Interior Boq

Embed Size (px)

Citation preview

  • 7/27/2019 Interior Boq

    1/8

    SL

    NO.

    PARTICULARS UNIT QTY RATE AMOUNT

    A INTERIOR:

    1 FALSE CEILING ( Gypboard)

    Providing and fixing Gypsum false ceiling as per India Gypsum specification for

    ceiling with drops as per drawing including of providing and fixing G.I. Frame work as

    per specification of India gypsum at a distance of 2'0" c/c both ways complete with

    12.5mm board (IS-2095-1982) and all necessary perimeter channels etc. No extra

    payment will be made for the cutting of light points , stain glass,cove lighting etc. The

    measurement will be taken in one level , rate should include the drops also, no extra

    amount will be paid for the drops. The joints to be properly mended with paper tapes

    and gypsum compound all complete. The rate should include the full completion of

    the ceiling. At the time of handing over the site all necessary repairing work to be

    considered if required. The work to be completed as per specification ,design and

    approval of the Architect.No Drop or design(if any )will be considered as extra

    measurement it will be considered flat ceiling.Rate is inclusive of two coats primer

    and two coats of Acrylic emulsion paint. SFT

    2 PARTITION

    Providing and fixing in position partition with 2"x2" finished sal wood section without

    saps and joints at maximum 2'-0"C/C both ways horizontally and vertically treated

    with Pentapehene pale from STP as antitermite & fire retardent from Viper to be fixed

    screwed to the floor and ceiling with M.S.Cleats. The frame work will be claded with

    6mm thk. BWR plywood both sides and finished with 1.0mm thk. approved shade

    laminate as per design with approved adhesive.3"x1/2" white beach /white ceader

    skirting with natural polish to be fixed along with the entire bottom length of partition

    on both sides.Extra frame work to be fixed for fixing glass. In the glazed partition

    8mm thk. Etched/Frosted glass with sand blusting/granular blasting to be provided

    fixed with white beach/ white ceader moulding with natural polished 37.5mmx25mm

    all complete.For the door 32mm solid core flush door with necessary hold fast fixed

    to the wall /partition with 1.0mm thk. laminate (approved shade).1 1/2"x1 1/2"white

    beach/white ceader moulding to be provided along the periferi of the door frame.

    The work to be completed as per design,specification and approval of the Architect.

    (a) PARTLY GLAZED PARTITION WITH DOOR

    (i) Full Ht. Partly Glazed Partition Upton 8'-0" SFT

    (ii) Low Ht. Partly Glazed Partition Upto 4'-0" & 6'-0". SFT

    (b) BLOCKED PARTITION

    (i) Full Blocked Partition Upto 8'-0" SFT

    (c) TOUGHEND GLASS PARTITION

    Providing and fixing in position 10mm thk toughened glass at top of teller counter

    front.The work to be completed in all respect as per design , direction and approval

    of Architect. SFT

    BOQ Of State Bank of Mysore, Behala, Kolkata

    Page 1

  • 7/27/2019 Interior Boq

    2/8

    3 Door AccessoriesSupplying and fixing door accessories as door closure,door stoper,Floor

    spring(heavy duty), hinges, locks and handle etc.The above items to be approved by

    Architect

    (a) PARTLY GLAZED DOOR

    (i) Partly glazed door with etching & frosting (7'-0"x3'-0") NOS

    (ii) Partly glazed door with out etching & frosting (7'-0"x3'-0") NOS

    (iii) Low ht. Glazed door.(6'-0"x2'-6") NOS

    (b) BLOCKED DOOR

    (i) Full ht. Blocked door with vision panel (7'-0"x3'-0") NOS

    (ii) Full ht. Blocked door without vision panel (7'-0"x3'-0") NOS

    (c) MAIN ENTRANCE DOOR (3'-6"x7'-0")

    Providing & fixing fully glazed pivoted door at the main entrance consists of

    6"x2"seasoned hard wood section covering with white beach/white ceader beading

    for bottom rail and 4"x2" seasoned hard wood section covering with white

    beach/white ceader beading for top rail finished with natural polish. 12mm thk.Modi

