Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
- 1 - REV.003
Build the future www.everdigm.com
EVERDIGM
Tower crane ED130F-8
1.5
m
0.2
5m
Concrete
foundation
HS
5.9
m5
.9m
5.9
m5
x 5
.9 m
Inte
rna
l
clim
bin
g d
evic
e
Internal climbingmax HUH 47.6m
1.7m
ST
D
1.6t
1.5
m11
.8m
0.2
5m
6 x
5.9
mH
SS
TD
1.7m
60m
max HUH 47.6m
HUH : Height under hook
• FEM 1.001 A4
• GOST – R/RTN
• 건설기계 안전기준에 관한 규칙
- 2 - REV.003
8 7 6
47.6
5 4 3
41.7 35.8 29.9
47.6 41.7 35.8
2 1 0
24.0 18.1 12.2
29.9 24.0 18.1
5.9m Mast m m
Concrete Foundation Internal climbing
56m 1.93t
50m 2.8t
44m 3.35t
38m 4.17t
32m 5.22t
26m 7.25t
14.5m 60m1.6t
61.7m
3.2
6m
02. Hoisting height ED130F-8
01. Jib combination ED130F-8
4m
HS
0.2
5m
5.9
m5
.9m
5.9
m
1.5
m
4m
1.5
m11
.8m
0.2
5m
HS
1.7m
min
. 1
2m
ma
x.
35
.9m
min. 2.1m
min
. 2
.0m
ma
x.
17
mm
in.
30
.9m
- 3 - REV.003
Jib length Max capacity (m/kg) Radius & Hoisting capacity
m 2 fall 4 fall m / kg 16 20 24 26 32 38 44 50 56 60
60 2.4 – 29
4,000
2.4 – 16.1
8,000
4 fall 8,000 6,310 5,108 4,646 3,606 2,895 2,377 1,984 1,708 1,600
2 fall 4,000 4,000 4,000 4,000 3,606 2,895 2,377 1,984 1,708 1,600
56 2.4 – 32
4,000
2.4 – 18.1
8,000
4 fall 8,000 7,143 5,792 5,272 4,102 3,302 2,720 2,277 1,930
2 fall 4,000 4,000 4,000 4,000 4,000 3,302 2,720 2,277 1,930
50 2.4 – 37
4,000
2.4 – 21.2
8,000
4 fall 8,000 8,000 6,879 6,276 4,918 3,989 3,313 2,800
2 fall 4,000 4,000 4,000 4,000 4,000 3,989 3,313 2,800
44 2.4 – 38
4,000
2.4 – 22.1
8,000
4 fall 8,000 8,000 7,225 6,569 5,094 4,084 3,350
2 fall 4,000 4,000 4,000 4,000 4,000 4,000 3,350
38 2.4 – 38
4,000
2.4 – 22.8
8,000
4 fall 8,000 8,000 7,533 6,831 5,250 4,168
2 fall 4,000 4,000 4,000 4,000 4,000 4,000
32 2.4 – 32
4,000
2.4 – 23.2
8,000
4 fall 8,000 8,000 7,588 6,858 5,216
2 fall 4,000 4,000 4,000 4,000 4,000
26 2.4 – 26
4,000
2.4 – 24.1
8,000
4 fall 8,000 8,000 8,000 7,254
2 fall 4,000 4,000 4,000 4,000
Hoist winch 37kW – 37HF550 – AC – Stepless Electrical information
2 Part
Line
1,200kg 0 ~ 115m/min
4,000kg 0 ~ 42m/min
Power supply 3ph x 380V, 50/60Hz (Standard)
3ph x 415V, 50/60Hz (Option)
Control circuit 24Vdc
Power consumption 70kVA
4 Part
Line
2,400kg 0 ~ 57m/min
8,000kg 0 ~ 21m/min
Power cable PNCT x 35SQ x 4Core
Slewing machinery- 2Drive units-AC-Stepless
2 fall
4 fall
21 32 57 64 80 90 115m/min
0
2000
4000
6000
kg
8000
42
2x5.5kW – AC
0 – 0.74rpm
Trolley winch 6.6kW - AC - Stepless
0 ~ 4,000kg 0 ~ 79m/min
8,000kg 0 ~ 40m/min
Hoist wire rope - standard 400m
Necessary wire length according to height under hook
W = ( H x P ) + R + 35
▪ W (Wire length)
▪ H (Height under hook)
▪ P (Part line) = 2 or 4
