Revised
Deadline
Executive
Director
Responsible officer's Update
Housing Management
1 Safeguarding 2016/17 Substantial Management information reports covering the safeguarding process, including performance measures and serious case reviews, should be produced on a periodic basis. The reports should be submitted to HfH Safeguarding Group and Haringey Council Safeguarding
The recommendation is accepted. A working group has been formed to develop a suite of management information and a reporting process.
01/06/2017 01/06/2020 Tracey Downie
A reporting mechanism has been put in place and the number and type of cases will be reported to monthly meetings of the Safeguarding Group from November 19. Further work will be carried out to improve the reporting process and information reported and it
Corporate Affairs
2 OHMS Application
Audit
2016/17 Substantial An exercise should be conducted to map / understand how the system permissions are configured in sufficient detail to demonstrate, which members of staff can carry out each key function within the organisation.
This is a significant piece of work due to the age of the system and the number of different roles that have existed throughout its time of use. The audit was able to evidence that critical data is managed by a controlled and limited group so the risk is low. When we move to a new system in the next 12- 18mths we will have the opportunity to review and rationalise the permissions so that they are clearer going forward.
01/03/2018 30/10/2020 Puneet Rajput
The project to replace OHMS with NPSH is now live and we have a resourced project plan in place to deliver it. The work in this recommendation will be part of the user access configuration prior to Go Live.
Property Services
2 Responsive Repairs
2018/19 Substantial Homes for Haringey should apply their text messaging feedback system to the obtaining of customer feedback with respect to out of- hours works.
A Customer service administrator role is being created as part of a current restructure. The post holder will be required to obtain feedback from OOH customers.
01/02/2019 30/06/2020 David Lewis This will be in place when CAPITA start using the IT system to log repairs (TBC)
Property Services
2 Gas Safety Checks
2018/19 Substantial As part of the new Gas Safety Contract that is being put in place, Homes for Haringey should consider the possibility of implementing Key Performance Indictors (KPIs) that are designed to encourage compliance with the 14 day notice period written into their policy.
The Gas Manager has already implemented monitoring of compliance with the notice periods. The Notice period will be reviewed and a KPI introduced with new gas contracts.
01/04/2019 01/09/2020 David Lewis This notice period will be introduced as part of the new gas contract but will be based on days numbering between 10-14 as discussed with the auditor at the time.
Property Services
3 Gas Safety Checks
2018/19 Substantial In the compilation of the new contract, Homes for Haringey should consider new KPIs to measure contractor performance such as the percentage of properties that are accessed before the minimum 42 day threshold or the percentage of properties per month that are referred back to the Compliance team.
As Part of the new gas contracts Homes for Haringey will consider the best KPI’s to ensure effective
management of the contractors.
01/04/2019 01/09/2020 David Lewis New KPI’s have been introduced into the specification of the
new gas contract to measure the contractor’s performance as
per the audit recommendation.
Housing Management
2 Housing Rents 2018/19 Substantial Periodic spot checks should be completed prior to the issue of an RA3 and RA4 letter to ensure the tenant has received an NOSP letter.
We accept the recommendation to introduce spot checks as this will help ensure the correct process is being followed. We will take a random sample of 20 cases on a quarterly basis and use the findings to improve our processes and approach to case management. However, we are confident that future spot checks will uncover fewer issues for the following reasons:• We have recently introduced a new escalation
process which moves away from bulk letters (bulkletters cannot be easily separated into individualcases and therefore not stored on SharePoint).• Individual Income Management Officers are
responsible for managing the rent account and arenow sending out individualised letters which will haveto be stored on SharePoint.• At the point of the case going to the Courts Team,
the Income Management Officer is required toproduce an information pack which provides evidencethat each stage of the recovery process has beenadhered to (this includes copies of the standardletters). This is in effect a spot checking exercise.
30/06/2019 31/07/2020 Tracey Downie
Further work is required to embed the system of periodic checks however, officers are aware of this requirement and confirm that they are checkign that the NOSP has been served before the RA3 & RA4 letter is sent out. There will be more rigourous monitoring of rent accounts in line with the new structure, key appointments to start by June 2020.
Property Services
3 Voids 2019/20 Adequate The Homes for Haringey Letting Standard and Voids procedure documents should be reviewed on a regular basis as part of the Business Improvement Plan. Future scheduled review dates should be agreed and recorded on the documents.
This is being covered in the Service Excellence document, we have started reviewing the procedure documents. The plan to have this procedure documented within the next 3 months and will review every quarter
01/09/2019 30/05/2020 David Lewis The voids process and lettings standards are being reviewed again in May 2020.
1
Service Prty Audit Area Year Assurance
level
Audit Recommendation Management Response Original
Deadline
Revised
Deadline
Executive
Director
Responsible officer's Update
Property Services
2 Voids 2019/20 Adequate Homes for Haringey should determine whose responsibility it is to remove and dispose of waste left by vacating tenants, and this should be reflected in the relevant policy and procedure documents.