    Guard /Saint Gobain clear float glass with sand blasting/etching (as per design) and

    finish handle(1'-0" long)of Neki/Hasseley make to be faxed on both sides & proper

    locking arrangement in bottom rail to be done. The rate should include

    lipping,moulding,beading & heavy duty floorspring.The work to be completed in all

    respect as per design, direction and approval of the architect. NO

    4 TABLE

    Providing and fixing tables made out of 19mm thk BWR block board for top,sidis and

    front of approved make cladded with 1.0mm laminate as per design in all visible

    areas. All the exposed edges to be covered with white beach/white ceader wooden

    lippings and mouldings with natural polish. The drawers to be made out of 19mm thk

    block board for the front ,sides to be made out of 12mm BWR plywood and bottom to

    be made out of 6mm BWR plywood and it should play in drawer sliding channels.

    The inside of the drawer and the table to be ename painted (approved colour) . A

    legrest to be provided duly polished made out of 19mm thk BWR plywood. A shutter

    to be made by 19mm bwr Block board cladded with 1.0mm laminate .The necessary

    locks,hinges, handles to be provided in each drawers and shutters.3" x 1/2" white

    beach/White ceader wooden skiritng to be provided in all visible areas duly

    polished.On top of the Chief managers/Br. Manager table 10mm thk glass to be

    placed duly edge polished.The table should have black powder coated ready made

    key board tray and tea traywith laminate finish.The necessary wire managers to be

    provided on the tables and provision for lights to be kept if required in the front of the

    table.

    Ready made CPU trolly to be provided every where with a provision of castors to be

    provided. 1.0mm laminate of approved colour and bruss steel laminate to be fixed asper design including the raised level.All the inside areas to be duly enamel

    painted.For Spl. Asst. Table should have 19mm thk. granite(approved colour)with

    bull nosed at front facia.1'-0"high 10mm thk.machine polished clear glass to be

    provided at top of table front.The work to be completed as per design and approval

    of the Architect.

    Page 2

  • 7/27/2019 Interior Boq

    3/8

    (a) Br. Manager (6'-0"x2'-6") NO

    (b) Officers/ staffs (4'-6"x2'-6") NOS(c) Spl. Asst. (4'-9"x2'-6") NOS

    6 WORKSTATION:

    Providing & fixing top, front & sides of workstation made out of 19mm thk. BWR

    block board and 6mm BWR ply for back as per design cladded with 1.0mm thk.

    Laminate & the all exposed edges to be finished with white beach/white ceader

    moulding ( as per design), l ipping with natural polish.The work station should have

    individual pedestral unit having drawer & shutter pallah.The front of the drawer made

    out of 19mm thk.BWP block board finished with 1.0mm thmk. laminate, sides 12mm

    thk. BWP ply and bottom to be made out of 6mm plywood. The inside and sides of

    the drawer to be enamel painted. The drawers and shutters to be provided with

    necessary drawer sliding channels , handles,hinges,locks etc.A leg rest to be

    provided made out of 19mm thk. BWP block board duly enamel painted. Inside of the

    workstation to be enamel painted in the matching tone.Wire manager (approved

    colour),Readymade black powder coated CPU trolly,Key board tray , Mouse pad tray

    finished with 1.0mm laminate to be provided.The work should be completed as perspecification and approval of Architects.

    RFT

    7 CASH COUNTER / SW (4'-9"x2'-6") HT. 3'-8"

    Providing and fixing top, front & sides of cash counter made out of 19mm BWR block

    board as per design cladded with 1.0mm thk laminate & the edges to be finished with

    necessary white beach or white ceader lippings, mouldings(as per design), etc.

    Special 6" drawer to be made for the cash with dividers of 12mm BWR plywood The

    front of the drawer made out of 19mm BWR block board finished with 1.0mm

    laminate, sides 12mm BWR plywood and bottom to be made of 6mm BWr plywood .

