61
INTERCHANGING OF RAILS A.Gunashekar ADEN .BPQ NAGPUR Division CENTRAL RAILWAY 1

INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Embed Size (px)

Citation preview

Page 1: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

INTERCHANGING OF RAILS

A.Gunashekar ADEN .BPQ NAGPUR Division

CENTRAL RAILWAY

1

Page 2: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Cause of Lateral wear

2

Page 3: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

• HOW TO INTERCHANGE IN STRAIGHT

3

We can not bodily lift the rail one by one and Shift from Left to Right

Page 4: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

• HOW TO INTERCHANGE IN STRAIGHT

4

We can not bodily lift the rail one by one and Shift from Left to Right

Page 5: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

Equal length of 200 m is cut squarely opposite

5

Page 6: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

One panel is slewed to the centre of track from LH side to RH

It has slightly shifted to the right side IN THE DIRECTION OF WORK

6

Page 7: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

How the panel is moving in the direction of Interchange (Straight)

7

500m

500m

When shifting from LH to RH,

Page 8: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

How to Interchange (Straight)

8

500m

500m

Page 9: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

How to Interchange (Straight)

9

500m

500m

Length required to form reverse curve is pulled in the direction of work

Page 10: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

How to Interchange (Straight)

10

500m

500m

Page 11: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

How to Interchange (Straight)

11

500m

500m

Page 12: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

How to Interchange (Straight)

12

500m

500m

And the panel has crept to Right side

Page 13: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

One panel is slewed to the centre of track from LH side to RH

It has slightly shifted to the right side IN THE DIRECTION OF WORK

13

Page 14: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Snakinglength

Other side panel is slewed over the first to otherside

It has moved ‘s’ distance to the right side

s

14

Page 15: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

15

Page 16: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

16

Page 17: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

17

Page 18: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

‘s’ distance is carried to the right side

18

Page 19: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

ss

After interchanging the panel has moved in the direction of work ‘s’ distance

19

Page 20: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Sameway the other panel has also moved to the right

Two extra rails are to be replacedFour extra cuts are to be provided

s

20

Page 21: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Snaking length s =60mm

21

Page 22: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

500 m

Equal length of 500 m is cut out of square by 60mm opposite

60mm 60mm

22

Page 23: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

One panel is slewed to the centre of track from RH side to LH

It has slightly shifted to the left side IN THE DIRECTION OF WORK

23

Page 24: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Other side panel is slewed over the first to otherside

It has moved ‘s’ distance to the right side

24

Page 25: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

25

Page 26: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

26

Page 27: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

‘s’ distance is carried to the right side

27

Page 28: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

‘s’ distance is carried to the right side

28

Page 29: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

ss

After interchanging the panel has moved in the direction of work ‘s’ distance

No extra rail replacement & no extra cut is involved

29

Page 30: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

LG/R

Interchanging of panels in curve

Para.424 IRPWM Outer length of Railis longer than inner Rail by LG/R

30

Page 31: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

LG/R increasing against the direction of progress

32

Page 32: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

33

How to start interchange in CURVE

We can not bodily lift the rail one by one and Shift from Left to RightLike in this animation

Page 33: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

34

How to start interchange in CURVE

Page 34: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

35

Outside panel is slewed to CENTRE OF TRACK . from LH to RH

LG/R gap is left at LH and LG/R extended at RH

Page 35: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

36

Inside panel is slewed outside from LH to RH

Page 36: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

37

Page 37: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

LG/R

38

Page 38: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

39

LG/R

Page 39: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

40

Page 40: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

41

LG/R

Page 41: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

42

Page 42: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

43

Page 43: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

Sameway the other panel has also moved to the right

Four extra rails are to be replacedFour extra cuts are to be provided

44

LG/R

Page 44: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

LG/R + La T - S

L T - S

45

Page 45: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Marking of cut locations at starting

46

Page 46: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

LG/R

Equal length of 200 m is cut out of square by LG/R.To your surprise Far end cuts will become square.

47

Page 47: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

48

Outside panel is slewed to CENTRE OF TRACK . from LH to RH

Page 48: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

49

Inside panel is slewed Outside from LH to RH

Page 49: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

50

Page 50: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

200 m

200 m

No extra rail replacement & no extra cut is involved

51

Page 51: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Criteria for Interchanging• On Curve when lateral wear exceeds 8mm• On Straight when cyclic wear exceeds 6mm• On Straight when half service life of rail has passed• Corrosion prone area where rail flange corrosion under liner’s seat is predominant

on inside. Conversion of SWR in to LWR (also in Tunnels). Conversion of 3 rail panel into 20 rail panel in Ghat (Under trial to avoid excessive creep)

52

Page 52: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Clueless Interchanging andBursting of Block

53

Page 53: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Clueless Interchanging andBursting of Block

• Without PLANNING ,if the Interchanging is carried out by deploying labours at both ends,

the rail will buckle as it reaches the centre of panel, as shown in figure.

First keep the Outer rail at middle of track,then the Inner rail to outside of curve.

54

Page 54: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Snaking length s =21.6mm

55

Page 55: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Different Locations

• 1. On Curves (In SWR)• a) With Square Joints • b) With Mid Staggered (Sharp Curves)

• 2. On Straight (LWR)• 3. On Curve (LWR)

56

Page 56: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

FACTORS AFFECTING THE LENGTH

• 1. LG/R increasing against the direction of progress

• 2. Snaking effect in the direction of progress

• 3.L T against the direction of progress• 4. Welding Gap

57

Page 57: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

d =La T

Rail Length Coeff.of expansion

Temp Variation

Change in Length

52Kg 100m 1.152X10-5 100 C 11.5mm 60Kg 100m 1.152X10-5 100 C 11.5mm

60

D =Lat

Page 58: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Consider 1 Km track with reverse curves of 300 m long each and 400m straight

• 1. The 300m of I st curve got to be Inter changed due to excessive side wear in LH rail

• 2. The 300m of II nd curve got to be Inter changed due to excessive side wear in RH rail

• 3.In the second Interchanging the 300m of I st curve got to be Inter changed due to excessive side wear in LH rail, for which I st or II nd class rails shall be arranged.

• 4.The released panel of the above shall be dollied to II nd curve and the second Interchanging shall be done

• 5. The released panel of the above shall be dollied to straight portion of the track and replaced .And the released rail can be kept reserved for future Interchanging.

61

Page 59: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

Advantages

• Safety• 1.Rail profile can be controlled and monitored• 2. GFC defects are avoided from propagation.• Economy• 3. Number of welded joints are reduced• 4.Optimum use of rail

62

Page 60: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

300 m

280 m

LG/R

63

At the mid of curve make two cuts on inner and outer rails in perfect square with each other

Measure equal distance ,up to where the rail is worn and got to be Interchanged on both rails and make cuts on both rails.

300 m

280 m

Keep the outer rail at the centre of track starting from LH end

Take the inner rail to the outer side over the rail at centre of track from LH end

Shift rail at the centre of track to the inner side from LH end

Same way the RH side of curve is Interchanged from RH end

NO CALCULATION AND NO THEORY

Follow the steps below to Interchange any curve without closure rails

Page 61: INTERCHANGING OF RAILS A.Gunashekar ADEN.BPQ NAGPUR Division CENTRAL RAILWAY 1

64