4
SUNDAR BABU AMBALAM RAMANATHAN Mobile: +971-50-5200590 ~ E-Mail: [email protected] www.linkedin.com/in/sundarbabu-ramanathan-b55072ab Interior Joinery & Fit- out work experience: High lights, but are not limited to the following: I am currently working as Construction Superintendent with a reputed organization ECG Engineering Consultants Group SA, Abu Dhabi, UAE as PMC coupled with PMT team “Al Hosn Gas” for the project Construction of CICPA Camps at Qusahwira - Abu Dhabi, UAE. Here I have supervising as PMC including interior work marble floor, Decorative tiles in Kit & Wash room, Wooden Doors, Glass doors, Cub Boards, Vanity counters, Reception counters, Relocatable partition, Decorative ceiling tiles and so on Directly I handled as Senior Project Engineer for Interior Joinery & fit out works for Fairmont Bab Al Bahr Hotel, Abu Dhabi, Emirates Park Tower Hotel for Emirates Air Lines @ Business Bay, Dubai & Al Ghurair City Expansion Phase II, Dubai with my Employer “Golden Arrow Interiors, Sharjah” UAE. Further more in my previous employer Dodsal Engineering Construction PTE Ltd.,(EPC Contractor), was working as Deputy Construction Manager (Civil) for GASCO Habshan Sulphur Granulation Plant with Loading Station and Pipelines. Here I have completed Major interior’ work at Main Control Building & Admin’ Building areas. I have received an appreciation mail from Operation Manger & GASCO team regarding Control Building’ interior finishes at Dodsal Eng., HSGP Project Major Works included in Interior projects: Public areas (Restaurant like All Day Dinning, Frankie’s, Lebanese, steak, Sushi Bar...., Banquet Hall, Meeting room, Entrance lobby) & Typical areas (Rooms like Presidential & Royal Suite, Bridal suite, Deluxe Suite.....) involve Wooden, Leather and Fabric panels, Decorative Acrylic screens, Simmer screens, Gypsum & GRG decorative ceiling, Stainless steel decorative ceiling, Wooden Ceiling, Decorative Stretch ceiling, Gypsum colored plaster work. Movable partition, Glass partition, Gypsum partition, Wooden partition, high raised Marble & Granite wall cladding, Circular & Square column stone cladding, Stainless steel decorative columns, Marble, Granite, Ceramic & Mosaic Floor and wall fixing, Glass Flooring, Wooden Flooring, Carpet Flooring and so on

Interior Joinery Fit- out work experience - High lights

Embed Size (px)

Citation preview

SUNDAR BABU AMBALAM RAMANATHANMobile: +971-50-5200590 ~ E-Mail: [email protected]

www.linkedin.com/in/sundarbabu-ramanathan-b55072ab

Interior Joinery & Fit- out work experience: High lights, but are not limited to the following:

I am currently working as Construction Superintendent with a reputed organization ECG Engineering Consultants Group SA, Abu Dhabi, UAE as PMC coupled with PMT team “Al Hosn Gas” for the project Construction of CICPA Camps at Qusahwira - Abu Dhabi, UAE. Here I have supervising as PMC including interior work marble floor, Decorative tiles in Kit & Wash room, Wooden Doors, Glass doors, Cub Boards, Vanity counters, Reception counters, Relocatable partition, Decorative ceiling tiles and so on

Directly I handled as Senior Project Engineer for Interior Joinery & fit out works for Fairmont Bab Al Bahr Hotel, Abu Dhabi, Emirates Park Tower Hotel for Emirates Air Lines @ Business Bay, Dubai & Al Ghurair City Expansion Phase II, Dubai with my Employer “Golden Arrow Interiors, Sharjah” UAE.

Further more in my previous employer Dodsal Engineering Construction PTE Ltd.,(EPC Contractor), was working as Deputy Construction Manager (Civil) for GASCO Habshan Sulphur Granulation Plant with Loading Station and Pipelines. Here I have completed Major interior’ work at Main Control Building & Admin’ Building areas. I have received an appreciation mail from Operation Manger & GASCO team regarding Control Building’ interior finishes at Dodsal Eng., HSGP Project

Major Works included in Interior projects:

Public areas (Restaurant like All Day Dinning, Frankie’s, Lebanese, steak, Sushi Bar...., Banquet Hall, Meeting room, Entrance lobby) & Typical areas (Rooms like Presidential & Royal Suite, Bridal suite, Deluxe Suite.....) involve

Wooden, Leather and Fabric panels, Decorative Acrylic screens, Simmer screens, Gypsum & GRG decorative ceiling, Stainless steel decorative ceiling, Wooden Ceiling, Decorative Stretch ceiling, Gypsum colored plaster work.

Movable partition, Glass partition, Gypsum partition, Wooden partition, high raised Marble & Granite wall cladding, Circular & Square column stone cladding, Stainless steel decorative columns, Marble, Granite, Ceramic & Mosaic Floor and wall fixing, Glass Flooring, Wooden Flooring, Carpet Flooring and so on

Office Interiors, Wardrobes, vanity counters, loose furniture and all type of joinery & fit out works.

EXPERIENCE ON VARIATION CLAIMS

Skilfully functioned as a key person for additional variation claiming for GAI at Fairmount Hotel Project from Client’ side M/S kulkarni QS team, which were differed at site constructed from Approved drawings, Feed drawings and Specifications. Due to other trade issues, modification by End User & Consultant at the time site discussion. For that we provided AS-Built drawings, related approved documents, site related progress photos. From that we were solved most of the issues and additionally claimed around twelve millions AED. For that, I can ensure that early identification of potential issues, program analysis for variation on multidisciplinary complex Engineering, Procurement & Construction projects and precautions will be taken on documents as per required.

Again I resolved some of critical issue on marble wall cladding near flash burner’s area at steak restaurant in Fairmount Hotel project, marble wall cladding on light weight lime block wall at All Day dining & external wall in Emirates Park tower Hotel Project, wall cladding/vanity counters on Gypsum wall at Main Control Building & Administrative and operation Building in HSGP project.

COMMERCIAL ISSUES RESOLVED

Overcame while we shall have been initiated Circular marble Stone Columns’ cladding at rotunda in Al Ghurair project for GAI, the circular Jerusalem Gold marble stones diameter had not matched with existing mall circular stone column’s diameter. GAI was continuing the project of extension mall. Inconsequence of materials have been ordered long lead basis as per approved shop drawings. Moreover the materials were received at site on schedule. However, I was taken that challenging job & made some modification in materials with our skill teams and successfully installed. From that we have resolved the commercial issues, cost savings, time etc,

At HSGP project site for Dodsal Engg, we have provided the marble wall cladding / vanity counters on Gypsum partition frames based on contract

drawing, appropriately I have highlighted and proved with my interior work experience regarding the weak point of rigidity on such frames. For that we provided additional GI Box section frames on gypsum partition for the above work. From that we saved the quality of work and prevent future issues on this part.

I have received great experience with my previous employers for interior work including civil related natural & artificial marble column / wall / ceiling / floor cladding, ceramic tiles on gypsum & wooden partition finishes, decorative wall plaster finish, Glass flooring and maintenance work on finishes and so on

Also being a solid team player, I can not only work to tight deadlines, but also have plenty of initiative to deal with unexpected problems. I have a consultative approach coupled with a “can-do” attitude, and you can be assured that I will always represent the company in a professional and diligent manner when greeting, meeting, and talking to clients.   Greater details of my accomplishments and achievements can be found in my attached resume and Linkedin Web site.