FIELD INSPECTION REPORT ITP NO. : INSPECTION Gr. : REPORT NO. : DATE : INSPECTION TYPE: HAND-OVER NOTICE (Inter-Contractor/Discipline Hand-oer! "OR# SCOPE/DISCIPLINE Pile From Piling Contractor to Civil Foundation Contractor Road or Paving From Civil Contractor to Erection Contractor to !e u"ed #or acce""$ Concrete Foundation From Civil Contractor to Erection Contractor Pi%ing& 'ec(anical& Steel$ Steel Structure Foundation From Civil Contractor to Erection Contractor Pi%ing& 'ec(anical& Steel$ Steel Structure From Civil Contractor to Erection Contractor Pi%ing& 'ec(anical& Steel$ )uilding From Civil Contractor to Electrical*In"trument Contractor +,AC From +,AC Contractor to Electrical Grou% -"e o# +,AC$ Pi%ing S"tem From Pi%ing Contractor to Ot(er Pa""ivation& Pigging& Painting& In"ulation& etc$ Static E/ui%ment From 'ec(anical to Painting*In"ulation or Pi%ing Rotating E/ui%ment From 'ec(anical to Pi%ing Electrical E/ui%ment From Electrical to Civil e.g. Ca!le trenc(& duct& etc$ In"trumentation From DCS& CCR E/ui%ment to ot(er grou% Painting From Painting to In"ulation*Fire%roo#ing Contractor In"ulation From In"ulation to ne0t Contractor Ot(er 1or2*Item : HAND-OVER ITE$ DETAIL 3 Area * 4ocation 5 Item No. 6 1or2 Detail 7 Re#erence Dra8ing and*or Re%ort" Attac(ment$ HAND-OVER VERIFICATION and ACCEPTANCE +and9over #rom Contractor A; From C(ec2ed ! Contractor A;: <<< ,eri#ied !: O=I Name Signature Date Name Signature Date Con"truction >ualit Control We hereby certify that the works related to this item/activity have been completed and inspected in accordance with approved drawings and specification.  Acce%tance o# Contrac tor ); To Received ! Contractor );: Aut(ori?ed !: O=I Name Signature Date Name Signature Date C'* SI *>C' We hereby approve the acceptance of hand-over of the above mentioned item as per current condition. Comment" i# an$: FOR' No. G9@@6

Inter Job Handed Over

Embed Size (px)

DESCRIPTION

SOP

Citation preview

Page 1: Inter Job Handed Over

7/21/2019 Inter Job Handed Over

http://slidepdf.com/reader/full/inter-job-handed-over 1/1

FIELD INSPECTION REPORT

ITP NO. :

INSPECTION Gr. :

REPORT NO. :

DATE :

INSPECTION TYPE:

HAND-OVER NOTICE

(Inter-Contractor/Discipline Hand-oer!

"OR# SCOPE/DISCIPLINE

Pile From Piling Contractor to Civil Foundation Contractor 

Road or Paving From Civil Contractor to Erection Contractor to !e u"ed #or acce""$

Concrete Foundation From Civil Contractor to Erection Contractor Pi%ing& 'ec(anical& Steel$

Steel Structure Foundation From Civil Contractor to Erection Contractor Pi%ing& 'ec(anical& Steel$

Steel Structure From Civil Contractor to Erection Contractor Pi%ing& 'ec(anical& Steel$

)uilding From Civil Contractor to Electrical*In"trument Contractor 

+,AC From +,AC Contractor to Electrical Grou% -"e o# +,AC$

Pi%ing S"temFrom Pi%ing Contractor to Ot(er Pa""ivation& Pigging& Painting& In"ulation&

etc$Static E/ui%ment From 'ec(anical to Painting*In"ulation or Pi%ing

Rotating E/ui%ment From 'ec(anical to Pi%ing

Electrical E/ui%ment From Electrical to Civil e.g. Ca!le trenc(& duct& etc$

In"trumentation From DCS& CCR E/ui%ment to ot(er grou%

Painting From Painting to In"ulation*Fire%roo#ing Contractor 

In"ulation From In"ulation to ne0t Contractor 

Ot(er 1or2*Item :

HAND-OVER ITE$ DETAIL

3 Area * 4ocation

5 Item No.

6 1or2 Detail

7Re#erence Dra8ing and*or Re%ort"Attac(ment$

HAND-OVER VERIFICATION and ACCEPTANCE

+and9over #rom Contractor A;

FromC(ec2ed ! Contractor A;: <<<<<<<<<<<<<<<< ,eri#ied !: O=I

Name Signature Date Name Signature Date

Con"truction

>ualit Control

We hereby certify that the works related to this item/activity have been completed and inspected in accordance withapproved drawings and specification.

 Acce%tance o# Contractor );

ToReceived ! Contractor );: <<<<<<<<<<<<<<<< Aut(ori?ed !: O=I

Name Signature Date Name Signature Date

C'* SI *>C'

We hereby approve the acceptance of hand-over of the above mentioned item as per current condition.

Comment" i# an$:

FOR' No. G9@@6