INTERGRATED GASIFICATION COMBINED CYCLE (IGCC)
ANH PHUONG NGUYENAPN274
25 Nov 2008
CHE 384 ENERGY TECHNOLOGY & POLICY
Content
OverviewIGCC ProcessFuture development Conclusions
Overview
COMBINED CYCLEGASIFICATION
PRODUCE SYNGAS
INTEGRATED GASIFICATION COMBINED CYCLE
POWER GENERATION
LOW EMISSION HIGH EFFICIENCY
IGCC Plants in the US
The Tampa Electric IGCC ProjectMulberry, Florida, 1996
Using: GE Energy Gasification Output: 250 MWe
The Wabash River IGCC ProjectWest Terre Haute, Indiana, 1995Using: The ConocoPhillips E-Gas
Gasification process Output: 262 MWe
IGCC PROCESS
GASIFIER TYPES
Manufacturer Gasifier type Application
ConocoPhillips Coal- water slurry feed, Oxygen blown, refractory lined gasifier
wide range of coal
General Electric Energy (GE)
Coal-water slurry feed, O2
blown, refractory lined gasifier
bituminous coal, pet- coke or blend of pet coke with low rank coal
Kellog Brown and Root (KBR)
dry feed, air blown transport reactor
low rank coal
Mitsubishi Heavy Industry (MHI)
dry feed, air blown low rank coal
Shell dry feed, coal is crushed, dried and fed into gasifier, oxygen blown, waterwall in gasifier
wide variety of feedstock
Kellog Brown and Root (KBR)
COMPARISON
IGCC (ConocoPhilips)
PC subcritical PC supercritical NGCC
CO2
captureNo Yes No Yes No Yes No Yes
Net power output (kWe)
623,370 518,240 550,445 549,613 550,150 545,995 560,360 481,890
HHV efficiency
(%)39.3% 31.7% 36.8% 24.9% 39.1% 27.2% 50.8% 43.7%
Levelized cost of
electricity ($/MWh)
75.3 105.7 64 118.8 63.3 114.8 68.4 97.4
Total plant cost
(Million $)1080 1259.8 852.6 1591.3 866.391 1567.073 310.710 564.628
IGCC COST BREAKDOWNUnit Cost ($)
Coal & sorbent handling 34,000
Coal & sorbent preparation and feed 52,665
Feed water system 34,944
Gasifier system total - Gasifier, syngas cooler & auxiliaries - Air Separation Unit & O2 compression
- Other gasifier units
446,129212,885170,44962,795
Gas cleanup and piping 228,370
CO2 removal system 35,754
Combustion turbine 123,611
Steam turbine 56,611
Cooling water system 24,614
Aspen, sorbent handling system 35,031
Accessory electric plant 73,409
Instrumentation & control 25,021
Building and structure 16,429
Total 1,259,800
FUTURE DEVELOPMENT
Improve gasifier performanceImprove gas turbine efficiencyImprove the heat exchanger systemReducing cost of air separation unit or switch
to air blown process as Japan didOptimize energy saving in IGCCImprove control of the integrated system
CONCLUSION
Promising technology in early development Substitute for current coal fired power plantNeed more R&D to make it more competitive Prospect of zero emission from coal
Q&A