HRS has brought a new position into the voids process, a Voids Coordination Manager, this position will fundamentally be managing the front end and NTLO part of the process, where possible an NTLO will visit the property when HFH are given a notice period
01/09/2019 30/05/2020 David Lewis The responsibility for ensuring there are adequate arrangements in place for the removal of waste in voids is the Voids CIM. This will be included in the updated policy
Corporate Affairs
1 Bespoke Systems
2019/20 Limited A comprehensive record of all ad hoc records systems should be prepared. This should detail the purpose of all systems and the data held, who is responsible for maintenance of records. This information should be reported to senior management and should beupdated regularly (at least once a quarter)
A record of all ad hoc systems will be prepared and risk rated. This will be reported to, and monitored by, senior management
01/10/2019 31/05/2020 Puneet Rajput
Other actions will follow the completion of the information gathering exercise (as above)
Corporate Affairs
2 Bespoke Systems
2019/20 Limited HfH's bespoke systems should be reviewed to determine whether user access is appropriately restricted. User access should be subject to periodic review. Guidance should be provided to all managers on the organisations expectations in relation to control of access to information.
Guidance will be produced and disseminated in September 2019. Services will be expected to provide details of user access and instructed to introduce procedures for reviewing, updating and monitoring. Access lists will be held centrally on SharePoint as well as details of the last review.
01/10/2019 31/05/2020 Puneet Rajput
Other actions will follow the completion of the information gathering exercise (as above)
Property Services
2 Fire Safety 2017/18 Limited Fire safety signage should be implemented in all shared communal residential blocks, including low and midrise blocks.
Tower blocks have evacuation signage installed with other properties having evacuation signage installed via HRS on a rolling programme to be completed with 18 months. This has been challenging due to high levels of vandalism where signage has been removed requiring re-visits for new signage to be installed. Street conversions will have signage installed as part of the installation of Automatic Fire Detection programme.
01/11/2019 30/05/2020 David Lewis There is an extensive action plan in place for the installation of fire signage. The plan will commence delivery in May 2020. The scope, timeframes, cost and delivery methods are monitored by PS SMT and the Fire Strategy Board. Where previously installed signage has vandalised or lost, this will be identified in block inspections or fire risk assessments and reported as a repair for HRS to action.
Property Services
2 Disrepair 2019/20 Limited The disrepair process work flow should be reviewed by management to reflect the issues raised
Accepted and agreed. A new disrepair process work flow to be completed and implemented within the surveying team
30/11/2019 30/06/2020 David Lewis Expected to be in place in June
Property Services
2 Disrepair 2019/20 Limited A record of all reported potential claims should be kept with subsequent investigations arranged to determine the tenant’s opinion on the issues.
Noted and agreed. A central register of potential claims to be kept and managed by the surveying team administrator. A process for reporting such queries will be created and distributed to all relevant colleagues / teams within HfH. Departments to be included areTenancy Management , Customer Services, HRS, Income Collection,
30/11/2019 30/07/2020 David Lewis Not in place yet. Conversation with all departments with front line staff to colate incidents where resident is claiming they are not happy and will take things further, not all cases will lead to disrepair but we still have to put right what is perceived to be wrong
Property Services
2 Disrepair 2019/20 Limited The targeted turnaround time on potential claim investigations should be agreed across service lines.
Target dates to be set and agreed with relevant stakeholders as part of the process in recording potential claims noted in 5.4.
30/11/2019 30/07/2020 David Lewis Not in place yet. As above, once notified we should make an appointment or at least contact resident to determine their cause for concern.
Corporate Affairs
2 Bespoke Systems
2019/20 Limited Bespoke systems utilised by HfH's services should be reviewed to determine whether the designs can promote data integrity such as the use of drop-down menus, user prompts and restrictions on the use of free text. Spot checks should be undertaken of the datato help ensure accuracy and completeness. Areas of good practice should be shared between service areas.
Once the information gathering exercise has been completed, we will review and impose a higher degree of control of the data processed and the manner of recording, storing and reviewing the data in accordance with our current polices.
01/12/2019 31/05/2020 Puneet Rajput
Some services are still gathering information and an extended deadline has therefore had to be set to complete this
Corporate Affairs
2 Bespoke Systems
2019/20 Limited Bespoke systems utilised by HfH's services should be reviewed on a regular basis (at least annual) to help ensure that the data held is sufficient to meet business operations and that the system is operating effectively and is fit for purpose. The outcomes following review should be reported centrally and escalated accordingly when required.
Further meetings to scrutinise the collation, necessity and compliance of data held within our bespoke systems are due to take place by the end of 2019. Priority will be given to teams currently using access databases and/or processing personal data.
