Nordströms Siwertell HIGH CAPACITY SHIP UNLOADING Presented by: Mr. Peter Goransson, Sales Manager & Advisor, Bulk Handling Division, MacGREGOR Bulk AB, December 2006 Tremont House, Galveston, Texas, USA

Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

HIGH CAPACITY SHIP UNLOADING

Presented by: Mr. Peter Goransson, Sales Manager & Advisor,

Bulk Handling Division, MacGREGOR Bulk AB, December 2006

Tremont House, Galveston, Texas, USA

Page 2: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 2 28/11/2006 BT/Peter Göransson

MacGREGOR BulkOur new name is

BMHMarine

We are known as

Our new name is

Name change

Page 3: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 3 28/11/2006 BT/Peter Göransson

About this presentation

How to minimize the time the ship is at your berth is the key factor to focus on!

The right way to approach this is to increase the efficiency and the unloading rate of the ship unloading system.

We will show an example of how it can be done!!

Page 4: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 4 28/11/2006 BT/Peter Göransson

Definition of high capacity

Each supplier have their own definition of high capacity, some even claim 300 mt/h to be high capacity!!

MacGREGOR Bulk’s definition of high capacity is as follows:

A rated unloading capacity of minimum 1500 mt/h with a maintained efficiency of minimum 70% of the rated capacity.

Efficiency =Through-the-ship capacity

Rated capacity

Page 5: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 5 28/11/2006 BT/Peter Göransson

1:st

mult

ipurp

ose

unloa

der r

ated

120

0 m

t/h

1974

1984

1980

1975

Siwe

rtell N

o. 1

is d

elive

red

rate

d 12

5 m

t/h

1:st

Siwe

rtell r

ated

150

0 m

t/h fo

r gra

in

1:st

Siwe

rtell r

ated

230

0 m

t/h fo

r mine

rals

1:st

Siwe

rtell f

or ce

men

t rat

ed 6

00 m

t/h

1:st

Siwe

rtell

rate

d 10

00 m

t/h fo

r coa

l

1:st

Siwe

rtell

rate

d 80

0 m

t/h fo

r cem

ent

1982

1990

2003

1996

2005

1:st

Siwe

rtell

rate

d 20

00 m

t/h fo

r coa

l19

96

1:st

Siwe

rtell r

ated

240

0 m

t/h fo

r coa

l

1:st

Siwe

rtell r

ated

150

0 m

t/h fo

r cem

ent

Unloading rate development

year

capa

city

Page 6: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 6 28/11/2006 BT/Peter Göransson

Siwertell ship unloaders with a rated unloading capacity exceeding 1500 mt/h

2; 11% 1; 5%

2; 11%

14; 73%

GrainCementMineralsCoal

Totally 19 ship unloaders delivered

Ship unloader statistics

Page 7: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 7 28/11/2006 BT/Peter Göransson

Design rate statistics cement

800 mtph56%

900 mtph3%

1500 mtph1%

300 mtph3%

350 mtph1%

700 mtph16%

600 mtph12%

500 mtph3%

450 mtph1%

400 mtph4%

1500 mtph900 mtph800 mtph700 mtph600 mtph500 mtph450 mtph400 mtph350 mtph300 mtph

Mobile unloaders excluded

Page 8: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 8 28/11/2006 BT/Peter Göransson

Which factors have an impact on the total unloading cost?

1. Freight cost (daily cost of ship)

2. Efficiency of the ship unloading system

3. The capacity of the ship unloading system

4. The energy consumption of the ship unloading system

5. The expected annual throughput of the terminal

6. The ship size

Page 9: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 9 28/11/2006 BT/Peter Göransson

Transportation cost

The transportation cost consists

of two parts:

Ship on route Ship at berth

We can contribute to reduce the number of days the ship is at berth

Page 10: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 10 28/11/2006 BT/Peter Göransson

Freight development

Page 11: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 11 28/11/2006 BT/Peter Göransson

When the factors previously mentioned have been made up, these numbers can then be entered into this spread sheet.