    The inside and sides of the drawer to be enamel painted .The drawers and shutters

    to be provided with necessary drawer sliding channels,handles, hinges, locks etc. A

    leg rest to be provided made out of 19mm thk BWR block board duly enamel

    painted. Inside of the unit to be enamel painted in the matching tone.All visible areas

    to be coverd with white beach or white ceader lippings, mouldings with natural

    polish.Wire manager, legrest,Redymade black powder coated CPU trolly, keyboardtray, tea tray finished with 1.0mm laminate to be provided. 3" x 1/2" white beach

    white ceader skiriting to be provided with natural polish in all visible areas.19mm thk

    Jet Black Granite with bullnosed moulding (double)

    to be provided at counter top at 3' 8" lvl. the work should be completed as per

    specification. The work to be completed as per specification ,design and approval of

    the Architect.RFT

    8 Side and Back Unit

    Page 3

  • 7/27/2019 Interior Boq

    4/8

    Providing and fixing Side Unit/ Back unit made out of 19mm BWR block board fortop, sides,front and 6mm BWR ply for back finished with 1.0mm laminate in all

    exposed areas . The drawers to be made out of 19mm BWR block board in the front

    cladded with 1.0mm laminate. sides to be made out of 12mm plywood and bottom

    made out of 6mm plywood duly enamel painted in matching tone and i t should play

    on drawer sliding channels . The Sliding shutters to be made out of 19mm block

    board with 1.0mm laminate finished and should play on channels all four sides. The

    necessary locks,hinges , handle etc to be provided . 3" x1/2" white beach/White

    ceader wooden skiritng with natural polish to be provided as per matching tone all

    along the visible areas . Inside of the unit to be enamel painted in matching tone . All

    the exposed edeges of the boards/plywoods to be coverd with White beach/White

    ceader lippings/mouldings with natural polished all complete.The work to be

    completed as per approval and specificaion of the Architect. SFT

    9 Writing Ledge

    Providing and fixing writing ledge as per design made out 19mm block board with

    necessary groove patterns ,1.0mm laminate to be cladded. 10mm thk bevelled glass

    to be provided on top of the writing ledge.A divider made of 19mm thk.block board to

    be provided. Whit beach/ White ceader lipping with natural polish to be used in all

    exposed areas. Inside of writing ledge to be enamel painted.The work to be

    completed as per design and approval of the architect. NO

    10 Planter Box

    Providing and fixing Planter Box made out of 19mm block board finished with 1.0mm

    laminate as per design with a 3"x 1/2" White beach / White ceader wooden skirting

    with natural polish. inside to be enamel painted .All exposed edges to be covered

    with white beach/ White ceader moulding with natural polish.The work to be

    completed as per design and approval of Architect. NOS

    11 STORAGE

    Providing and fixing storage made out of 19mm bwp block board for top,sides&

    6mm BWP ply for back finished with 1.0mm laminate . The shutters to be made out

    of 19mm block board with 1.0mm laminate. The necessary locks , handles, hinges

    etc to be provided . 3" x1/2" white beach/White ceader wooden skiritng to be

    provided duly natural polished as per matching tone. Inside of the unit to be enamel

    painted in matching tone . All the exposed edeges of the boards/plywoods to be

    coverd with white beach/white ceader wooden lippings/mouldings duly natural

    polished all complete.For full ht. storage file divider made out of 6mm thk ply to be

    provided.1.0mm thk. bruss steel laminate to be provided as per design on pallah.The

    work to be completed as per approval and specificaion of the Architect.

    (a) Full ht storage 7'0'' SFT

    (b) Low ht storage 2'6'' SFT

    12 VERTICAL BLINDS

    Page 4

  • 7/27/2019 Interior Boq

    5/8

    Providing and fixing vertical blinds of 100mm thk (Mac/Annums) of approved shadeand pattern having handrail made of high strength alluminium alloyed wall thickness

    of 1.2mm thk. Headrail to have 25mm decorative insert. Control unit shall be ofderlin.

    The runners are also to be a derlin with antiflixtion adeshive. Spacers should be

    made of stainless steel. Fabric should be polyester viscosted/polyester yarn having

    protective coating with chemicals for stain resistance & soil repalancy. The rate shall

    include necessary scoch gurd treatment on both sides. The overlaping should be

    uniform and adequate.Necessary operative arrangements,frames to be provided.