01/12/2019 31/05/2020 Puneet Rajput
Other actions will follow the completion of the information gathering exercise (as above)
2
Service Prty Audit Area Year Assurance
level
Audit Recommendation Management Response Original
Deadline
Revised
Deadline
Executive
Director
Responsible officer's Update
Property Services
2 Disrepair 2019/20 Limited Policies and procedures governing disrepair claims should be reviewed to include management actions that will be taken should performance fall below the expected standard.
Noted and agreed. Team and individual performance will be monitored and managed considering new KPIs. 121s are being completed monthly within the new team structure and will be used to include performance management as required.
31/01/2020 30/07/2020 David Lewis Ongoing 121's happening on a regular basis, new KPI's not in place at moment. Performance management in place for surveyors.
Property Services
2 Vehicle Management
2019/20 Limted The HfH Drivers Policy should be updated according to the policy terms and the policy control section should be updated accordingly.
The driver policy was reviewed but will need a further review and implementation by January 2020 to accommodate the new fleet and enhancements
31/01/2020 30/05/2020 David Lewis The policy is now being revised and will be completed and implemented in advance of the new vehicles being delivered in May 2020.
Property Services
2 Vehicle Management
2019/20 Limited Vehicles should be inspected on a regular basis (at least weekly) and records should be maintained in terms of what and when checks were completed. Faults should be noted for management trail and reference and passed to the Transport Manager for action.
We are looking at putting this on the pda so the vehicle inspection can be carried out each morning and mileage monitored more closely, this can also be stored electronically
31/01/2020 30/08/2020 David Lewis A dedicated app will be implemented (known as the Northgate app) to record all required inspections and faults. The Transport Manager will oversee all repair and damage issues and take appropriate action, once appointed.
Property Services
2 Disrepair 2019/20 Limited Key Performance Indicators should be established to help ensure the service is compliant with the legislative 20 day turnaround time.
Agreed. Key performance indicators will be created, implemented and monitored as part of the service improvement plan.
31/01/2020 30/07/2020 David Lewis Not in place yet. We have a sprea sheet which we can draw on re performance and other KPI information. KPI's on system to be implemented by July
Property Services
2 Bonus Scheme 2019/20 Adequate The outstanding post inspection should be reviewed regularly to ensure information included in the planned post inspections are undertaken prior to bonus payment being made.
Agreed. This should be part of the daily duties of the Continuous Improvement Managers. The interim Head of Service will reiterate and ensure this takes place. Post inspection KPIs will be incorporated into the suite of KPIs monitored by the Executive.
28/02/2020 30/05/2020 David Lewis The post-inspection KPIs will be reviewed in May 2020 and targets re-agreed. This will be used to inform the bonus review and resulting payments in the new scheme.
Property Services
3 Bonus Scheme 2019/20 Adequate Procedure guide for staff that is in place should be periodically reviewed and contain approval and version control to help ensure that these are up to date and relevant for the staff and service.
Agreed. The procedure will initially be reviewed an updated and then at least annually thereafter.
31/03/2020 01/10/2020 David Lewis The procedure guide will be updated to reflect changes in the bonus system following its overhaul and review, due to be conducted in the 20/21 financial year. It is planned that this review will take place in time for the budget to be set for 21/22.
Property Services
2 Vehicle Management
2019/20 Limited Preparation for the renewal of agreements and contracts with the vehicle leaseholder should be commenced.
Work has started on the fleet renewal programme we are currently at the tender stage, we have brought in an external fleet specialist to assist and we are working closely with procurement to ensure the costings are competitive and vehicles are delivered on time to suit the business needs
30/04/2020 30/05/2020 David Lewis The tender was won by Northgate, the contract has been signed and it is now beng mobilised. A temporary Prjoect Manager (Dan Thurlow) is overseeing this process. An update report will be tabled to Propert Services SMT in May 2020.
Property Services
3 Vehicle Management
2019/20 Limited Permit forms for each driver should be retained at all times
Borough Wide Permit forms are required for all HfH fleet vehicles to obtain a permit this is obtained by completing the form and by me submitting a copy of the v5 form and a copy of our fleet insurance. The licence check is carried out independently of permit applications the driver of the vehicle LP64XGE has had this undertaken. A process will be put in place with the new fleet and new annual permits will be issues and signed for with a register of these being kept
30/04/2020 30/08/2020 David Lewis The permits for all vans will follow the Council's rules and a register will be kept by the new Transport Manager (to be recruited).
Property Services
1 Vehicle Management
2019/20 Limited A vehicle tracker system should be implemented such as through the RAC telematics system, where information can be collated in the form of reports and mileage can be monitored.
The RAC telematics currently used as stated records the vehicles movement as observed these reports are supplied to team leaders / Continuous Improvement Managers for specific time frames as requested. Wider access to be given to team leaders to allowcloser monitoring of the tracker system. With the new fleet the tracker system is a lot more user friendly with better reporting
30/04/2020 30/08/2020 David Lewis A full telematics system will be in place for the new fleet and the it will be the Transport Manager's respnsibility to monitor and action all issues arising from this data. S/he will also use this data to inform day to day and future planning for the fleet, including training, compliance and financial costs.