Calculations

Page 12: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 12 28/11/2006 BT/Peter Göransson

Cost summary

1050560tons/hourThrough-ship-capacity

1,100,523US$Annual cost saving

2,080,854.-3,181,377.-US$Total ship cost at quay

48*89*daysNumber of unloading days

20,00020,000US$Ship cost per day

1500800tons/hourRated unloading capacity

60,00060,000dwtShip size

1,000,0001,000,000tons/yearAnnual throughput

Siwertell 1500 t/hSiwertell 800 t/hUnit Input data

Annual throughput 1 million ton

* Based on 20 hours of operation

Page 13: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 13 28/11/2006 BT/Peter Göransson

1050560tons/hourThrough-ship-capacity

1,517,190US$Annual cost saving

2,557,044.-4,070,324.-US$Total ship cost at quay

48*89*daysNumber of unloading days

30,00030,000US$Ship cost per day

1500800tons/hourRated unloading capacity

60,00060,000dwtShip size

1,000,0001,000,000tons/yearAnnual throughput

Siwertell 1500 t/hSiwertell 800 t/hUnit Input data

Annual throughput 1 million ton

* Based on 20 hours of operation

Cost summary

Page 14: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 14 28/11/2006 BT/Peter Göransson

1050560tons/hourThrough-ship-capacity

2,268,857.-US$Annual cost saving

3,458,949.-5,727,806.-US$Total annual cost

96*178*daysNumber of unloading days

20,00020,000US$Ship cost per day

1500800tons/hourRated unloading capacity

60,00060,000dwtShip size

2,000,0002,000,000tons/yearAnnual throughput

Siwertell 1500 t/hSiwertell 800 t/hUnit Input data

Annual throughput 2 million ton

* Based on 20 hours of operation

Cost summary

Page 15: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 15 28/11/2006 BT/Peter Göransson

1050560tons/hourThrough-ship-capacity

3,102,190.-US$Annual cost saving

4,411,320.-7,513,520.-US$Total annual cost

96*178*daysNumber of unloading days

30,00030,000US$Ship cost per day

1500800tons/hourRated unloading capacity

60,00060,000dwtShip size

2,000,0002,000,000tons/yearAnnual throughput

Siwertell 1500 t/hSiwertell 800 t/hUnit Input data

Annual throughput 2 million ton

* Based on 20 hours of operation

Cost summary

Page 16: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 16 28/11/2006 BT/Peter Göransson

How would my terminal benefit from a ship unloading capacity upgrade?

Thoughts

Page 17: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 17 28/11/2006 BT/Peter Göransson

From thinking to action!

Houston Cement Company, Houston, Texas USA

Page 18: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 18 28/11/2006 BT/Peter Göransson

Study of layouts (Ship unloader and dock)

Page 19: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 19 28/11/2006 BT/Peter Göransson

Study of terminal layout

Page 20: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 20 28/11/2006 BT/Peter Göransson

Study of terminal layout

Page 21: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 21 28/11/2006 BT/Peter Göransson

Ship unloader main dimensions

Page 22: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 22 28/11/2006 BT/Peter Göransson

Ship unloader working diagram

Page 23: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 23 28/11/2006 BT/Peter Göransson

Siwertell D-type ship unloader

• The Siwertell D-type is the heavy-duty machine of continuous Siwertell screw-type ship unloaders

• The D-type unloads ships up to 180,000 dwt

• Can be used for all applications, no limitations

• Now also available for operation at large cement terminals when a high through-ship-capacity and annual intake is required

Page 24: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 24 28/11/2006 BT/Peter Göransson

Ship unloader facts

The largest continous cement ship unloader

known in terms of size and capacityFacts:

Model ST 640-D

Vertical arm: 22 m

Vertical conveyor: VST 640

Horizontal arm: 25,25 m

Horizontal conveyor: HST 1000

Total weight: 415 tons

Power consumption:0,40 kWh/ton

Installed power: 952 kW

At rated capacity: 600 kW

Rated capacity 1500 mt/h

Page 25: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 25 28/11/2006 BT/Peter Göransson

View of horizontal arm and vertical conveyors

Horizontal conveyor size 1000 mm (40”)

Vertical conveyor size 640 mm (25”)

Twin motor drive unit for vertical conveyor

Ship unloader facts

Page 26: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 26 28/11/2006 BT/Peter Göransson

Terminal data

6 storage silos, total storage volume 100,000 m ton

Dock facilities with ship unloaderand belt conveying system

Page 27: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 27 28/11/2006 BT/Peter Göransson

Ship unloader and belt conveyor

Page 28: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 28 28/11/2006 BT/Peter Göransson

Movable Transfer Trolley

Purpose:

Transfer the unloaded product from ship unloaderto shore conveying system without interfering with the operation of the Ship Unloader.