▪ R (Jib length)
04. Driving performance ED130F-8
03. Radius and capacity ED130F-8
Speed
Speed
- 4 - REV.003
Upper part
Description Q’ty Sketch Dimension(m)
L W H
Weight(kg)
Unit Total
No. 1
No. 2
Jib single
Element
No. 3
No. 4
1
11.940 1.240 2.510 2,440 -
1
6.170 1.240 2.280 920 -
1
6.170 1.240 2.280 840 -
1
6.160 1.240 2.280 690 -
No. 5
No. 6
Jib single
Element
No. 7
No .8
N0. 9
1
6.160 1.240 2.270 650 -
1
12.050 1.240 2.270 1,260 -
1
6.130 1.240 1.370 510 -
1
4.640 1.240 1.350 370 -
1
3.360 1.240 1.350 270 -
Initial counter jib ass’y,
Tie rod, Handrail etc. 1
8.155 1.597 0.760 4,690 -
End counter jib ass’y,
Hoist winch, Handrail etc. 1
5.220 1.528 1.547 3,460 -
Turn table ass’y,
Slewing ass’y etc. 1
2.194 2.688 2.063 3,150 -
Top head &
Connection plate 1
2.031 1.279 2.322 1,330 -
Operating cabin &
Platform ass’y 1
2.344 1.531 2.201 1,200 -
Panel frame &
Electric panel 1
1.425 2.165 2.135 630 -
05. Packing list l continued l ED130F-8
- 5 - REV.003
Description Q’ty Sketch Dimension(m)
L W H
Weight(kg)
Unit Total
Trolley winch ass’y 1
1.442 0.540 0.891 320 -
Trolley ass’y 1
1.880 1.478 0.755 300 -
Hook block ass’y 1
1.290 0.291 1.819 265 -
Counter weight block 8 1.8
ton
1.240 0.285 2.700 1,850 14,800
Climbing equipment
Climbing cage ass’y 1
12.000 2.485 2.280 6,180 -
Mast
Connection mast 1
1.550 1.896 1.896 655 -
5.9m Mast section -
5.900 1.920 1.920 1,910 -
11.8m Mast section -
11.800 1.920 1.920 4,180 -
Foundation anchor 1
1.730 1.960 1.960 610 -
Internal climbing equipment
Climbing section ass’y 1
6.108 1.920 1.920 3,530 -
Climbing frame(Collar) 6
2.310 1.365 0.500 565 3390
Resting beam 4
1.750 0.182 0.330 130 520
Ladder 6
2
3.820
2.920
0.080
0.080
0.180
0.180
120
85
720
170
6m 1st Special Mast 1
5.900 1.920 1.920 2325 -
6m 2nd
Special Mast 1
5.900 1.920 1.920 2470 -
05. Packing list l continued l ED130F-8
- 6 - REV.003
max HUH 224.6m
※ NOTES 상기 타워크레인 제원 및 사양은 사전통보 없이 변경 될 수 있음.
06. Tie schedule ED130F-8
1st
max H
UH
77.1
m
max.
35.6
5m
max.
41.4
5m
max. 47.6
m
1st
max H
UH
106.6
m
max. 29.5
m
2nd
1st
max H
UH
130.2
m
max. 29.5
m
2nd
3rd
max.
35.5
5m
1st
max H
UH
153.8
m
max. 29.5
m
2nd
max. 23.6
mm
ax.
35.5
5m
3rd
4th
max H
UH
177.4
m
max. 23.6
mm
ax.
35.5
5m
3rd
4th
max. 23.6
m
5th
ma
x H
UH
201m
max. 23.6
mm
ax.
35.5
5m
3rd
4th
max. 23.6
m
5th
max. 23.6
m
6th
max H
UH
224.6
m
max. 23.6
mm
ax.
35.5
5m
3rd
4th
max. 23.6
m
5th
max. 23.6
m
6th
7th
max. 23.6
m
max.
35.6
5m
max.
41.4
5m
max. 29.5
mm
ax.
35.6
5m
max. 29.5
mm
ax.
35.6
5m
1st max. 29.5
m
2nd max. 29.5
mm
ax.
35.6
5m
1st max. 29.5
m
2nd max. 29.5
mm
ax.
35.6
5m
1st max. 29.5
m
2nd max. 29.5
mm
ax.
35.6
5m