Property Services
1 Vehicle Management
2019/20 Limited Vehicle faults should be reported to management such as through a monthly report or annual report which keeps tracks of the number of faults having occurred. This should make reference to the resulting expenditure for management to identify trends. A reporting framework should be implemented for drivers to use when reporting any faults.
A new process and guidelines will need to be put in place for this, I have tasked our external fleet specialist to put in place to coincide with the new fleet for April
30/04/2020 30/08/2020 David Lewis Northgate app will be the reporting tool, and this will be monitored by HRS SMT. Issues of concern will be reported to PS SMT as required, with a summary on a quarterly basis or as otherwise required.
3
Service Prty Audit Area Year Assurance
level
Audit Recommendation Management Response Original
Deadline
Revised
Deadline
Executive
Director
Responsible officer's Update
Property Services
2 Vehicle Management
2019/20 Limited In cases of poor driving, actions should be taken to address these cases. These should be recorded and efforts should be made to decrease the cases of poor driving such as through the implementation of an incentive for drivers.
A new process and guidelines will need to be put in place for this, I have tasked our external fleet specialist to put in place to coincide with the new fleet for April
30/04/2020 30/06/2020 David Lewis All cases of misues or incorrect use of a vehicle will be subject to management action and reporting. This will link with the H&S accident reporting procedures. The current Transport Policy will be revised to reflect current and modern requirements. Compliance will be monitored through 1:1s and appraisals.
Property Services
2 Vehicle Management
2019/20 Limited A framework should be implemented which can track and monitor the time off the road of vehicles. This framework should encompass a record which details how long it has taken vehicles to be repaired for example, as well as any communication having taken place to monitor this.
A new process and guidelines will need to be put in place for this, I have tasked our external fleet specialist to put in place to coincide with the new fleet for April
30/04/2020 30/08/2020 David Lewis This will be the Transport Manager's responsiblity to introduce appropriate systems, based on the data and costs arising from the Northgate app, Telematics and any other systems requred to be implemented.
Housing Management
3 Safeguarding 2019/20 Substantial Policies and procedures should be reviewed at least annually and updated accordingly with any necessary changes. Updated policies should be approved and circulated to all relevant staff.
Accepted and achieved. Will ensure the Policies continue to be promoted among staff: Review of the key Policies and Procedures; Safeguarding (Adults) Policy Feb 2020 and due for another review in 2022; Safeguarding (Children and Young People) Policy. Feb 2020 and due another review in 2022; New Domestic Violence Policy - Residents. October 2019 and due another review in 2021; New Domestic Violence Policy - Staff. As above; and Revised Vulnerable Tenants Procedure. March 2020.
30/04/2020 Denise Gandy
Housing Management
2 Estate Management
2019/20 Limited Managers and staff working within Estate Services and Neighbourhood Improvement should agree on annual SMART targets that are monitored in regular one to one meetings over the year.
The action plan mentioned above is based on SMART targets and will form the basis of the services targets.
30/05/2020 Tracey Downie
Smart targets will be discussed and agreed through the annual performance conversations and in line with new grading.
Housing Management
3 Estate Management
2019/20 Limited A Work Instruction review schedule should be prepared that outlines the deadlines for policy and procedure review, and that is updated on an annual basis.
A schedule will be implemented that splits the work instructions into quarters to ensure they are all thoroughly reviewed annually and signed off.
31/05/2020 Tracey Downie
Housing Management
1 Resident Engagement
2019/20 Adequate Customer satisfaction with regards to resident engagement should be determined via the use of quantifiable results that are reported in the monthly highlight reports against again SMART (Specific, Measurable, Achievable, Realistic Timely) targets. The metrics should: • Define agreed customer
satisfaction metrics. • Define a level of expected
activity. They should report monthly on where performance is against the agreed level and what is the trend.
We use evaluation sheets that measure satisfaction and gather feedback on: • Events • Training •
Conferences/large meetings We also use the star survey tomeasure satisfaction with involvement and benchmark it against data from the sector. The last BMG satisfaction report measured this and identified improvement areas. Going forward, we will publish quarterly data summarising customer satisfaction with engagement activities starting April 2020
30/06/2020 Tracey Downie
On target to have system to measure satisfaction. Due to reduced engagement activities at the moment reporting may be delayed.
Housing Management
3 Resident Engagement
2019/20 Adequate Homes for Haringey should mail and also publish all Leaseholder Improvement Forum newsletters on their website.
Information on this will be included in the next e-newsletter for leaseholders
30/06/2020 Tracey Downie
This can be found on our website.
Housing Management
1 Estate Management
2019/20 Limited Inventory and stores procedures should be developed and a single central inventory produced. The inventory should be audited on an annual basis.