Advantage:

Gives an environmentally safe transfer of the product to the receiving system.

Increases the efficiency of operations

Key feature

Page 29: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 29 28/11/2006 BT/Peter Göransson

Conveying system to silos

Page 30: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 30 28/11/2006 BT/Peter Göransson

Belt conveyor factsConveyor gallery with belt conveyor, open top type

72” belt conveyor (1905 mm) is used

Page 31: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 31 28/11/2006 BT/Peter Göransson

Terminal data

Conveying to shore with belt conveyors

Vertical elevation by two bucket elevatorseach rated at 1000 t/h

Height of bucket elevators about 70 m

Page 32: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 32 28/11/2006 BT/Peter Göransson

Terminal data

Distribution of material on the silo top by meansof aero slides

Page 33: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 33 28/11/2006 BT/Peter Göransson

Belt conveyor and transfer tower

Page 34: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 34 28/11/2006 BT/Peter Göransson

Performance testing

Page 35: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 35 28/11/2006 BT/Peter Göransson

Performance testing

Page 36: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 36 28/11/2006 BT/Peter Göransson

New feature

Page 37: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 37 28/11/2006 BT/Peter Göransson

References – more than 1500 mt/h

Page 38: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 38 28/11/2006 BT/Peter Göransson

Summary

Panamax size ship unloader

New industry standard unloading rate: 1500 mt/h

Efficient operation > 70% of rated capacity

Ship unloader Siwertell ST 640-D

Efficient operation > 70% of rated capacitythrough the ship

Page 39: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 39 28/11/2006 BT/Peter Göransson

• Achieved through the ship capacity: 1063 mt/h

• Guaranteed through the ship capacity: 1050 mt/h

• Achieved rated unloading capacity (2 hr average) 1643 mt/h

Guaranteed performance

• Guaranteed rated capacity 2 hr average: 1500 mt/h

• Energy consumption: 0,40 kWh/ton (through ship)

Page 40: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 40 28/11/2006 BT/Peter Göransson

Conclusion – why high capacity?

Fast ROI for the additional investment cost going from 800 mt/h to 1500 mt/h

Reduction of unloading days by ~ 50%

Enables a high annual intake

Great savings in ship costs

Reduction of berth occupancy by ~ 50%

Page 41: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 41 28/11/2006 BT/Peter Göransson

Superior Performance by Swedish Technology

Page 42: Intercem workshop Galvestoncementdistribution.com/wp-content/uploads/2016/10/1500... · 2016. 10. 28. · Slide 12 28/11/2006 BT/Peter Göransson Cost summary Through-ship-capacity

NordströmsSiwertell

Slide 42 28/11/2006 BT/Peter Göransson

Bjuv, Sweden (Head office): Ship unloaders & loaders, mobile unloaders, and complete marine terminals.

BMH Marine ABGunnarstorpBox 566SE-267 25 BJUV, Sweden

Tel: +46 42 85800Fax:+46 42 85899

E-mail: [email protected]

Enköping, Sweden (Branch office): Selfunloaders and conveying systems, mechanical and pneumatic.

BMH Marine ABGesällgatan 7Box 914SE-745 25 ENKÖPINGSwedenTel: +46 171 23200Fax:+46 171 23299

E-mail: [email protected]

MacGREGOR offices in Sweden and abroad

USA representative: Mr Sture LindgrenP.O. Box 2116322529 Fox Glenn Circle76021 BEDFORD, TX

E-mail [email protected] (817) 354 8108, 214-649 8591