    The work to be completed as per specification and approval of the architect. SFT

    13 SYNTHETIC DOOR MAT

    Providing and fixing synthetic door mats of approved shade from Birla 3M( 6mm

    thk).The work to be completed as per approval of the Architect. NOS

    14 SOFT BOARD / NOTICE BOARD

    Providing and fixing soft board /Notice board fabricated out of 12mm BWP ply

    covered with 12mm soft board padding and upholsply propylene fabric @ 80/mtr.

    Edges of soft board should have white beach/whiteceader moulding with natural

    polished. SFT

    Note: Where pin up board is in a panelled area, the top of the pin up board should

    be flushed with the panel, keeping the same level. The work should be completed as

    per specification,design&approval of the Architects.

    15 Lunch Counter

    Providing and fixing in position Lunch counter fabricated out of 19 mm thick

    BWP solid ply finished with 1.0mm thk. Laminates on top & sides.The

    necessary white beach/white cedar moulding/lipping with natural polish and

    necessary hardware shall be provided as per design.The work is to be

    completed in all respects as per design,design and approval of the achitect. RFT

    16 PAINTING

    (a)

    Providing and applying Acrylic emulsion/OBD paints after removing the damaged

    plaster , replastering with 12mm thk cement morter after finishing with P.O.P to make

    the necessary smoothness , reparing all damages . Then two coats of Primer of

    approved make to be applied finished with two or more coats of acrylic emulsion

    paints .The work to be completed as per approval and satisfaction of the Architect. SFT

    (b) TEXTURE PAINT

    Providing , spraying and applying Texture pain of approved shade and colour on

    walls and coloumns.The job is inclusive of scaping,leveling and preparing the

    surface.Bi colour texture paint will be used. The wall surface has to duly prepared by

    removing the damaged plaster and applying P.O.P to give a smooth surface as per

    approval of the Architect. SFT

    (c)

    SYNTHETIC ENAMEL PAINT FOR WINDOW GRILL, ROLLING SHUTTER &

    COLLAPSEABLE GATE

    Page 5

  • 7/27/2019 Interior Boq

    6/8

    Providing and applying 2 coats synthetic enamel paint on window grill,rolling shutter

    and collapsiple gate.Before putting final paint scrapping,leveling,preparing thesurface and 2 coats primer to be done.The wall to be completed as per the direction

    of architect. SFT

    (d) OIKAS

    Providing , spraying and applying Oikas paint of approved shade and colour on walls

    and coloumns.The job is inclusive of scaping,leveling and preparing the surface.Bi

    colour paint will be used. The wall surface has to duly prepared by removing the

    damaged plaster and applying P.O.P to give a smooth surface as per approval of the

    Architect. SFT

    17 SOFA

    Providing and placing in position sofa made of 2"x2" hard wood section and 19mm

    BWP block board for bottom,spring jute cloth,coir,8"cotton HDF,4"loose

    foam,upholstery @RS.120 per mt.all complete as per drawing.3/4"x3/4" ss finish

    square shape pipe to be used as legs & other areas as shown in drawing.The work

    to be completed as per approval & direction of the architect. SEATS

    18 SOFA SIDE TABLE, CENTRE TABLE

    Providing and fixing center table fabricated out of 12mm thk. Bevelled glass on

    top,3/4"dia ss stud,19mm thk. Block board finished with 1.0mm thk laminate for all

    four sides and base.Bruss steel laminate to be used as per drawing.10mm thk.

    Machine polished glass to be used as a shelves.The work to be completed in all

    respect as per the direction of architect. NOS

    19 CORNICE MOULDINGProviding and fixing pop cornice moulding along the periferi wherever the walls/

    partition meeting the ceiling size 3" x 1 1/2" duly painted as per approval of the

    architect. RFT

    20 Plants ( artificial )

    Providing and placing artificial plants & Creepers of approved colour to be provided

    wherever required. The work to be completed as per approval of the Architect and

    provision to be made to fix it . SETS

    21 Suggestion Box

    Providing and fixing suggestion box made out of 19mm block board and finished with

    1.0mm thk laminate & inside to be synthetic enamel painted.A 1" high slit & small

    door with key and locking arrangement to be done for dropping & taking out the

    slips.The work to be completed as per design,direction & approval of the architect. NO