We are currently in the process of identifying a central store location; in conjunction with this we will introducing stock control measures that will include up to date stock levels and triggers for reordering and access will be restricted to team managers only. The above will be formalised into a working procedure/manual.
31/07/2020 Tracey Downie
Housing Management
1 Estate Management
2019/20 Limited A procedure for making additions to and drawings from inventories should be established and records should be maintained of all inventory transactions.
As above 31/07/2020 Tracey Downie
Housing Management
3 Resident Engagement
2019/20 Adequate The next scheduled Leaseholder Improvement Forums should be confirmed and communicated on the Homes for Haringey website and published in the next newsletter. Dates should be planned and communicated for at least the next 12 months
We are currently reviewing the forum structure and we are working with a group of leaseholders to co-design the new structure for engagement. Progress and outcome of this review will be communicated to Leaseholders. This process has started in January 2020 and will take 6 months to complete.
31/07/2020 Tracey Downie
Initial discussions with the leasehold team have taken place, we are starting the leasehold team review and will consult with leaseholders through this forum.
4
Service Prty Audit Area Year Assurance
level
Audit Recommendation Management Response Original
Deadline
Revised
Deadline
Executive
Director
Responsible officer's Update
Property Services
1 Disrepair 2019/20 Limited The causes for disrepair claims are analysed to determine the key drivers for claims. Once the key drivers are determined an action plan should be established to minimise claims due to these causes.
Accepted. Early prevention is a key area we will be focusing on which will be addressed within a review and implementation of a new service improvement plan for the disrepair surveying / management process. All surveys are now being completed with the view of summarising the primary causes of the claim providing data for future analysis. This process will be included in the new workflow.
31/07/2020 30/06/2020 David Lewis Expected to be in place in June
Housing Management
1 Housing Rents 2019/20 Limited A Report to Senior Management should be made detailing the current position and balances on Current and FTAs. Senior Management should then make the decision based on risk and staff availability if the current position on current and FTA collections should continue or whether additional resources should be allocated to recovering FTAs. Regular management reporting should then take place detailing the current position on current and former tenant arrears including current balances, movement over time, age of debt, inter alia.
Currently the FTA process is separated into two. The former, former accounts are currently being completed by one Former Tenants Officer. The accounts which are former but are linked to a current account are currently being looked at by the Income Collection Officers. The work currently being completed by the FTA officer is looking at cases which are coming into the statue barred status. A search is completed for these cases but if no contact can be made or a suitable rrangement made then cases are prepared for W/O and are submitted through the Council. Moving on HFH are to have a new system hopefully by December. This system unfortunately does not link cases how they currently are so it will not be possible for Officers to see the debt which is linked to current accounts nor previous formers. Currently we have gone through a restructure whereby it was confirmed that the FTA process would be being dealt with by one Team Support Officer. This is quite technical and will require a review of the work conducted after Q1.
31/12/2020 Tracey Downie
This is currently being managed by Lesley Bott, I am reviewing the work required for FTA collection and arrears management.
Housing Management
2 Housing Rents 2019/20 Limited The Homes for Haringey Financial Regulations should be subject to regular review (e.g. annually). Inclusion on the Board and Audit and Risk Committee Forward Planners should be considered.
Three yearly reviews of the Financial regulations will be conducted. The last review was carried out in June 2019
30/06/2022 Tracey Downie
5
HfH Risk Register Q1 2020/21 - Corporate (Organisation Wide) Risks
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
CO1 Low levels of satisfaction across different tenures
resulting in a failure to achieve a key Council objective
and Management Agreement requirement.
Managing
Director
5 3 15 Dedicated task and finish group 4 3 12
Some programmes overseen by
this group have been put on hold
due to COVID-19.
Resident Scrutiny Panel
Learning from customer and councillor
feedback
Regular satisfaction surveys
External assessment (HQN) and
improvement programme in place
Customer care training for all staff
CO2 Failure to manage budgets effectively impacting the
ability for timely planning for the use of a projected
underspend or mitigation of a projected overspend.
Director of
Corporate Affairs
5 4 20 Board and ELT monitoring and
oversight.
4 3 12
Strengthened Board with additional
financial expertise
Budget holders ability to manage and
project budgets effectively.
LBH financial service under SLA.
CO3 Adverse impact of Universal Credit resulting in
increased rent arrears, poor tenancy sustainment and
liklihood of increasing homelessness
Executive
Director of
Housing
Management
5 3 15 Additional staffing resource is in place
(3 fixed term UC Advisors).
4 3 12
Restructure conducted, all staff
are getting upskilled with UC and
using the Landlord portal. The
team are getting more UC
verifications and tenants applying
for UC as a result of Covid-19
UC preparedness - LL and tenant packs
for ASTs and amended conversations.
3 2 6
This is still in hand, most sign ups
are virtual at the moment, but
we have an UC sign up process
which is being tested through the
CBS sign ups
UC preparedness - amended pre
tenancy training and learning from
impact studies
3 2 6
This is still in hand, most sign ups
are virtual at the moment, but
we have an UC sign up process
which is being tested through the
CBS sign ups
Multi agency/cross organisational 2 2 4
Most organisations are affected
by the increase in UC claims and
we are working with partner
agencies to help our mutual
customers. Meeting scheduled
with CAB.
6
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
CO4 Poor people management resulting in average
performance, low productivity, unnecessary costs and
poor talent development.
Director of
Corporate Affairs
5 3 15 Management training and
development
3 3 9
FirstCare absence management
support service and Employee
Assistance Programme
Competency and performance
management frameworks
HR Strategy
Accreditation
CO5 Failure of staff to follow policies, procedures and
business terms and conditions resulting in serious
injury, reputational damage, external challenge or
financial irregularity such as bribery or fraud
Director of
Corporate Affairs
4 3 12 Up to date and robust policies and
procedures
3 3 9
Competent persons available to advise
and guide HfH
Quality management systems
CO6 Poor ability to recruit to, or retain, staff in key
positions due to uncompetitive salary levels or current
recruitment processes impacting on the ability to
function and deliver services.
Director of
Corporate Affairs
5 3 15 Market review of key positions 3 3 9
Competitve benefits and wider terms
and conditions of employment
Efficient and effective recruitment and
advisory service
HfH culture and appeal as an employer
of choice
CO7 Poor performing services under SLA from the Council
impacting HfH's ability to function effectively and
demonstrate value for money
Managing
Director
4 3 12 Service Level Agreements in place 2 3 6
Management Agreement with
provisions to address SLA performance
concerns
Influence with Council to shape and
change services and charges
CO8 Poor procurement practices resulting in more costly
engagement of supply chain, possible breach of
regulations, external challenge and potential fines.
Director of
Corporate Affairs
5 3 15 Contract Regulations 4 3 12
Corporate Procurement support
Culture of competitive selection and
VfM
ELT and CLT oversight of procurement
compliance
CO9 Serious breach of data protection resulting in sanction
from the ICO and possible reputational damage.
Director of
Corporate Affairs
4 4 16 Mandatory data protection awareness
training for all staff
4 3 12
7
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Data protection policy, procedures and
tools.
IT systems and controls
CO10 A Council review of the ALMO leading to a decision to
bring the service in house resulting in interim
uncertainty for the ALMO and potential adverse
impact on services to residents.
Managing
Director
4 4 16 HfH Board Chair and MD relations with
Council senior leadership
3 3 9
Council nominees on HfH Board
Conducive political view and ideology
Strong tenant support for HfH
CO11 Changes in the social, political, economic and
technological environment making it harder for HfH to
fulfil its purpose.
Managing
Director
5 4 20 NFA lobbying to influence government
policy
5 3 15
HfH trusted partner by Haringey
Council
Councillor stakeholder management
HfH reserves to counter funding
pressures
Business continuity and resilience
planning and joint working with
Council to mitigate impact of a no deal
or disruptive Brexit or virus pandemic
Skilled IT team at HfH
SLA / Contractual arrangements with
LBH
CO12 Inadequate or out of date IT systems that hinder
service effectiveness, efficiency and data
management
Director of
Corporate Affairs
5 3 15 Maximising use and potential of
existing housing management system
5 2 10
Use of bespoke solutions
Skills of an in house IT team
CO13 Failure to manage our safeguarding responsibilities
leading to service failure and reputational damage
Executive
Director of
Housing Demand
4 3 12 Safeguarding policies and procedures
including inter-agency pathways
3 3 9
Mandatory safeguarding training
Better profiling leading to strong
vulnerability checks
Up to date good quality Support Plans
in place
Regular audits from statutory
safeguarding boards
CO14 Out of date, inaccurate or missing data resulting in
poor information management and decision making
Director of
Corporate Affairs
5 4 20 Stock condition survey 5 3 15
H&S compliance related data
8
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Housing system tenancy data
Employee records management
CO15 A failure to effectively manage HCBS operations as its
managing agent impacting its service and cost
effectiveness and HfH reputation
Managing
Director
4 3 12 Property management agreement
clarying respective roles and
responsibilities
3 2 6
HfH expertise in core housing
management functions
HCBS funding to support the cost of
running its operations
Dedicated management resource
9
HfH Risk Register Q1 2020/21 - Homelessness Related Risks
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
HD1 Excessive reliance on Temporary Accommodation
resulting in substantial financial pressure on LBH and
harm to HfH reputation
Executive
Director of
Housing Demand
4 4 16 Temporary accommodation reduction
action plan and working group
3 3 9
FHSG projects and setting aside of
FHSG to offset overspend.