    22 Cheque Deposit Box

    Providing and fixing cheque deposit box made out of 19mm thk block board &

    finished with 1.0mm thk. Laminate & inside to be synthetic enamel painted.a 1" highslit & small door with key and locking arrangement to be done for dropping & taking

    out the slips.The work to be completed as per the design,direction & approval of the

    architect. NO

    23 First Aid Box

    Page 6

  • 7/27/2019 Interior Boq

    7/8

    Providing & fixing in position first aid box made out of 19mm thk. BWP block boardfinished with 1.0mm thk. Laminate.Inside to be enamel painted.all exposed edges to

    be covered with white beach/white cedar lipping with natural polish.Necessary

    hardware like multipurpose lock,box hinges and handle to be provided.The work to

    be completed as per the direction & approval of the architect. NO

    24 Brass Plaque with lettering

    Providing & fixing in position brass plaque with lettering of Bank's name, work

    timings& any other details deemed necessary by them. The item to be completed in

    all respect as per the direction of the Architects. NO

    25 PVC Flooring

    Providing and laying 2mm thk. PVC flooring in UPS/Server and strong room of

    approved colour on the existing floor with adhessive. The floor should be

    clean,smooth,level,dry and free from oil, The item to be completed in all respects as

    per design, direction and approval of the Architect. SFT

    26 PILLAR CLADDING

    Providing & fixing in position column cladding consisting of 6mm BWP

    plywood,1.0mm thk. laminate with hardwood ribbing of 1 1/2"x 1" dimension. The rest

    of the column is to be texture/ heritage painted.Texture/Heritage paint area as shown

    in drawings.The item is to be completed in all respects as per design,direction &

    approval of the architect.The rate is inclusive of dismantling,removal of existing pillar

    cladding and disposal from site to municipal dumping ground. SFT

    27 ROLLING SHUTTER ENCASEMENT

    Providing and fixing in position rolling shutter encasement fabricated out of 19mm

    thk. BWP BB finished with 1.0mm thk. laminate for top,sides, front and bottom with

    necessary openable pallah at bottom, hardware including locks, hinges & handles.

    The job to be completed as per approval of the Architect. SFT

    28 Main Panel Encasement

    Providing & Fixing main panel encasement in position fabricated out of 19mm BWP

    BB with 1.0mm thk. Laminate for top,both sides&front.Encasement will be having

    louver & 6mm thk. Glass for seeing the indicator in both pallahs.The exposed surface

    of 19mm BWP BB will be finished with white beach/white ceader lipping & inside to

    be enamel painted . The item to be completed in all respect as per design , direction

    and approval of the Architects. SFT

    29 Window Blocking with ply

    Providing and fixing 19mm BWP BB for existing window blocking wherever required

    with paint finished. The work to be completed in all respect as direction and approval

    of the Architects. SFT

    TOTAL

    C CIVIL WORK

    Page 7

  • 7/27/2019 Interior Boq

    8/8

    SL PARTICULARS UNIT

    NO.

    1 IPS Flooring

    Providing and laying cement concrete flooring 40mm thk. M-15,C.M laid to

    proper level and slope in alternate bays including compaction filling joints

    marking lines to give the appearance of tiles 30cm x30cm laid diagonally or

    square finishing smooth ( with extra cement) in any colour as directed by SFT

    Architect and curing complete in all respect.

    2 PCC

    P/E PCC OF grade 1:2:4 of desired thickness including shuttering if required.

    The thk. may vary from 4" to 6" as per requirement. SFT

    3 Treds & Riser of Steps

    Providing and laying in required position granite slab of 25mm thk. Upto 6'-0"

    in length (single piece) approved shade and colour as per design and patternwith machine cut and machine polish in CM 1:3 for treads/ risers of steps.

    The rate is inclusive of full rounded nosing for treads and 3nos groove on treads SFT

    complete in all respect. Basic rate of granite Rs/- 130/sft

    TOTAL

    Part - D Bought out items

    Chairs

    i High Back with arms (DX - 718) Nos

    ii Medium Back with arms ( DX - 725) Nos

    iii Medium Back without arms ( DX - 722) Nos

    iv Low Back without arms ( DX - 722) Nos

    v Stool for pantry Nos

    TOTAL

    Page 8