Review of Demand structures in mid
2020 to ensure the structure remains
fit for purpose given new challenges.
Participation in new governance
arrangements and TA Reduction Board.
HD3 Loss of the use of Council stock as TA (stock utilised
within regeneration areas, shortlife lodges, Council
owned hostels - e.g. Brunel Walk) resulting in reliance
in more expensive TA types.
Executive
Director of
Housing Demand
3 3 9 Work with the council to ensure that
opportunities are created within the
CBS by the time decisions are made on
regen estates and development sites.
3 2 6
Prioritisation of TA residents for the
available new build.
HD4 Inability to source accommodation within pan London
rates which may result in the use of more expensive
TA and shared B&B accommodation
Executive
Director of
Housing Demand
3 4 12 Work with the Council to deliver
schemes that are within the Council's
control (CBS, PR&M, Real Lettings,
modular housing) for use as TA as part
of a wider TA strategy
3 3 9
Membership of Capital Letters and
access to £39m funding. LBH
agreement to be a founding member
of this scheme.
Continue to develop TA supplier
relationships and secure pan London
properties availble in planning for
demand and management of TA
portfolio
HD6 Interruption of AST supply during implementation of
Capital Letters and risk of competition resulting in not
meeting core AST target
Executive
Director of
Housing Demand
4 3 12 Work with council to secure
nominations to the CBS stock
4 2 8
10
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
On the Board of Capital Letters and
Lead Member on Steering Board.
Escalation of concerns to Capital
Letters Chief Executive. Urgent
meetings with Operational leads -
recovery plan for Haringey being
drafted.
Working closely with Capital Letters to
ensure a smooth transition when staff
are seconded and supply funding for
the vacant post.
Use of Find Your Own (FYO) scheme to
bolster numbers
11
HfH Risk Register Q1 2020/21 - Housing Management Related Risks
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
HM1 Weak income management resulting in substantially
unrecoverable debt in both rent and service charge.
Executive
Director of
Housing
Management
5 4 20 Change in leadership and culture in the
income management team
4 3 12
Restructure completed with
some new managers. We are
working with the teams to
embed a new working culture
New working practices with a greater
performance focus
This is currently being worked on,
we are working on creating our
new procedure and working
practices and alinging this to
OHMS and Northgate. There are
more performance related
discussions.
Apply the recovery procedure
correctly.
This is currently being worked on,
we are working on creating our
new procedure and working
practices and alinging this to
OHMS and Northgate. There are
more performance related
discussions.
Board and ELT performance focus
Debt recovery and management
options for FTA
This is currently in place,
however a review of the work
streams for FTA are underway
IT tools and systems that aid proactive
income management
The Head of Income
Management is reviewing
different services available
including considering out of
hours income management
services. Discussions with
different providers has already
commenced and also reviewing
different options with our IT
team
IT tools and systems that aid proactive
income management
HM2 Customer fraud (e.g. Illegal subletting) leading to loss
of revenue / assets and reputational damage.
Executive
Director of
Housing
Management
5 3 15 Systems and processes to perform
checks including mobile working
devices
4 2 8
Develop a robust programmed
Tenancy check programme to
ensure proactive approach.
Embed as part of new focus for
Tenancy
12
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Legal SLA Review is underway and
comparing to different
organisations
Close working with Fraud Team and
other parties as appropriate
HM3 Untidy / poorly maintained estates impacting
lettability and creating a negative perception of
council housing.
Executive
Director of
Housing
Management
5 4 20 New estates inspection regime to be
implemented involving E&N managers
and senior staff from across HM as
appropriate.
3 3 9
New estates grading system to be
piloted and introduced to provide
greater targetting of management and
resources
New estates system has now
been implemented and showing
continuous improvement
Deep cleaning initiative to be
implemented to work through all
blocks over time
Deep cleaning initiaitive is now
underway and is making a
significant improvement
Deployment of all ES resources to be
analysed and re-oriented as required
to deliver better results on the ground.
Expected to restructure during
the year to ensure ongoing
improvements
New service contract with Veolia and
Parks
New service level agreement
with Parks which results in a
dedicated team for HfH.
Implementation on hold pending
Covid-19 restraints however Ward walkabouts to be re-introduced
with revised purpose
Walkabouts on hold pending
changes following Covid-19
Asset Management five year
investment programme.
Use of mobile technology to share and
act on information and
implementation of email with
caretaker for improved communication
with site based staff.
Estates Services Review outcomes to
be implemented
Continued work however Covid-
19 has slowed this work
13
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Robust measures of performance Reviewing structure and
integrating this with the
introduction inspection regime.
14
HfH Risk Register Q1 2020/21 - Property and Maintenance Related Risks
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
PM1 Claims against HfH from contractors resulting in
financial loss / contract overspend.
Executive
Director of
Property Services
4 3 12 Robust contract management practices 2 2 4
Good contract management capability,
systems and processes
Contract contingencies
Good clienting profiling
Post Contract negotiation and
management
PM2 Insufficient budget provision to meet property
compliance related responsibilities.
Executive
Director of
Property Services
3 4 12 Compliance programme in place 1 4 4
Adequate, skilled and competent staff
Negotiation / re-prioritisation of
budget provision by LBH / HfH
PM3 Delays / lengthy timescale / lack of clarity for
determining capital works programmes (1-30 year)
impacting ability to mobilise resources and deliver,
resulting in poorer standard assets.
Executive
Director of
Property Services
4 3 12 Regular meetings with LBH to identify
and agree budgets and approvals
3 3 9
Stock investment plan and asset
management strategy
PM4 Contractor insolvency impacting ability to repair and
maintain homes and possible financial loss.
Executive
Director of
Property Services
3 3 9 Regular contractor review meetings 1 2 2
Use of retention and performance
bonds
Insurance
Use of localised subcontractors
through Dynamic Procurement
systems
D&B financial reviews
Spreading the procurement of
contracts accross more suppliers
PM5 Poor sub-contractor management resulting in a
fraudulent activity, loss of assets and reputational
damage.
Deputy Managing
Director
4 4 16 Contract management processes and
procedures in place
3 3 9
Modern Slavery Training
Separation of duties
Policies, procedures and systems
Staff training and development
15
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Internal audit function
PM7 Progressive collapse of the tower blocks at
Broadwater Farm in the unlikely event of a gas
explosion
Director of BWF 2 5 10 Replacement of all gas cookers with
electric cookers
1 3 3
Installation of gas disruptor valves
Installation of localised temporary
communal heating system and removal
of gas supply from the blocks
Implementation of a long term
permanent solution for the provision
of heating and hot water
24 hour concierge in place on blocks
where identified to fail the lower (17
k/n) test
Home visits to affected properties
where identified to fail lower (17 k/n)
test
Implementation of strengthening
solutions where required
Rehousing Tangmere residents
16
HfH Risk Register Q1 2020/21 - Health and Safety Related Risks
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
HS1 Serious injury or death of an employee as a result of
breach of duty by HfH as an employer
Executive
Director of
Property Services
3 3 9 Legal register setting out all H&S
related obligations and mechanisms to
deliver compliance
2 3 6
Health and Safety policy
Safety Systems in place including, e.g.
provision of PPE and supporting
Policies and Procedures which are
regularly reviewed/updated
Job roles and person specifications
setting out health and safety related
responsibilities
Full range of competent employees in
the health and safety team
H&S training matrix in place setting out
skill requirements
Health and Safety training programme
Suite of periodically reviewed risk
assessments in place.
Site Safety Inspections carried out by
team leaders/managers and H&S
monthly across main services (HRS &
Estate Services)
Reduced due to COVID-19
lockdown restrictions
Safety First Talks carried out by team
leaders/managers monthly (ES & HRS)
Monitoring Framework - Staff facing
Compliance KPIs which are reported
quarterly to ELT/Audit Committee
Internal audit programme in place,
supported by external audits e.g.
British Safety Council
Internal audit programme
currently suspended. Audit staff
furloughed due to COVID-19
HS2 Serious injury or death of a resident / member of
public as a result of breach of duty by HfH to fulfil its
obligations
Executive
Director of
Housing
Management
4 4 16 Estate Services Inspection programme
in communal areas including fire,
repairs and tenancy enforcement
issues.
Roll out of the programme still in early
stages for converted street properties.
3 4 12
Fire Risk Assessment programme -
annual programme for properties over
6 stories and sheltered accomodation
properties
17
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Fire Risk Assessment programme - 3
yearly programme for properties
below 6 stories
5 yearly Fire risk assessment
programme in place
Type 3 and 4 fire risk assessments
List of vulnerable residents that may
create a additional fire risk.
Tenancy enforcement
Joint working and coordination
between different customer facing
teams
Added following death of a
resident in 2019
Regular inspections carried out by
scheme managers in sheltered
accommodation and hostels
Clear communal policy
HS3 Serious injury or death as a result of breach of
obligations by HfH to manage properties
Executive
Director of
Property Services
5 4 20 Property Compliance project/task
group
4 3 12
M&E team employing competent staff
to oversee gas, lifts, electrical safety
and legionella
Fire policy
Asbestos policy
Lift policy
Adaptation policy
Electrical policy
Gas Policy
Water hygiene (legionella) policy
Monitoring Framework - Property
Compliance Key Performance
Indicators which are reported quarterly
to ELT/Audit and Risk Committee
18
Ref Description Risk Lead Gross
Prob.
Gross
Impact
Gross
Severity
Description of Controls Control
Rating
Net Prob. Net
Impact
Net
Severity
Move-
ment
Comments/ Actions to Improve
Controls
Window maintenance programme in
place
Management of timber framed
buildings/properties
Fire safety group
19